Upload
luhana1
View
39
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Instructiuni sauna
Citation preview
MICA HEATING BO SAUNA ROOM
Model : WS-1215
INSTRUCTION MANUAL
No advanced advice will be submit before we change our design and size.
The pictures may be a little different from the real products.
Our company keep the final explanation right.
1
1. Users should read through this manual before assembly
and use.
2. The product must install a reliable earth line and
electricity leak protection.
3. Users should install power supply according to actual
condition.
4. Patients with hypertension or drunk are not permitted to
use this products.
5. Adult guidance is necessary for children or under age to
use sauna.
6. Corrosive liquid are not allowed to bring into the room.
7. Sauna room must not over working for long time. The
heat pipe may damage of long time heating.
8. Our company would not take responsibility if the product
is damaged but caused by violating the normal operating
procedures.
9. When the product is discarded, please deal with it
ATTENTION
TECHNICAL PARAMETERS
1. rated voltage: AC380V±10% 50Hz/60Hz
2.Power of Sauna heater: 9000w3. Size: 2000X1500X2100mm
1800X1500X2100mm
1600X1500X2100mm
2
The whole view
Top view
Tem
pe
ratu
re
Se
nso
r w
ire
Sig
na
l w
ire
Spe
aker
(w
hite
con
nect
or )
12
V li
ttle
led
wire
(re
d c
on
ne
cto
r )
Le
d L
am
p D
rive
r
Po
we
r in
pu
t ca
ble
Sa
un
a s
tove
wire
22
0V
exp
losio
n p
roo
f la
mp
wire
(re
d co
nn
ect
or
)
Le
d
17
Circuit Diagram Schematic Diagram
3
1
2
3
4
5
16
6
16.
Finish the sauna room installation by locking the solid wood roof cover 1.Roof
2.Control panel (on left side panel )
3.Sauna room body
4.Electric box (under the base plate )
5.sauna stove
SPARE PART
6.solid wood roof
15
1.Put the backplane on the level floor.
2.Put the back side wall on the backplane inside the groove.
4
INSTALLATION DIAGRAM
15. Install the lower culture stone . Locked the screws when the lower culture stone closed after the backrest board .
5 14
3.Put the right side wall on the backplane inside the groove , and lock the 2pcs side wall together with 3 parts special screw .One part of the screw already install on the right side wall .
3 part special screw installation show
14.Backrest board installation . Locked screws when the board closed after the upper culture stone .
13
BA C
3 parts screws
3.Tooth C is already installed in the right side wall , firstly pls. lock the B part into the tooth C .Secondly , align the left panel hole , 2 plate close to each other at 90 degree .Thirdly , put A part to the corresponding hole in left side wall through B& C .
13. Install the upper culture stone .Culture stone need to put in the same level of roof , and lock the culture stone on the left side wall by screws in the surrounding..
6
Due to the heavy weight of the culture stone , pls. move the culture stones into the room in vertical .
Connect this wall with the back side wall in the same way by locking 3 parts screws
4.Put the front glass panel on the backplane inside the groove, connect the front glass panel & left side wall , right side wall together by 3 parts screws . Installation procedure, pls. refer to the side wall connection.
7 12
12.Put the base plate on the corresponding shelf .
5.Roof installation.Lock the screws on the roof as the above drawing. Before the roof installation, pls. pull out the lamp cable to the roof through corresponding hole. After locking the screws on the roof , the glass door panel is stationary .
11 8
10. Install the lower seat frame .
11. Install the lower seat apron.
little leds explosion-proof lamp
cable hole
9 10
6.Tooth C is already installed in the right side wall .Firstly , pls. lock the B part into the tooth C ; Secondly , align the back side wall hole , 2 plate close to each other at 90 degree ; Thirdly , put a part to the corresponding hole in the back side panel .
8. Install the upper seat frame .
9. Install the upper apron .