WSDOT/AGC/ACEC Design-
Build Subcommittee Annual Report
Derek Case / Paul MayoWSDOT / AGC Co-Chairs
WSDOT / ACEC Annual Meeting
Bellevue, WA
June 14, 2016
Roger MillarActing Secretary of Transportation
Jeff Carpenter / Lindsay YamaneWSDOT / ACEC Executive Co-Chairs
WSDOT / AGC / ACEC-WA sub-committee team consisting of
approximately 25 members (+\-)
• WSDOT is represented by State Construction Office, State
Design Office, State Materials Lab, NWR, OR, SR 520 Program, I-
405 Program, AWV Program and FHWA
• AGC is currently represented by Max J. Kuney Co., Kiewit,
Atkinson, Granite, PCL, Flatiron, and Graham.
• ACEC is currently represented by COWI, Parsons, AECOM,
Rohila Consulting Services, and GeoEngineers.
Who we are
3
• Vision - A nationally recognized Design-Build Program that
consistently delivers quality projects through positive coordination
with Design-Builders, executed through competitive contracts that
appropriately allocate risk, promote innovation and collaboration
that ultimately benefits the citizens of Washington.
• Mission - Founded on strong WSDOT and Design-Builder
relationships, further develop and maintain WSDOT’s Design-Build
Program based on the values of collaboration, innovation and
continuous improvement that result in industry best practices.
• Purpose - To serve as a resource for establishing Design-Build
policy, procedures and process improvement.
Team’s Purpose and Function
4
Team’s Purpose and Function (continued)
5
• Meet approximately every six weeks
• Provide specific expertise to support Design-Build project delivery
• Review, comment and collectively discuss high priority RFP sections
focused on establishing consistency and appropriate risk allocation.
• Discuss specific Design-Build related topics as they relate to project
delivery.
2015 Accomplishments
• Established the Team’s Charter and Goals
• Standardized Hi-Priority RFP Documents
• Supported the development and Finalization of WSDOT’s Small
Design-Build Pilot Projects Report
• Developed and deployed the Project Delivery Method Selection
Guidance
• Unfortunately HQ Construction lost both Scotty Ireland and Teresa
Eckard, big shoes to fill!
6
2016 Focus Areas
• Transition to new HQ Design Build Program Manager Art McCluskey
and Design Build Engineer Jolena Missildine
• Further refinement of DBE requirements as they apply to DB delivery
• Formalize WSDOT DB administration processes and policy for
consistent statewide application
• Support upcoming major DB delivery through Connecting Washington
• Continue to engage and participate in national forums through FHWA
and the DBIA
• Status upcoming DB projects and other opportunities as identified by
the subcommittee
7