Page 1: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

WSSC Pipeline Design

Manual AmendmentProposed

80-Foot Setbackv

POSITION PAPER

v

April 2012

Page 2: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Table of Contents Part I – Executive Summary ....................................................................................3 Part II – PCCP Setback Background and Analysis..................................................7 Part III – Setback Recommendations Report.........................................................17 Part IV – Treatise on Water Jet Force and Kinetic Energy....................................77 Part V – Design Manual Amendment....................................................................84

Page 3: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

EXECUTIVE SUMMARY The Washington Suburban Sanitary Commission (WSSC) has used Prestressed Concrete Cylinder Pipe (PCCP) since it was introduced, and has installed 145 miles of large diameter PCCP transmission mains. The Problem: Failure in the structural integrity of large transmission mains poses a substantial risk to public safety; such a failure results in an initial explosive force of between 20 and 200 tons pounds* of dynamite and the release of pressurized water with an initial velocity of 90 miles per hour. The potential hazards associated with large diameter PCCP structural failure are shown in the Engineering Report section of this document. WSSC has experienced several of these pipe failures, including:

Clagget Farm 96-inch PCCP - March 1996

Allentown Road 42-inch PCCP – September 2001

Palatine Drive 60-inch PCCP – December 2003

River Road 66-inch PCCP - December 2008

Capital Heights 54-inch PCCP – January 2011 Evolving Solutions: WSSC pioneered the installation, operation, and maintenance of PCCP, including the analysis of its failure mechanisms and risk management strategies like the use of state-of-the-art monitoring, inspection and repair technologies. WSSC is confident that its current PCCP monitoring, inspection and repair program is as or more effective than any other utility’s management program in the United States. In the 1980s, WSSC initiated a Condition Assessment Program, including a safety analysis score (SAS) for large diameter transmission mains that considered pipe diameter and year of construction, pipe material used and manufacturing process, and proximity to buildings or structures (a higher score means greater risk). These factors are important considerations in assessing the potential hazard posed to buildings or people in proximity to these pipelines. Over time, WSSC’s approach to managing these pipelines has evolved as our monitoring, inspection and repair programs have become much more robust, e.g. “Smart Ball” acoustic leak detection, internal acoustic fiber optic “AFO” cables to monitor wire breakage, and carbon fiber wrap repairs. However, robust inspection and maintenance programs and state-of-the-art technologies do not eliminate the risk of structural failure of these large PCCP transmission mains, and WSSC developed the proposed Amendment to the Design Manual as an additional safeguard. Using Public Policy to Address the Continuing Risks: Development activities adjacent to large diameter PCCP transmission mains increase the risk factor for those pipelines. A 2008 engineering analysis highlighted the challenge of the significant increase in the number of high density projects near large transmission mains. Moving these pipelines or replacing them in their current locations using different materials are not practical options. There are policy options, however, that provide a substantial opportunity to further reduce the risk associated with a potentially catastrophic structural failure. While WSSC can do nothing to rectify the proximity of existing development, there is both an obligation and an opportunity to reduce known risks to public safety by working with developers to use siting, design and other engineering elements early in

Page 4: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

the design phase of future development projects to better manage the potential risks associated with encroachment on the PCCP pipelines. Basis of the Proposed 80-Foot Setback Design Manual Amendment: WSSC staff investigated a strategy to provide greater transparency, clarity and better coordination with the development community on future development projects along the PCCP transmission lines in an effort to enhance public safety. WSSC’s Pipeline Design Manual currently includes language that development within 200 feet of these pipelines may require special consideration. WSSC determined that:

The 200-foot language currently in the Pipeline Design Manual provides inadequate guidance to developers and to WSSC project plan reviewers;

The Design Manual Amendment should provide a very specific guideline that would be relatively easy for all to interpret and utilize;

The Design Manual Amendment should provide substantial flexibility to the developer in the design and engineering of a structure to meet an appropriate standard if a project encroaches on a PCCP transmission main;

The Amendment should account for the fact that each development is unique (for example, the size and configuration of a parcel, its soil conditions, design and uses of each structure and the size and location of the adjacent pipe).

In order to address these objectives, WSSC prepared an Engineering Report which examined large diameter PCCP pipe failures at WSSC and elsewhere and concentrated on three areas:

1. The size of the hole created by the initial explosive break and washout from a pipeline break (averages 30 to 50 feet from the center line of a break)

2. The debris thrown by the explosive release of energy when the pipe catastrophically fails (30 to 210 feet), and

3. The amount and velocity of the water flowing from the broken pipeline (up to 90 miles per hour releasing tremendous volumes of water).

Each of these factors poses meaningful risk, but if the intent is to improve the likelihood that a structure will survive a catastrophic failure of these large PCCP pipelines, the building should not be in the vicinity of the hole created by the failing pipeline, and it is possible that building foundations outside of the hole may still be too close to it (the ground supporting the foundation could fail due to the load from the structure resulting in the structure still being claimed by the hole.) This is the primary factor (of the three) that led to the 80-foot setback proposal. WSSC provided flexibility in the application of the standard by allowing a project developer and their professional engineer to make a determination that balances their project objectives, e.g. proximity to PCCP pipe and other objectives like building location and placement, building design/structural elements, hardscape design, parking structures, and the pipe location, condition and operating factors. WSSC also analyzed the force of the water jet striking the structure, using the varying pipeline pressures that WSSC transmission mains operate under to estimate how the force drops off with distance from a failed pipe. The Force Analysis also supported the choice of an 80-foot setback.

Page 5: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Design Manual Amendment Permits Construction Within 80 Feet: Based on this analysis, WSSC chose an 80 foot setback distance, but it is critically important to note that WSSC is not forcing all new structures to remain outside the setback. As currently written, the proposed revision to the Pipeline Design Manual will continue to require structures to remain outside the WSSC right of way, but structures may be built within the setback distance. Should a structure be placed within the setback area, the developer is obligated to ensure that the structure isdesigned and built to survive a potential failure of the large PCCP transmission main with consideration of the four factors discussed above. Clarifying Existing Regulations to Address Risks to Future Development Projects: The Pipeline Design Manual Amendment is a policy/rulemaking initiative resulting from multiple strategies that have evolved over a long period of time. As WSSC continues to seek solutions that optimize outcomes for the community we serve, the public safety focus of this initiative is paramount. WSSC has also, however, worked to ensure that it follows an objective, transparent, inclusive and measured approach, hallmarks of good policy development, in developing this regulatory proposal.

WSSC experienced several instances of catastrophic failure involving large diameter PCCP transmission mains within its distribution system.

There has been direct observation of events within WSSC’s distribution system that resulted in serious property damage and the attendant and demonstrable risk to human health and safety. This experience extends to other utilities that have installed PCCP pipelines, as well.

WSSC has relied on expert internal staff and outside resources to refine our understanding and define the parameters of the problem.

WSSC worked over several years to develop assessment tools, management and operations practices, monitoring and inspection technologies, as well as leading edge maintenance and repair technologies. These efforts are intended to ensure we take progressive steps required to reduce the risk of damage to physical infrastructure from a catastrophic failure of large diameter PCCP that poses a public safety hazard.

WSSC promulgated a policy position (regulation noting special considerations within 200 feet of these pipelines) to address the emerging understanding of the risks posed by large diameter PCCP pipe when there is a loss of structural integrity.

WSSC’s experience with this previously promulgated regulation (the “special considerations” language) demonstrates that the policy has been inadequate, providing insufficient guidance to private and public project developers as well as to WSSC development project reviewers.

WSSC completed an engineering analysis (inclusive of case evaluation of PCCP pipeline failures). Based on careful consideration of its findings, WSSC developed a practical proposal addressing new development projects adjacent to large diameter PCCP transmission mains.

Page 6: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

WSSC is responsible for this infrastructure, but has also shared information and encouraged other agencies with appropriate and cross-cutting regulatory authority to assist in this effort, but with no adequate response to date.

The proposed regulation is based on an industry consensus and WSSC’s experience indicating there is risk of catastrophic PCCP pipe failure.

The proposed regulation follows progressive and methodical improvements in best management practices and new and emerging technologies to address the issue and thereby reduce risks to public safety by other means. WSSC recognizes that development and redevelopment in Prince George’s and Montgomery counties is critically important. This agency has a critical role in working with the private sector and with other agencies to not simply facilitate, but to support economic growth and development. Therefore, in advance of the formal public notice that will solicit additional public comment, WSSC has reached out to stakeholders in both the public and private sectors to seek specific guidance and advice to improve the proposal as amended. We have taken that guidance very seriously, and took very significant steps to address the concrete problems that stakeholders identified. As a result the amendment is a much improved proposal that provides clarity and flexibility while achieving a better outcome for developments planned adjacent to large diameter PCCP transmission mains. *Note: Correction of tons to pounds April 18, 2013

Page 7: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

Background and Analysis Summary 

 

Prestressed Concrete Cylinder Pipelines are Portland cement concrete composite pipelines that utilize prestressed  carbon  steel wires  to achieve necessary  tensile  strength.   A view  is  shown below.   Problems develop  if enough of the carbon steel wires fail as the pipeline segment will then fail.  Should the composite structure become compromised and allow aggressive corrosive tendencies to occur then the pipeline can fail much earlier than the pipeline would otherwise be expected to fail. 

 

The WSSC  has  a  long  history with  Prestressed  Concrete  Cylinder  Pipe,  beginning  to  utilize  it almost since  its  inception as a viable product  in the market place.     Engineering staff at WSSC have pioneered  the  inspection and maintenance of  this  type of pipeline ever since  identifying the potential failure mechanisms associated with this type of pipe.  WSSC has always been at the forefront of the effort to manage the risk associated with this pipe, utilizing the cutting edge of available technologies to manage that risk.  As the pipelines age WSSC continues to manage that risk with state‐of‐the‐art technology.   But as development continues to move closer and closer to  existing  transmission  mains  it  has  become  apparent  that  perhaps  another  layer  of  risk mitigation for future development is in order.   

INSTALLATION HISTORY 

Prestressed Concrete Cylinder Pipe, or PCCP, has been manufactured  since 1943.    Its history with  the Washington Suburban Sanitary Commission  (WSSC)  is almost as  long as  the  first  line constructed  for WSSC  occurred  in  1945  (Contract  Number  143‐W).    This  42‐inch  diameter pipeline remains in service today originating at the Patuxent Water Filtration Plant and crossing under I‐95 heading toward south‐central Prince George’s County. 

  1

Page 8: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

For  approximately  35  years,  from  1945  to  1976, WSSC  constructed  350 miles of  PCCP water mains with diameters ranging from 16 to 96 inches.  During this era, for pipelines that were 36 inches  and  larger  in  diameter,  WSSC  typically  bid  contracts  allowing  either  PCCP  or  steel pipelines as determined by  the contractor.   The awarded contracts predominantly used PCCP and WSSC now owns 145 miles of large‐diameter PCCP (36‐inch and larger diameter). 

PCCP Water Transmission Mains (miles by pipe diameter) 

Diameter  16‐30”  36”  42”  48”  54”  60”  66”  72”  96” 

Mileage  205  37.6  30.3  18.2  8.7  21.9  12.8  4.5  11 

 

PCCP SUSCEPTIBLE TO CORROSION 

The composite design of  the steel and concrete pipe makes  it susceptible  to corrosion should the steel elements become exposed to corrosive environments.  The steel component that gives the pipe its strength is a high carbon steel wire, one of the strongest steels made.  The very high‐strength wire  is  protected  from  corrosion  by  a  coating  of  cement mortar.    However,  some strength  classes  of  the  steel  wire  can  suffer  a  failure  mechanism  known  as  hydrogen embrittlement, which  can  result  in  sudden  breaks  in  the wire  (this  occurs when  the wire  is subject to corrosion and the wire adsorbs hydrogen generated by the corrosion process).   The hydrogen embrittlement  failure of wire and the subsequent  failure of pipes became prevalent around the nation.   A reason for the pipe failures caused by hydrogen embrittled wire was the fact that in the 1970’s the manufacturers of PCCP began to include what came to be known as “Class  IV”, a higher strength wire.   While stronger,  this newly extruded wire  turned out  to be very  susceptible  to  hydrogen  embrittlement  and  by  1985  this  problem  was  very  well documented.  Ultimately there were a series of class‐action lawsuits against the manufacturers and designers that concluded with a settlement for the plaintiffs (including WSSC) in 1994. 

WSSC INITIATES AN INSPECTION PROGRAM 

Beginning  in  1968  and  through  the  1970’s  water  utilities,  primarily  in  the  southeast  began experiencing PCCP failures.  WSSC began experiencing PCCP failures in 1970 through the 1980’s, and in 1979 began to create what became the WSSC PCCP Inspection Program; its first internal large diameter pipeline  inspection was conducted  in 1981 on a 72‐inch  line that had failed the year before. 

TECHNOLOGY AND INSPECTION HISTORY 

The first inspections were internal and utilized manned teams conducting visual inspections and soundings  by  striking  on  the  pipes  with  hammers.    Sighting  of  large  circumferential  and longitudinal  cracks  indicate  distress  while  soundings  identify  ‘hollow  sounds’  or  areas  of delamination  in  the  concrete  indicating  likely  separation  of  the  prestressed  wires  and  the concrete they are embedded within. 

As early adopters of PCCP, WSSC staff has been integrally involved with PCCP inspection and the development of inspection technologies: 

  2

Page 9: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

In 1987 WSSC  staff, along with Openaka Corporation and Corrpro Company,  surveyed PCCP using pipe  to  soil electro potential  surveying  in an attempt  to determine  if wire corrosion could be determined from above ground. 

In 1988, working with Entech Engineering, Incorporated, WSSC used infrared technology and  surface penetrating  radar on  failed PCCP  in  storage.   WSSC  also  contracted with metallurgical  and materials  consultants  and  hired  a metallurgical materials  engineer from the oil and gas  industry to  investigate failed PCCP and to  investigate methods for PCCP condition assessment. 

In 1989 WSSC began looking at radar, pulse echo, acoustic emissions and seismic pulse echo as techniques to move beyond the simple visual and sounding approach utilized in the inspection program at that time.  Working with Gould, Lewis and Proctor (currently Lewis  Engineering)  staff work  resulted  in what  became  the  ASTM  and  AWWA  PCCP standards for prestressing wires.  These investigations and standards were the basis for the wire manufacturing industry modifying its wire production methods. 

In  1990, WSSC  was  the  first  to  perform  electromagnetic  inspection  of  a  PCCP  line adapting  equipment  used  in  the  oil  and  gas  industry.    1990 was  also  the  year when WSSC  validated  the  viability of  acoustic monitoring  and  remote  field  electromagnetic technologies  for PCCP  condition  assessment.   Also beginning  in 1990  and  throughout the  rest  of  the1990’s  WSSC  worked  with  the  Weston  Geophysical  Corporation  to develop  and  to build  a prototype of  sonic/ultrasonic pulse  echo  (seismic  pulse  echo) technology,  enhancing  the  sounding  technique  utilized  from  the  beginning  of  the program.   WSSC was a  joint holder of the resulting patent of this technology for PCCP.  Use  of  this  sonic/ultrasonic  technology  was  incorporated  into  WSSC’s  inspection activities  and  became  a  significant  part  of  the  inspection  and  condition  assessment program in 1995. 

During the 1990’s WSSC shared  its work on acoustic monitoring with the United States Army Corps of Engineers in their support of the Bureau of Land Reclamation.  The work led  to  the  formation  of  Pipe  Technologies,  Incorporated  later  sold  to  Pressure  Pipe Inspection  Company  (PPIC).    PPIC  was  formed  in  1994  from  remote  field electromagnetic work WSSC shared with Dr. Atherton at Queens University at Kingston (Canada)  in 1992.    In 1995 WSSC  introduced acoustic and electromagnetic assessment methods to Sound Print Company, which went on to become Pure Technologies.  WSSC first used electromagnetic  testing as part of  the  inspection program  in 2002 and used Pure’s Hydrophone arrays to listen to a 42‐inch PCCP along Norbeck Road. 

In 2007  the use of permanently  installed  fiber optic cabling  for acoustic monitoring of PCCP wire‐break activity began and then  in 2008 “Smart Ball” acoustical  leak detection was added to the inspection process.  That year was also the first use of internal carbon fiber reinforcement as a repair method for pipe segments that could not be placed  back into service post  inspection but which were deemed repairable  (if not repairable, pipe segments are replaced).    In 2010 WSSC piloted  internal robotic  inspection of a 42‐inch line using electromagnetic and camera visual inspection.  

 

  3

Page 10: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

CURRENT INSPECTION AND PCCP REPAIR PROCESS  

The current inspection process follows a six‐year plan updated annually that utilizes a frequency intended to  inspect the 77 miles of 48‐inch and  larger diameter pipelines approximately every six years.  Those 77 miles of pipe will have been inspected by the close of FY 13.  Beginning in FY 13 the additional 68 miles of 36 and 42‐inch diameter lines will begin robotic inspections.  Also beginning in FY 14 the inspection process begins will be repeated for the 77 miles of 48‐inch and larger pipelines.  

The  inspection process begins with  internal  coordination with operating elements  in order  to confirm  that  operations  and  maintenance  activities  can  support  the  intended  plan.    The inspection  itself begins with utilizing the “Smart Ball” to  locate any  leaks within the pipeline to be  inspected  that would  otherwise  not  be  discernable  to  the  inspectors.    The  “Smart  Ball” identifies  leaks  and  their  location  so  that  crews  can  locate  them  and  ensure  repairs  are completed before the pipeline is put back into service. 

The pipeline is then dewatered and manned teams enter the pipeline to conduct the inspection.  Steps include pipe section numbering, visual inspection and sounding as well as sonic/ultrasonic inspections  that are very similar  to  inspections conducted since  the  inception of  the program.   However,  since 2002 electromagnetic  field  testing  is also done.   Results of all  the  testing are analyzed to establish a baseline number of broken wires for each pipe segment.  Finite element analysis techniques are utilized to estimate the yield and ultimate strength limits in terms of the number of broken wires for each  individual design classes of PCCP segments within a pipeline.  Segments that are found to be  in a critical state are repaired or replaced while the pipeline  is out of service.   Before putting  the pipeline back  into service a permanent acoustic  fiber optic (AFO)  cable  and  data  acquisition  computers  are  placed  (if  not  already  there)  for  use  in monitoring wire break activity once the pipe is put back into service.  Once these steps are done the pipeline is put back into service.   It costs WSSC about $150,000 per mile to inspect its PCCP infrastructure.    Approximately  1  to  2%  of  the  pipe  segments  inspected  using  these  three methods are found to need some form of rehabilitation.  On average, WSSC has replaced 2 pipe segments (each 16 feet long) per mile and repaired 3 pipe segments per mile with carbon fiber.  The cost of replacing a pipe segment is $80,000 and repairing using carbon fiber is $70,000 at an average cost per mile (for replaced/repaired segments) of $375,000.    

For  the  smaller  36  and  42‐inch  diameter  pipelines  robotic  inspections  will  be  used.    The differences  for  inspections  are  primarily  two‐fold.    First,  WSSC  will  reduce  the  operating pressure in the pipeline but will not fully dewater the pipeline.  This means that the inspection will  use  robotics  rather  than  relying  on  human  entry  into  the  pipe.   With  robots,  the  visual inspection will  use  high‐definition  cameras  and  the  electromagnetic  inspection will  be  done from a towed package of  instruments.   The second difference will be that the sonic/ultrasonic sounding will not be done.   The cost of robotic inspections will be $80,000 per mile.   

FIBER OPTIC MONITORING 

As noted above, permanent AFO cables are placed in the pipelines as the last step in the current inspection process before putting the pipeline back into service.  At the conclusion of the FY 11 program  year,  over  50 miles  of  48‐inch  and  larger  diameter  pipelines  have  been  inspected, rehabilitated and have AFO monitoring systems installed.  By the conclusion of FY 13 all 77 miles of 48‐inch and larger diameter pipelines will have AFO monitoring systems. 

  4

Page 11: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

AFO monitoring  systems allow WSSC  (through  its  consultants’  computerized  system and data analysis) to monitor wire break activity in PCCP pipelines that are in service.  When a wire breaks a sound  is created and the resulting mechanical sound wave propagates away from the break.  This mechanical wave interacts with the electromagnetic light wave that is moving through the fiber  optic  cable.    This  interaction  is  “sensed  and  filtered”  by  the  data  acquisition  computer system  and  a  corresponding  signal  utilizing  GPS  locates  the  origin  of  the  wire  break.    The computer assigns a wire break to a specific pipe section number and a notification  is made to consultant  analysts  and WSSC  staff.    Since  each  segment  has  a  baseline  already  established, keeping  track  of  the  status  of  the wire  break  activity  becomes  a  book  keeping  exercise  and allows the analysts and WSSC staff to decide what,  if any, mitigating steps are to be taken and when to act as a pipe segment approaches its yield and ultimate strength limits. 

The system has been tested and has proven to be a viable warning system.   Perhaps the most widely known example occurred in late June 2010.  The AFO system warned of a cascade of wire break  activity  that  concerned  the WSSC  staff.    This  led  to  the  decision  to modify  the  PCCP Inspection Program schedule then underway and take the 96‐inch pipeline with the wire break activity out of service under emergency conditions.  When the sixteen‐foot pipeline section was removed over the 4th of July Holiday, the visual signs of incipient failure were obvious.  The AFO system worked.  While the cost of this occurrence was relatively high at about $500,000, when compared  to  the  costs  associated with having  to  react  to  the 66‐inch River Road break over Christmas  2008  it was  a  relative  bargain.    River  Road  cost  $1.7million  for  repairs  alone,  lost millions of gallons of water and put people  in  serious  jeopardy.   WSSC’s decision  to  take  the pipeline out of service saved at  least an estimated $1.2million  in repair costs and addressed a potentially imminent and very serious risk to public safety. 

The incident above is widely known but it is not the only pipeline where AFO has proven itself.  The  Inspection  Program  is  one where  reaction  to  day‐to‐day  activities may  force  changes  to planned  inspection  activities.    Operational  requests  for  an  investigation  of  a  sinkhole necessitated  changes  in  the  FY 12 program.   There was  a 96‐inch PCCP  in  the  vicinity of  the sinkhole  (though not  leaking  and not  the  cause of  the  sinkhole)  and  exploratory  excavations necessitated dewatering the pipeline (for safety reasons).  Coincidentally, this same pipeline had been experiencing  some  increasing wire break activity  some distance away  from  the  sinkhole investigation.   Because the pipeline was already out of service for the sinkhole investigation, the annual inspection plan was adjusted to take advantage of the unplanned work and the pipeline dewatering was enlarged to cover the segment with the wire break activity.   The  investigation concluded that the pipe segment with  increasing wire break activity was  in a state of  incipient failure and needed replacement.  This was done prior to the pipeline being put back into service at  the  conclusion  of  the  sinkhole  investigation.    Thus  another  potentially  dangerous  pipe segment identified by AFO was safely dealt with.   

The cost to supply and  install an AFO monitoring system  in a typical six‐mile  length of PCCP  is about $764,000 or approximately $128,000 per mile  (AFO cabling at $12.12 per  foot and one monitoring computer at $380,000).   Annual AFO monitoring costs per mile are approximately $13,000.  

While the AFO system works well, it does not preclude a pipe break and the setback proposal is intended to add an additional layer of safety to supplement these current measures.   

 

  5

Page 12: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

COMPLETE PCCP PIPELINE REPLACEMENT IS NOT A REALISTIC OPTION 

Many  have  asked  whether  a  PCCP  replacement  program  would make  sense  because  these pipelines have  the potential  to be so problematic.    Indeed  it  is an option  that WSSC staff has studied.  The conclusion is that this approach is not feasible or warranted at this time. 

For  the pipelines  that are  largest  in diameter  there  is no available open  space  to build  relief pipelines  that  could minimize  downtime  to  only  that  necessary  to make  the  tie‐ins  to  the existing system.  Thus new pipelines would have to be in the same location as the existing lines or built at high cost as tunnels deep underground.  Whether slip lining with steel, which has the added  problem  of  sacrificing  hydraulic  capacity,  or  same‐trench  replacement,  the  overall problem of having  the pipelines out of  service  for a  long period of  time would have a major adverse impact on the water transmission system. 

There  is  a  limit  to  the  redundancy  that  the WSSC  system  includes  and  it  is  not  feasible  for pipelines to be out for extended periods of time for replacement while also taking others out of service to inspect them, and others to support other needs like development tie‐ins.  WSSC staff estimates that it will take a year to replace two‐thirds of a mile of pipeline.  For the 145 miles of 36‐inch and larger diameter pipelines this means a combined down time of 218 years (115 years just for the 77 miles of 48‐inch and larger). 

Another  issue  is  the  significant  cost  associated with  such  a  program  to  replace  these  PCCP pipelines.  The current construction cost (only) estimate to replace all 350 miles of PCCP is $2.9 billion and $2 billion of this is for the 36‐inch and larger diameter pipelines.   

As WSSC inspects its PCCP assets each year, the typical number of segments in need of repair or replacement  rarely exceeds 2% of  the number  inspected.   This means a program designed  to begin  just  replacing  pipelines  would  be,  on  balance,  replacing  98%  of  pipe  segments  with significant useful life remaining in them.  In other words out of the $2 billion needed to replace the 36‐inch and  larger diameter pipelines, $1.96 billion of  it would be dollars spent to replace pipes with remaining useful life.   

The  current program, with  the  inclusion of  the proposed Amendment  to  the Design Manual, maximizes the useful life of this portion of our critical infrastructure, maintains adequate access to  critically  important  water  transmission  pipelines,  and  manages  the  demonstrated  public safety risk that is associated with PCCP.    

SERIOUS CONCERN ABOUT ENCROACHMENT 

WSSC  is  confident  that  the  current  PCCP monitoring,  inspection  and  repair  program  is  as  or more effective a management program as exists at any other utility  in the United States.   The WSSC staff has been, and remains, second to none in its knowledge of the risks associated with PCCP and the appropriate operational practices and technologies available to manage risk.     

WSSC  acknowledges  and  accepts  the  fact  that  the  potentially  catastrophic  failure  of  a  large diameter  PCCP  is  a  serious  and  genuine  risk.    In  many  instances,  construction  of  these transmission mains  preceded  development.   As  the  20th  century  closed WSSC  staff  began  to review the impact of the close encroachment of new properties to WSSC’s large diameter PCCP water mains as developers sought to maximize the value of their investments.  Close proximity of  structures  to  existing  water  mains  has  always  been  factored  into  determining  WSSC’s 

  6

Page 13: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

inspection  priorities.    While  WSSC  can  do  nothing  to  rectify  the  proximity  of  existing development,  there  is both an obligation and an opportunity  to  reduce known  risks  to public safety by working with developers to use siting, design and other engineering elements early in the design phase of future development projects to better manage the potential risks associated with encroachment on the PCCP pipelines. 

Work  analyzing  PCCP  failures has been ongoing  since  the  first  failures  in  the  1970’s  and  the 1980’s.  The first step, based upon the known “debris throw” of over 200 feet that is associated with a large PCCP failure, led WSSC to insert the current language in its Pipeline Design Manual stating  that  development within  200  feet of  these  pipelines may need  special  consideration.  WSSC  staff  investigated  a  strategy  to  provide  greater  transparency,  clarity  and  better coordination with the development community on future development projects along the PCCP transmission lines in an effort to enhance public safety.  

ANALYSIS THAT LED TO THE 80‐FOOT SETBACK RECOMMENDATION 

The  language currently  in  the Pipeline Design Manual has proven  inadequate as development has been allowed up  to  the edge of WSSC pipeline  rights‐of‐way, and  in  some  cases  into  the rights‐of‐way.   Absent additional direction or guidance  from WSSC or other  regulatory bodies that directly  regulate development activity  in  the Sanitary District,  the 200‐foot  language also does not provide WSSC staff with sufficient guidance in their review of development projects as they  pertain  to  PCCP  pipelines.    Thus WSSC  staff  concluded  that  it  was  necessary  to  take additional action to help ensure that new structures (buildings) survive a PCCP failure.  Safety of a building’s inhabitants is the primary motivator for this action.  The intention for changing the Design Manual was to develop a very specific guideline that would be relatively easy for all to interpret and utilize and would provide substantial flexibility to the developer in the design and engineering of a structure that encroaches on a PCCP line.   

Such  a  standard  should  recognize  that  each  development  opportunity/project  is  unique  (for example,  the  size and  configuration of a parcel,  its  soil  conditions,  facility design and uses of each structure, and the working pressure, size and depth of adjacent pipe).  But any attempt to provide  a  guideline  or  family  of  guidelines  tailored  to  address  all  the  potentially  countless variables of any given project would prove unmanageable for all concerned. 

In order to address these objectives, analysis of large diameter PCCP and cast iron pipe failures at WSSC, as well as other  locations, concentrated on  three areas.   Results of  that analysis are summarized  in  a March  25,  2011  Engineering  Report,  and  include  the  results  of  staff  effort begun in 2007 and concluded in 2008.  The three areas covered by the analysis include: 

The size of the hole created by a pipeline break 

The  distance  debris  is  thrown  by  the  explosive  release  of  energy when  pipe catastrophically fails, and 

The amount/velocity of the water flowing from the broken pipeline. 

The biggest risk  in terms of the sheer amount of potential damage lies with the flowing water.  Of  the  three  factors,  this  is  the one  that depending upon  the  topography and proximity may result in the most serious damage.  It is also one that depending upon the terrain, establishing a setback basically may do little to mitigate.  With the right terrain and other circumstances even 

  7

Page 14: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

having a very large setback could do little.  Imagine a situation where a pipeline bursts at the top of a long hill and all the water is channeled down the hill.  A setback of a very long distance will do little to protect the structure if that structure is in the path of the water at the bottom of the hill.  On the other hand, the topography may be such that a setback may be enough to provide an increased benefit and may provide the additional room necessary to greatly alleviate risk.  

Debris  throw  is another  factor  that was  investigated.   Debris  throw was measured anywhere between 30 and 210 feet from the point of failure.  Since the pipes fail basically at a point on the pipeline the associated danger zone is more limited than from the water flow.  Additionally, this factor  is only relevant for the very short duration occurring right as the pipe fails.   The kinetic energy of any debris throw lessens the further from the throw one goes but that energy is going to  be  different  for  each  circumstance.  So  a  setback will  decrease  the  risk  as  furthering  the distance will  lessen  the  energy  but  trying  to  choose  a  simple  guideline  to  cover  this  range proved difficult and ultimately was not a  large  factor used  to make  the  final  selection of  the setback distance.   

The last area investigated was the size of the hole created by the failure.  There was a consistent range of 35 to 50‐foot diameter holes regardless of the size of the pipe.  Clearly if one intends to have a structure survive a catastrophic failure of a PCCP line the structure should not be in the vicinity of  the hole  created by  the  failing pipeline.   When one  looks at  the potential building foundations that might be involved, it is possible for structures to be outside of the hole but still too  close  to  it  –  the  ground  supporting  the  foundation may  fail  (due  to  the  load  from  the structure) and the structure could still be claimed by the hole.  Another situation noted is that if the soil  is not very cohesive then the soil  itself may fall  into the hole and again may result  in a structure at risk.   This is the primary factor (of the three) that led to the 80‐foot setback Pipeline Design Manual amendment proposal.  Since the foundation and the soil types will be unique to each situation,  the desire  to have a clear guideline  led WSSC  to use 80  feet as  that guideline. Note that the March 25, 2011 Setback Recommendations Report is enclosed as a reference for the reader.   

After the determination was made regarding the setback distance based on the size of the hole, a fourth factor was analyzed.  The fourth factor dealt with the force of the water jet striking the structure.  That analysis attempted to use the varying pipeline pressures that WSSC transmission mains operate under to estimate how the force drops off with distance from a failed pipe.  That analysis supported the decision to  impose an 80‐foot setback.   Note that this analysis entitled, “Treatise on Water Jet Force and Kinetic Energy” is also enclosed as a reference for the reader. 

While WSSC  chose  80  feet  as  its  setback  distance,  it  is  important  to  note  that WSSC  is  not forcing  all  structures  to  remain  outside  the  setback.    As  currently  written,  the  intended provision for the Pipeline Design Manual will require structures to remain outside  its right of way but  structures may be built within  the  setback distance.    Should  a  structure be placed within the setback then the developer is obligated to ensure that the structure is designed and built to survive the failure of a PCCP  in close proximity, with respect to and  in consideration of the four factors discussed above.  

EARLY STAKEHOLDER INVOLVEMENT 

Concerns  regarding  the encroachment of development  and what  to do  about  it were  shared with WSSC senior management via a series of briefings  in 2007 (when the study was directed) 

  8

Page 15: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

and culminating in a briefing to the Interim General Manager on March 6, 2008.  At that meeting the decision to brief the Commissioners was made.  At the March 19, 2008 Commission meeting the Commissioners provided direction to approach Maryland National Capital Park and Planning Commission (MNCPPC) for assistance in moving the issue forward.   

The briefing  to MNCPPC occurred on April 16, 2008 with WSSC’s expectation  that WSSC and MNCPPC would address the issue in concert.  That expectation was not realized and the issue lay dormant.  Periodic discussions with the Maryland National Capital Building Industry Association (MNCBIA) did continue culminating in a November 10, 2008 meeting where MNCBIA comments led  to  the  concept allowing  structures  to  sit within  the  setback  zone  if designed  to  take  into account  the potential  for  the water‐line  failure.   When  the 48‐inch Derwood  line  failed  in  the summer  of  2008  and  then  the  66‐inch  River  Road  failure  occurred,  the  program  received attention  resulting  in more  emphasis  being  placed  on  the  inspection  program  along with  a commensurate  increase  in resources for the program – one of the recommendations from the earlier study. 

PIPELINE DESIGN MANUAL AMENDMENT – 2010 TO 2012 

The  issue  reemerged  with  the  arrival  of  the  current  General  Manager.    Development  was continuing and  the 200‐foot  consideration was of no meaningful effect.   The  current General Manager received a briefing on the topic and decided to move forward on the setback issue to address a continuing Agency concern about public safety.  The initial proposed language for the Pipeline Design Manual utilizing the 80‐foot setback was briefed to the WSSC Commissioners on December 15, 2010.    The briefing  to  the Commissioners  included  the  intention  to utilize  the language with reviews of ongoing development plans.  That practice continues today. 

Following another briefing to the Commissioners on February 16, 2011, WSSC staff met with a stakeholder group on February 24, 2011 whose membership consisted of staff from both Prince George’s and Montgomery Counties as well as from MNCPPC.  The primary outcome of this first meeting was the cancellation of an already scheduled Public Hearing on March 1, 2011.  Also on February 24, 2011 WSSC staff attended a MNCPPC meeting  in Silver Spring.   Both meetings on 24  February  provided  input  that  served  notice  that  the WSSC  intention  to  establish  setback requirements, even with the potential for mitigation through properly engineered solutions, was not well received.       

Meetings with the stakeholder group continued on March 18, April 8 and October 25, 2011, as well as on February 8, 2012.   At each meeting WSSC  received  comments  consistent with  the concerns which had been  raised earlier, but WSSC  received no  specific  recommendations  for language  to modify  the  proposed  Pipeline Design Manual  amendment.   WSSC  staff  failed  to discern  any  movement  from  stakeholders  who  continued  to  express  consistent  concerns regarding the “foundation” for justifying further action by WSSC on this issue. 

While  receiving no  recommendations  for specific  language changes,  the stakeholder meetings resulted in substantial modifications by WSSC to address concerns raised by the staff members of the stakeholder group: 

A concern regarding the  impact of the setback on redevelopment plans within the  Counties  led WSSC  to modify  its  proposed  amendment  to  fully  exclude redevelopment projects, 

  9

Page 16: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

  10

A concern regarding the impact of the setback on in‐fill development led WSSC to modify  its proposed amendment to  fully exclude  in‐fill development  for 40‐acre parcels (or smaller), and   

A Concern  raised  that  the proposed  language did not  sufficiently  address  the option  to  build  within  the  80‐foot  setback  since  WSSC  had  to  approve  the mitigation  leading  WSSC  staff  to  amend  its  proposal  to  ensure  that  the developer’s professional engineer will  certify  the mitigation necessary  for  the structure to sit within the 80‐foot setback. 

WSSC  staff  seriously  considered  these  concerns  resulting  in  a  substantive  reevaluation  and modification to the proposed amendment. 

One other result from the staff stakeholder meetings was the result of discussion surrounding the actual size of the setback and how it was determined.  A question arose as to whether it was the correct distance in terms of any objective way of measurement.  The question was the basis for work that led to looking at the force water jet from a failed pipe striking a building (the force decreases  the  further  the  structure  is  away  from  the  break).    Analysis  of  this  force  was completed  and  indicated  that  the  80‐foot  setback was  an  appropriate  distance  to  use when considering the force of the water jet and it was the basis for the fourth factor cited above.   

WSSC staff members have also met with representatives of the development community. Their comments  have  not  been  positive.    This  is  not  surprising;  although WSSC  believes  that  this provision will mitigate  risks of  a pipe  failure  to new building  structures  and  to public  safety, which is a benefit to all stakeholders, it may also result in additional near‐term costs (neither the setback nor its engineering mitigation in lieu of the setback are likely to have zero cost). 

Meetings with  individual developers as a consequence of WSSC plan reviews are also ongoing.  To  date,  no  developer  has  concluded  that  the  80‐foot  setback  provision  in  its  entirety  will prevent implementation of the developer’s project. 

DESIGN MANUAL LANGUAGE 

The  text  portraying  the  provision  for  the  Pipeline Design Manual  as  it  is  currently written  is enclosed as a reference for the reader. 

 

 

 

 

Page 17: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Setback Recommendations Report Case Study Review of Failures of 36-inch Diameter and Greater

Pre-Stressed Concrete Cylinder Pipe and Cast Iron Pipe

Prepared by:

WASHINGTON SUBURBAN SANITARY COMMISSION

LAUREL, MARYLAND

March 25, 2011

Page 18: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

2

TABLE OF CONTENTS

ARTICLE I. INTRODUCTION.................................................................................................................................... 3

SECTION 1.01 PREFACE.................................................................................................................................................. 3

SECTION 1.02 PURPOSE.................................................................................................................................................. 4

ARTICLE II. EVALUATION OF PCCP AND CIP PIPE FAILURES...................................................................... 6

SECTION 2.01 TEN CASE STUDIES................................................................................................................................ 6

CASE 1: WSSC 96-INCH PCCP, CLAGGET FARM PROPERTY, MONTGOMERY COUNTY, MD .......................................... 6

CASE 2: 72-INCH PCCP, BROENING HIGHWAY AND DUNHAVEN ROAD, DUNDALK, MARYLAND ................................... 8

CASE 3: 66-INCH PCCP, INTERSTATE 25, DENVER, COLORADO.................................................................................... 11

CASE 4: WSSC 66-INCH PCCP, RIVER RD, BETHESDA, MARYLAND............................................................................ 12

CASE 5: WSSC 60-INCH PCCP, PALATINE DRIVE AND PINEY MEETINGHOUSE ROAD, MARYLAND............................ 14

CASE 6: WSSC 54 -INCH PCCP, E. HAMPTON RD, CAPITAL HEIGHTS, MARYLAND..................................................... 17

CASE 7: 48-INCH CIP, MANHATTAN, NEW YORK AT 5TH AVENUE AND 19TH

STREET..................................................... 19

CASE 8: WSSC 42-INCH PCCP, ALLENTOWN RD, PRINCE GEORGE’S COUNTY............................................................ 21

CASE 9: 42-INCH PCCP, FORT LAUDERDALE, FLORIDA................................................................................................ 22

CASE 10: 36-INCH PCCP, WEST MONTROSE AVENUE, CHICAGO, ILLINOIS .................................................................. 24

SECTION 2.02 FACTORS EFFECTING CONSEQUENCES OF FAILURE.................................................................. 26

1) STAGES IN A PCCP AND CIP PIPELINE FAILURE ........................................................................................ 26 2) WSSC RIGHT-OF-WAY LIMITS AND BUILDING SETBACK LINE ............................................................. 27 3) FAILURE SITE CONDITION FACTORS............................................................................................................ 28

SECTION 2.03 ANALYTICAL EVALUATION OF CASE STUDY FAILURES........................................................... 31

ARTICLE III. EXISTING GUIDELINES AND CONDITIONS................................................................................ 35

SECTION 3.01 WSSC RIGHT-OF-WAYS AND SETBACK GUIDELINES.................................................................. 35

SECTION 3.02 EXAMPLES OF INADEQUATE SETBACKS....................................................................................... 36

SECTION 3.03 WSSC PCCP ASSET MANAGEMENT STRATEGY ............................................................................ 38

SECTION 3.04 WHAT ARE OTHER WATER UTILITIES DOING?............................................................................. 42

ARTICLE IV. SUMMARY OF FINDINGS ................................................................................................................. 44

ARTICLE V. CONCLUSIONS .................................................................................................................................... 45

APPENDIX I. LARGE DIAMETER WATER MAIN SETBACK ANALYSIS ....................................................... 47

APPENDIX II. WSSC PIPELINE DESIGN MANUAL................................................................................................ 56

Page 19: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

3

ARTICLE I. INTRODUCTION

Section 1.01 PREFACE

This report examines ten case studies of 36-inch diameter and greater water transmission main

failures which were constructed of rigid pipe materials including Pre-stressed Concrete Cylinder Pipe

(PCCP) and Cast Iron Pipe (CIP) to determine an appropriate setback distance for these major

transmissions mains from new development, specifically, proposed buildings and dwellings. The

information for the case studies in this report are in part from first hand investigations performed

following the failure of Washington Suburban Sanitary Commission (WSSC) pipelines as well as

information obtained through research of significant pipe failures from other utilities.

In recent years, an increasing amount of new development is occurring on sites in the WSSC

service area containing large diameter water transmission mains which are contained with a WSSC

dedicated right of way. The current setback for pipelines 12-inch diameter and greater is 25 feet from

the outside diameter of the pipe to a building or dwelling. WSSC right of way widths for 36-inch to

42-inch pipe is 40 feet, for 48-inch to 66-inch pipe is 60 feet and for the largest diameter of 72-inch

and greater the right of way width is 75 feet. These parameters were developed primarily to allow for

future maintenance of the pipelines. Currently a 96-inch diameter water main centered in a 75 foot

right of way would require the maximum setback of 33.5 feet. A review of the case studies will make

it clear that the current setback is not adequate to protect buildings and dwellings in the event of a

catastrophic pipe failure.

An engineering review of water pipeline failures and the consequential damage does not appear

to have been performed by the water utility industry agencies such as AWWA, EPA, WRF, etc.

Accordingly, this report was prepared to examine various factors such as pipe diameter, operating

pressure, surface cover material and others to examine the consequences of failure of large diameter

water mains. The concept of an acceptable setback from a building or dwelling will be determined

based on actual cases, as well as by performing analytical calculations of the theoretical debris throw

and diameter of the crater resulting from a pipe failure. The degree of risk reduction and damage in the

Page 20: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

4

event of a failure as result of a greater setback will vary based on site conditions because some events,

including flooding, may not be mitigated by setbacks.

Section 1.02 PURPOSE

Many of WSSC’s transmission mains have been in service for nearly fifty years.

Approximately 80% of the mains 36-inch thru 96-inch are made of PCCP and CIP. WSSC has 163

miles combined of PCCP and CIP 36-inch thru 96-inch which includes 18 miles of CIP and 145 miles

of PCCP as shown in Table 1.0. Due to the rigid and brittle inherent nature of these pipe materials,

they can fail with little or no warning. As pipes of any material type age, the risk of failure increases.

Any water main break is problematic, but a large diameter transmission main failure can be

catastrophic, particularly if it is a rigid pipe that fails practically instantaneously without a leak or other

warning. Such failures release very large quantities of water, soil, rocks and often pieces of pavement

and other debris as they quickly erode their earth cover.

TABLE 1.0 WSSC Large Diameter PCCP and CIP Water Mains

Pipeline Diameter

PCCP (miles)

CIP (miles)

36-inch 37.6 5.4

42-inch 30.3 9.9

48-inch 18.2 2.7

54-inch 8.7 none

60-inch 21.9 none

66-inch 12.8 none

72-inch 4.5 none

96-inch 11 none

Total 145 18

According to a 2007 AWWA Research Foundation presentation at the AWWA Annual

Convention in Toronto, Canada, each pipe section in a large diameter PCCP pressurized water main

Page 21: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

contains stored energy equal to between 20 and 200 lbs of dynamite. The initial explosive force is

immense, and very large amounts of highly pressurized water are released with an initial velocity

approaching 100 miles per hour after the water breaks through the ground cover. As the distance from

the break increases, the intensity and velocity of the emitted water jet decreases and spreads as shown

in the picture below. In addition to the danger to the public and property damage posed by the actual

break and flooding, there is a significant impact to the water distribution system and customers, which

can disrupt water service to large portions of the service area for days at a time.

Released water from a failed large diameter water main.

In order to mitigate the effects of a 36-inch and greater PCCP and CIP pipeline failure, an

additional separation beyond the existing right of way limits and 25 foot building separation

requirements specified by the current WSSC Pipeline Design Manual is required between proposed 36-

inch and larger mains and proposed buildings and dwellings. Additional separation between new

development and water transmission mains are expected to lower the potential property damage risk to

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

5buildings and dwellings, lower the potential safety risks to the public and lower the property density

Page 22: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

6

adjacent to WSSC transmission mains. This will also lower the cost of maintenance and future

replacement.

ARTICLE II. EVALUATION OF PCCP AND CIP PIPE FAILURES

Section 2.01 TEN CASE STUDIES

Following are te iated characteristics useful

to prom

CASE 1:

n representative PCCP failures used to discern assoc

ulgate a revision to the setback distance in the WSSC Pipeline Design Manual. For each there

is a summary of the pipe diameter, measured or estimated debris throw, measured or estimated crater

size, the existence of pavement (or not), the soil classification and the working pressure of the pipe.

Where available, actual measured or known parameters were used where noted; when these were

unavailable, industry accepted or estimated parameters were used.

WSSC 96-inch PCCP, Clagget Farm Property, Montgomery County, MD

On the morning of March 12, 1996 at approximately 8:00 a.m., a 96-inch PCCP water main

failed on Clagget Farm in Montgomery County near Berger Terrace. Figure 1.a. shows the condition

of the break approximately one hour after the initial report was received. Before the valve could be

closed, over 70 million gallons of water were released in approximately 4 hours, which is nearly the

daily production total of the WSSC Patuxent Water Filtration Plant. The main was substantially

shutdown with the help of portable electric valve operators at approximately noon that day.

Page 23: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 1.a. WSSC 96-inch PCCP failure on Clagget Farm property, approx. one hour after report received. Initial debris throw has ended and water is forming a crater and causing flooding.

Fortunately, the pipe failure did not create any damage to buildings or dwellings since the event

occurred on farm land. The pipeline was without a pavement cover under 5 to 6 feet of earth cover

consisting of silty clay and sandy soil with some rocks which were transported approximately 200 to

250 feet away.

50 Ft Crater

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

7

Page 24: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 1.b. WSSC 96-inch PCCP pipe failure site during dewatering of trench.

50 Ft

Figure 1.c. WSSC 96-inch PCCP pipe failure site following trench dewatering.

Case 1 Parameters:

Pipe Diameter: 96-inch PCCP

Measured Debris Throw Distance: 90 feet

Measured Crater Diameter: 50 feet

Pavement: None

Soil Type: SC/SP (USC)

Working Pressure (per Manufacturer Specs): 115 psi

CASE 2: 72-inch PCCP, Broening Highway and Dunhaven Road, Dundalk, Maryland

On the afternoon of September 18, 2009, a 72-inch PCCP water main failed near Broening

Highway and Dunhaven Road in Baltimore County which flooded more than 100 homes in Logan

Village, Watersedge and Turner Station washing away part of a road, flooding cars and trapping some

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

8

residents in their homes. Water at the height of flooding was chest deep in some places. Figures 2.a.

and 2.b. show the severe flooding and Figure 2.c. shows the resulting crater.

Page 25: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

9

Figure 2.a. Flooding from 72-inch PCCP failure in Dundalk, Baltimore, MD.

Figure 2.b. Aerial View - Flooding from 72-inch PCCP failure in Dundalk, Baltimore, MD.

Page 26: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

large diamete the flooded

homes

Figure 2.c. Crater from 72-inch PCCP failure in Dundalk, Baltimore, MD.

The Dundalk pipe failure is an example of the more severe flooding which is possible with

40 Ft Approx.

r water main failures. In this case, the pipe failed at a higher elevation and

were in a low lying area with poor drainage. The crater caused by the failure was somewhat

limited by the presence of asphalt cover.

Case 2 Parameters:

ipe Diameter: 72-inch PCCP

feet

10 psi (assumed)

P

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 40

Pavement: Asphalt

Soil Type: Assumed SC (USC)

Working Pressure: 1

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

10

Page 27: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

CASE 3: 66-inch PCCP, Interstate 25, Denver, Colorado

On the afternoon of February 7, 2008, a 66-inch PCCP water main failed on Interstate 25 near

the 58th Avenue exit ramp in north Denver. The break caused a sinkhole 40 feet wide by 16 feet deep,

shutting down all northbound lanes of the highway. State Police saw water bubbling out of the

roadway and closed off the lanes before the collapse of the road. The very thick highway pavement

provided an early warning sign and restrained the size of the hole and intensity of the failure event.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

11

Figure 3.a. 66-inch PCCP Failure, Denver, Colorado, Interstate 25.

Figure 3.b. 16 foot deep excavation to repair the failed Denver 66-inch PCCP.

Page 28: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

12

Case 3 Parameters:

Pipe Diameter: 66-inch PCCP

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 40 feet

Pavement: Very Thick Asphalt

Soil Type: Assumed SC/SM (USC)

Working Pressure: 110 psi (assumed)

CASE 4: WSSC 66-inch PCCP, River Rd, Bethesda, Maryland

On the morning of December 23, 2008 at approximately 7:30 a.m., a 66-inch PCCP water main

failed on River Road in Bethesda, Maryland. The unique site conditions limited potential damage to

property in the immediate vicinity of the break. Damage to the nearest residential property was

prevented as the property was at a significantly higher ground elevation above the pipeline and away

from pipeline right of way (Figure 4.b.) This PCCP pipeline was also constructed in a trench that was

blasted through rock which limited the crater size and the area washed out was also limited by an

embankment, see Figure 4.b. and 4.c. The site configuration created a fast flowing river by the release

of water from the pipeline down River Road with as much as 150,000 gallons per minute flowing

down the steep incline, stranding motorists in their cars who were rescued by fire truck, helicopter and

a tethered boat as shown partially in Figure 4.a. There were no injuries in the incident which resulted

in severe erosion on either side of River Road and the water drained into Cabin John Branch stream at

the bottom of the incline.

Page 29: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 4.a. Conditions along River Road after WSSC 66-inch PCCP failure during water discharge.

Approx 30 ft Crater

Rocks from collapsed embankment and debris throw from trench

Figure 4.b. WSSC 66-inch River Road failure, trench condition after shutdown and before dewatering.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

13

Page 30: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 4.c. WSSC 66-inch River Road failure, dewatered trench, rock under River Road restrained the size of the crater and prevented road from washing out.

Case 4 Parameters:

Pipe Diameter: 66-inch PCCP

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 30 feet

Pavement: None

Soil Type: Rock/GW (UCS)

Working Pressure: 118.6 psi

CASE 5: WSSC 60-inch PCCP, Palatine Drive and Piney Meetinghouse Road, Maryland.

On December 1, 2003, a WSSC 60-inch PCCP water main near Palatine Drive and Piney

Meetinghouse Road failed. The break caused a crater 35 foot wide and debris was found to have been

thrown approximately 115 feet away. The area was outside of the limit of pavement and the pipeline

was parallel to a 36-inch PCCP. The 36-inch was not damaged because it was on the opposite side of

the failure from the 60-inch; as can be seen from the picture, the area washed out was on the same side

of the pipeline as the hole in the pipe.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

14

Page 31: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure.5.a. Crater created from WSSC 60-inch PCCP failure at Palatine Drive

and Piney Meetinghouse Rd. Montgomery County, MD.

Figure 5.b. Soil content from WSSC 60-inch PCCP failure at Palatine Drive and Piney Meetinghouse Road.

.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

15

Page 32: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

115 feet rock and debris throw

35 ft Crater Width

30 ft

74 ft To wall &

WSSC ROW Limit

Figure 5.c. WSSC 60-inch PCCP failure at Palatine Drive and Piney Meetinghouse Rd. Distance

comparison showing the size of the crater and the distance of the debris throw.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

16

Page 33: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

45 ft 30 ft WSSC ROW Limit

Figure 5.d. WSSC 60-inch PCCP failure at Palatine Drive and Piney Meetinghouse Rd.

Case 5 Parameters:

Pipe Diameter: 60-inch PCCP

Measured Debris Throw Distance: 115 feet

Measured Crater Diameter: 35 feet

Pavement: None

Soil Type: GC/GM (UCS)

Working Pressure: 127.0 psi

CASE 6: WSSC 54 -inch PCCP, E. Hampton Rd, Capital Heights, Maryland

On the early morning of January 24, 2011, at approximately 4:00 a.m., a 54-inch PCCP water

main failed at E. Hampton Roads, Capital Heights, Maryland. The water main break caused the

closure of the inner loop of the Capital Beltway in Prince George County due to flooding and freezing

conditions, snarling morning traffic. The pipe ruptured Monday morning between Ritchie Marlboro

Road and Route 214 and closed all southbound lanes of Interstate-95 for several hours. There was

significant damage to the adjacent office park building, with chunks of asphalt strewn across the

parking lot, the glass front of the building shattered, the building flooded and three cars filled with

water and overturned.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

17

Page 34: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

55 Ft.

Approx.

Figure 6.a. WSSC 54-inch PCCP failure in Capitol Heights. Distance to the building shown.

35 Ft. Crater

Figure 6.b. WSSC 54-inch PCCP failure at East Hampton Rd. in Capitol Heights; crater size.

Figure 6.c. WSSC 54-inch PCCP failure at East Hampton Rd. in Capitol Heights; building view.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

18

Page 35: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

35 Ft

Figure 6.d. WSSC 54-inch PCCP failure; size of crater following dewatering.

Case 6 Parameters:

Pipe Diameter: 54-inch PCCP

Measured Debris Throw Distance: 80 feet

Measured Crater Diameter: 35 feet

Pavement: Asphalt Parking Lot

Soil Type: SC (UCS)

Working Pressure: 125.0 psi (per Manufacturer Specs)

CASE 7: 48-inch CIP, Manhattan, New York at 5th Avenue and 19th Street

On January 2, 1998, early Friday morning about 5:00 a.m., a 48-inch CIP ruptured at 5th

Avenue and 19th Street in New York City. The water main break caused a 35 foot wide sinkhole

callapsing a portion of 5th Avenue and flooding numerous businesses and apartments; no one was hurt

during the incident.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

19

Page 36: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

35 Ft. Approx.

Figures 7.a. and 7.b. 48-inch Cast Iron Pipe (CIP) failure in

Manhattan, New York at 5th Avenue and 19th Street.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

20

Page 37: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Case 7 Parameters:

Pipe Diameter: 48-inch CIP

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 35 feet

Pavement: Asphalt Roadway

Soil Type: Unknown

Working Pressure: 110 psi (assumed)

CASE 8: WSSC 42-inch PCCP, Allentown Rd, Prince George’s County

On September 15, 2001, at approximately 2 a.m., a 42-inch PCCP water main ruptured on

Allentown Road, in Camp Springs, Maryland. The water main break caused a 30 foot wide and 10 feet

deep sinkhole with debris throw up to to 60 feet away and collapsing a portion of the asphalt and

concrete roadway in Allentown Road; no one was hurt during the incident.

30 Ft. Crater

Figure 8.a. WSSC 42-inch PCCP failure at Allentown Road in Public Road R/W

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

21

Page 38: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 8.b. WSSC 42-inch PCCP failure at Allentown Road; very sandy soil under the paving.

Case 8 Parameters:

Pipe Diameter: 42-inch PCCP

Measured Debris Throw Distance: 60 feet

Measured Crater Diameter: 30 feet

Pavement: Asphalt and Concrete

Soil Type: SW/SP (USC)

Working Pressure: 110 psi (per Manufacturer Specs)

CASE 9: 42-inch PCCP, Fort Lauderdale, Florida

On June 21, 2003, a 42-inch PCCP water main ruptured in Fort Lauderdale, Florida. The water

main break caused a 25 foot wide sinkhole callapsing a portion of the roadway. Sandy soil was found

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

22

Page 39: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

below the asphalt paving and the existing pavement minimized the effect of the PCCP burst and size of

the hole.

Approx 25 ft.

Figure 9.a. 42-inch PCCP failure in Fort Lauderdale in public right of way under the paving.

Case 9 Parameters:

Pipe Diameter: 42-inch PCCP

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 25 feet

Pavement: Asphalt Roadway

Soil Type: SW/SP (USC)

Working Pressure: 110 psi (assumed)

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

23

Page 40: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

CASE 10: 36-inch PCCP, West Montrose Avenue, Chicago, Illinois

Overnight at approximately 1:30 a.m. on February 22, 2008, a 36-inch PCCP failed at W.

Montrose Avenue in Chicago, Illinois collapsing a major portion of the street. Trees, street lights,

parked cars and parking meters along with sections of the concrete sidewalk and ashpalt and concrete

roadway all collapsed into the crater.

Water rushed down Honroe Street at depths reaching 4 feet until the main was finally shutdown

near 7 a.m. The initial crater is estimated at 24 feet and the resulting excavation from the repair was

approximately 50 feet by 50 feet and 15 feet deep. Existing pavement minimized the throw of debris

and the effect of the pipe burst however, the water undermined the rigid concrete and asphalt roadway.

Figure 10.a. 36-inch water main failure in West Montrose Avenue, Chicago

in the public right of way under the paving.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

24

Page 41: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

~24ft

Figure 10.b. 36-inch water main failure in West Montrose Avenue, Chicago following dewatering.

Figure 10.c. Crews begin repairing the ruptured 36-inch main in W. Montrose Ave.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

25

Page 42: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

26

Case 10 Parameters:

Pipe Diameter: 36-inch PCCP

Measured Debris Throw Distance: Unknown

Estimated Crater Diameter: 24 feet

Pavement: Asphalt/Concrete Roadway

Soil Type: SC (USC)

Working Pressure: 110 psi (assumed)

Section 2.02 FACTORS EFFECTING CONSEQUENCES OF FAILURE

There are many factors that will ultimately contribute to the nature of a failure of a rigid PCCP

and CIP pipe and the extent of damage and consequences of that failure. They include factors such as

pipe diameter, internal pressure, pipe bury depth, soil type, soil surface cover such as grass or

pavement, ground topography, length of time before shutdown, distance from failure to surrounding

structures, population density, time of day, season of the year, etc. These many factors present the

challenges in determining or predicting the ultimate outcome as result of a catastrophic large diameter

pipeline failure. The one common predictable denominator effecting the consequence of failure is

distance of a building/dwelling from the failure site at the time of rupture.

1) STAGES IN A PCCP AND CIP PIPELINE FAILURE

There are three stages of a PCCP and CIP rigid pipe failure that cause damage:

Stage One The sudden burst of the energy from the failed pipe causes the initial opening up of the

ground cover, and as the water quickly erodes the cover it generates a throw of debris such as pipe

pieces, soil, rocks and pavement fragments (if present) along a trajectory that are carried a distance

by the high pressure water jet. Structural damage from the thrown materials and the resulting

impulse of the water jet against the structure.

Stage Two Continued structural damage, potentially both from the water jet and any subsequent

flooding from the continuous flow of water, and scouring of the surrounding ground in the direction

of the water exiting the hole in the pipe creating a crater.

Page 43: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Stage Three Consequential surrounding damage caused by the failure event above may produce:

(a) Third party failures such as gas main explosions, biohazards, electrical faults and shocks in

affected properties;

(b) Structural damage and collapse of adjacent buildings and structures, settlement and

foundation failures caused by erosion due to the continuous flow of water;

(c) Flooding of buildings/dwellings and properties in the path of water flow and icing of roads.

2) WSSC RIGHT-OF-WAY LIMITS AND BUILDING SETBACK LINE

A schematic of a typical large diameter pipeline right of way and the building/dwelling setback

line is depicted in Figure 2.a. Section 2.03 will summarize an analysis of the ten case studies

presented and compare the observed and theoretical crater size and debris throw distances to the

right of way widths and minimum building setback specified in the WSSC Pipeline Design Manual.

ROW Width

Owned by WSSC

Land Owner

Distance to New Setback Line

H

New Building Setback Line

Existing Building Setback Line

Current Setback - 25 ft

Figure 2.a. Schematic of a pipeline right of way with building setback – note that for most

large diameter pipelines the ROW actually extends beyond the setback line

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

27

Page 44: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

28

3) FAILURE SITE CONDITION FACTORS

The extent of damage caused by a pipe failure depends upon many factors and site conditions

which affect the energy released in the beginning of Stage One; velocity, the amount of the thrown

debris and the rate of the water flow in Stage Two are the results of that energy release. The force

associated with that energy release is the working pressure of the pipe. Specific site conditions and

pipeline design will affect the scale of the damages caused by pipe failures and topography will play

a large role in possible flooding and dissipation of the water released.

(a) Pipe Size

i) Debris throw distance (Stage One) is independent of pipe size but depends on operating

(working) pressure in the pipe and site conditions;

ii) The larger the pipe size, the greater the potential damage caused in Stage Two due to water

quantity discharged and flooding.

(b) Pipe Material

PCCP and CIP are rigid or “brittle pipe materials” and can fail suddenly, without warning,

releasing significant amount of initial energy. The progress and extent of the damage caused

by the failure is dependant on a number of pipe properties and operating conditions. Steel and

ductile iron pipe differ because they are flexible materials that tend to first corrode and leak

extensively prior to failure which will likely be detected before rupture.

(c) Pipe Depth

i) The greater the depth of the failed pipeline, the greater the crater size created by the water,

but debris throw distance is reduced due to the energy dissipation, the clear angle of

trajectory from the crater;

ii) Shallow pipe depths cause a greater distance of the debris throw of pipe pieces, rock

debris, soil and pavement fragments due to less energy dissipation and less obstructed

trajectory angle.

Page 45: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

29

(d) Working Pressure

i) The higher the working pressure in the pipe, the greater the damage due to greater initial

energy release and the faster water velocity and scouring of the crater;

ii) Higher working pressure results in further distance for the debris thrown from the ground

and washed along the ground surface.

(e) Soil Properties

i) The type of soils covering and surrounding the pipeline contribute to the degree of the

damage;

ii) Coarse soil containing a large amount of rocks, gravel and buried construction debris add

more material for the debris throw, conversely, fine sandy, silty and clayey soils contain

smaller particles which result in less debris throw;

iii) The density of soil contents determines the speed and character of the crater excavation

and the trajectory range of debris, for example, loose sand and gravel will be quickly

scoured and thrown, whereas, compacted clay would be slower to scour.

(f) Ground Cover

Existing pavement or road surface mitigates the initial Stage One energy, the degree of the

damage and causes a smaller crater. Hard cover such as thick concrete slows progression of

failure, provides a short warning, and minimizes the debris throw. This same hard cover can

also cause unseen sink holes under road surface before the road collapses.

(g) Location of Break (Hole) in Pipe

Most PCCP pipe failures occur at the 4 and 8 o’clock positions around the pipe. The location

around the pipe determines the hole size and geometry (as do soil type and site geometry) and

direction of the initial blast and debris throw. The hole location also influences the trajectory

Page 46: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

30

and distance of the debris throw. CIP failures are either a circumferential split or a longitudinal

split. The longitudinal split in CIP is the most severe and damaging.

(h) Local Topography

i) An elevated pipe location will increase the debris throw distance to the adjacent areas

situated at a lower elevation within Stage One.

ii) During Stage Two, a pipeline located at a higher elevation has a potential for greater

property damage due to the path of water flow. A pipe on the top of a hill has a potential

for great property damage for any low lying areas located below.

iii) As a contrast, buildings/dwellings located at elevations higher than the ground surface at

the break location are at a much lower risk for flooding.

(i) Urban Areas

Consequences of failure are greater in developed urban areas. Exposure time may be very short

for the debris throw and the crater size will be somewhat reduced due to mostly paved surfaces.

But soils with rock debris and presence of the pavement fragments will increase personal injury

risk within Stage One. Structural property damage may be less in Stage One than that caused

by the water flood within Stage Two. Water flow from failed pipe causes the most damage and

in terms of quantity, poses the highest injury and drowning risk to the public. The sudden water

flood event following a pipeline break is almost impossible to mitigate.

(j) Property Use

The presence of electric, gas, chemicals and biohazards near the failure site will increase

consequential damage within Stage Three.

(k) Building/Dwelling Setback

The closer the buildings/dwellings are to the failed pipeline, the greater the Stage One, Stage

Two and Stage Three property damage and public risk. The foundation type and depth, and

Page 47: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

31

structural framing materials (wood, sidings, concrete blocks) becomes significant to mitigate

damages due to the close range.

(l) Shutdown Time

The longer the time to shutdown the water main following a failure, the greater the Stage Two

consequences of the event caused by the continuous water flow.

Section 2.03 ANALYTICAL EVALUATION OF CASE STUDY FAILURES

This section will compare the consequences of failure, namely the crater size and debris throw

distance from the ten case study failures presented in Section 2.01, with an analytical calculation of the

theoretical crater size and debris throw in order to determine an average of the same to determine a

minimum setback distance for water transmission mains 36-inch and greater. The case study samples

contain a good data set representing pipe sizes across the range between 36-inch through 96-inch and

include both PCCP and CIP. A summary of the parameters used in the analysis are shown in Table 2.1

below. Where available, actual measured or known parameters were used where noted; when these

were unavailable, industry accepted or estimated parameters were used.

The analytic calculations were performed based on the methods presented in Appendix I. The

results of the analysis are shown for comparison in Table 2.2 below. An average of the measured or

estimated values as well as calculated theoretical values for all test cases were also computed for both

the debris throw and the crater size and are shown in the table. The collective results of the observed

and theoretical provide a debris throw ranging from 60 to 115 feet and average distance of 93 feet and

a crater size ranging from 24 to 50 feet with an average of 34 feet.

There are two reasons why an average debris throw distance less than 96 feet is expected. The

calculated theoretical debris throw is based on the optimum angle of 45 degrees; meaning the hole in

the pipe would need to be at either the 10 o’clock or 2 o’clock position. Most PCCP pipes fail at the 8

o’clock or 4 o’clock position; therefore, the actual trajectory angle would normally be less than the 45

degrees that would create the maximum throw distance. Secondly, the pipe depth is at an elevation

Page 48: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

lower than the ground surface so the path or trajectory of the debris throw shown in Figure 2.b. is

truncating the trajectory short of its maximum. So the factors that will lesson the values calculated for

the debris throw include the depth of cover above the pipe, the location of the break and the associated

angle of the water jet and the pressure in the pipe. Using physics to determine the equations of motion

(as done in Appendix I) will result in equations that can be used to get a sense of the shortened

distance. There is no horizontal acceleration so once knowing the appropriate time, (t), the resulting

debris throw would be: Sx = Vpcos Ө (t)

To calculate the appropriate time (t) one would use:

Sy = Vp sin Ө (t) – ((g) t2)/2

where: g = gravitational constant (32.2 ft/sec2) Example: Using Ө = 45°, Vp = 54 feet/sec (110 psi) and a cover depth of 6 feet with the break at 2 o’clock, we calculate t = 0.23 sec to clear the crater and 2.14 sec to strike the earth. Using t = 2.14 sec yields a debris throw of 82 feet which is 10 feet less than the 92 feet cited in Appendix I as the maximum debris throw at 110 psi pipe pressure (Co = 0.7).

Debris Throw (Calculated)

Water Flood

ROW Width

Owned by WSSC

Land Owner

Debris Throw (Ground Surface) Pipe Depth

Setback from Pipe OD

Figure 2.b. Schematic of Debris Throw Distance for a large diameter pipeline failure

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

32

Page 49: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

TABLE 2.1. TEN CASE STUDIES - PARAMETERS USED FOR ANALYSIS

Case No.

Location

Pipe (in)

Working Pressure

(psi)

Measured Debris Throw

(ft)

Estimated Crater Size (ft)

Pavement

Soil

(USC)

1 Clagget Farm, MD*

96 PCCP

115.0

90 50** None SC/ SP

2 Dundalk, Balt., MD

72 PCCP

110.0 NA 40 Asphalt SC

3 Denver, CO 66 PCCP

110.0 NA 40 Asphalt SC/ SM

4 River Rd., MD*

66 PCCP

118.6 NA 30 None Rock GW

5 Palantine Dr., MD*

60 PCCP

127.0 115 35** None GC/ GM

6 Capital Hghts., MD*

54 PCCP

125.0 80 35** Asphalt (part)

SC

7 5th Ave NYC 48 CIP

110.0 NA 35 Asphalt N/A

8 Allentown Rd., MD*

42 PCCP

110.0 60 30** Asphalt SW/ SP

9 Ft. Lauderdale FL

42 PCCP

110.0 NA 25 Asphalt SW/ SP

10 Chicago, IL

36 PCCP

110.0 NA 24 Asphalt SC

* WSSC Pipeline ** Measured Crater NA – Not Available (USC) – Unified Soil Classification

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

33

Page 50: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

TABLE 2.2 RESULTS OF CASE STUDY ANALYSIS

Soil Data

USC (6)

in psi / ft feet feetinternal soil

friction96 115.0** 90.0 50 SC/ SP

PCCP 265.3 96.3 38 2772 110.0* N/A 40 SC

PCCP 253.7 92.1 31 3066 110.0* N/A 40 SC/ SM

PCCP 253.7 92.1 36 2766 118.6 N/A 30 Rock GW

PCCP 273.6 99.3 33 3060 127.0 115.0 35 GC/ GM

PCCP 293.0 106.3 36 3054 125.0** 80.0 35 SC

PCCP 288.3 104.7 35 3048 110.0* N/A 35 N/A

CIP 253.7 92.1 36 2742 110.0** 60.0 30 SW/ SP

PCCP 253.7 92.1 33 2942 110.0* N/A 25 SW/ SP

PCCP 253.7 92.1 33 2936 110.0* N/A 24 SC

PCCP 253.7 92.1 31 3093.2 34.2

Notes:1.

2. 0.73. 2.74.5.6.7.

A

Crater

Size(5)

Estimated

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

34

sphalt

Calculated

A(p

A

A

A

A

A

N/A - Not available

Debris

Throw(5)

Estimated

sphalt art)

sphalt

sphalt

sphalt

sphalt

sphalt

None

None

Calculated

United Soil Classification (USC) soil group information is estimatedAngle of internal friction is estimated

Capital Heghts, MD

Allentown Rd, MD

Specific gravity of rocks used for calculations in the table Sp=

Average calculated values:

Working pressures indicated thus XXX.X* are assumed.Working pressures indicated thus XX.X** are per Manufacturer Specs average

1Clagget Farm,

MD

Case No.

Location

N

Working

Pressure(1) Pipe

Design

2Dundalk, Balt.,

MD

Denver, CO3

4 River Rd, MD

5Palantine Dr.,

MD

6

7

8

Calculated Throw Distance and Crater Size are given without pavement

Orifice Coefficient used for calculations in this table - Co =

Chicago,IL

10

9Ft. Lauderdale

FL

5th Ave NYC

Pav

emen

t

one

Page 51: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

35

ARTICLE III. EXISTING GUIDELINES AND CONDITIONS

any temporary construction strips) and to allow for the mobility of equipment and personnel for future

maintenan n 2.b. in

Table 20 of the Design Manual, are also included in Appendix II and summarized in Table 3.1 below.

TABLE 3.1 WSSC Right of Way Width Requirements for Water Pipelines

Width of Right of Way

Section 3.01 WSSC RIGHT-OF-WAYS AND SETBACK GUIDELINES

WSSC current guidelines for right of way widths and setbacks or clearances between

buildings/dwellings and pipelines are set forth in the WSSC Pipeline Design Manual. The minimum

right of way widths are specified to allow adequate space for construction of the pipeline (along with

ce. The right of way widths for water pipelines are specified in Part Three, Sectio

Pipeline Diameter

36-inch to 42-inch 40 feet

48-inch to 66-inch 60 feet

72-inch and larger 75 feet

The Pipeline Design Manual also includes additional guidelines for new development proposed

in close p

2.b.1). This section states:

“1) The existing widths of right of w

Concrete Cylinder

Pipe (PCCP). PCCP fail catastrophically and result in serious public safety concerns. For

roximity to existing right of ways for large diameter PCCP pipelines in Part Three, Section

ays shown/provided for existing large diameter pipelines

(30-inch and larger) may be inadequate from both public safety and operation and

maintenance perspectives. The most serious risks are posed in situations where occupied

spaces are built within short distances of large diameter Pre-Stressed

any new development proposed within two hundred (200) feet of these pipelines, special

considerations and modifications may be imposed.”

Page 52: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

36

The minimum building/dwelling setbacks are set to allow for adequate clearance for equipment

to access the pipeline and to allow for excavation of the pipeline without damage to building

foundations. The Pipeline Design Manual guidelines for building/dwelling clearances from large

diameter

states:

maintenance and failure of the pipeline in assessing whether a

reater separation is warranted. Select the separation so that the existing or proposed

w process and all too often, new

development prevails and buildings or dwelling ilt at or very near, the WSSC right of way line.

Therefore, a c er mitigate

the consequences of a large diameter PCCP or CIP pipeline failure.

water/sewer pipelines are contained in Part Three, Section 3.c.2).b) and Appendix II which

“b) For pipelines larger than 12-inches in diameter, the minimum separation from a building

or dwelling is to be determined based on the following factors: maintain a minimum

horizontal separation of 25 feet and consider the potential property damage and physical

injury during construction,

g

foundation of the building or dwelling will not be damaged during construction, maintenance

or failure of the pipeline.”

As indicated above for both determining right of way widths and dwelling/building setbacks,

WSSC promotes design guidelines for new development to take into consideration as part of the

design, an appropriate setback distance from existing large diameter water mains in the interest of

protecting property and public safety in the event of a catastrophic pipeline failure. However, it has

been the experience of WSSC engineering and project management staff that it is difficult or

impossible to implement these guidelines during the design revie

s are bu

hange in the current Pipeline Design Manual guidelines is necessary to furth

Section 3.02 EXAMPLES OF INADEQUATE SETBACKS

When many of WSSC’s large diameter water mains were originally constructed, they were

often built across open land areas within right of ways suitable for pipeline access and maintenance.

As development sprawls and expands, the once rural areas become more urban and closed in on the

water transmission main right of ways. When WSSC does not own the land adjacent to the right of

Page 53: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

way, development often is built very near or directly abutting the right of way. This often places new

buildings, homes and other development at higher risk of the consequences that could result from a

major pipeline failure. Figure 3.1 below, illustrates an example of a large open tract of land with the

proposed development superimposed. The once undeveloped pipeline right of way becomes the

location for high density development with dwellings and buildings often having their foundations and

basements built at or near the right of way line. Figure 3.2 depicts the close proximity of the proposed

wellings/buildings to the pipeline with the pipeline right of way being highlighted in pink.

igure 3.1 Proposed Development with High Density/Occupancy surrounding 36/60-inch PCCP R/W

sed Buildings/Dwellings on 36/60-inch PCCP R/W line (highlighted), the

yellow/green lines are 10 foot interval lines beyond the 50 foot r/w shown in pink.

d

F

Figure 3.2 Propo

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

37

Page 54: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

38

nd larger. By the end of 2011, WSSC will have 54.5 of the

77 miles of mains 48-inch and larger equipped with continuous monitoring, with the remaining 22.5

miles p

nificant remaining useful life and do not require replacement at this time.

This low percentage of deteriorated pipe sections warrants the use of an asset management strategy

versus

Section 3.03 WSSC PCCP ASSET MANAGEMENT STRATEGY

The WSSC manages its inventory of large diameter PCCP pipelines with an asset management

strategy designed to maintain safe and continuous operation of the mains and realize the practical

useful life of the pipelines to assure value to the ratepayers. WSSC owns a total of 350 miles of PCCP

water mains including 77 miles that are 48-inch and greater and 68 miles that are 36-inch through 42-

inch totaling 145 miles that are 36-inch and greater. The WSSC approach to managing these critical

assets to mitigate pipeline failures includes proactive routine inspections and repairs followed by

continuous monitoring of mains 48-inch a

lanned to be completed by 2013.

There are a number of reasons why WSSC cannot simply replace the PCCP pipelines. For the

vast majority of the mains, there is no available space to build replacement mains within or adjacent to

the existing right of way due to development. This means that most replacements will have to be

placed along the same alignment as the existing lines, which requires the existing pipeline to be taken

out of service and removed for replacement. As the primary supply mains, there is not adequate

redundancy to allow the long term shutdown for replacement. The construction time is estimated at

two-thirds of a mile per year. For the 77 miles of 48-inch and larger that would equate to over 115

years (total) to replace these mains but more importantly, our system will experience 115 years that

these pipelines will be out of service. Routine PCCP inspections identify an average of 2% or less of

the total number of individual pipe sections in a pipeline as requiring repair or replacement. This

means that approximately 98% of the existing segments at the time of inspection need no repair or

replacement and have sig

total replacement.

Page 55: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Under the WSSC PCCP Inspection and Condition Assessment Program, routine cyclic internal

inspections are performed on a 5 to 7 year interval for mains 48-inch and larger on a prioritized basis

using state of the art techniques for leak detection, condition assessment, repairs or replacements and

long term monitoring. Advanced acoustical fiber optic (AFO) technology is used to monitor acoustical

reinforcing wire breaks at an early stage so that pro-active remedial action can be taken. State of the

art techniques are used for leak detection, condition assessment and repairs to establish a baseline

pip onitoring is installed and maintained on a continuous

ba

Internal sonic/ultrasonic non-destructive testing to detect anomalies (Figure 3.2);

Figure 3.1. Electromagnetic survey of PCCP to detect broken wires

eline condition, and then the long term AFO m

sis. These methods include:

Internal acoustical leak detection;

Internal visual inspection and sounding of concrete pipe core;

Internal electromagnetic survey to detect broken pre-stressing wires (Figure 3.1);

Permanent acoustic fiber optic monitoring to listen for wire breaks (Figure 3.3);

Internal carbon fiber repair or replacement of individual pipe sections (Figure 3.4).

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

39

Page 56: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

40

Figure 3.3. Acoustical Fiber Optic (AFO) PCCP monitoring equipment

Figure 3.2. Sonic/ultrasonic survey of PCCP to detect anomalies

Page 57: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 3.4. Internal Carbon Fiber Repair of 66-inch PCCP

3.4; this pipe section was

located in a residential area approximately 50 feet from the nearest dwelling.

An example of the benefits of this asset management strategy was revealed on June 29, 2010.

A series of multiple acoustical events was recorded and reported from the WSSC AFO monitoring

system on a 96-inch PCCP in the 8000 block of Tuckerman Lane, in Montgomery County. WSSC

took immediate decisive action based on the information provided by the monitoring system and

shutdown the main removing it from service to begin an investigation and repairs on the main. The

pipe was found to be in a significant deteriorated condition requiring immediate replacement. The

condition of the section of 96-inch pipe that was removed is shown in Figure

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

41

Page 58: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Figure 3.4. WSSC 96-inch PCCP Tuckerman Lane deteriorated pipe with cast coating removed

and an area of broken pre-stressing wires shown on the right pipe end.

Section 3.04 WHAT ARE OTHER WATER UTILITIES DOING?

A review was performed for water utilities that own and operate large diameter PCCP and CIP

water mains located in Maryland as well other states to obtain information on their right of way

requirements and buildings setbacks for large diameter water mains and any special requirements if

PCCP or CIP was used. The results are shown in Table 3.2.

The review of the water utilities contacted revealed only two utilities requiring special

considerations for large diameter water mains. Howard County, Maryland requires dwelling units to

be located a minimum of 30 feet from transmission main easements. The County’s right of way width

for this size of main is 30 feet, which would result in a minimum setback of 45 feet if the main is

centered in the right of way. Phoenix Water requires a right of way width of 80 feet for transmission

mains and a setback of 20 additional feet from the right of way line which would result in a minimum

building setback of 60 feet if the main is centered in the right of way. If a building is less than 20 feet

from the right of way line, a registered Arizona Professional Engineer is required to submit signed and

sealed calculations which verify the integrity of structures adjacent to the water main under the

condition of a main failure.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

42

Page 59: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

43

TABLE 3.2 RESULTS OF UTILITY REVIEW

Water Utility

Setback Requirement Right of Way Widths Special Requirements

Baltimore County DPW

None

Minimum Easement Widths: All pipe sizes: 15' minimum unless additional width is determined to be

needed during design

None

Howard County DPW

Transmission mains: 30' setback between

easement line and any proposed dwelling units.

Minimum Easement Widths: 16" to 24" - 25'

> 30" - 30'

None

Fairfax County

Minimum 20' setback from outside diameter of

pipe to building.

Transmission mains: centered in

24' foot easement.

None

Dallas Water Utility

None

Minimum Easement Widths: 8" to 12" - 25' 16" to 24" - 50' 30" to 66" - 75'

72" and Larger - 100'

None

Denver Water

None

Minimum Easement Widths: 16" to 24" - 34'

> 30" - 50'

None

Tucson Water

None Design for available site conditions. None

Phoenix Water

20' minimum from easement line - * See City of Phoenix Note.

Minimum Easement Widths: < 16” - 25'

16" to 30" - 50' > 30" - 80'

* See City of Phoenix Note.

San Diego Water

None The main should be

positioned 5' from the property line.

Minimum Easement Widths: < 20” - 15'

20" to 36" - 20' > 36" - 25'

None.

* City of Phoenix Note: " Regardless of the easement width, buildings shall have a sufficient setback

from the easement boundary such that buildings, building foundations, or building slabs will not be

undermined of damaged by a water main break. Proposed developments with buildings, building

foundations, or building slabs proposed to be closer than 20' from an easement boundary shall be

required to submit structural and soil calculations, signed and sealed by a registered Arizona

Professional Engineer, which verify integrity of structures adjacent to the water main under the

condition of a main failure."

Page 60: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

44

ARTICLE IV. SUMMARY OF FINDINGS

The evaluation of the pipe failure case studies demonstrated the scale of the consequences

caused by large diameter pipeline failures and also presented the various factors in the site

conditions, time of failure and pipeline design and operation that will influence the degree of

resulting damage.

1. The crater size created by a failure will exceed the WSSC right of way widths in practically

every case for mains 36-inch and larger if the pipe is centered in the right of way cases will

cause structural damage to building and dwelling foundations located at or near the right of

way line.

2. Debris throw will always significantly exceed the WSSC right of way width and may cause

serious injury or property damage to those in its path. The amount of property damage from

the debris throw is expected to be less than that by the resulting water flood.

3. Increasing the distance from the pipeline to the nearest structure reduces the risk to building

occupants by providing more warning time to take avoidance action and more significantly, by

reducing the initial energy of the failure that would cause property damage.

4. Direction of the water flow from the failed pipe is mostly controlled by the topography of the

site as well as by which side of the pipe that the failure is on and may not by mitigated by a

setback.

Page 61: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

45

ARTICLE V. CONCLUSIONS

Based on the Summary of Findings derived from the evaluation of the ten case studies, and a

review of the current guidelines in the WSSC Standard Design Manual, it can be concluded that:

1. In order to minimize property damage and personal risk for new development, the building or

dwelling setback distance from the current 25 feet must be increased.

a. Looking at the crater, it is important that the structure be safely beyond any resulting

crater. Calculated and measured values (see Table 2.2) generally were an average of 35

feet with the worst case at 50 feet. The worst case example will occur when the soil

conditions are favorable for erosion and there is no pavement surface involved. Any

setback needs to be at least 50 feet plus a safe distance to ensure that intermediate earth

between the crater and the structure will not fail, resulting in a secondary action

damaging the structure.

b. Looking at the debris throw, (see Table 2.2) and an average distance of 93 feet with a

median and most frequent distance of 92 feet seemingly would yield a similar value as

the requirement. However, the pipeline is below the ground surface and the angle of the

water jet is unlikely to be the optimum, so the value portrayed is likely overly

conservative. The example in Section 2.03, calculates a shortened distance for the

debris throw considering the depth of the pipe of 10 feet. But rather than 82 or 83 feet,

we decided that 80 feet would be a good representation of the average debris throw.

c. A reasonable value that safely goes beyond the 50 foot crater requirement and meets the

debris throw average is 80 feet.

2. In cases where the minimum setback cannot be provided, include a requirement that mitigative

measures suitable to withstand the forces of the pipeline failure be provided to protect the building

Page 62: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

46

or dwelling. Such measures shall be submitted to WSSC and supported by necessary calculations

and drawings, signed and sealed by a Professional Engineer licensed in the State of Maryland.

3. Continue to implement the aggressive WSSC 5 Year PCCP Condition Assessment and Inspection

Program Plan which will install continuous AFO monitoring in all PCCP pipelines for mains 48-

inch and larger and initiate the routine inspection of 36-inch and 42-inch PCCP mains by the end of

2013. The inspection of the 68 miles of 36-inch and 42-inch PCCP mains will be included along

with the cyclic inspection of mains 48-inch and larger to be completed in approximately ten years.

Page 63: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

APPENDIX I. LARGE DIAMETER WATER MAIN SETBACK ANALYSIS

By David C. Shen, P.E. December 31, 2007 (Rev. March, 2011 - By David C. Shen, P.E., Michael P.Gipsov, P.E.)

Approach 1: To analyze the required set-back distance once assuming that the trajectory of a debris particle resulting from a pipe burst would follow the trajectory of the water jet.

Any debris particle with a mass (mp), greater than the mass of air, (ma) would be subject to the

same gravitational deceleration as the water jet undergoes while traveling through the air, thus following the trajectory inscribed by a water jet through the air. Another assumption is that any debris particle of mass, (mp), which is subject to motion in air as the water jet impinges on it, would travel through air. Any particles which are too heavy to be moved by the water jet would either remain in-place, or move without being thrown into the air.

The key to this approach is how to estimate the resulting motion or the velocity, of the debris

particle as it is impinged upon by a water jet. _ Y

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

47

Fig. 1. Initial velocity of the debris particle

Ө

_

Vp horiz

Vp

X

Vp vert

Page 64: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

48

Let: Vp = Initial velocity of debris particle at which the projectile motion is launched Ө = initial angle at which the particle trajectory travels through air, with respect to the ground

surface, which is assumed to be horizontal. Let the vertical velocity component be Vp vert

Vp vert = Vp (sin Ө) [Equation 1] Let the horizontal velocity component be Vp horiz

Vp horiz = Vp (cos Ө) [Equation 2] Based on the theory of projectile motion of trajectory: the time, t, where Vp vert decelerates to zero is:

t = Vp vert /g , [Equation 3]

where: g = gravitational constant (32.2 ft/sec2); Vp vert = initial vertical velocity of the projectile motion

The vertical distance Svert the particle attains in time (t) is:

Svert(t) = Vp vert (t) – gt2/2; [Equation 4] The horizontal velocity of the debris particle is Vp horiz which is NOT subject to gravitational deceleration. Therefore, the total horizontal distance that the particle travels through air would eventually be assumed to be the farthest horizontal distance that a debris particle could travel as the result of a pipe burst. This is an important assumption. Let the total horizontal distance be Dp horiz. Therefore, Dp horiz = Vp horiz (2t), where (2t) = total time that a particle would travel through air. This assumes that the final resting place is the same elevation as the initial launch elevation. Therefore:

Dp horiz = Vp (cos Ө) (2t) [Equation 5] Where (t) is calculated by [Equation 3] above: Dp horiz = (2Vp cos Ө Vp vert) /g which equates to: Dp horiz = (2Vp cos Ө Vp sin Ө) /g Therefore: Dp horiz = (2V2

p cos Ө sin Ө) /g By differentiating the above equation with respect to angle (Ө), it can be shown the farthest horizontal distance of Dp horiz is obtained with Ө = 45° Where:

cos Ө = sin Ө = (0.5)1/2 Therefore:

Page 65: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

49

MAX Dp horiz = 2[(0.5)1/2]2(V2p /g)

Then: MAX Dp horiz = V2

p /g [Equation 6] Key: Equation 6 is to be used to calculate the farthest horizontal distance of the displacement of the trajectory of a debris particle, as a result of a pipe burst. Question: How can Vp be determined? Answer: Assuming that there is no air resistance to the projectile motion, then, Vp may be determined by assuming a water jet completely transforming its energy to a debris particle, thereby moving the debris particle along the same trajectory as the water jet projectile. Assuming that the velocity of the water jet, Vw, as a result of a water main burst, is derived from the pressure energy contained in the water main at the onset of the pipe burst. By Bernoulli’s theory, for every unit weight of water, the total fluid energy is balanced, therefore: (V2

w /2g) + (Zw) + (Pw / γw ) = (V2m/2g) + (Zm) + ( Pm/ γw ) [Equation 7]

where: Vw = velocity of the water jet Zw = vertical elevation of the water jet at its starting point Pw = gage pressure contained in the water jet

Vm= velocity of water inside of the water main

Zm = vertical elevation of the water main Pm = gage pressure contained in the water main above atmospheric pressure γw = unit weight of water

We can assume that:

Elevation of the water jet: Zw = Zm, Atmospheric pressure: Pw =0, Velocity of water: Vm = 0 (in the water main, compared to Vw.)

Therefore:

(V2w /2g) = (Pm/ γw ) => V2

w = ( 2gPm/ γw ) = 2gHm,

where: Hm = pressure head of water (in feet), Which leads to Vw for every unit weight of water:

Vw = (2gHm) 1/2 [Equation 8]

Using [Equation 7], by extending the balance of the total fluid energy to the transfer of fluid energy and the energy of a debris particle, therefore, let Vp be the velocity of a debris particle with a unit weight of γp = ρp g where ρp = unit density of the debris particle.

Page 66: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

50

Therefore, by the energy balance between water and debris particle:

γp [(V2

p /2g) + (Zp) + (pp / γp )] = γw [(V2

w /2g) + (Zw) + (Pw /γw ) ]; Which equals to:

γp [(V2

p /2g) + (Pp / γp )] = γw [(V2

w /2g) + (Zw) + (Pw /γw )]; So:

γw [(V2

m /2g) + (Zm) + (Pm /γw ) ]

Where: (Zp) = (Zw) = (Zm) = 0; (At zero vertical height, assuming zero height is the vertical datum of the bursting water main.)

(Pp / γp ) = fluid pressure energy of debris particle which is non-existent because debris is NOT a fluid, therefore, (Pp / γp ) = 0 and (Pw /γw ) = 0 because they are subject to atmospheric pressure, Therefore: [γp (V

2p /2g) ] = γw [(V

2w /2g) ] = γw [(V

2m /2g) + (Pm /γw ) ] where Vm = velocity

of flow inside the water main which is small compared to Vp or Vw.

From [Equation 7] and [Equation 8] above:

(V2w /2g) = (Pm /γw ).

Therefore: [γp (V

2p /2g) ] = γw [(V

2w /2g) ] = γw [ (Pm /γw ) ],

Simplified as: Vp = [ (γw / γp)

1/2 ] Vw ; [Equation 9] From Equation 8:

Vw = (2gHm) 1/2

Where:

Hm = fluid pressure of water inside the water main in feet; g = gravitational constant (32.2 ft/sec2).

Therefore, Equations 6, 8 & 9 can be used to estimate the horizontal distance traveled by a debris particle as it is carried by a water jet resulting from a burst of a water main. Note: If introducing an orifice coefficient, Co, to equation 8 in order to calculate the true velocity of water, Vm, resulting from the burst pipe. This coefficient is dependent upon the pressure and the shape and size of the resulting orifice (the hole resulting from the break). The Co relates the water pressure inside the water main to the pressure outside the water main accounting for the energy loss as the water exits the pipeline through the break. Then:

Page 67: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Vm = Co (2gHm) 1/2 [Equation 10]

Calculations of Distance MAX Dp horiz (using Equations 6, 8 and 9)

Since: Vm = Co (2gHm) 1/2 [Eq. 10]

Vp = [(γw / γp)1/2] Vw [Eq.9]

MAX Dp horiz = (V2p /g) [Eq.6]

Since unit weight of a debris particle is γp = ρp g Where:

ρp = unit mass (density) of the debris particle and; ρp = Sp ρw; Sp = specific gravity of a debris particle; ρw = unit mass (density) of water.

Therefore: (γw/γp ) = γw / [(Sp ρw g) ] = ρw g / [(Sp ρw g) ]

So: (γw/γp )

1/2 = (1/Sp) 1/2

Table of Some Common Debris Specific Gravity

Shale Granite Sandstone Basalt Asphalt Concrete Limestone 2.75 2.65 2.2 2.65 2.22 2.38 2.45

Assume an average specific gravity of a debris (rock) particle to be 2.7, Therefore:

(1/Sp) 1/2 = (1/2.7) 1/2 = 0.61.

So:

Vp = 0.61 Vm

Assume maximum pressure in WSSC water transmission system Hm = 150 psi = 346 feet and using Co = 0.80; Therefore:

Vm = 0.8 [2(32.2)(346)] (.5) = 120 ft/sec Since:

Vp = 0.61 Vm = 0.61(120) = 73.2 ft/sec

MAX D p horiz = (V2p /g) = (73.22

/32.2) = 165 feet Final Formula : MAX D p horiz = [ (γw/ γp ) (2) (C2

o) (Hm) ] feet [Equation 11]

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

51

Page 68: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Based on above Equations, Table 1 is a comparison of horizontal distances of a debris particle thrown out by a water jet as a result of a water main burst. Due to the unpredictable shape and size of the pipe opening, the value of Co may vary from 0.6 to 0.9. Also, as discussed above, the farthest horizontal distance of Dp horiz is obtained for Ө = 45°.

Sp= 2.7 => (1/ Sp)1/2 = 0.61 and γw/γp = 1/2.7

Table 1. Horizontal Distance of a Debris Particle Thrown Out by Water Main Burst

0.9 0.6 0.7Hm psi Hm feet Vm

ft/sec

Vp

ft/sec

MAX Dp horiz

feet

Vm

ft/sec

Vp

ft/sec

MAX Dp horiz

feet

Vm

ft/sec

Vp

ft/sec

MAX Dp horiz

feet150 346 134 82 208 90 55 92 104 64 126140 323 130 79 194 87 53 86 101 61 117130 300 125 76 180 83 51 80 97 59 109120 277 120 73 166 80 49 74 93 57 100110 254 115 70 152 77 47 68 89 54 92100 231 110 67 138 73 45 62 85 52 8490 208 104 63 125 69 42 55 81 49 7580 185 98 60 111 65 40 49 76 46 6770 161 92 56 97 61 37 43 71 43 5960 138 85 52 83 57 34 37 66 40 50

Average Throw @ Co = Presusure Max. Throw @ Co = Min. Throw @ Co =

Approach 2: To analyze the required set back distance by looking at the size of the hole in the ground resulting from the excavation of soils around a water main burst. This is based on an assumption of the seepage force due to groundwater flow in the soil exerting upon the soil particle when the seepage force equals to the force or the weight of the overburden soil strata, the overburden soil will burst open, thereby creating a hole in the ground. If, the seepage force in soil due to seepage flow is Fseepage,

Then: Fseepage = (γw )i [Equation 12]

where: γw = unit weight of water i = hydraulic gradient of groundwater

i = ΔH/Δdist [Equation 13]

where: ΔH = Change in hydrostatic pressure due to groundwater flow

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

52

Page 69: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

53

Δdist = Change in horiz. distance due to hydrostatic pressure change in groundwater flow

The seepage force has an effect on the soil strata causing movement of the particle along the seepage line depending on the vector sum of the seepage force and the submerged unit weight, γsub of the soil.

γeff = (γsub ) - Fseepage where:

γeff = effective unit weight of soil γsub = submerged soil unit weight

When Fseepage reaches a critical value such that i = icritical , then Fseepage ≥ (γsub ) Therefore, when soil becomes loosened, boils and lifts up forming a hole in the ground:

γeff ≤ 0 γw (ΔH/Δdist) ≥ (γsub )

Δdist ≤ (γw /γsub) ΔH [Equation 14]

Where: γsub = (ρsoil – 1) γw ρsoil = specific gravity of a soil particle

Assume ρsoil = 2.7, Therefore: Δdist ≤ [1/(2.7-1)] ΔH Δdist ≤ 0.588ΔH [Equation 15] Using Equation 14: Δdist ≤ (γw /γsub) ΔH; Note: This derivation supposes that the break in the pipeline is toward the side and thus the distance calculated would extend beyond the break (a worst case). Should the break be at the very top, for instance, while the value calculated would be the associated with a crater of the approximate same size, it would span both sides of the pipe, thus lessening the distance needed to be away from the pipeline. An important assumption: The seepage pressure gradient, or the change in hydrostatic pressure in groundwater flow, is assumed to vary linearly with respect to ∆dist. For submerged soil unit weight using a particle with a specific gravity of 2.7: γsub = (ρsoil - 1) γw

γw /γsub = γw / [(2.7-1) γw] = 1/1.7 = 0.588

Page 70: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Therefore: Δ dist.max ≤ 0.588ΔH

Pressure in Main Hm , (psi)

Pressure in Main, Hm , (feet)

Δ dist.max

(feet)150 346 204140 323 190130 300 176120 277 163110 254 149100 231 13690 208 12280 185 10970 161 9560 138 81

Remember that Co was introduced representing the coefficient relating pressure (and resulting speeds) of the water within the pipe and as it exits, then ΔH and Hm can be related by: ΔH = C2

oHm

Therefore, we can modify Equation 13 to:

i = (C2o Hm/Δdist) [Equation 16]

Evaluating particular site conditions we can specify soil characteristics based on soil type, including

angle of internal friction () and the coefficient of internal resistance tan() of the soil. Replacing

(ΔH) by (C2oHm) in Equation 14 and using coefficient of internal resistance tan() will give us the

maximum size in plan of the crater developed in the ground:

Δdist ≤ (γw /γsub) (C2

o Hm) (1-tan()); [Equation 17]

Equation 15 becomes:

Δdist ≤ (1 /1.7) [C2o (Hm)] (1-tan()); [Equation 18]

Based on the above Equations, Table 2 is a comparison of horizontal size of a crater, in feet. Due to the unpredictable shape and size of the pipe opening value of Co may vary from 0.6 to 0.9. The range of

internal friction angle () varies based upon soil types between 25° (softer soil) to 35° (stiffer soil). Intermediate values can be obtained by interpolating.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

54

Page 71: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Table 2. Size of the crater developed by water main burst

0.9 0.6 0.7

25 30 35 25 30 35 25 30 35

150 346 104 85 68 39 31 22 53 42 30140 323 97 79 63 36 29 21 50 39 28130 300 90 74 59 34 27 19 46 37 26120 277 83 68 54 31 25 18 43 34 24110 254 76 62 50 29 23 16 39 31 22100 231 69 57 45 26 21 15 35 28 2090 208 63 51 41 23 19 13 32 25 1880 185 56 45 36 21 17 12 28 22 1670 161 49 40 32 18 14 10 25 20 1460 138 42 34 27 16 12 9 21 17 12

Crater @ Average Co = Presusure Crater @ Co = Crater @ Co =

Hm

psiHm feet

Example: At Piney Meetinghouse Road/ Palantine Drive intersection, the existing 60” PCCP is under a HHG of 675 feet and the ground elevation = 390 feet, therefore, the pressure under HHG inside the 60” PCCP = (675 – 390) + 5). Therefore based on a specific gravity of 2.7 for rock (168 lb/ft3) = unit weight of rock), ΔH = 290 feet By using Approach 1 with a ΔH = 290 feet , with Co = 0.7 and using Equation 11:

MAX Dp horiz = 105 feet

Using Approach 2 with ΔH = 290 feet w/average = 30o and using Equation 18:

Δdist.max = 35 feet with Co = 0.7

√ The measurement of the crater at Piney Meetinghouse Road/ Palantine Drive water main burst showed 35-40 feet which is in the range of the calculated values.

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

55

Page 72: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

56

APPENDIX II. WSSC PIPELINE DESIGN MANUAL

Excerpts from Part Three, Sections 2 and 3

Page 73: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Part Three, Section 2. Rights of Way and Construction Strips COMMON DESIGN GUIDELINES

2. Rights of Way and Construction Strips.

a. General.

1) When a water or sewer pipeline(s) extends into property that is not publicly owned, show the limits of the right of

way and construction strip on the drawings, see the requirements listed in this section and in Appendix "D" (WSSC Survey and Right of Way Criteria). WSSC will review the widths of both the right of way and the construction strip for maintenance and constructability due to the depth and/or soil conditions and make any necessary changes to the widths.

2) After determining the limits of the right of way and construction strips and receiving concurrence from WSSC,

prepare the right of way documents.

b. Existing Pipeline Width Requirements.

1) The existing widths of right of ways shown/provided for existing large diameter pipelines (30-inch and larger) may be inadequate from both public safety and operation and maintenance perspectives. The most serious risks are posed in situations where occupied spaces are built within short distances of large diameter Pre-Stressed Concrete Cylinder Pipe (PCCP). PCCP fail catastrophically and result in serious public safety concerns. For any new development proposed within two hundred (200) feet of these pipelines, special considerations and modifications may be imposed.

c. Proposed Pipeline Width Requirements.

1) For right of way and construction strip minimum width requirements for water and sewer pipelines, see Tables

"20" and "21". WSSC may require an increase in the width of the right of way and/or construction strip, greater than those indicated in Tables "20" and "21".

2) Consider the construction and maintenance requirements when determining the required widths for the

construction strip(s) and the right of way.

a) Construction strip(s). Take into account the topography along the alignment, when determining the area necessary to construct the pipeline (i.e., steep side slopes which may require the contractor to bench an area to be able to construct the alignment, deep excavations, etc.). If additional area is required to construct the pipeline due to stockpiling material along the alignment, consider the following items: storing the pipe along the trench; stockpiling stone, gravel and/or select backfill, and excavated trench material; contractor's access along the alignment; trench width and equipment area; and the area along the trench for other construction equipment (i.e., front-end loader, etc.).

b) Right(s) of way. Take into account when determining the width of the right of way, the area required to

facilitate future maintenance, excavation, and repairs. Additional access points along the alignment may be required to facilitate the mobility of equipment and personnel.

1) Provide sufficient right of way to minimize the potential for personal injury to the public and/or significant

property damage caused by water or sewer pipeline breaks.

2008 C-2.1

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

57

Page 74: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Part Three, Section 2. Rights of Way and Construction Strips COMMON DESIGN GUIDELINES TABLE "20"

Right of Way and Construction Strip Minimum Width Requirements for Water Pipelines Pipeline Diameter Width of Right of Way Total Width of Construction Strips

14-inch and smaller

20 feet 15 feet

16-inch to 24-inch 25 feet 20 feet 30-inch 30 feet 20 feet

36-inch to 42-inch 40 feet To be determined by WSSC 48-inch to 66-inch 60 feet To be determined by WSSC 72-inch and larger 75 feet To be determined by WSSC

TABLE "21"

Right of Way and Construction Strip Minimum Width Requirements for Sewer Pipelines Pipeline Diameter Width of Right of Way Total Width of Construction Strips

Smaller than 15-inch

20 feet 20 feet

15-inch to 24-inch 45 feet 20 feet 30-inch to 36-inch 50 feet To be determined by WSSC 42-inch and larger 55 feet To be determined by WSSC

(For Right of Way widths for deep sewers, see information below) c). Right of Way for Deep Sewers

1) For requirements for Deep Sewers, see Part Two, Section 8 (Vertical Alignment (Profile).

2) For determining width of right of way for sewer pipelines over twenty-two (22) feet of cover, use the following: (a)For sewers 12-inch and smaller with depth greater than twenty (22) feet, multiply two (2) feet of right of

way width by each foot of cover pipeline depth. If Deep Sewer is sharing the right of way with another pipeline, see additional in this section.

Example: For a 12-inch diameter sewer pipeline with twenty (23) feet of cover:

2 (feet of right of way) times 23 (feet of cover) equals 46 feet. Total ROW width shall be 46 feet width.

(b) For sewers 15-inch and larger, with depth greater than 22 feet, multiply one (1) foot of right of way width from the edge of the right of way to the centerline of the deep sewer for each foot of cover pipeline depth. Also, see requirements for Location of Pipelines Within Rights of Way and Construction Strips

Example: For a 15-inch diameter sewer pipeline with twenty (23) feet of cover:

1 (feet of right of way) times 23 (feet of cover) equals 23 feet for both pipelines (new sewer and future relief sewer). Offset the sewer for future relief sewer, add minimum of 10 feet separation; Total ROW width shall be 56 feet width.

d. Location of Pipelines Within Rights of Way and Construction Strips.

1) One (1) pipeline within the right of way. Typically, locate one pipeline in the center of the right of way and

equally divide construction strip on both sides of the right of way, except for the following:

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

58

2008 C-2.2

Page 75: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Part Three, Section 3. Pipeline Crossings and Clearances COMMON DESIGN GUIDELINES 3. Pipeline Crossings and Clearances.

a. General.

1) When determining pipeline clearances, measure the distance between pipelines or utilities, from the outside diameter (OD) or edge of each pipe or utility unless otherwise noted.

2) When sewer pipelines (which include gravity sewers, small diameter pressure sewers, force mains, and SHCs) run

parallel or cross water pipelines and WHCs, special clearance/separation requirements are necessary to protect the water supply from contamination due to possible sewerage leaks. See Vertical Separation for Water Pipelines Crossing Sewer Pipelines, Horizontal Separation Between Water and Sewer Pipelines and Horizontal Separation Between WHCs and SHCs in this section.

b. Vertical Clearances for Pipeline or Utility Crossings.

1) Provide minimum of one (1) foot vertical clearance between two (2) pipelines or utilities.

2) When two (2) pipelines or utilities cross each other and are not perpendicular ninety (90) degrees check the

plotting of the entire pipeline or utility crossing in the vertical plane. In the profile, when the crossing is not perpendicular, the total length of the crossing may be greater than one (1) pipe diameter. The vertical clearance requirements may be several feet from the centerline of the two (2) pipelines or utilities. Sketch "AA" is an example of two pipelines, in which the required pipeline clearances are satisfied at the centerline of the two crossings, but the entire pipeline crossing does not meet the required pipe clearances, see the example below.

8" Sewer PipelineCrossing Angle = 45°

36" S

torm

Drai

nStation 2+00 Station 2+50

PLAN

36" Storm Drain (RCP)

8" Sewer @ 8.00%

Station 2+008" Sewer @ 36" Storm DrainInvert Elevation 208.76

L 36" Storm DrainInvert Elevation 210.80c

Requiredclearanceof 12"

PROFILE

SKETCH "AA"Clearances - Pipeline Crossing

Only 6" cle

ar

between 8" Sewer

and 36" Storm Drain

cL 36" Storm DrainInvert Elevation 210.80

8" Sewer @ Station 2+05Invert Elevation 209.00

SECTION

Example. 8-inch sewer at station 2+00 crosses a 36-inch storm drain at an angle of 45. At the centerline of the two pipelines, the design shows that the two pipelines have a 12-inch clearance, but at station 2+05 the two pipelines have only 6-inch of clearance. This is due to the slope of the two

2008 C-3.1

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

59

Page 76: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Washington Suburban Sanitary Commission 14501 Sweitzer Lane • Laurel, Maryland 20707-5902

Setback Recommendations Report

301-206-WSSC (9772) • 301-206-8000 • 1-800-828-6439 • TTY: 301-206-8325 • www.wsscwater.com

60

Part Three, Section 3. Pipeline Crossings and Clearances COMMON DESIGN GUIDELINES pipelines, see "Section" of Sketch "AA". To have the required pipe clearance at the centerline of the two pipelines, the clearance at station 2+00 will need to be at least two (2) feet so that the centerline crossing will have the required one (1) foot clearance over the entire pipeline crossing, see Sketch "AA".

3) The minimum vertical clearance for other jurisdiction's utilities, is governed by that utility (i.e., Colonial Pipeline requires a minimum of two (2) feet of vertical clearance).

c. Horizontal Separation With Other Utilities/Structures.

1) Provide a minimum of five (5) feet horizontal separation between water/sewer pipelines and other utilities and

structures (manholes, inlets, vaults, poles, etc.).

2) Provide the following minimum separation when a water/sewer pipeline is parallel or adjacent to existing or proposed buildings or dwellings:

a) For pipelines 12-inch and smaller in diameter, provide a minimum separation from a building or dwelling the

greater of the following: fifteen (15) feet horizontal separation or 1:1 slope from the bottom of the foundation of the existing or proposed building or dwelling to the bottom edge of the pipeline trench.

b) For pipelines larger than 12-inch diameter, the minimum separation from a building or dwelling is to be

determined based on the following factors: maintain a minimum horizontal separation of twenty-five (25) feet and consider potential property damage and physical injury during construction, maintenance and failure of the pipeline in assessing whether a greater separation is warranted. Select the separation so that the existing or proposed foundation of the building or dwelling will not be damaged during the construction, maintenance and failure of the pipeline.

c) For exceptions to the above, submit supporting documentation showing that the pipeline can be constructed and

maintained.

3) Minimum separation requirements between existing and proposed or relocated water pipelines, where the existing water line is to remain in service.

a) For pipelines 14-inch and smaller in diameter, provide a minimum of ten (10) feet separation centerline to

centerline of the two pipelines.

b) For pipelines 16-inch to 24-inch in diameter, provide a minimum of ten (10) feet separation OD to OD of the two pipelines.

c) For pipelines 30-inch and larger in diameter, provide a minimum of twenty (20) feet separation OD to OD of the

two pipelines. d) Horizontal separation between the existing and proposed pipelines may have to be increased when the pipeline

is within the zone of influence of existing concrete blocking. To determine if there is adequate passive soil resistance, see Passive Soil Pressure for Concrete Thrust Blocks in Part Three, Section 27 (Thrust Restraint Design for Buried Piping).

2008 C-3.2

Page 77: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Treatise on Water Jet Force and Kinetic Energy 

Others have developed analysis and a report determining that, based upon the resulting crater 

size and debris throw distance from a transmission main break, the setback distance from these 

mains should be 80 feet.   A question regarding any resulting reduction  in adverse affect from 

doing  this  has  resulted  in  this  effort.    This  document  provides  a  brief  examination  of  the 

reduction of energy and  force of water  from a broken water main as a  function of distance 

away from the break.  This shows derivations for and results of a supporting spread sheet.  The 

tables and graphs below summarize results portrayed in that spread sheet where more detailed 

results can be found. 

 

 

The drawing above attempts to portray a water main break and the resulting water jet moving along a 

path that includes a structure before the jet terminates at the surface of the earth.  

 

Kinetic Energy: 

Let’s begin by looking quickly at the energy involve in a water main break.  Kinetic energy is the energy 

associated with motion.  The water jet is definitely moving so we begin by looking at kinetic energy. 

Ek = 1/2mv2   Energy is directly proportional to V2 and any energy reduction will also 

be directional proportional to any reduction in V2 

Page 78: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Looking at the reduction of energy as a function of the setback distance away from the break in the pipe 

yielded a summary table and associated graph as below: 

Setback Distance    

(feet) 

Average Amount of 

Energy Reduction        

(in %) 

Setback Distance    

(feet) 

Average Amount of 

Energy Reduction        

(in %) 

25  20  60  38.4 

30  23.3  65  40.2 

35  26.4  70  41.7 

40  29.3  80  44 

45  31.9  90  45.3 

50  34.3  100  45.8 

55  36.5  110  45.4 

 

 

 

 

One can see from the graph above that the gain in energy reduction starts to lose effectiveness after the 

setback extends beyond 80 to 90 feet. 

Page 79: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Force: 

Water striking a structure results in an impulse to that structure as designated below. 

Force will be directly proportional to the velocity component of

momentum, thus the reduction in force will also be directly 

proportional to the veloci

 

ty (or speed) 

Looking at the reduction of applied force as a function of the setback distance away from the break in 

the pipe yielded a summary table and associated graph as below: 

Setback Distance    

(feet) 

Average Amount of 

Force Reduction          

(in %) 

Setback Distance    

(feet) 

Average Amount of 

Force Reduction          

(in %) 

25  10.6  70  23.7 

30  12.5  80  25.2 

35  14.3  90  26.1 

40  16  100  26.4 

45  17.6  110  26.2 

50  19.1     

60  21.7     

 

Looking at the graph above portraying force reduction one can again see that the percent reduction of 

the force becomes less effective with setbacks beyond 80 feet. 

Page 80: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

 

 

Alternate  

Jet Rebound(s) 

Vm x component 

 

 

 

 

 

 

 

 

Continuing the  look at force using the  impulse equation shown above,  it can be derived that the Force 

from the water jet striking the structure is the time rate of change of the momentum of the water as it 

strikes the structure. 

The drawing above shows the horizontal component of the water  jet striking a structure (blue arrow).  

The other colored arrows show potential rebound directions and θ  is the angle of that rebound to the 

horizontal.   First  look at the result when θ  is 90˚ or when the water does not rebound away at all and 

runs along the structure vertically.  This will be the case where the force is least.  Note the symbol θ is 

again used (before to represent the angle of the water  jet  leaving the break) this time as the rebound 

angle noted in this paragraph. 

Mass of water, m, is constant 

     ax = 0, dv/dt = 0 

F = m (Vm – Vm’)         Vm’ along x axis goes to zero as water is diverted up and down along structure 

F = mVm              m is mass of the water 

F = ρQVm                           ρ is the density of water in lbm (so g will need to be introduced to get lbf), Q is the 

flow rate of the water of the jet   

F = ρVmAVm                            A is the cross sectional area of the water jet striking the structure 

F/A = ρVm2        

Page 81: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

To Calculate Vm 

From Appendix I,   Vw =    = (2gHw)1/2 

  Vm = Co        Assume Co = 0.7 

          Or 

  Vm = Co (2gHw)1/2 

 

Vm = Vmcosθî + VmsinθĴ                          S = So +Vmcosθt 

V m(t) = Vmcosθî + (Vmsinθ – gt)Ĵ           t = S/Vmcosθ            t is time to travel horizontal distance S 

               So 

 Vm(t)   = ((Vmcosθ)2  + (Vmsinθ – gt)

2)1/2 

      = (Vm2cos2θ + Vm

2sin2θ – 2Vmsinθgt + g2t2)1/2 

And substituting for t to travel distance S 

  Vm(s)  = (Vm2(sin2θ + cos2θ) – 2VmsinθgS/Vmcosθ +g

2S2/Vm2cos2θ)1/2 

           = (Vm2 – 2gtanθS + g2S2/Vm

2cos2θ)1/2 

When θ = 45˚ as the optimum angle of the water jet yielding the maximum distance from the break that 

water will travel.  Here this angle θ refers to the angle of the water jet exiting the broken pipe. 

sinθ = cosθ = 0.707 and tanθ = 1 and so, 

Vm(s) = (Vm2 – 2gS +32.22S2/.7072Vm

2)1/2 

 

So for the best case (lowest force) the results can be summarized in the table below and subsequent 

graph (this is when the water does not rebound – θ = 90˚): 

Setback 

Distance 

(feet) 

25  40  50  60  70  80  90  100  110 

Force 

(K/SF) 

6.03  5.38  5.01  4.70  4.45  4.25  4.11  4.03  4.00 

Page 82: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

 

A quick review of  the graph shows  that the value where the plot begins to approach an asymptote is 

just after 80 feet. 

 

The force will actually be larger when water rebounds from the structure as portrayed above by the red 

and green arrows.  For those cases it can be shown that the equation derived above changes slightly to: 

Vm(s) = (Vm2 – 2gS +32.22S2/.7072Vm

2)1/2 (1 + cosθ),  this θ is the rebound angle to the horizontal. 

 

In the case where θ = 30˚, the results are summarized below: 

Setback 

Distance 

(feet) 

25  40  50  60  70  80  90  100  110 

Force 

(K/SF) 

11.26  10.03  9.35  8.77  8.3  7.93  7.67  7.52  7.47 

 

Page 83: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

 

And though with this less optimal case (more force) the asymptote is shifting slightly to the right, the 80 

feet setback is still a pretty good figure to use. 

 

 

Summary: 

One  sees a  common  trait when  looking at all of  the graphs above, whether percent energy, or  force 

reduction,  versus  setback  distance  or  a  look  at  the  values  of  the  forces  themselves  versus  setback 

distance.   At greater than 80 feet setbacks, there  is  little to be gained by way of reduction of adverse 

effects.   That  they all consistently point  to  this should not be surprising.   By  looking at  the equations 

governing these phenomena one can see they are indeed directly related – in fact energy and force are 

two ways physicists utilize to describe the same physical phenomenon that they experience.  But in this 

case it is comforting to see the consistency and it provides some corroboration that an 80 feet setback is 

a  good  figure.    To make  it  larger would  not  gain much.    To make  it  smaller would  run  afoul  of  the 

analysis described in the earlier work. 

 

Page 84: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Part Three, Section 2. Rights of Way and Construction Strips COMMON DESIGN GUIDELINES

2. Rights of Way and Construction Strips. Changes to this Section are as follows: b. DELETE in its entirety. “Existing Pipeline Width Requirements.”

b. Existing Pipeline Width Requirements.

1) The existing widths of right of ways shown/provided for existing large diameter

pipelines (30-inch and larger) may be inadequate from both public safety and operation and maintenance perspectives. The most serious risks are posed in situations where occupied spaces are built within short distances of large diameter Pre-Stressed Concrete Cylinder Pipe (PCCP). PCCP fail catastrophically and result in serious public safety concerns. For any new development proposed within two hundred (200) feet of these pipelines, special considerations and modifications may be imposed.

2011 C-2.1

Page 85: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Part Three, Section 3. Pipeline Crossings and Clearances COMMON DESIGN GUIDELINES

3. Pipeline Crossings and Clearances.

Changes to this Section are as follows:

c. Horizontal Separation With Other Utilities/Structures.

2) Provide the following minimum separation when a water/sewer pipeline is parallel or adjacent to existing or proposed buildings or dwellings:

a) Water Pipelines.

(1) For water pipelines 12-inch and smaller in diameter, provide a minimum separation from a

building or dwelling the greater of the following: fifteen (15) feet horizontal separation or 1:1 slope from the bottom of the foundation of the existing or proposed building or dwelling to the bottom edge of the pipeline trench.

(2) For water pipelines larger than 12-inch diameter, but less than 36-inch diameter if PCCP or

cast iron pipe, the minimum separation from a building or dwelling is to be determined based on the following factors: maintain a minimum horizontal separation of twenty-five (25) feet and consider separation required for construction and maintenance and potential structural damage and personal injury during a potential failure of the pipeline in assessing whether a greater separation is warranted. Select the separation so that the existing or proposed foundation of the building or dwelling will not be structurally damaged during the construction, maintenance, or potential failure of the pipeline.

(3) For PCCP or cast iron water pipelines with a 36-inch diameter or larger, WSSC studies have indicated that damage from a catastrophic failure can extend in excess of eighty (80) feet beyond the pipeline. A minimum horizontal separation of eighty (80) feet from a building or dwelling is required. Developments with buildings, building foundations or building slabs proposed less than 80 feet from the edge of the large diameter water main shall be required to submit structural and soil calculations, signed and sealed by a registered Maryland professional engineer, which verify the integrity of structures located within 80 feet of the large diameter water main in the event of a water main failure. This requirement does not apply to:

(a) redevelopment of existing of existing buildings, which can retain the existing setback

distance; or,

(b) infill development (development that takes place on vacant or underutilized parcels within an urban area) of less than 40 acres of property located within a high density residential, mixed use, commercial, industrial, land use area as designated by the local zoning map

(a) Should the designer/applicant propose a separation of less than eighty (80) feet, the

diminished separation must be mitigated through use of structural enhancements, building material selections rated to withstand a potential pipeline failure or other site-specific engineering solutions approved by WSSC Technical Services Group Leader using the below review process.

2012 C-3.2

Page 86: WSSC Pipeline Design Manual Amendment Proposed 80-Foot

Part Three, Section 3. Pipeline Crossings and Clearances COMMON DESIGN GUIDELINES

[1] The designer must develop an appropriate solution to ensure that a building or dwelling foundation will not be structurally damaged in the event of a pipeline failure and that the public is not subject to significant risk. Adequate documentation, including, but not limited to, diagrams, calculations and/or drawings, must be provided to support a deviation of the required horizontal separation. All such documentations must be sealed, dated, and signed by a Professional Engineer registered in the State of Maryland. If, after review and a written decision issued by the WSSC Technical Services Group Leader, the proposed engineering solution is denied, the designer/applicant may appeal the denial to the Chief Engineer within fifteen days of the date of the written denial. The appeal will be handled as an adjudicatory hearing pursuant to WSSC Standard Procedure L-07-02.

b) Sewer Pipelines.

(1) For sewer pipelines 12-inch and smaller in diameter, provide a minimum separation from a

building or dwelling the greater of the following: fifteen (15) feet horizontal separation or 1:1 slope from the bottom of the foundation of the existing or proposed building or dwelling to the bottom edge of the pipeline trench.

(2) For sewer pipelines larger than 12-inch diameter, the minimum separation from a building or

dwelling is to be determined based on the following factors: maintain a minimum horizontal separation of twenty-five (25) feet and consider separation required for construction and maintenance and potential structural damage and personal injury during a potential failure of the pipeline in assessing whether a greater separation is warranted. Select the separation so that the existing or proposed foundation of the building or dwelling will not be structurally damaged during the construction, maintenance, or potential failure of the pipeline.

2012 C-3.3