WTT NETWORK CONFIGURATION

GOVERNANCE (L1-CHE-MAN-010)

Page 2: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

WTT NETWORK CONFIGURATION GOVERNANCE

L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 2 of 12

Approval

Name Position Signature

Document Author Bryan Piercy

Configuration Management

Specialist

Document Endorser/s

Lambros Lambropoulos

Process & Interface Manager

Ron Bria Director of Operations

Todd Bentley Director of

Safety/Environment & Risk

Paul O’Halloran Director of Engineering

Approving Manager

Phil Ellingworth Chief Engineer

Amendment Record

Approval Date Version Description

31/03/2017 1 Initial release under MTM Engineering. This release supersedes WTT Addenda System Description Operations dated Dec 2013.

Page 3: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 3 of 12

Table of Contents [NC 0] GOVERNANCE ............................................................................................................................................ 4

0.1 PURPOSE .................................................................................................................................................... 4 0.2 SCOPE ......................................................................................................................................................... 4 0.3 ACRONYMS ................................................................................................................................................. 4 0.4 DEFINITIONS ............................................................................................................................................... 4 0.5 REFERENCES AND LEGISLATION ........................................................................................................... 5 0.6 DOCUMENT MANAGEMENT ...................................................................................................................... 5 0.7 RELATED DOCUMENTS ............................................................................................................................. 5 0.8 DOCUMENT AUTHORISATION .................................................................................................................. 6 0.9 RESPONSIBILITY MATRIX ......................................................................................................................... 6 0.10 CONFIGURATION & CHANGE MANAGEMENT ........................................................................................ 9 0.11 NETWORK CONFIGURATION CHANGE NOTICE..................................................................................... 9 0.12 SAFEWORKING CIRCULAR ....................................................................................................................... 9 0.13 WEEKLY OPERATIONAL NOTICE ........................................................................................................... 10

List of Tables Table 1 – Responsibility Matrix for WTT Network Configuration .................................................................................. 7

List of Figures Figure 1 – WTT Network Configuration – Document Management [Governance] ....................................................... 5 Figure 2 – WTT Network Configuration Control Process Map ................................................................................... 11

Page 4: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 4 of 12

[NC 0] GOVERNANCE

0.1 PURPOSE

The WTT Network Configuration documentation, formerly System Description [WTT Addenda], detail the operational specifications of the Melbourne metropolitan trains network in respect to lease boundaries, engineering specifications, rolling stock/infrastructure assets and approved Third Party operators.

The Melbourne Metropolitan Train Franchise Agreement specifies ownership of lease operation for Metro across the defined Melbourne metropolitan trains network within Victoria, Australia.

This document contains the governance responsibilities and processes for the management of the WTT Network Configuration suite of documents.

0.2 SCOPE

The WTT Network Configuration documents are applicable to Metro trains operator, V/Line trains operator, Public Transport Victoria, Third Party organisations and contractors that use the Melbourne metropolitan trains network as defined within the Metro Trains Franchise Agreement.

0.3 ACRONYMS

Generic acronyms used throughout the body of this document are inclusive of the below:

NC Network Configuration

WTT Working Timetable

PTV Public Transport Victoria

CM Configuration Management

MTM Metro Trains Melbourne

EC Engineering Change

SW Safeworking

WON Weekly Operational Notice

ARTO Accredited Rail Transport Organisation

RS Rolling Stock

0.4 DEFINITIONS

In the context of the WTT Network Configuration suite of documents, the following applies:

the use of “shall” conveys mandatory compliance.

the use of “should” conveys required compliance except for justifiable reasons.

the use of “may” conveys optional compliance.

Page 5: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 5 of 12

0.5 REFERENCES AND LEGISLATION

Rail Safety National Law Application Act 19th May 2014

Melbourne Metropolitan Train Franchise Agreement – 2009

Book of Rules and Operating Procedures – 1994

0.6 RELATED DOCUMENTS

Metro Operations – Working Timetable (Operational Planning).

0.7 DOCUMENT MANAGEMENT

Where a separate procedure is referenced, the contents of that procedure shall take precedence over this document.

WTT Network Configuration - Governance is one of the eight documents forming the WTT Network Configuration suite of documents as highlighted below.

For more information refer to Figure 2 – WTT Network Configuration Process Map on page 11 of this document.

Figure 1 – WTT Network Configuration – Document Management [Governance]

Page 6: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 6 of 12

0.8 DOCUMENT AUTHORISATION

The approval of this document applies to the baseline release and subsequent updates of the following associated documents. A cross reference indicates that it may be necessary to jointly refer to more than one document in this suite of documents.

[NC 0] L1-CHE-MAN-010 WTT Network Configuration - Governance

[NC 1] L1-CHE-MAN-011 WTT Network Configuration - System Requirements

[NC 2] L1-CHE-MAN-012 WTT Network Configuration - Network Boundaries

[NC 3] L1-CHE-MAN-013 WTT Network Configuration - Line Description

[NC 4] L1-CHE-MAN-014 WTT Network Configuration - Line Speeds

[NC 5] L1-CHE-MAN-015 WTT Network Configuration - Ruling Grade Loads

[NC 6] L1-CHE-MAN-016 WTT Network Configuration - Metro Rolling Stock

[NC 7] L1-CHE-MAN-017 WTT Network Configuration - Third Party Rolling Stock

The approval also authorises the management of subordinate documents L1-CHE-MAN-011 to L1-CHE-MAN-017 in accordance with the responsibility matrix shown on pages 7 and 8 and the configuration control process shown on page 11 of this document.

0.9 RESPONSIBILITY MATRIX

The responsibility matrix on the following pages lists the responsible and accountable department representative for each subordinate document. The source documentation used to populate the contents contained within the subordinate documents are maintained and controlled by the responsible department representative.

The role of the responsible department representative is to maintain and control the source data set(s) for their area of responsibility. They are the point of contact for enquiries relating to the data set. They co-sign the NC Change Notice form, confirming that the proposed change data description is correct, and update the register containing the data set.

The accountable department representative maintains overall technical authority for any change and currency of the supporting data set through delegation by the Chief Engineer. They also co-sign the NC Change Notice approving the implementation of the proposed change into the associated master WTT Network Configuration section.

Page 7: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L0-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 7 of 12

WTT Network Configuration – Responsibility Matrix

System Requirements [NC 1] – Responsible for technical engineering verification of system operating requirements of the Melbourne metropolitan rail network – Including: train speeds, vehicle axle loading limits, trailing loads, vehicle loading profiles, communications, and heritage vehicle operational restrictions.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

System Requirements Train speeds/vehicle axle loading limits/trailing loads/vehicle loading profile/communications/heritage vehicles

Process & Interface Manager Chief Engineer

Network Boundaries [NC 2] - Responsible for verification for the network boundaries of the Melbourne metropolitan rail network and interfacing network boundaries, in accordance with the Franchise Agreement.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Network Boundaries/Interfaces MTM Franchise rail network boundary/interfacing network boundaries Safety Interface Co-ordinator Manager – Network Safety

Line Description [NC 3] – Responsible for technical engineering verification for the line descriptions of the Melbourne metropolitan rail network – Including: location, platform lengths, siding lengths, bridges, crossings, etc.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Line Description (Track & Structures) Tracks/platform lengths/siding lengths/bridges/crossings

Track & Structures Design & Review Manager

Head of Engineering – Track & Structures

Line Description (Signalling Operations) Signal Box locations/signalling types Manager – Operations Network Signalling General Manager Network Operations

Line Description (Safe Working Systems/Signals) Signalling system Signalling Design & Review Manager Head of Engineering - Signals

Table 1 – Responsibility Matrix for WTT Network Configuration

Page 8: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L0-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 8 of 12

WTT Network Configuration – Responsibility Matrix

Line Speeds [NC 4] – Responsible for technical engineering verification for the track maximum line speeds on the Melbourne metropolitan rail network.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Network Line Speeds Track maximum line speeds

Track & Structures Design & Review Manager

Head of Engineering – Track & Structures

Signalling Design & Review Manager Head of Engineering – Signals

Ruling Grade Loads [NC 5] – Responsible for technical engineering verification of the ruling grade loads authorised to run on the Melbourne metropolitan rail network.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Network Ruling Grade Loads Track maximum gradients Track & Structures Design & Review Manager

Head of Engineering – Track & Structures

Network trailing load per Rolling Stock Rolling stock maximum trailing loads Senior Mechanical Engineer Head of Engineering – Rolling Stock

Metro Rolling Stock [NC 6] – Responsible of technical engineering verification of the Metro operated rolling stock fleet authorised to run on the Melbourne metro rail network.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Metro Rolling Stock

Metro fleet specs (class/description of vehicle/max speed/mass rating/passenger seating/length of vehicle/restrictions)

EMU - Planning Manager Head of Engineering – Rolling Stock

Non EMU – Senior Mechanical Engineer

Third Party Rolling Stock [NC 7] – Responsible for verification/update of the Third Party rolling stock authorised to run on the Melbourne metropolitan rail network.

SECTION CONFIGURATION ITEM (CI) RESPONSIBLE ACCOUNTABLE

Third Party Rolling Stock

Third party fleet specs (class/description of vehicle/max speed/mass rating/passenger seating/length of vehicle/restrictions)

Configuration Management Specialist Process & Interface Manager

Table 1 – Responsibility Matrix for WTT Network Configuration (cont.)

Page 9: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 9 of 12

0.10 CONFIGURATION & CHANGE MANAGEMENT

The WTT Network Configuration Control Process Map (Figure 2) depicts the formal change management and configuration control of the WTT Network Configuration documentation. A change to WTT Network Configuration – Governance, is achieved by following the MTM Management of Change procedure (L1-SQE-PRO-001), which will require the release of a new document version. Such changes relate to the business requirements, responsibilities and document management process of the suite of the WTT Network Configuration documents.

The change mechanism for each subordinate document, however, is via formal Engineering Change procedure when the change event impacts on the franchise operations of the Melbourne metropolitan trains network regarding network boundaries, line description, line speeds, ruling grade loads, and Metro rolling stock. A change to the aforementioned aspects of the WTT Network Configuration documents prompts the requirement of a Network Configuration (NC) Change Notice. The NC Change Notice (L4-CHE-FOR-049) is the interface between the engineering change event and a formally issued Safeworking (SW) Circular.

The NC Change Notice is created by the Engineering Change Coordinator and signed off by the responsible department representative. The change events are tracked through the release of SW Circulars. These approved changes will be incorporated into the applicable subordinate documents as SW Circulars are issued to continually provide the most up-to-date release of each document.

Third Party rolling stock is separately managed through a joint V/Line and Metro registration procedure. The NC Change Notice and SW Circular are then utilised for the formal update of the rolling stock document.

For tracking and referencing purposes, the SW circular number, date and title will be recorded under the WTT NC – Circular Record Index of applicable subordinate documents.

Refer to Figure 2 – WTT Network Configuration Control Process Map on page 11 and accompanying notes on page 12 of this document for detailed steps to the configuration control process.

0.11 NETWORK CONFIGURATION CHANGE NOTICE

The Network Configuration (NC) Change Notice is a formal notice to communicate the proposed change to the WTT Network Configuration to Metro Rail Safety, for publication of a Safeworking (SW) Circular. The NC Change Notice details a change to the Melbourne metropolitan trains network and also contains the endorsement and authority of the accountable department representative. An NC Change Notice is required if a change affects any aspect of the operational configuration of the Metro network captured within the WTT Network Configuration documents.

NOTE A NC Change Notice and/or SW Circular are not the formal change vehicle. This is effective through formal authorisation by applicable Management of Change (MoC) , Engineering Change (EC) or Third Party Rolling Stock Registration approval.*

0.12 SAFEWORKING CIRCULAR

A Safeworking (SW) Circular is a change notice formally released by Metro Rail Safety which provides the authorisation for the change to be implemented into the applicable documents of the WTT Network Configuration. This will be formulated on advice of the NC Change Notice. The SW Circular will include the reference number of the original change event which could be in the form of an Engineering Change or a Third Party Rolling Stock registration. The SW Circular also communicates to all necessary stakeholders via email any permanent operational variations or short term changes to the Melbourne metropolitan trains network and the effective implementation date.

NOTE A SW Circular is released in compliance with the Rail Safety Act and Metro’s Franchise Agreement responsibilities.

Page 10: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 10 of 12

0.13 WEEKLY OPERATIONAL NOTICE

The Weekly Operational Notice (WON) is a general communication to all Metro stakeholders regarding various operational timetable changes, maintenance works, temporary restriction notices, track warnings, new rolling stock, signalling box de-commissions etc.

These WONs, produced by Metro Rail Safety, aims to capture and compile all issued circulars of the week into one notice to ensure all stakeholders are aware of alterations, temporary or permanent alike, to the network.

NOTE A WON may communicate changes to the WTT Network Configuration as applicable to various stakeholders but the changes communicated will be extractions from formally released SW Circulars.

Page 11: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 11 of 12

Figure 2 – WTT Network Configuration Control Process Map

Page 12: WTT NETWORK CONFIGURATION GOVERNANCE - … NETWORK CONFIGURATION GOVERNANCE L1-CHE-MAN-010 Version: 1 Effective from: 31st March 2017 Document Number: L 1-CHE-MAN-010 Document Name:

Document Number: L1-CHE-MAN-010 Document Name: WTT Network Configuration - Governance Approving Managers: Chief Engineer Effective Date: 31/03/2017

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION [NC 0] Page 12 of 12

WTT Network Configuration Control Process – Steps & Definitions

NOTE#1 – WTT Network Configuration – Governance is the overarching document that defines the scope, document management, responsibilities, configuration control and change management. L1-CHE-MAN-010 contains the sign off authority for the contents of the suite of subordinate documents in respect to the engineering standards, rolling stock and infrastructure assets as defined within [NOTE #4].

NOTE#2 – Proposed change events are major changes to the scope/business requirements/responsibilities/industry requirements – the L1-CHE-MAN-010 document will be rarely subject to new revision and will require a MoC as the change vehicle.

NOTE#3 – Management of Change – Refer to L1-SQE-PRO-001.

NOTE#4 – The suite of WTT Network Configuration documents that sit under the L1-CHE-MAN-010 WTT Network Configuration - Governance include L1-CHE-MAN-011 to L1-CHE-MAN-017. These documents are subject to modification through Engineering Change [See Note #5]. Third Party Rolling Stock modifications follow a separate process – Refer to [NOTE #6]. Sign off authority will be in accordance with those identified within the Responsibility Matrix of L1-CHE-MAN-010.

NOTE#5 – Engineering Change – Refer to L1-CHE-PRO-031.

NOTE#6 – Third Party Rolling Stock Registration Procedure – Refer to L1-CHE-PRO-006.

NOTE#7 – NC Change Notice – OCE – Process & Interface will provide an NC Change Notice to Metro Rail Safety which communicates to the business and key stakeholders that a change to the Melbourne metropolitan network has been approved/authorised to occur. It details the group/line/discipline/area/fleet affected and the necessary change to be updated within the documents of the WTT Network Configuration (as applicable).

NOTE#8 – SW Circular – Metro Rail Safety will incorporate the NC Change Notice into a SW Circular and release the SW Circular to the business to communicate the WTT Network Configuration change to all necessary stakeholders. This will also be included in the WONs (Weekly Operating Notices).

NOTE#9 - An authorised Engineering Change affecting the WTT Network Configuration will prompt: (a) a release of a SW Circular and (b) an update of the WTT Network Configuration - L1-CHE-MAN-011 to L1-CHE-MAN-016 documents as applicable. (Including updating the Circular Record Index with the circular reference number and create a new release of the affected document from the ‘effective from date’).

NOTE#10 - An authorised Third Party Rolling Stock Registration will prompt: (a) a release of a SW Circular and (b) an update of the WTT Network Configuration – L1-CHE-MAN-017 document as applicable. (Including updating the Circular Record Index with the circular reference number and create a new release of the affected document from the ‘effective from date’).