Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Tab C.1.18
Waste Water Treatment System TAB
C.1.18.1 Introduction ...........................................................................................................C.1.18.1
C.1.18.1.1 General C.1.18.1.2 Purpose
C.1.18.1.3 Reference C.1.18.1.4 Description
C.1.18.1.5 Outline
C.1.18.1.6 Description of Equipment
C.1.18.2 Operation.................................................................................................................C.1.18.2
C.1.18.2.1 Start Up
C.1.18.2.2 Normal Operation
C.1.18.2.3 Shut Down
C.1.18.2.4 Instrument Set Point List
C.1.18.3 Drawings..................................................................................................................C.1.18.3
C.1.18.4 Electrical Cross Reference List .............................................................................C.1.18.4
C.1.18.5 Instrument Cross Reference List...........................................................................C.1.18.5
C.1.18.6 Valves Cross Reference List...................................................................................C.1.18.6
C.1.18.6.1 Automatic Valve Cross Reference List C.1.18.6.2 Manual Valve Cross Reference List C.1.18.6.3 Piping Specialty Cross Reference List
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Waste Water Treatment System
C.1.18.1 Introduction
C.1.18.1.1 General
This operation and maintenance manual provides a brief description of the waste water treatment system.
Operation and maintenance personnel should follow the guidelines specified in the vendor supplied
information.
C.1.18.1.2 Purpose
This manual is intended to familiarize O&M personnel with the waste water system and assist O&M
Company in developing detailed operating instructions. All maintenance activities referred to in the
vendor information are to be conducted by suitably qualified and experienced plant technicians or by
equipment manufacturer supplied technicians.
C.1.18.1.3 Reference
N/A
C.1.18.1.4 Description
C.1.18.1.4.1 Components
Cross Ref. No.
• Two (2) Oily water transfer pump (C.2.6)
• One (1) CPI Oil Separator (C.2.6)
• One (1) Portable Oil skimmer (C.2.6)
• One (1) Oil holding tank (C.2.6)
• One (1) Oil sludge storage tank (C.2.6)
• Two (2) Portable Waste Oil transfer Pump (C.2.6)
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
• Two (2) Effluent Pump (C.2.6)
• Two (2) Air blowers (C.2.6)
• One (1) HCl Dosing Tank (C.2.6)
• One (1) NaOH Dosing Tank w/electric heater (C.2.6)
• Two (2) HCl dosing Pump (C.2.6)
• Two (2) NaOH dosing Pump (C.2.6)
• One (1) Waste water discharge Pump (C.2.6)
• One (1) Fume Scrubber (C.2.6)
• One (1) Self priming Tank. (C.2.6)
• Two (2) Blowdown sump pumps for each Block (C.2.12.8)
• Two (2) Chlorination area sump pump (C.2.12.8)
• Two (2) Evaporative cooler blown sump pumps for each Block (C.2.12.8)
• One (1) Aqueous ammonia sump pump (C.2.12.8)
• Two (2) Seawater pump area sump pump (C.2.12.8)
• Two (2) Water treatment sump pumps (C.2.12.8)
• One (1) Chemical dosing package drain sump pump for each Block (C.2.12.8)
• Four (4) Compound tank sump pumps for #1 ~ #4 Block (C.2.12.8)
• Two (2) Fuel oil unloading area sump pump (C.2.12.8)
• Four (4) Steam turbine generator area sump pumps (C.2.12.8)
• Twelve (12) HRSG area sump pumps for sump pumps (C.2.12.8)
• One (1) Warehouse and workshop building sump pump (C.2.12.8)
• One (1) BSDG building sump pump (C.2.12.8)
• One (1) Sea water intake area TR sump pump (C.2.12.8)
• One (1) Fuel gas compressor area TR sump pump (C.2.12.8)
• Two (2) Portable submergible type pumps for general service (C.2.12.9)
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
• Four (4) Sewage sump pump for power block #1~#4 (C.2.12.9)
• One (1) Sewage sump pump 380Kv GIS building (C.2.12.9)
• One (1) Sewage sump pump administration building (C.2.12.9)
• One (1) Sewage sump pump fire truck building (C.2.12.9)
• One (1) Sewage sump pump warehouse & workshop building (C.2.12.9)
• One (1) Sewage sump pump central control building (C.2.12.9)
• One (1) Sewage sump pump water treatment building (C.2.12.9)
• One (1) Sewage sump pump Elec. Chlorination building (C.2.12.9)
• One (1) Sewage sump pump for security control building (C.2.12.9)
• Three (3) spare pumps for sewage sump (C.2.12.9)
C.1.18.1.5 Outline
The purpose of Wastewater treatment system is to treat all wastewater, chemical waste water, oily water,
sanitary waste water and contaminated storm water discharges from the Plant by suitable facilities to meet
the effluent discharge limits of RCER 2004.
The waste water treatment systems shall include the following:
• Industrial wastewater collection and treatment system
• Storm water collection and treatment system
• Sanitary wastewater collection and treatment system
Industrial Wastewater
The Plant will not discharge industrial waste water to the Industrial Wastewater Treatment Plant (IWTP)
of Central Treatment Facilities directly if it exceeds the acceptable limit by wastewater pre-treatment
standards (RCER 2004, Table 3B) at the point of discharge from Plant.
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Industrial wastewater treatment system is to treat all the wastewater including oily water and chemical
wastewater delivered from Plant to meet discharge limit before transport to the Industrial Wastewater
Treatment Plant (IWTP).
All drains possibly polluted by oil are collected in oily water collecting basin. With the support of
portable oil skimmer the oil layer is removed from the water. The effluent from oily water collecting
basin (API) is pumped by oily water transfer pump to the CPI oil separator. The waste oil and oil sludge
generated from oily water treatment system is corrected to the oil holding tank or oil sludge tank and
disposed of at the Royal Commission approved waste treatment/disposal facilities. Treated oily water by
CPI oil separator is discharged to waste water control basin.
The industrial wastewater from HRSG blowdown, GT evaporative cooler blowdown, Regeneration
wastewater of demineralization, Drains of chlorination system, drains from aqueous ammonia system and
drains from chemical dosing package and sampling system are transferred on demand by pumps to each
block HRSG blowdown sump.
The collected waste water shall be re-circulated / neutralized by HCl or NaOH dosing with mixing ejector
and effluent pump.
After completion of pH adjustment, the neutralized water will be discharged by the effluent pumps to the
Central Treatment Facilities (IWTP) by effluent pumps.
A holding pond will be provided to retain three days (72 hours) of treated waste water.
The ponds are normally kept empty to provide containment for emergencies and to minimize fugitive
emissions.
Storm water
Storm water management system will be provided to collect the first flush storm water from industrial
process areas and hazardous material storage and handling areas. The first flush will be considered to be
the first 30mm of rainfall from each storm event.
Sanitary wastewater
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
All sanitary wastewater produced in the Plant will be transported to the Sanitary Waste Treatment Plant
(SWTP) via sewer according to RCER 2004, Section 3.7.
But the following chemical wastewater generated during the maintenance period is transferred to a tank
truck for final disposal without any treatment in the plant.
• GT compressor washing wastewater
• HRSG chemical cleaning wastewater
C.1.18.1.6 Description of Equipment
The specifications of the major components are as follows;
Oily water collecting basin
Tag Numbers 100-WW-A-TK-03
Type Rectangular, Underground
Rated Capacity 150 m3
Dimension 5.3 m(W) x 16 m(L) x 2 m(H)
Oily water transfer pump
Tag Numbers 100-WW-M-PP-05-A/B
Type Centrifugal, Horizontal
Material Impeller: A743 CF8M / Casing: A743 CF8M
Quantity 2 x 100%
Rated Capacity 15 m3/hr
Discharge Pressure 1.5 barg
Motor Data 2.2 kW
CPI Oil separator
Tag Numbers 100-WW-M-OS-01
Type CPI
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Material Body: A283C(SS400) / Frame: A36(SS400)
Quantity 1 x 100%
Rated Capacity 15 m3/hr
Portable oil skimmer
Tag Numbers 100-WW-M-OS-02
Type Floating
Material Body: A240-304(STS 304)
Frame: A276M-304(STS 304)
Quantity 1 x 100%
Rated Capacity 5 m3/hr
Oil holding tank
Tag Numbers 100-WW-M-TK-02
Type Vertical, Cylindrical
Material A283-C
Quantity 1 x 100%
Capacity 10 m3
Dimension 2.4 m(D) x 2.5 m(H)
Elec. Heater 5 kW
Oil sludge storage tank
Tag Numbers 100-WW-M-TK-01
Type Vertical, Cylindrical
Material A283-C
Quantity 1 x 100%
Capacity 5 m3
Dimension 1.75 m(D) x 2.5 m(H)
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Portable waste oil transfer pump
Tag Numbers 100-WW-M-PP-06-A/B
Type Centrifugal, Horizontal
Material Impeller: A743 CF8M / Casing: A743 CF8M
Quantity 2 x 100%
Rated Capacity 5 m3/hr
Discharge Pressure 1.5 barg
Motor Data 1.5 kW
Self priming tank
Tag Numbers 100-WW-M-TK-05
Type Vertical, Cylindrical
Material A283-C
Capacity 0.13 m3/hr
Discharge Pressure(Normal/Design) -0.5 barg / -1 barg
Waste water control basin
Tag Numbers 100-WW-A-TK-01
Type Rectangular, Underground
Rated Capacity 200 m3
Dimension 7 m(W) x 16 m(L) x 2 m(H)
Waste water holding pond
Tag Numbers 100-WW-A-TK-02
Type Rectangular, Underground
Rated Capacity 2800 m3
Dimension 35 m(W) x 40 m(L) x 2 m(H)
Effluent pump
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Tag Numbers 100-WW-M-PP-01-A/B
Type Submersible
Material SS316
Quantity 2 x 100%
Rated Capacity 110 m3/hr
Discharge Pressure 4 barg
Motor Data 30 kW
Effluent pump
Tag Numbers 100-WW-M-PP-02
Type Submersible
Material SS316
Quantity 1 x 100%
Rated Capacity 110 m3/hr
Discharge Pressure 4 barg
Motor Data 30 kW
Fresh air blower
Tag Numbers 100-WW-M-FN-01-A/B
Type Roots
Material Impeller & Casing : A48 CL.35(GC 250)
Quantity 2 x 100%
Rated Capacity 200 Nm3/hr
Discharge Pressure 4,500 mmAq
Motor Data 11 kW
HCl dosing tank
Tag Numbers 100-WW-M-TK-04
Type Vertical, Cylindrical
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Material FRP
Quantity 1 x 100%
Capacity 6 m3
Dimension 1.9 m(D) x 2.5 m(H)
NaOH dosing tank w/electric heater
Tag Numbers 100-WW-M-TK-03
Type Vertical, Cylindrical
Material FRP
Quantity 1 x 100%
Capacity 5 m3
Elec. Heater 3 kW
NaOH dosing pump
Tag Numbers 100-WW-M-PP-03-A/B
Type Diaphragm
Material Cylinder: STS316 / Diaphragm: PTFE
Quantity 2 x 100%
Rated Capacity 100 L/hr
Discharge Pressure 3 barg
Motor Data 0.18 kW
HCl dosing pump
Tag Numbers 100-WW-M-PP-04-A/B
Type Diaphragm
Material Cylinder: PVDF / Diaphragm: PTFE
Quantity 2 x 100%
Rated Capacity 150 L/hr
Discharge Pressure 3 barg
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Motor Data 0.18 kW
Fume scrubber
Tag Numbers 100-WW-M-TK-06
Type Vertical, Cylindrical
Material PVC
Quantity 1 x 100%
Rated Capacity 0.1 ㎥/hr
Dimension 0.25 m(D) x 1.0 m(H)
C.1.18.2 Operation
C.1.18.2.1 Start Up
Refer to O&M part C.2.6 for Waste Water Treatment System
Refer to O&M part C.2.12.8 for Sump Pump
Refer to O&M part C.2.12.9 for Sewage Sump Pump
C.1.18.2.2 Normal Operation
Refer to O&M part C.2.6 for Waste Water Treatment System
Refer to O&M part C.2.12.8 for Sump Pump
Refer to O&M part C.2.12.9 for Sewage Sump Pump
C.1.18.2.3 Shut Down
Refer to O&M part C.2.6 for Waste Water Treatment System
Refer to O&M part C.2.12.8 for Sump Pump
Refer to O&M part C.2.12.9 for Sewage Sump Pump
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.2.4 Instrument Set Point List
TAG NO. SERVICE SET POINT CONSEQUENCES
100-LI-91100 Oily water collecting basin level
BT+1.5 m (HH) BT+1.2 m (H) BT+0.5 m (L) BT+0.3 m (LL)
Alarm, Standby pump start Alarm, Pump start Alarm, Pump stop Alarm, Pump trip
100-LA-91102 Oil holding tank level 2.1 m (H) Alarm 100-LA-91101 Oil sludge tank level 2.1 m (H) Alarm
100-PI-91103 Oily water transfer pump discharge press.
0.2 (L) 0.1 (LL)
Alarm Alarm, Start stand-by pump
100-LI-91201 NaOH dosing tank level 2.2 m (H) 0.5 m (L) 0.264 m (LL)
Alarm Alarm Alarm, Pump trip
100-LI-91202 HCl dosing tank level 2.2 m (H) 0.5 m (L) 0.264 m (LL)
Alarm Alarm Alarm, Pump trip
100-PI-91207 Air blower discharge press.0.2 barg (L) 0.1 barg (LL)
Alarm, Start stand-by blowerAlarm
100-LI-91203 Wastewater control basin level
BT+2.3 m (HH) BT+2.0 m (H) BT+0.7 m (L) BT+0.4 m (LL)
Alarm, Standby pump start Alarm, Pump start Alarm, Pump stop Alarm, Pump trip
100-TI-91200 Wastewater temp. 60 oC (HH) 55 oC (H)
Alarm, Effluent valve close Return valve open Alarm
100-AI-91200 Wastewater pH
10.5 (HH) 9.0 (H) 6.0 (L) 5.5 (LL)
Alarm, Effluent pump stop Alarm, HCl pump start,
NaOH pump stop Alarm, NaOH pump start,
HCl pump stop Alarm, Effluent pump stop
100-LI-91204 Wastewater holding pond level
BT+1.7 m (H) BT+0.5 m (L) BT+0.3 m (LL)
Alarm, Pump start Alarm, Pump stop Alarm, Pump trip
100-LS-91003 Fuel Gas Compressor TR Area Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91004 Sea Water Intake TR Area BT+1.3 m (HH) Alarm
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
Sump Level BT+1.0 m (H) BT+0.6 m (L)
Alarm, Pump start Alarm, Pump stop
100-LS-91005 BSDG Building Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91006 Warehouse & Workshop Building Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91007 Fuel Oil Unloading Area Sump Level
BT+2.0 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91011 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91012 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91013 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91014 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91015 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91016 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91017 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91018 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91019 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91020 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
100-LS-91021 Cable Trench Sump Level BT+0.64 m (HH) BT+0.52 m (H) BT+0.28 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91305 Sewage Sump Level for 380KV GIS Building
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91307 Sewage Sump Level for Central Control Building
BT+1.0 m (HH) BT+0.75 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91308 Sewage Sump Level for Administration Building
BT+1.0 m (HH) BT+0.75 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91309 Sewage Sump Level for Fire Truck Building
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91310 Sewage Sump Level for Security Control Building
BT+1.0 m (HH) BT+0.70 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91311 Sewage Sump Level for Warehouse & Work Shop Building
BT+1.0 m (HH) BT+0.75 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91312 Sewage Sump Level for Elec. Chlorination building
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91313 Sewage Sump Level for Water Treatment Building
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
000-LS-91703 Chlorination Area Sump Level
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91701 Water Treatment Sump Level
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
100-LS-91050 Aqueous Ammonia Sump Level
BT+1.0 m (HH) BT+0.65 m (H) BT+0.5 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
110-LS-91001 Steam Turbine Building Sump Level for Block #1
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
110/120/130/140-LS-91002
Compound Tank #1~#4 Sump Level
BT+1.3 m (HH) BT+1.0 m (H)
Alarm Alarm, Pump start
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
BT+0.6 m (L) Alarm, Pump stop 111/121/131/141-LS-91003
Block #1~#4-1 HRSG Area Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
112/122/132/142-LS-91003
Block #1~#4-2 HRSG Area Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
113/123/133/143-LS-91003
Block #1~#4-3 HRSG Area Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
140-LS-91003 Block #4 HRSG Area Sump Level
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
110/120/130/140-LS-91301
Sewage Sump Level for Power Block #1~#4
BT+1.3 m (HH) BT+1.0 m (H) BT+0.6 m (L)
Alarm Alarm, Pump start Alarm, Pump stop
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.3 Drawings
Flow Diagram of Waste water treatment system: WW-S-12-015-001
P&ID for Waste water treatment system: WW-S-20-028-001~004
P&ID for Gas turbine system: GT-S-20-006-009
P&ID for HRSG blowdown water system (For #1~3 Block): HG-S-20-007-005
P&ID for HRSG blowdown water system (For #4 Block): HG-S-20-008-006
P&ID for Chemical dosing system (For #1~3 Block): CF-S-20-019-001
P&ID for Chemical dosing system (For #4Block): CF-S-20-020-001
P&ID for Circulating water system: CW-S-20-021-001
P&ID for Chlorination system: CL-S-20-023-004
P&ID for Water treatment system: WT-S-20-024-003
P&ID for Aqueous ammonia supply system for SCR: SR-S-20-034-001
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.4 Electrical Cross Reference List
PROJECT : Marafiq IWPP
SYSTEM : WATER TREATMENT SYSTEM
100-WW-M-FN-01-A WW-S-20-028-003 AIR BLOWER A
100-WW-M-FN-01-B WW-S-20-028-003 AIR BLOWER B
100-WW-M-PP-01-A WW-S-20-028-003 EFFLUENT PUMP A
100-WW-M-PP-01-B WW-S-20-028-003 EFFLUENT PUMP B
100-WW-M-PP-02 WW-S-20-028-003 EFFLUENT PUMP
100-WW-M-PP-04-A WW-S-20-028-003 HCL DOSING PUMP A
100-WW-M-PP-04-B WW-S-20-028-003 HCL DOSING PUMP B
100-WW-M-PP-03-A WW-S-20-028-003 NAOH DOSING PUMP A
100-WW-M-PP-03-B WW-S-20-028-003 NAOH DOSING PUMP B
100-WW-M-TK-03 WW-S-20-028-003 NAOH DOSING TANK HEATER
100-WW-M-PP-05-A WW-S-20-028-003 OILY WATER TRANSFER PUMP A
100-WW-M-PP-05-B WW-S-20-028-003 OILY WATER TRANSFER PUMP B
100-WW-M-PP-11 WW-S-20-028-003 SEA WATER INTAKE TR AREA SUMP PUMP
100-WW-M-PP-12 WW-S-20-028-003 BSDG BUILDING SUMP PUMP
100-WW-M-PP-13 WW-S-20-028-003 WAREHOUSE & WORKSHOP BUILDING SUMPPUMP
100-WW-M-PP-14-A WW-S-20-028-003 FUEL OIL UNLOADING AREA SUMP PUMP
100-WW-M-PP-14-B WW-S-20-028-003 FUEL OIL UNLOADING AREA SUMP PUMP
100-WW-M-PP-16 WW-S-20-028-003 FUEL GAS COMPRESSOR TR AREA SUMP PUMP
100-WW-M-PP-17 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-18 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-19 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-20 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-21 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-22 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-23 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-24 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-25 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-26 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
100-WW-M-PP-27 WW-S-20-028-003 CABLE TRENCH SUMP PUMP
000-CL-M-PP-06-A CL-S-20-023-004 CHLORINATION AREA SUMP PUMP
C.2.6
C.2.6
C.2.6
TAG NO.
ELECTRICAL CROSS REFERENCE LIST
REMARKS
CROSSREFERENCE
TAP
C.3.2.3
C.3.2.3
P&ID NO. EQUIPMENT DESCRIPTION
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.3.2.3
C.3.2.3
C.3.2.3
C.2.6
C.2.6
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
1/3
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO. REMARKS
CROSSREFERENCE
TAP
000-CL-M-PP-06-B CL-S-20-023-004 CHLORINATION AREA SUMP PUMP
100-WT-M-PP-05-A WT-S-20-024-003 WATER TREATMENT SUMP PUMP
100-WT-M-PP-05-B WT-S-20-024-003 WATER TREATMENT SUMP PUMP
100-SR-M-PP-02 SR-S-20-034-001 AQUEOUS AMMONIA SUMP PUMP
110-WW-M-PP-01 WW-S-20-028-003 STEAM TURBINE BUILDING SUMP PUMP FORBLOCK #1
110-WW-M-PP-02 WW-S-20-028-003 COMPOUND TANK #1 SUMP PUMP
111-WW-M-PP-03 WW-S-20-028-003 BLOCK #1-1 HRSG AREA SUMP PUMP
112-WW-M-PP-03 WW-S-20-028-003 BLOCK #1-2 HRSG AREA SUMP PUMP
113-WW-M-PP-03 WW-S-20-028-003 BLOCK #1-3 HRSG AREA SUMP PUMP
110-GT-M-PP-01-A GT-S-20-006-009EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #1
110-GT-M-PP-01-B GT-S-20-006-009EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #1
110-HG-M-PP-01-A HG-S-20-007-00 BLOWDOWN SUMP PUMP FOR BLOCK #1
110-HG-M-PP-01-B HG-S-20-007-00 BLOWDOWN SUMP PUMP FOR BLOCK #1
110-CF-M-PP-05 CF-S-20-019-001CHEMICAL DOSING PACKAGE DRAIN SUMPPUMP FOR BLOCK #1
120-WW-M-PP-01 WW-S-20-028-003 STEAM TURBINE BUILDING SUMP PUMP FORBLOCK #2
120-WW-M-PP-02 WW-S-20-028-003 COMPOUND TANK #2 SUMP PUMP
121-WW-M-PP-03 WW-S-20-028-003 BLOCK #2-1 HRSG AREA SUMP PUMP
122-WW-M-PP-03 WW-S-20-028-003 BLOCK #2-2 HRSG AREA SUMP PUMP
123-WW-M-PP-03 WW-S-20-028-003 BLOCK #2-3 HRSG AREA SUMP PUMP
120-GT-M-PP-01-AGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #2
120-GT-M-PP-01-BGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #2
120-HG-M-PP-01-A HG-S-20-007-005 BLOWDOWN SUMP PUMP FOR BLOCK #2
120-HG-M-PP-01-B HG-S-20-007-005 BLOWDOWN SUMP PUMP FOR BLOCK #2
120-CF-M-PP-05CF-S-20-019-001
CHEMICAL DOSING PACKAGE DRAIN SUMPPUMP FOR BLOCK #2
130-WW-M-PP-01 WW-S-20-028-003 STEAM TURBINE BUILDING SUMP PUMP FORBLOCK #3
130-WW-M-PP-02 WW-S-20-028-003 COMPOUND TANK #3 SUMP PUMP
131-WW-M-PP-03 WW-S-20-028-003 BLOCK #3-1 HRSG AREA SUMP PUMP
132-WW-M-PP-03 WW-S-20-028-003 BLOCK #3-2 HRSG AREA SUMP PUMP
133-WW-M-PP-03 WW-S-20-028-003 BLOCK #3-3 HRSG AREA SUMP PUMP
130-GT-M-PP-01-AGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
2/3
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO. REMARKS
CROSSREFERENCE
TAP
130-GT-M-PP-01-BGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #3
130-HG-M-PP-01-A HG-S-20-007-005 BLOWDOWN SUMP PUMP FOR BLOCK #3
130-HG-M-PP-01-B HG-S-20-007-005 BLOWDOWN SUMP PUMP FOR BLOCK #3
130-CF-M-PP-05CF-S-20-019-001
CHEMICAL DOSING PACKAGE DRAIN SUMPPUMP FOR BLOCK #3
140-WW-M-PP-01 WW-S-20-028-003 STEAM TURBINE BUILDING SUMP PUMP FORBLOCK #4
140-WW-M-PP-02 WW-S-20-028-003 COMPOUND TANK #4 SUMP PUMP
141-WW-M-PP-03 WW-S-20-028-003 BLOCK #4-1 HRSG AREA SUMP PUMP
142-WW-M-PP-03 WW-S-20-028-003 BLOCK #4-2 HRSG AREA SUMP PUMP
143-WW-M-PP-03 WW-S-20-028-003 BLOCK #4-3 HRSG AREA SUMP PUMP
140-GT-M-PP-01-AGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #4
140-GT-M-PP-01-BGT-S-20-006-009
EVAPORATIVE COOLER BLOWDOWN SUMPPUMP FOR BLOCK #4
140-HG-M-PP-01-A HG-S-20-008-006 BLOWDOWN SUMP PUMP FOR BLOCK #4
140-HG-M-PP-01-B HG-S-20-008-006 BLOWDOWN SUMP PUMP FOR BLOCK #4
140-CF-M-PP-05CF-S-20-020-001
CHEMICAL DOSING PACKAGE DRAIN SUMPPUMP FOR BLOCK #4
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
C.3.2.3
3/3
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.5 Instrument Cross Reference List
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
110-LS-91001 WW-S-20-028-001 STM TBN BLDG SUMP LVL
110-PI-91001 WW-S-20-028-001 STM TBN BLDG SUMP P/P OUTLET PRESS
120-LS-91001 WW-S-20-028-001 STM TBN BLDG SUMP LVL
120-PI-91001 WW-S-20-028-001 STM TBN BLDG SUMP P/P OUTLET PRESS
130-LS-91001 WW-S-20-028-001 STM TBN BLDG SUMP LVL
130-PI-91001 WW-S-20-028-001 STM TBN BLDG SUMP P/P OUTLET PRESS
140-LS-91001 WW-S-20-028-001 STM TBN BLDG SUMP LVL
140-PI-91001 WW-S-20-028-001 STM TBN BLDG SUMP P/P OUTLET PRESS
110-LS-91002 WW-S-20-028-001 COMPOUND TK SUMP LVL
110-PI-91002 WW-S-20-028-001 COMPOUND TK SUMP P/P OUTLET PRESS
120-LS-91002 WW-S-20-028-001 COMPOUND TK SUMP LVL
120-PI-91002 WW-S-20-028-001 COMPOUND TK SUMP P/P OUTLET PRESS
130-LS-91002 WW-S-20-028-001 COMPOUND TK SUMP LVL
130-PI-91002 WW-S-20-028-001 COMPOUND TK SUMP P/P OUTLET PRESS
140-LS-91002 WW-S-20-028-001 COMPOUND TK SUMP LVL
140-PI-91002 WW-S-20-028-001 COMPOUND TK SUMP P/P OUTLET PRESS
111-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
111-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
112-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
112-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
113-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
113-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
121-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
121-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
122-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
122-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
123-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
123-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
131-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
131-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
132-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO.
INSTRUMENT CROSS REFERENCE LIST
REMARKS
CROSSREFERENCE
TAP
1/4
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO. REMARKS
CROSSREFERENCE
TAP
132-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
133-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
133-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
141-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
141-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
142-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
142-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
143-LS-91003 WW-S-20-028-001 HRSG AREA SUMP LVL
143-PI-91003 WW-S-20-028-001 HRSG AREA SUMP P/P OULET PRESS
000-LS-91004 WW-S-20-028-001 SEA WTR SUMP INTAKE AREA TR SUMP LVL
000-PI-91004 WW-S-20-028-001 SEA WTR INTAKE AREA TR SUMP OUTLET PRESS
100-LS-91005 WW-S-20-028-001 BSDG BULDING SUMP LVL
100-PI-91005 WW-S-20-028-001 BSDG BULDING SUMP P/P OUTLET PRESS
100-LS-91006 WW-S-20-028-001 WORKSHOP BULDING SUMP LVL
100-PI-91006 WW-S-20-028-001 WORKSHOP BULDING SUMP P/P DISCH PRESS
100-LS-91007 WW-S-20-028-001 FUEL OIL UNLOADING AREA SUMP LVL
100-PI-91007 WW-S-20-028-001 FUEL OIL UNLOADING AREA SUMP P/P-A OUTLET PRESS
100-PI-91008 WW-S-20-028-001 FUEL OIL UNLOADING AREA SUMP P/P-B OUTLET PRESS
100-LS-91003 WW-S-20-028-001 FUEL GAS COMP AREA TR SUMP LVL
100-PI-91003 WW-S-20-028-001 FUEL GAS COMP AREA TR SUMP P/P OUTLET PRESSS
100-LS-91011 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91012 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91013 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91014 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91015 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91016 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91017 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91018 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91019 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91020 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LS-91021 WW-S-20-028-001 CABLE TRENCH SUMP LVL
100-LT-91100 WW-S-20-028-002 OILY WTR COLLECTING BASIN LVL
100-PI-91101 WW-S-20-028-002 OILY WTR TRANS. PP-A OUTLET PRESS
C.2.6
C.2.6
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
2/4
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO. REMARKS
CROSSREFERENCE
TAP
100-PI-91102 WW-S-20-028-002 OILY WTR TRANS. PP-B OUTLET PRESS
100-PT-91103 WW-S-20-028-002 OILY WTR TRANS. PP OUTLET PRESS
100-LS-91101 WW-S-20-028-002 OIL SLUDGE TK LVL SW
100-LS-91102 WW-S-20-028-002 OIL HOLDING TK LVL SW
100-TI-91102 WW-S-20-028-003 OIL HOLDING TK TEMP
100-PI-91201 WW-S-20-028-003 NaOH DOSING PP-A OUTLET PRESS
100-PI-91202 WW-S-20-028-003 NaOH DOSING PP-B OUTLET PRESS
100-LT-91201 WW-S-20-028-003 NaOH DOSING TK LVL
100-TI-91201 WW-S-20-028-003 NaOH DOSING TK TEMP
100-PI-91203 WW-S-20-028-003 HCl DOSING PP-A OUTLET PRESS
100-PI-91204 WW-S-20-028-003 HCl DOSING PP-B OUTLET PRESS
100-LT-91202 WW-S-20-028-003 HCl DOSING TK LVL
100-PI-91205 WW-S-20-028-003 AIR BLOWER-A OUTLET PRESS
100-PI-91206 WW-S-20-028-003 AIR BLOWER-B OUTLET PRESS
100-PT-91207 WW-S-20-028-003 AIR BLOWER OUTLET PRESS
100-AT-91200 WW-S-20-028-003 WASTE WTR CTRL BASIN PH ANALYZER
100-TE-91200 WW-S-20-028-003 WASTE WTR CTRL BASIN TEMP
100-LT-91203 WW-S-20-028-003 WASTE WTR CTRL BASIN LVL
100-PI-91208 WW-S-20-028-003 EFFLUENT PP-A OUTLER PRESS
100-FT-91200 WW-S-20-028-003 EFFLUENT PP OUTLET FLOW
100-LT-91204 WW-S-20-028-003 WASTE WTR HOLDING POND LVL
100-PI-91209 WW-S-20-028-003 EFFLUENT PP-B OUTLER PRESS
100-PI-91210 WW-S-20-028-003 EFFLUENT PP OUTLET PRESS
100-PI-91211 WW-S-20-028-003 SOLENOID VALVE PANEL-01 INLET AIR PRESS
100-PI-91212 WW-S-20-028-003 SOLENOID VALVE PANEL-02 INLET AIR PRESS
110-LS-91301 WW-S-20-028-004 POWER BL#1 SEWAGE SUMP LVL
110-PI-91301 WW-S-20-028-004 POWER BL#1 SEWAGE P/P OUTLET PRESS
120-LS-91301 WW-S-20-028-004 POWER BL#2 SEWAGE SUMP LVL
120-PI-91301 WW-S-20-028-004 POWER BL#2 SEWAGE P/P OUTLET PRESS
130-LS-91301 WW-S-20-028-004 POWER BL#3 SEWAGE SUMP LVL
130-PI-91301 WW-S-20-028-004 POWER BL#3 SEWAGE P/P OUTLET PRESS
140-LS-91301 WW-S-20-028-004 POWER BL#4 SEWAGE SUMP LVL
140-PI-91301 WW-S-20-028-004 POWER BL#4 SEWAGE P/P OUTLET PRESS
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
C.2.6
3/4
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO. REMARKS
CROSSREFERENCE
TAP
100-LS-91305 WW-S-20-028-004 380KV GIS BLDG SEWAGE SUMP LVL
100-PI-91305 WW-S-20-028-004 380KV GIS BLDG SEWAGE P/P OUTLET PRESS
100-LS-91307 WW-S-20-028-004 CENTRAL CTRL BLDG SWAGE SUMP LVL
100-PI-91307 WW-S-20-028-004 CENTRAL CTRL BLDG SWAGE SUMP P/P OUTLET PRESS
100-LS-91308 WW-S-20-028-004 ADMIN BLDG SEWAGE SUMP LVL
100-PI-91308 WW-S-20-028-004 ADMIN BLDG SEWAGE P/P OUTLET PRESS
100-LS-91309 WW-S-20-028-004 FIRE TRUCK BLDG SEWAGE SUMP LVL
100-PI-91309 WW-S-20-028-004 FIRE TRUCK BLDG SEWAGE P/P OUTLET PRESS
100-LS-91310 WW-S-20-028-004 JWAP ADMIN BLDG SEWAGE SUMP LVL
100-PI-91310 WW-S-20-028-004 JWAP ADMIN BLDG SEWAGE P/P OUTLET PRESS
100-LS-91311 WW-S-20-028-004 WORKSHOP BLDG SEWAGE SUMP LVL
100-PI-91311 WW-S-20-028-004 WORKSHOP BLDG SEWAGE P/P OUTLET PRESS
000-LS-91312 WW-S-20-028-004 SEAWTR INTAKE BLDG SEWAGE SUMP LVL
000-PI-91312 WW-S-20-028-004 SEAWTR CHLORINE BLDG SEWAGE P/P OUTLET PRESS
100-LS-91313 WW-S-20-028-004 WTR TREAT BLDG SEWAGE SUMP LVL
100-PI-91313 WW-S-20-028-004 WTR TREAT BLDG SEWAGE P/P OUTLET PRESS
100-FT-91301 WW-S-20-028-004 SEWAGE SUMP OUTLET FLOW
100-FQT-91301 WW-S-20-028-004 SEWAGE SUMP OUTLET FLOW(TOTALIZER)
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
C.4.2
4/4
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.6 Valves Cross Reference List
C.1.18.6.1 Automatic Valve Cross Reference List C.1.18.6.2 Manual Valve Cross Reference List C.1.18.6.3 Piping Specialty Cross Reference List
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.6.1 Automatic Valve Cross Reference List
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
Vendor PackageC.2.6
Automatic Valve Cross Reference List
REMARKS
CROSSREFERENCE
TAP
Automatic Valves in Vendor Package
P&ID NO. EQUIPMENT DESCRIPTIONTAG NO.
1/8
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.6.2 Manual Valve Cross Reference List
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
140-WO-VC200 WW-S-20-028-001 CHECK 3 150#
140-WO-VN200 WW-S-20-028-001 NEEDLE 3 150#
140-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
130-WO-VC200 WW-S-20-028-001 CHECK 3 150#
130-WO-VN200 WW-S-20-028-001 NEEDLE 3 150#
130-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC200 WW-S-20-028-001 CHECK 2 600#
100-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
100-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
120-WO-VC200 WW-S-20-028-001 CHECK 3 150#
120-WO-VN200 WW-S-20-028-001 NEEDLE 3 150#
120-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC201 WW-S-20-028-001 CHECK 2 600#
100-WO-VN201 WW-S-20-028-001 NEEDLE 2 600#
100-WO-VG201 WW-S-20-028-001 GLOBE 1/2 600#
110-WO-VC200 WW-S-20-028-001 CHECK 3 150#
110-WO-VN200 WW-S-20-028-001 NEEDLE 3 150#
110-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
130-WO-VC201 WW-S-20-028-001 CHECK 2 600#
130-WO-VN201 WW-S-20-028-001 NEEDLE 2 600#
130-WO-VG201 WW-S-20-028-001 GLOBE 1/2 600#
121-WO-VC200 WW-S-20-028-001 CHECK 2 600#
121-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
121-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
120-WO-VC201 WW-S-20-028-001 CHECK 2 600#
120-WO-VN201 WW-S-20-028-001 NEEDLE 2 600#
120-WO-VG201 WW-S-20-028-001 GLOBE 1/2 600#
111-WO-VC200 WW-S-20-028-001 CHECK 2 600#
111-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
111-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
110-WO-VC201 WW-S-20-028-001 CHECK 2 600#
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
RatingTAP
Manual Valve Cross Reference List
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
2/8
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
RatingTAP
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
110-WO-VN201 WW-S-20-028-001 NEEDLE 2 600#
110-WO-VG201 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC202 WW-S-20-028-001 CHECK 2 600#
100-WO-VN202 WW-S-20-028-001 NEEDLE 2 600#
100-WO-VG202 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC203 WW-S-20-028-001 CHECK 2 600#
100-WO-VN203 WW-S-20-028-001 NEEDLE 2 600#
100-WO-VG203 WW-S-20-028-001 GLOBE 1/2 600#
131-WO-VC200 WW-S-20-028-001 CHECK 2 600#
131-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
131-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
140-WO-VC201 WW-S-20-028-001 CHECK 2 600#
140-WO-VN201 WW-S-20-028-001 NEEDLE 2 600#
140-WO-VG201 WW-S-20-028-001 GLOBE 1/2 600#
141-WO-VC200 WW-S-20-028-001 CHECK 2 600#
141-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
141-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC204 WW-S-20-028-001 CHECK 3 150#
100-WO-VN204 WW-S-20-028-001 NEEDLE 3 150#
100-WO-VG204 WW-S-20-028-001 GLOBE 1/2 600#
100-WO-VC205 WW-S-20-028-001 CHECK 3 150#
100-WO-VN205 WW-S-20-028-001 NEEDLE 3 150#
100-WO-VG205 WW-S-20-028-001 GLOBE 1/2 600#
122-WO-VC200 WW-S-20-028-001 CHECK 2 600#
122-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
122-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
123-WO-VC200 WW-S-20-028-001 CHECK 2 600#
123-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
123-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
112-WO-VC200 WW-S-20-028-001 CHECK 2 600#
112-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
112-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
113-WO-VC200 WW-S-20-028-001 CHECK 2 600#
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
3/8
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
RatingTAP
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
113-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
113-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
132-WO-VC200 WW-S-20-028-001 CHECK 2 600#
132-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
132-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
133-WO-VC200 WW-S-20-028-001 CHECK 2 600#
133-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
133-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
142-WO-VC200 WW-S-20-028-001 CHECK 2 600#
142-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
142-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
143-WO-VC200 WW-S-20-028-001 CHECK 2 600#
143-WO-VN200 WW-S-20-028-001 NEEDLE 2 600#
143-WO-VG200 WW-S-20-028-001 GLOBE 1/2 600#
100-WW-VN211 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN212 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN213 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN214 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN215 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN216 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN217 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN218 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN219 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN220 WW-S-20-028-001 NEEDLE 2 600#
100-WW-VN221 WW-S-20-028-001 NEEDLE 2 600#
100-WO-VF200 WW-S-20-028-001 BUTTERFLY 10 150#
110-WW-VA204 WW-S-20-028-003 GATE 4 150#
120-WW-VA204 WW-S-20-028-003 GATE 4 150#
130-WW-VA204 WW-S-20-028-003 GATE 4 150#
140-WW-VA209 WW-S-20-028-003 GATE 4 150#
100-WW-VF200 WW-S-20-028-003 BUTTERFLY 6 150#
100-WW-VC202 WW-S-20-028-003 CHECK 6 150#
100-WS-VC200 WW-S-20-028-004 CHECK 3 150#
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
4/8
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
RatingTAP
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
100-WS-VA200 WW-S-20-028-004 GATE 3 150#
100-WS-VG200 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC201 WW-S-20-028-004 CHECK 3 150#
100-WS-VA201 WW-S-20-028-004 GATE 3 150#
100-WS-VG201 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC202 WW-S-20-028-004 CHECK 3 150#
100-WS-VA202 WW-S-20-028-004 GATE 3 150#
100-WS-VG202 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC203 WW-S-20-028-004 CHECK 3 150#
100-WS-VA203 WW-S-20-028-004 GATE 3 150#
100-WS-VG203 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC204 WW-S-20-028-004 CHECK 3 150#
100-WS-VA204 WW-S-20-028-004 GATE 3 150#
100-WS-VG204 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC205 WW-S-20-028-004 CHECK 3 150#
100-WS-VA205 WW-S-20-028-004 GATE 3 150#
100-WS-VG205 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC206 WW-S-20-028-004 CHECK 3 150#
100-WS-VA206 WW-S-20-028-004 GATE 3 150#
100-WS-VG206 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC207 WW-S-20-028-004 CHECK 3 150#
100-WS-VA207 WW-S-20-028-004 GATE 3 150#
100-WS-VG207 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC208 WW-S-20-028-004 CHECK 3 150#
100-WS-VA208 WW-S-20-028-004 GATE 3 150#
100-WS-VG208 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC209 WW-S-20-028-004 CHECK 3 150#
100-WS-VA209 WW-S-20-028-004 GATE 3 150#
100-WS-VG209 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC210 WW-S-20-028-004 CHECK 3 150#
100-WS-VA210 WW-S-20-028-004 GATE 3 150#
100-WS-VG210 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VC211 WW-S-20-028-004 CHECK 3 150# C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
5/8
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
RatingTAP
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
100-WS-VA211 WW-S-20-028-004 GATE 3 150#
100-WS-VG211 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VA212 WW-S-20-028-004 GATE 6 150#
100-WS-VA213 WW-S-20-028-004 GATE 6 150#
100-WS-VA218 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA214 WW-S-20-028-004 GATE 4 150#
100-WS-VA219 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA215 WW-S-20-028-004 GATE 6 150#
100-WS-VA220 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA216 WW-S-20-028-004 GATE 6 150#
100-WS-VA221 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA217 WW-S-20-028-004 GATE 4 150#
100-WS-VA222 WW-S-20-028-004 GATE 3/4 600#
100-WS-VC212 WW-S-20-028-004 CHECK 6 150#
100-WS-VA223 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA224 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA225 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA226 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA227 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA228 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA229 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA230 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA231 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA232 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA233 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA234 WW-S-20-028-004 GATE 3/4 600#
100-WS-VA235 WW-S-20-028-004 GATE 3/4 600#
100-WS-VC213 WW-S-20-028-004 CHECK 3 150#
100-WS-VA236 WW-S-20-028-004 GATE 3 150#
100-WS-VG212 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VA237 WW-S-20-028-004 GATE 3/4 600#
100-WS-VC214 WW-S-20-028-004 CHECK 3 150#
100-WS-VA238 WW-S-20-028-004 GATE 3 150#
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
C.7.3.1
6/8
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
RatingTAP
TAG NO. P&ID NO.
CROSSREFERENCE
REMARKSItem Size(Inch)
100-WS-VG213 WW-S-20-028-004 GLOBE 1/2 600#
100-WS-VA239 WW-S-20-028-004 GATE 3/4 600#
Vendor Package
C.7.3.1
C.7.3.1
C.2.6Valves in Vendor Package
7/8
Doc. No.: EM-G-40-001-001 Operation & Maintenance Manual Rev. No. : A
C.1.18.6.3 Piping Specialty Cross Reference List
PROJECT : Marafiq IWPP
SYSTEM : WASTE WATER TREATMENT SYSTEM
REMARKSTAP
Piping Specialty in Vendor Package C.2.6
Piping Specialty Cross Reference List
TAG NO. P&ID NO. Item Size(Inch) Rating
CROSSREFERENCE
8/8