Daftar Isi
Instruksi ................................................................................................................ i Kata Pembuka ....................................................................................................... ii Standard Method of Measurement (TLSMM-1) Bangunan Gedung
Judul Dokumen ............................................................................................... 1 Tujuan ........................................................................................................... 1 Definisi ........................................................................................................... 1 Ketentuan Umum ............................................................................................ 2
• Satuan Pengukuran ...................................................................... 2 • Kode TLSMM ................................................................................ 2 • Sub Seksi ...................................................................................... 3 • Aturan pengukuran ...................................................................... 3 • Definisi ........................................................................................ 4 • Cakupan Pengukuran .................................................................... 4 • Penjelasan Tambahan ................................................................... 4
Satuan dan Singkatan ...................................................................................... 4 Tabel Konversi ................................................................................................. 5 Metode Pengukuran........................................................................................ 7
• Persiapan ......................................................................... 8 • Struktur Bawah ................................................................ 12 • Struktur Atas .................................................................... 15 • Dinding ............................................................................ 18 • Pintu dan Jendela ............................................................. 19 • Plafon .............................................................................. 20 • Lantai ............................................................................... 21 • Atap ................................................................................. 21 • Pekerjaan Akhir ................................................................ 22 • Pekerjaan Mekanikal ........................................................ 23 • Pekerjaan Listrik ............................................................... 27 • Pekerjaan Luar ................................................................. 29 • Pembersihan Akhir Lapangan ........................................... 30 • Furniture .......................................................................... 30 • Peralatan ......................................................................... 30 • Biaya Umum .................................................................... 31 • Profit ............................................................................... 31 • Provisional Sum ............................................................... 31 • Contingency ..................................................................... 32
• Fee Consultan .................................................................. 32 • PMU Cost ......................................................................... 33 • Pajak ................................................................................ 33
Standard Method of Measurement (TLSMM-) Bangunan Jalan dan Jembatan
Judul Dokumen ............................................................................................... 34 Tujuan ............................................................................................................. 34 Definisi ............................................................................................................ 34 Ketentuan Umum ............................................................................................ 35
• Satuan Pengukuran .......................................................... 35 • Kode TLSMM .................................................................... 35 • Sub seksi .......................................................................... 36 • Aturan Pengukuran .......................................................... 36 • Definisi............................................................................. 37 • Cakupan Pengukuran ....................................................... 37 • Penjelasan Tambahan ...................................................... 37
Satuan dan Singkatan ...................................................................................... 37 Tabel Konversi ................................................................................................. 38 Metode Pengukuran........................................................................................ 40
• Umum.............................................................................. 41 • Drainase........................................................................... 43 • Pekerjaan Tanah .............................................................. 45 • Pelebaran Pekerjaan dan Batu Jalan ................................. 47 • Pondasi Pekerjaan Jalan Lapis Pondasi Material Berbutir.. 48 • Lapisan Pondasi Berbaris Stabilisasi .................................. 49 • Pekerjaan Beraspal BITUMINOUS Pavement .................... 51 • Struktur ........................................................................... 57 • Pengenbalian Kondisi dan Pekerjaan Minor ...................... 63 • Pekerjaan Harian .............................................................. 66 • Pekerjaan Pemeliharaan Rutin ......................................... 67 • Pembersihan Lapangan .................................................... 68 • Biaya Umum .................................................................... 68 • Profit ............................................................................... 69 • Provisional Sum ............................................................... 69 • Contingency ..................................................................... 69 • Fee Konsultan .................................................................. 70 • PMU Cost ......................................................................... 70 • Pajak ................................................................................ 71
Standard Method of Measurement (TLSMM-3) Bangunan Irigasi dan Sungai
Judul Dokumen ............................................................................................... 72 Tujuan ............................................................................................................. 72 Definisi ............................................................................................................ 72 Ketentuan Umum ............................................................................................ 73
• Satuan Pengukuran .......................................................... 73 • Kode TLSMM .................................................................... 73 • Sub seksi .......................................................................... 74 • Aturan Pengukuran .......................................................... 74 • Definisi............................................................................. 75 • Cakupan Pengukuran ....................................................... 75 • Penjelasan Tambahan ...................................................... 75
Satuan dan Singkatan ...................................................................................... 75 Tabel Konversi ................................................................................................. 76 Metode Pengukuran........................................................................................ 78
• Pekerjaan Persiapan ......................................................... 79 • Pekerjaan Galian .............................................................. 81 • Pekerjaan Timbunan ........................................................ 82 • Pekerjaan Pengeringan (Dewatering) ............................... 83 • Pekerjaan Pasangan Batu ................................................. 83 • Pekerjaan Suling-Suling (Weep hole) ................................ 85 • Pekerjaan Beton............................................................... 86 • Pekerjaan Gebalan Rumput .............................................. 87 • Pekerjaan Pintu Air .......................................................... 88 • Pekerjaan Pemasangan Trash Rack ................................... 88 • Pekerjaan Pasangan Bronjong .......................................... 89 • Pekerjaan Pemasangan Geotextile ................................... 89 • Pekerjaan Tiang Pancang.................................................. 90 • Pekerjaan Pemecah/Penahan Gelombang/Cut/APO ......... 90 • Pekerjaan Pemasanagan Papan DugaAir (Staff Gauge) ..... 91 • Pekerjaan Tanggul ............................................................ 91 • Pekerjaan Krib .................................................................. 92 • Pekerjaan Pemasangan Water Stop .................................. 92 • Pekerjaan Pembersihan Lapangan .................................... 92 • Biaya Umum .................................................................... 93 • Profit ............................................................................... 93 • Provisional Sum ............................................................... 93 • Contingency ..................................................................... 94 • Fee Konsultan .................................................................. 94
• PMU Cost ......................................................................... 94 • Pajak ................................................................................ 95
Standar Koefisien Analisa Harga Satuan Pekerjaan (AHSP)
• Pekerjaan Persiapan ......................................................... 96 • Pekerjaan Tanah .............................................................. 99 • Pekerjaan Pondasi ............................................................ 101 • Pekerjaan Beton............................................................... 103 • Pekerjaan Penutun Atap .................................................. 113 • Pekerjaan Dinding ............................................................ 116 • Pekerjaan Plesteran ......................................................... 117 • Pekerjaan Finishing Siar Pasangan .................................... 119 • Pekerjaan Kayu ................................................................ 120 • Pekerjaan Penutup Lantai dan Dinding ............................. 127 • Pekerjaan Langit-Langit .................................................... 130 • Pekerjaan Besi dan Aluminum .......................................... 131 • Pekerjaan Kunci dan Kaca................................................. 132 • Pekerjaan Sanitasi ............................................................ 133 • Pekerjaan Pengecatan ...................................................... 136
Pekerjaan Cara Perhitungan Analisa Harga Satuan Alat Berat
• Embankment with Material from Borrow Excavation ....... 138 • Embankment with Common Material............................... 142 • Common Excavation ........................................................ 144 • Clearing and Grabbing ...................................................... 146 • Sub grade Preparation ..................................................... 148 • Sub base Agregate B ........................................................ 152 • Base Aggregate A ............................................................. 155 • Prime Cost ....................................................................... 158 • Tack Cost ......................................................................... 160 • Asphalt Concrete Base AC-Base ........................................ 162 • Asphaltic Concrete Binder Course .................................... 166 • Asphaltic Concrete Wearing Course ................................. 170 • Hot Rolled Sheet Wearing HRS- WC .................................. 174 • Hot Rolled Sheet Base HRS-Base ...................................... 178 • Asphalt Treated Base ATB ................................................ 182
Contoh Analisis Alat Berat ............................................................................... 186 Tebel Faktor Efisiensi Alat................................................................................ 221
Standar Biaya Komponen Bangunan dan Standar Fee Konsultan ......................... 224 Kata Penutup ........................................................................................................ 231
1
1.0. JUDUL DOKUMEN
Judul Dokumen ini adalah TIMOR LESTE STANDARD METHOD OF MEASUREMENT – 1 untuk Bangunan Gedung, Edisi Pertama (Januari 2015), disingkat TL-SMM - 1 TL-SMM -1 dibuat untuk dipakai dalam hubungannya dengan General Condition of Contract, General Specifications atau aturan tambahan lain yang tertera didalam Dokumen Kontrak. Pekerjaan-pekerjaan harus dberi nomor dan diuraikan dalam Bill of Quantity secara detail agar memudahkan Kontraktor memberikan harga yang akurat dan metode pengukuran harus dicantumkan dalam Pembukaan dari Bill of Quantity Dalam Pembukaan harus mencantumkan metode pengukuran yang lain dari TL-SMM – 1, jika ada, yang dipakai dalam menghitung Bill of Quantity, khususnya pekerjaan-pekerjaan yang tidak tercakup dalam TL-SMM - 1.
2.0. TUJUAN
Tujuan dari TL-SMM – 1 adalah mengatur prosedur menghitung Bill of Quantity dan harga satuan dari suatu proyek konstruksi.
3.0. DEFINISI
3.1. Dalam dokumen ini dan dalam Bill of Quantity yang disusun sesuai dengan prosedur yang ditetapkan ini, kata-kata maupun pernyataan berikut mempunyai arti yang mengacu pada prosedur ini, kecuali ditetapkan lain.
3.2. “Condition of Contract” artinya “General Condition of Contract” yang tertera dalam Bidding/Contract Documents yang disediakan oleh Owner
3.3. Kata-kata dan pernyataan yang ditetapkan dalam Condition of Contract selanjutnya mempunyai arti yang sama.
3.4. Semua referensi ke klausul adalah referensi klausul yang diberi nomor dalam Condition of Contract dan referensi ke paragraph adalah referensi ke nomor yang ada disini
3.5. Kata “Pekerjaan” termasuk didalamnya pekerjaan yang dikerjakan, barang, material dan jasa yang diperlukan, dan kewajiban, pertanggungan serta risiko yang diperlukan oleh Kontraktor sesuai Kontrak.
3.6. Pernyataan “Yang diperlukan” berarti seperti yang tercantum dalam gambar dan Spesifikasi, atau atas perintah Pengawas/Engineer yang sesuai dan relevan dengan Condition of Contract
3.7. “Day work” berarti metode dalam menilai pekerjaan berdasarkan waktu yang digunakan oleh pekerja, material yang digunakan pada tempat yang disediakan.
3.8. “Original Ground Surface” berarti permukaan tanah sebelum suatu pekerjaan dimulai 3.9. “Final Excavated Surface” berarti suatu permukaan yang ditandai dalam gambar
dimana pekerjaan galian dikerjakan 3.10. “Commencing Ground Surface” untuk suatu item dalam Bill of Quantity berarti,
permukaan tanah dimana item tersebut dimulai 3.11. “Excavated Ground Surface” untuk suatu item dalam Bill of Quantities berarti,
permukaan dari suatu galian dari item pekerjaan yang akan dikerjakan.
2
4.0. KETENTUAN UMUM 4.1. Satuan Pengukuran
Satuan Pengukuran untuk setiap item harus sesuai dengan item yang tercantum dalam TL-SMM-1. Satuan Pengukuran yang ditetapkan terhadap suatu jenis pekerjaan dalam TL-SMM-1 harus diterapkan juga pada semua item yang berkaitan dengan item tersebut. Sistem: Meter, Kilogram, Second (MKS) yang akan digunakan dalam TL-SMM -1 ini. Didalam menulis dimensi atau mendiskripsikan suatu pekerjaan, urutan penulisannya harus dimulai dari panjang, kemudian lebar, dan tinggi.atau tebal. Setiap pekerjaan harus dihitung volumenya secara neto, tanpa menambah sisa/buangan, overlapping, pemadatan, penekanan, perluasan/pelebaran dan lain-lain. Hal-hal yang tercantum disini ataupun yang tidak tercantum tapi nyata-nyata mengeluarkan biaya misalnya angkutan, gudang, perijinan, bongkar muat dll akan dihitung dalam harga satuan pekerjaannya. Satuan dari setiap pekerjaan, mengikuti satuan yang tercantum dalam butir 5.0 Volume dihitung pembulatan sampai 2 digit di belakang titik, contoh 1,234.78, bukan 1,234.7765
4.2. KODE TL-SMM - 1 Pekerjaan-pekerjaan akan diklasifikasikan dalam berbagai “Sections”, dan selanjutnya dijabarkan lagi dalam “sub section” dan jenis pekerjaannya seperti yang tercantum dalam TL-SMM – 1, Bill of Quantity. Tatacara pengkodean seperti yang tertera dibawah ini:
. Digit Pertama menunjukan “Department”
. Dua digit berikutnya menunjukan“Section”
. Dua digit berikutnya lagi menunjukan“Sub Section”
. Digit selanjutnya menunjukan level pekerjaan yang lebih detail selanjutnya
3
4.3. Sub Seksi
Pekerjaan yang termasuk dalam Sub Seksi ini digunakan untuk keperluan pembayaran (pay item)
4.4. Aturan Pengukuran
Aturan Pengukuran menjadi pedoman untuk bagaimana cara mengukur suatu pekerjaan,
dan bagaimana metode untuk menghitung kuantitinya. Sebagai tambahan, General
Condition dibawah ini perlu diterapkan juga:
a. Kuantiti dari suatu pekerjaan yang diakui yang berkaitan dengan spesifikasi harus
dihitung dalam dimensi neto sesuai gambar dan dengan metode yang ditetapkan
dalam dokumen ini, kecuali dicantumkan secara khusus dalam penjelasan tambahan
dalam dokumen kontrak. Tidak diijinkan untuk memperhitungkan bulking, shrinkage
ataupun wastage, dalam menghitung kuantiti.
b. Semua pekerjaan harus diukur sesuai dengan gambar dan spesifikasi, dan jika
diperlukan, harus diklasifikasikan dan diukur tersendiri sesuai Bill of Quantity.
c. Kontraktor tidak boleh mengklaim perbedaan volume yang dihitung berdasarkan TL-
SMM -1 dengan kuantiti actual dilapangan, kecuali ada pengecualian untuk item-item
yang spesifik yang tercantum dalam dokumen kontrak.
DEPARTMENT : Building (B) Road & Bridge (R) Irrigation (I) Harbour (H) Airport (A) Transmition Line (T)
SECTION : Preliminaries Sub Structures Upper Structures Etc………………. (01 to 99)
SUB SECTION: Foundation Concrete Column Brick wall Etc………………. (01 to 99)
SUBSEQUENT LEVELS
4
4.5. Definisi
Definisi menjelaskan batasan dan fungsi dari suatu item dalam klasifikasi pekerjaan
dan dalam Bill of Quantities yang disusun menurut TL-SMM - 1
4.6. Cakupan Pengukuran Cakupan pengukuran menjelaskan tentang cakupan pekerjaan atau material dari suatu
item pekerjaan yang tercantum dalam Kontrak. Sebagai tambahan pada aturan
cakupan ini, kondisi berikut perlu diterapkan:
a. Bongkar muat dan transportasi material yang berhubungan dengan item pekerjaan
tersebut
b. Semua item pekerjaan dalam TL-SMM – 1 harus dianggap termasuk didalamnya
semua operasi yang diperlukan untuk mewujudkan pekerjaan tersebut sesuai
dokumen kontrak.
c. Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh
TL-SMM – 1 ini akan diberikan terhadap item pekerjaan yang relevan.
4.7. Penjelasan Tambahan
Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh
pekerjaan yang tercakup dalam TL-SMM – 1 ini, akan disediakan terhadap pekerjaan
tertentu yang diperlukan.
5.0 SATUAN DAN SINGKATAN Berikut ini adalah satuan dan singkatan yang akan digunakan:
Satuan Singkatan Millimeter mm Meter m Millimeter persegi mm2 atau mm2 Meter persegi m2 atau m2 Hektar ha Meter kubik m3 atau m3 Kilogram kg Ton ton Metrik Ton m.ton Summary sum Nomor no. Horse Power hp Minggu mg. Liter ltr. Lump Sum ls Jam jam. Hari hr.
5
6.0 TABEL KONVERSI : Dari Ke Dikalikan
PANJANG Millimeter Inch 0.03937 Inch Millimeter 25.40005 Meter Foot 3.28084 Foot Meter 0.3048 Meter Yard 1.09361 Yard Meter 0.9144 Kilometer Mile 0.62137 Mile Kilometer 1.60935 BERAT MASSA Kilogram Pound 2.20462 Pound Kilogram 0.45359 Gram Ounce 0.03527 Ounce Gram 28.34949 Kilogram Quintal 0.01 Milligram Grain 0.01543 Kilogram Hundred Weight 0.01968 Hundred weight Tone 0.0508 Kilogram Tone 0.001 Kilogram Ton 0.00098 Pound Ton 0.00045 Tone Ton 0.98421 Kilogram Seer 1.01605 Kilogram Maund 0.02679 Gram Tola 0.08573 VOLUME Litre Pint (UK) 1.75975 Litre Gallon (imperial) 0.21997 Litre Gallon (US) 0.26417 Litre Cubic Foot 0.3531 Litre Cubic Meter 0.001 Cubic Foot Liter 28.31682 Milliliter Fluid ounce 0.0352 Gallon Imperial Liter 4.5461 Gallon US Liter 3.78541 Gallon Imperial Gallon US 1.20095 Cubic millimetre Cubic inch 0.00006 Cubic meter Cubic foot 35.31472 Cubic foot Cubic meter 0.02832 Cubic meter Cubic Yard 1.30795 Cubic yard Cubic meter 0.76456 LUAS Square millimeter Square inch 0.00155 Square inch Square millimeter 645.1613 Square meter Square foot 10.76392 Square foot Square meter 0.0929 Square meter Square yard 1.19599 Square yard Square meter 0.83613
6
Square meter Acre 0.00025 Hectare Acre 2.47105 Acre Hectare 0.40469 Square meter Hectare 0.0001 Square kilometer Square mile 0.3861 Square mile Square kilometer 2.58999 Hectare Square mile 0.00386 Square mile Hectare 258.9989 MASSA/UNIT LUAS Kilogram per square kilometer Ton per square mile 0.00255 Kilogram per square meter Pound per square foot 0.20482 Pound per square foot Kilogram per square
meter 4.88243
MASSA PER UNIT VOLUME Kilogram per cubic meter Pound per cubic foot 0.06243 Grams per liter Pound per cubic foot 0.06243 Pound per cubic foot Kilogram per cubic meter 16.01845 Pound per cubic foot Grams per liter 10.01845
Dalam mengkonversi satuan dari system yang satu ke system yang lain, pengukuran harus diambil 3 digit yang terdekat dalam system MKS, dan 2 digit yang terdekat dalam system FPS.
7
7.0 METODE PENGUKURAN
Seksi 01: Persiapan
Seksi 02: Struktur bawah
Seksi 03: Struktur atas
Seksi 04: Dinding
Seksi 05: Pintu dan Jendela
Seksi 06: Plafon
Seksi 07: Lantai
Seksi 08: Atap
Seksi 09: Pekerjaan Finishing
TOTAL PEKERJAAN SIPIL DAN ARSITEKTUR (01 s/d 09)……….. (A)
Seksi 10: Pekerjaan Mekanikal
Seksi 11: Pekerjaan Listrik
TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL (10 s/d 11) ,…… (B)
TOTAL NET BIAYA BANGUNAN, ………………………………. C = (A+B)
Seksi 12: Pekerjaan Luar
Seksi 13: Pembersihan lapangan
TOTAL NET BIAYA PROYEK,………………………………D = (C+12+13)
Seksi 14: Furnitures
Seksi 15: Peralatan
Seksi 16: Biaya Umum
Seksi 17: Profit
Section 18: Provisional Sum
Seksi 19: Contingency
Seksi 20: Fee konsultan
Seksi 21: PMU Cost
Seksi 22: Pajak
TOTAL GROSS BIAYA PROYEK, …… E =D+ (14 s/d 22)
8
7.1. PERSIAPAN: (B-01)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN
SATUAN PEKERJAAN
CAKUPAN
PENGUKURAN
B-01-01
PEMBONGKARAN
Pembongkaran adalah pekerjaan membongkar bangunan lama yang terdapat dalam lokasi bangunan yang akan dibangun
Jika dalan BOQ diuraikan jenis pekerjaan bongkaran, maka dalam memberikan harga satuan dipisahkan menurut BOQ, dengan satuan ls
Harga satuan sudah termasuk peralatan, tenaga kerja serta perijinan, pengamanan, serta pembuangan ketempat pembuangan yang ditetapkan
B-01-02
PEMBERSIHAN LAPANGAN
Pembersihan lapangan adalah membersihkan lapangan dari kotoran, sampah, pohon diameter lebih kecil dari 15 cm
Dihitung dalam satuan m2
Harga satuan sudah termasuk peralatan, tenaga kerja serta perijinan, pengamanan, serta pembuangan ketempat pembuangan yang ditetapkan
B-01-03
MOBILISASI
Mobilisasi adalah suatu kegiatan awal untuk memobilisasi alat, tenaga kerja, fasilitas, perijinan yang diperlukan sebelum proyek dimulai secara fisik.
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci quantity, serta specificationnya sedemikian rupa agar memudahkan dalam menghitung harga/biaya mobilisasinya. Satuan unitnya adalah ls
Dalam menghitung harga /biaya mobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya social lainnya.
B-01-04
DEMOBILISASI
Demobilisasi adalah suatu kegiatan akhir untuk mendemobilisasi alat, tenaga kerja, fasilitas yang sudah tidak digunakan lagi di proyek
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci quantity, serta specificationnya sedemikian rupa agar memudahkan dalam menghitung harga/biaya demobilisasinya. Satuan unitnya adalah ls
Dalam menghitung harga /biaya demobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya social lainnya
B-01-05
PEKERJAAN
Pembersihan
Pembersihan dan
Pembersihan lapangan
9
PEMBERSIHAN DAN PERATAAN LAPANGAN
lapangan adalah membersihkan lahan di lapangan tempat bangunan akan didirikan.
peratan lapangan diukur luas area daerah pelaksanaan dengan satuan ukuran m2.
dilakukan dengan membersihkan tanah dari humus, rumput, semak-semak sampai pada akar-akarnya, pembuangan lumpur, puing-puing, kotoran, pemindahan batu, dan penutupan lubang pada seluas lokasi pelaksanaan.
B-01-06
PEKERJAAN PEMBUATAN FOTO DOKUMENTASI
Pembuatan foto dokumentasi menunjukkan kondisi fisik lahan/bangunan pada saat tertentu
Pembuatan foto diukur dengan satuan ls
Pembuatan foto dokumentasi dilakukan minimal dari empat titik pandang pengambilan yang sama, pertama kali dilakukan pada kondisi fisik lapangan 0% Pembuatan foto/dokumentasi yang kedua kali dan seterusnya sesuai dengan ketentuan
B-01-07
PEKERJAAN PAGAR SEMENTARA DAN POS JAGA
Pagar sementara dibuat pada sekeliling lokasi untuk pengamanan
Pintu masuk sementara dibuat pada tempat tertentu pada pagar.
Pos jaga dibuat pada pintu masuk.
Pagar sementara diukur panjang pagar dengan satuan ukuran m.
Pintu masuk sementara diukur panjang pintu dengan satuan ukuran m.
Pos jaga diukur luas bangunan dengan satuan ukuran m2.
Pagar sementara pengamanan pada sekeliling lokasi, kuat, kaku dan tahan lama sesuai dengan spesifikasi.
Pintu masuk terbuat dari rangka kayu kelas III ukuran 5/7 cm dengan penutup seng BJLS 30 dengan lebar yang cukup untuk memudahkan mobilisasi.
Pos jaga terbuat dari kayu kelas III dengan atap seng BJLS 30
B-01-08
PEKERJAAN PAPAN NAMA PROYEK
Papan nama proyek adalah papan dengan tulisan yang memberikan
Papan nama proyek diukur dengan satuan bh.
Papan nama proyek dibuat dengan ukuran dan jenis bahan sesuai gambar perencanaan detail dan spesifikasi
10
keterangan tentang proyek
teknik Papan nama proyek dipasang dilapangan tempat bangunan didirikan pada tempat yang mudah dilihat oleh masyarakat sebelum pekerjaan dilaksanakan sampai pekerjaan selesai
B-01-09
PEKERJAAN PENENTUAN TITIK DUGA
Penentuan titik duga adalah penetuan titik pada patok yang menunjukan elevasi ± 0.00
Patok titik duga diukur dengan satuan bh
Titik duga dibuat dengan memasang patok permanen dilapangan tempat bangunan akan didirikan sesuai dengan gambar perencanaan detail atau sesuai kesepakatan antara Kontraktor dan Pengawas lapangan. Patok titik duga dipasang kokoh dan dijaga kedudukannya supaya tidak berubah selama pekerjaan berlangsung, serta tidak boleh dibongkar sebelum mendapat ijin dari Pengawas.
B-01-10
PEKERJAAN PENGUKURAN DAN PEMASANGAN BOUWPLANK
Bouwplank adalah alat bantu untuk menentukan letak as bangunan
Bouwplank diukur panjang keliling luar bangunan dengan satuan ukuran m.
Termasuk semua peralatan yang dibutuhkan antara lain, theodolite, tenaga surveyor, dan semua bahan yan di perlukan.
Harus cukup kuat dan di pelihara sampai semua as bangunan telah terpasang secara permanen.
B-01-11
PEKERJAAN PEMBUATAN KANTOR PROYEK
Kantor proyek adalah bangunan sementara tempat semua unsur pelaksana proyek
Kantor proyek diukur luas bangunan dengan satuan ukuran m2.
Kantor proyek dilengkapi dengan furniture seperti meja, kursi, lemari, file cabinet, white board, obat-obatan untuk pertolongan pertama pada kecelakaan (P3K),
11
melakukan kegiatan pelaksanaan, pengawasan, monitoring dan evaluasi kegiatan pelaksanaan pekerjaan
buku harian, buku direksi, buku tamu, alat tulis dan kertas (ATK), dan lain-lainnya.
B-01-12
PEKERJAAN PEMBUATAN LOS KERJA DAN GUDANG
1. Los kerja adalah bangunan tempat melaksanakan pekerjaan. 2. Gudang adalah bangunan untuk menyimpan alat dan material.
Los kerja dan gudang diukur luas bangunan dengan satuan ukuran m2.
Gudang dan los kerja dilengkapi dengan peralatan bantu yang diperlukan sesuai dengan persyaratan dalam spesifikasi
B-01-13
PEKERJAAN PENYEDIAAN AIR DAN TENAGA LISTRIK
1. Penyediaan air adalah air bersih guna kebutuhan air kerja, air minum untuk para pekerja, serta air bersih untuk kebutuhan kamar mandi dan WC. 2. Tenaga listrik adalah untuk keperluan penerangan dan pelaksanaan pekerjaan.
1. Penyediaan air diukur dengan satuan ls. 2. Penyediaan tenaga listrik diukur dengan satuan ls.
Harus sudah termasuk semua peralatan dan perijinan yang diperlukan untuk memungkinkan kebutuhan air dan listrik sementara di proyek dapat terpenuhi.
12
7.2. STRUKTUR BAWAH: (B-02)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-02-01
GALIAN TANAH
Galian tanah adalah pekerjaan galian tanah yang diperuntukan bagi penempatan pondasi bangunan, saluran, septictank, basement
Volume galian dihitung mengacu pada lebar dan tinggi pondasi dari muka tanah asal, dipisahkan menurut jenis tanah yang digali dan kedalamannya, dengan satuan m3. Volume tanah pembuangan dihitung volume padatnya bukan volume lepas (loose), dalam satuam m3. Volume untuk pekerjaan meratakan, memiringkan, merapikan, memadatkan dan pekerjaan lainnya untuk dasar galian dihitung dalam satuan m2.
Termasuk dalam pekerjaan galian adalah semua peralatan dan tenaga kerja yang diperlukan sesuai metode kerja dan pengamanan lereng yang diperlukan serta penyimpanan sementara atau pembuangan keluar site.
B-02-02
TIMBUNAN TANAH KEMBALI
Timbunan tanah kembali adalah pekerjaan penimbunan kembali lubang pondasi dengan menggunakan tanah bekas galian.
Volume timbunan kembali dihitung volume padat sesuai dengan volume yang dipadatkan dalam satuan m3.
Termasuk dalam pekerjaan timbunan adalah semua peralatan dan tenaga kerja yang dibutuhkan sesuai dengan metode kerja dan spesifikasi
B-02-03
TIMBUNAN TANAH
Timbunan tanah adalah pekerjaan penimbunan dengan menggunakan tanah yang didatangkan
dari luar.
Volume timbunan dihitung volume padat sesuai dengan volume yang dipadatkan dalam satuan m3.
Termasuk dalam pekerjaan timbunan adalah semua bahan, peralatan dan tenaga kerja yang dibutuhkan sesuai dengan metode kerja dan spesifikasi
13
B-02-04
LAPISAN KEDAP AIR (WATERPROOFING)
Lapisan kedap air adalah pekerjaan pelapisan kedap air yang dipasang untuk mencegah rembesan/ aliran air.
Lapisan kedap air dipasang pada konstruksi yang berhubungan dengan air dan dihitung dalam m2 luas bersih.
Harga untuk lapisan kedap air yang berbentuk membrane harus diperhitungkan sambungan/overlap dan sealent-nya.
B-02-05
PONDASI
Pondasi adalah konstruksi pendukung utama gedung, dapat berupa pondasi dangkal (batu kali, beton bertulang) ataupun pondasi dalam (tiang pancang, tiang bor dll)
a. Pondasi dangkal,
dihitung sesuai dengan gambar dan spesifikasi, dengan satuan m3.
b. Pondasi dalam, dihitung sesuai gambar dan spesifikasi, dengan satuan titik/buah .Pondasi dalam dapat berupa tiang pancang atau tiang bor dan jenis lainnya. Test daya dukung pondasi dihitung per-titik dengan persyaratan sesuai spesifikasi. Pondasi dalam dapat terbuat dari beton atau baja
a. Pondasi dangkal
termasuk didalamnya semua peralatan dan tenaga kerja yang dibutuhkan, sehingga pondasi tersebut dapat terpasang pada tempatnya.
b. Pondasi dalam termasuk didalamnya peralatan dan tenaga kerja yang dibutuhkan untuk menempatkan pondasi pada posisinya, termasuk test daya dukung dan pemotongan kepala tiang yang tidak diperlukan, sehingga siap untuk dilanjutkan dengan pekerjaan pile cap
B-02-06
PILE CAP
Pile cap adalah bagian konstruksi pondasi yang berfungsi sebagai penyatu pondasi- dalam, untuk menyalurkan beban dari kolom ke pondasi
Pile cap terdiri dari konstruksi beton bertulang dengan ukuran tertentu sesuai gambar dan spesifikasi. Dalam menghitung volume beton tidak perlu dikurangi dengan volume besi yang dikandung. Volume beton, besi tulangan dan formwork harus dihitung secara terpisah merupakan satu item tersendiri. Volume beton dalam m3, volume besi tulangan dalam kg,
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengadakan beton, transportnya dan pengecoran serta curingnya. Untuk besi tulangan sudah harus termasuk pemotongan, pembengkokan, kawat pengikat, penyangga tulangan, kait, panjang penyaluran dan pemasangan pada
14
dan volume formwork dalam m2
posisinya. Untuk formwork sudah harus termasuk assembling dan pemasangannya serta konstruksi pendukungnya (scaffolding)
B-02-07
TIE BEAM
Tie beam adalah bagian konstruksi pondasi yang berfungsi sebagai penyalur beban pada pile cap/pondasi dari kolom, dan pengikat antar pile cap.
Tie beam terdiri dari konstruksi beton bertulang dengan ukuran tertentu sesuai gambar dan spesifikasi. Dalam menghitung volume beton, tidak perlu dikurangi dengan volume besi yang dikandung.Panjang tie beam dihitung dari tepi pile cap/kolom yang satu ketepi pile cap/kolom lainnya,. Volume beton, besi tulangan dan formwork harus dihitung secara terpisah merupakan satu item tersendiri. Volume beton dalam m3, volume besi tulangan dalam kg, dan volume formwork dalam m2
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengadakan beton, transportnya dan pengecoran serta curingnya. Untuk besi tulangan sudah harus termasuk pemotongan, pembengkokan, kawat pengikat, penyangga tulangan, kait, panjang penyaluran dan pemasangan pada posisinya. Untuk formwork sudah harus termasuk assembling dan pemasangannya serta konstruksi pendukungnya (scaffolding)
15
7.3. STRUKTUR ATAS: (B-03)
Untuk struktur beton bertulang, dalam BOQ nya harus dihitung secara terpisah antara beton, besi tulangan dan bekistingnya. Beton harus dipisahkan sesuai mutu yang ditetapkan dalam spesifikasi, besi tulangan dipisahkan sesuai diameter dan mutunya, dan bekisting dipisahkan sesuai jenis bahannya dan fungsinya. Untuk besi anyaman (wire mesh), dihitung dalam m2, luas bersih. Sambungan/overlapping dimasukan dalam harga satusn pekerjaan. Untuk struktur baja, dalam BOQ nya harus dihitung secara terpisah sesuai fungsinya,misalnya kolom, balok ,dan ukuran profilnya.
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-03-01
KOLOM
Kolom adalah bagian konstruksi vertical dari suatu bangunan yang menopang balok-balok
Kolom dihitung dengan batas ketinggian setiap lantai , diukur dari tepi atas lantai ke tepi atas lantai diatasnya., dengan satuan m3. Volume beton, besi tulangan dan formwork harus dihitung secara terpisah merupakan satu item tersendiri. Volume beton dalam m3, volume besi tulangan dalam kg, dan volume formwork dalam m2
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengadakan beton, transportnya dan pengecoran serta curingnya. Untuk besi tulangan sudah harus termasuk pemotongan, pembengkokan, kawat pengikat, penyangga tulangan, kait, panjang penyaluran dan pemasangan pada posisinya. Untuk formwork sudah harus termasuk assembling dan pemasangannya serta konstruksi pendukungnya (scaffolding)
B-03-02
BALOK (BEAM)
Balok (beam) adalah bagian konstruksi horizontal yang memikul dinding, plat lantai dan tangga dari suatu bangunan
Beton balok dihitung dengan batas panjang dari tepi kolom ke tepi kolom lainnya., tinggi balok dihitung sampai bagian atas dari plat lantai yang dipikulnya, dengan satuan m3. Tulangan balok dihitung, dalam satuan kg. Formwork dihitung luas bidang sentuh dengan balok betonnya, dalam satuan m2.
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengadakan beton, transportnya dan pengecoran serta curingnya. Untuk besi tulangansudah harus termasuk pemotongan, pembengkokan, kawat pengikat, penyangga
16
Perancah/scaffolding dihitung terpisah sesuai metode kerja, dengan satuan ls.
tulangan, kait, panjang penyaluran dan pemasangan pada posisinya. Untuk formwork sudah harus termasuk assembling dan pemasangannya serta konstruksi pendukungnya (scaffolding)
B-03-03
PLAT LANTAI
Plat lantai adalah bagian konstruksi yang akan memikul langsung beban-beban hidup maupun beban mati dari suatu konstruksi
Beton lantai dihitung dengan batas panjang dan lebar yang diukur dari tepi balok ke tepi balok pendukungnya lainnya. tebal dihitung sesuai gambar dan spesifikasi, dengan satuan m3. Lubang sparing pipa, kabel pada lantai tidak dihitung sebagai pengurangan volume. Tulangan lantai dihitung, dalam satuan kg. Formwork dihitung luas bidang sentuh dengan plat betonnya, dalam satuan m2. Perancah/scaffolding dihitung terpisah sesuai metode kerja, dengan satuan ls.
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengadakan beton, transportnya dan pengecoran serta curingnya. Untuk besi tulangan sudah harus termasuk pemotongan, pembengkokan, kawat pengikat, penyangga tulangan dan pemasangan pada posisinya. Serta kait dan panjang penyaluran yang dibutuhkan. Untuk formwork sudah harus termasuk assembling dan pemasangannya serta konstruksi pendukungnya (scaffolding)
B-03-04
KONSTRUKSI BAJA
Konstruksi baja adalah struktur pemikul beban bangunan seperti halnya beton (balok dan kolom) namun terdiri dari konstruksi baja profil tertentu sesuai gambar dan spesifikasi
Struktur baja harus dihitung terpisah menurut fungsi dan ukuran profilnya masing-masing, dengan panjang bersih sesuai gambar/spesifikasi dengan satuan kg. Plat sambungan harus sudah termasuk dalam perhitungan berat profil. Bout dan las harus dihitung terpisah sebagai item tersendiri, bout dalam satuan kg dan las dalam satuan m.
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk memfabrikasi, mengangkut dan memasang dilapangan pada posisinya. Tidak dibedakan antara konstruksi baja fabrikasi dan konstruksi baja yang dibuat dilapangan.
17
B-03-05
BETON PRE-CAST
Beton pre-cast adalah struktur pemikul beban bangunan seperti halnya beton (balok dan kolom) namun terdiri dari beton precast dengan ukuran tertentu sesuai gambar dan spesifikasi.
Beton precast dihitung dalam satuan unit menurut tipe dan ukuran masing-masing sesuai gambar dan spesifikasi. Dianjurkan agar BOQ nya dipisahkan menurut fungsi strukturnya misalnya: kolom, balok, plat, tangga, dll. Untuk beton precast yang tidak structural, dihitung terpisah misalnya :saluran, kerb, list dll
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk memfabrikasi, mengangkut dan memasang dilapangan pada posisinya
B-03-06
BETON PRE-STRESSED
Beton pre-stressed adalah konstruksi beton mutu tinggi yang bertulang biasa dan bertulang kabel/strand yang ditegangkan untuk menambah daya dukungnya. Beton pre-stressed dapat dengan cara pre-tension ataupun post tension
Beton prestressed dihitung dalam unit menurut tipe dan ukuran masing-masing sesuai gambar dan spesifikasi
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk memfabrikasi, mengangkut , men stress, grouting dan memasang dilapangan pada posisinya
18
7.4. DINDING: (B-04)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-04-01
DINDING BATAKO, BATU BATA
Dinding batako/bata adalah dinding pada bangunan baik dipasang pada bagian luar maupun bagian dalam sebagai dinding pemisah ruangan.
Dinding batako/bata dihitung dalam satuan m2, dengan panjang, lebar, tinggi yang diukur dari tepi balok/kolom ketepi balok /kolom lainnya. Lubang pintu dan jendela harus mejadi factor pengurang dalam menghitung luas dinding. Lubang sparing pipa atau kabel pada dinding tidak dihitung sebagai factor pengurang. Jika dalam dinding batako diberikan tulangan besi, maka besinya dihitung tersendiri dalam satuan kg sesuai diameter nya. Jika terdapat glass blocks pada dinding maka dihitung per-buah sesuai ukurannya. Untuk batako yang dipasang pada tread ataupun riser dari tangga, maka dihitung per- m- panjang
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengaduk mortar, mengangkut dan memasang dinding pada posisinya,termasuk siar/alur sesuai gambar dan spesifikasi
B-04-02
PLESTERAN DAN ACIAN
Plesteran adalah bagian pekerjaan penutup pasangan dinding batako/bata/beton. Acian adalah bagian pekerjaan penghalusan permukaan pekerjaan plesteran agar siap di cat dasar/plamur
Plesteran dihitung dalam m2, dan dipisahkan itemnya sesuai mutu campuran masing-masing. Pekerjaan acian dipisahkan dari item plesteran, dan dhitung dalam satuan m2.
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengaduk mortar, mengangkut dan memasang plesteran pada posisinya sesuai gambar dan spesifikasi
B-04-03
CURTAIN WALL
Curtian wall adalah dinding
Kerangka alluminium dihitung dalam satuan m
Termasuk didalamnya semua peralatan dan
19
kaca dengan kerangka alluminium yang dipasang pada bagian dinding luar gedung
sesuai profil yang digunakan. Kaca dihitung dalam satuan m2 menurut ukuran bersih lubang yang ditutupnya, sesuai jenis dan ketebalannya. Pekerjaan penggantung dan pengunci, hiasan.dekorasi dan yang terkait harus dihitung tersendiri dalam buah
tenaga kerja serta bahan pelengkap (sealent dll) yang diperlukan untuk fabrikasi, assembling dan pemasangan di lapangan pada posisinya
7.5. PINTU DAN JENDELA: (B-05)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-05-01
PINTU/ JENDELA
Pintu /jendela adalah bagian pekerjaan penutup ruangan, yang dapat terdiri dari kayu, kaca, metal atau lainnya.
Kusen kayu dihitung per-m3 sesuai jenis dan ukurannya. Kusen metal dihitung dalam satuan meter panjang (m’) sesuai jenis dan ukurannya Rangka daun pintu/jendela kayu dan metal dihitung per-m2, sesuai jenis dan ukurannya. Semua volume dihitung volume bersih sesuai gambar, sisa pemotongan tidak boleh dimasukan dalam volume. Kaca dihitung luas (m2) bersih seluas lubang yang ditutupnya, overlaping dan list tidak boleh dihitung dalam luasan. Untuk kaca louvre dihitung dalam satuam meter panjang (m). Untuk pintu jendela yang pengdaannya secara unit lengkap, dapat dihitung dalam unit
Termasuk didalamnya semua peralatan dan tenaga kerja serta bahan pelengkap (sealent dll) yang diperlukan untuk fabrikasi, assembling dan pemasangan di lapangan pada posisinya. Engsel, kunci dan alat-alat penggantung/pengunci lainnya harus dihitung terpisah dalam buah, sesuai jenis,dan spesifikasinya.
B-05-02
PARTISI
Partisi adalah dinding pemisah ruangan, yang
Dalam menghitung kuantiti partisi harus dipisahkan antara kuantiti rangka dan kuantiti penutup rangka.
Termasuk didalamnya semua peralatan dan tenaga kerja serta bahan pelengkap
20
dapat terdiri dari rangka kayu, metal dan penutup kayu, kaca, gypsum atau lainnya.
Jika rangka kayu maka harus dihitung dalam m3 sesuai ukuran dan jenis kayunya. Jika rangka metal, maka harus dihitung dalam m’ sesuai jenis dan ukuran profilnya. Untuk penutup rangka yang terdiri dari kayu, kaca, gypsum atau lainnya harus dihitung per-m2 Semua volume dihitung volume bersih sesuai gambar, sisa pemotongan tidak boleh dimasukan dalam volume
(sealent dll) yang diperlukan untuk fabrikasi, assembling dan pemasangan di lapangan pada posisinya
7.6. PLAFON: (B-06)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-06-01
PLAFON/CEILING (LANGIT-LANGIT)
Pekerjaan plafon adalah bagian pekerjaan penutup bagian atas ruangan, yang dapat terdiri dari rangka kayu, metal dan penutup kayu, kaca, gypsum, acoustic board atau lainnya.
Dalam menghitung kuantiti plafon harus dipisahkan antara kuantiti rangka dan kuantiti penutup rangka. Jika rangka kayu maka harus dihitung dalam m3 sesuai ukuran dan jenis kayunya. Jika rangka metal, maka harus dihitung dalam m’ sesuai jenis dan ukuran profilnya. Untuk penutup rangka yang terdiri dari kayu, kaca, gypsum, acoustic atau lainnya harus dihitung per-m2 Semua volume dihitung volume bersih sesuai gambar, sisa pemotongan tidak boleh dimasukan dalam volume. Lubang untuk lampu, diffuser, sprinkler, loud speaker dll tidak boleh dihitung sebagai factor pengurang dalam menghitung kuantiti. Pekerjaan insulation harus
Termasuk didalamnya semua peralatan dan tenaga kerja serta bahan pelengkap (kawat penggantung) yang diperlukan untuk fabrikasi, assembling dan pemasangan di lapangan pada posisinya. Lis plafon, sound barriers, heat barriers yang diperlukan harus dihitung sebagai bagian tersendiri sesuai spesifikasi dan gambar.
21
dihitung terpisah merupakan item tersendiri dalam satuan m2, dengan ukuran sesuai gambar/spesifikasi
7.7. LANTAI: ( B-07)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-07-01
LANTAI
Lantai adalah penutup bagian bawah ruangan yang dapat terdiri dari keramik, granite, vinyl, carpet, atau lainnya
Lantai diukur dalam satuan m2, sesuai gambar design lantai, dalam jenis dan ukuran yang sesuai dengan gambar dan spesifikasi. Plint (skirting),tread dan riser pada tangga, diukur dalam satuan m’
Termasuk didalamnya semua peralatan dan tenaga kerja serta bahan perekat/mortar yang diperlukan untuk pemotongan dan pemasangan di lapangan pada posisinya, termasuk pemolesan sampai dicapai permukaan yang disyaratkan.
7.8. ATAP: (B-08)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-08-01
PENUTUP ATAP
Penutup Atap adalah bagian konstruksi penutup atap bangunan agar terhindar dari panas, hujan, debu, dll, yang dapat terdiri dari beton, seng, genteng, sirap, atau bahan penutup atap lainnya.
Termasuk seluruh bagian bidang atap tetapi tidak termasuk bubungan/nok/ridge capping, talang, jurai luar/dalam, yang dihitung tersendiri. Bidang atap dihitung dalam satuan m2, sedangkan bubungan, talang, jurai, dihitung dalam satuan m.
Termasuk didalam perhitungan atap, semua peralatan dan tenaga kerja serta alat bantu (paku, sekerup, Lem) yang diperlukan untuk menempatkan atap pada posisinya. Jika diperlukan lapisan lain pada atap misalnya waterproofing, cat, insulation atau lainnya, maka harus dihitung tersendiri dalam satuan m2
B-08-02
RANGKA ATAP
Rangka atap adalah bagian
Rangka atap kayu dihitung dalam satuan m3,
Termasuk didalamnya semua peralatan dan
22
struktur atap yang memikul beban atap yang dapat terdiri dari beton, baja berat, baja ringan, kayu dan lainnya.
dan dihitung sesuai panjang bersih yang terdapat dalam gambar. Sisa potongan kayu tidak boleh dimasukan sebagai kuantiti dari rangka atap. Rangka atap baja ringan/berat, dihitung dalam satuan kg atau m, menurut panjang bersih sesuai gambar dan bentuk/besaran profilnya. Rangka atap beton, dihitung per-m3 sesuai panjang bersih dalam gambar.(lihat pek.beton)
tenaga kerja yang dibutuhkan, alat bantu seperti paku, bout, rivet, keling, yang diperlukan untuk memasang rangka pada posisinya.
7.9. PEKERJAAN AKHIR: (B-09)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-09-01
CAT, PELITUR, PERNIS
Cat, pelitur, pernis adalah bagian pekerjaan finishing akhir pada bidang plesteran, kayu, guna menutup bidangnya agar Nampak bersih, rapih dan indah.
Kuantiti bidang cat, pernis, pelitur dihitung sesuai bidang yang dilapisi dalam satuan m2. Untuk list, pegangan tangga/railing, dan bagian yang lebarnya lebih kecil dari 30 cm , dihitung dalam satuan m.
Termasuk didalamnya peralatan, tenaga kerja serta pekerjaan-pekerjaan awal yang diperlukan (amplas, cat dasar, plamur, meni dll)
B-09-02
PEKERJAAN METAL
Yang dimaksud dengan pekerjaan metal disini adalah pekerjaan non struktural dari metal misalnya pekerjaan tralis, railing, ballustrade,dll
Pekerjaan metal disini dihitung sesuai bidang cakupannya, dalam satuan m2, atau meter panjang (m)
Termasuk didalamnya semua peralatan, tenaga kerja serta peralatan bantu untuk memfabrikasi, meng assembling dan memasang pada posisinya dalam keadaan finish, rapih, indah
23
7.10. PEKERJAAN MEKANIKAL: (B-10)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-10-01
GENERATOR DIESEL
Pembangkit listrik yang menggunakan mesin diesel sebagai penggerak mula (prime mover) yang mempunyai fungsi menghasilkan energi mekanis yang diperlukan untuk memutar rotor generator.
Dihitung dalam satuan unit, sesuai dengan kapasitas yang tercantum dalam gambar/spesifikasi
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit generator diesel , instalasi dan peralatan pembantunya, antara lain Panel Outdor dan Indoor, ATS /AMF(Automatic Transfer Switch/ Automatik Main Falure), sehingga generator diesel dapat terpasang pada posisinya dan menghasilkan tenaga listrik. Termasuk juga commissioning testing, manual untuk operasinal dan maintenance
B-10-02
TRANSFORMATOR
Transformator adalah suatu mesin listrik yang tetap atau bergerak berfungsi menimbulkan energi listrik dari sistem primer ke sistem sekunder dimana pada umumnya disertai perubahan-perubahan harga tegangan atau arus dengan frekwensi yang konstan melalui suatu gandengan magnetik dan berdasarkan konduksi elektromagnetik.
Dihitung dalam satuan unit, sesuai dengan kapasitas yang tercantum dalam gambar/spesifikasi
Termasuk didalamnya semua pekerjaan yang berhubungan dengan Transformator , instalasi dan peralatan proteksi, antara lain Lighting Arester, Cut Out dan Panel Distribusi, sehingga Transformator dapat terpasang pada posisinya dan menghasilkan tenaga listrik. Termasuk juga commissioning testing, manual untuk operasinal dan maintenance
24
B-10-03
UNINTERRUPTIBLE POWER SUPPLY (UPS)
UPS adalah suatu unit lengkap yang berfungsi sebagai cadangan penyedia tenaga listrik sementara jika terjadi pemutusan arus listrik secara tiba-tiba
Dihitung dalam satuan unit, sesuai dengan kapasitas yang tercantum dalam gambar/spesifikasi
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit UPS sets, instalasi dan peralatan pembantunya, sehingga UPS dapat terpasang pada posisinya dan menghasilkan tenaga listrik. Termasuk juga commissioning test, manual untuk operasinal dan maintenance
B-10-04
AIR CONDITIONING (AC)
Air Conditioning (AC) adalah seperangkat alat yang mampu menkondisikan suhu ruangan sesuai kebutuhan. Seperangkat alat tersebut diantaranya kompresor, kondensor, orife tube, evaporator, dan katup expansi
Dihitung dalam satuan unit dan sub unit sebagai pelengkap/pendukung antara lain : kompresor, kondensor, orife tube, evaporator, dan katup expansi dll, yang memungkinkan seluruh system AC dapat berfungi baik untuk menghasilkan suhu ruangan yang direncanakan sesuai spesifikasi dan gambar.
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit AC sets, instalasi dan peralatan pembantunya, sehingga AC dapat terpasang pada posisinya dan menghasilkan suhu ruangan yang disyaratkan.Termasuk juga commissioning test, manual untuk operasinal dan maintenance
B-10-05
PEMADAM KEBAKARAN (FIRE FIGHTING)
Pemadam kebakaran adalah suatu system instalasi pemadam kebakaran yang dapat terdiri dari berbagai system antara lain : Fire Hydrand & Hosereel System, Sprinkler System, Gaseous Extinguishing System, Audio/visual advisory system, Automatic Fire
Dihitung dalam satuan unit dan sub unit sebagai pendukung antara lain: pemipaan, pompa, instalasi listrik dll, untuk memungkinkan pemadaman dini dapat berjalan baik sesuai dengan gambar dan spesifikasi yang ditetapkan.
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit Pemadam Kebakaran, instalasi dan peralatan pembantunya, sehingga dapat terpasang pada posisinya dan menghasilkan kinerja yang disyaratkan.. Termasuk juga commissioning test, manual untuk operasinal dan maintenance
25
Alarm & Detection System, Portable Hand Operated System, lengkap dengan instalasi listrik dan system pengontrolan.
B-10-06
ALAT PEMADAM API RINGAN (APAR)
Alat Pemadam Api Ringan (Apar) adalah alat perlindungan kebakaran aktif yang digunakan untuk memadamkan api atau mengendalikan kebakaran kecil, umumnya dalam situasi darurat.
Dihitung dalam satuan unit
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit Pemadam Kebakaran, instalasi dan peralatan pembantunya, sehingga dapat terpasang pada posisinya dan menghasilkan kinerja yang disyaratkan..
B-10-07
SISTEM PERPINDAHAN HORIZONTAL DAN VERTICAL (LIFT & ESCALATOR)
Sistem perpindahan horizontal dan vertical dalam gedung adalah suatu system perpindahan yang memungkinkan orang atau barang dapat dipindahkan secara horizontal dan vertical, yang dapat terdiri dari : Lift, Escalator ataupun Conveyor dll
Dihitung dalam satuan unit dan sub unit sebagai pendukung antara lain: pekerjaan sipil (pondasi, ruang mesin, rangka peluncur, instalasi listrik dll, untuk memungkinkan perpindahan orang/barang dapat berjalan baik sesuai dengan gambar dan spesifikasi yang ditetapkan.
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit system perpindahan, instalasi dan peralatan pembantunya sehingga dapat terpasang pada posisinya dan menghasilkan kinerja yang disyaratkan. Termasuk juga testing, commissioning, manual untuk operasinal dan maintenance.
B-10-08
BUILDING AUTOMATION
Building Automation adalah suatu system otomatisasi terintegrasi dalam gedung yang berfungsi untuk
Dihitung dalam satuan unit dan sub unit sebagai pendukung antara lain: IT system, CCTV, electrical system, security system, acces control system dll, untuk memungkinkan system otomatis dapat berjalan baik sesuai
Termasuk didalamnya semua pekerjaan yang berhubungan dengan unit system otomatis, instalasi dan peralatan pembantunya, sehingga dapat terpasang pada posisinya dan
26
mengintegrasikan seluruh system yang ada dalam gedung secara otomatis sehingga dapat bekerja secara terintegrasi
dengan gambar dan spesifikasi yang ditetapkan.
menghasilkan kinerja yang disyaratkan. Termasuk juga commissioning test, manual untuk operasional dan maintenance
B-10-09
INSTALAI AIR BERSIH
Instalasi air bersih adalah suatu system yang memungkinkan dapatnya tersedia air bersih didalam/diluar gedung secara cukup dan Sehat. Fitting artinya semua asesoris yang digunakan untuk penyambungan pipa misalnya elbow, bends, tees, unions, sockets, pompa, nipples dll. Semua pipa dan fittingnya harus diklasifikasikan sesuai dengan tipe, diameter, metode penyambungan dan pemasangannya.
Panjang pipa harus diukur sepanjang garis sumbunya dalam meter panjang (m1), termasuk panjang fitting nya, untuk pipa dengan diameter dibawah 3” Diameter pipa adalah diameter dalam Untuk pipa diatas diameter 3” , maka fittingnya dihitung tersendiri dengan satuan buah (No). Untuk sumber air bersih dari sumur dangkal / sumur dalam, atau dari instalasi kota, dihitung tersendiri dengan satuan unit. Pompa dihitung dalam unit.
Termasuk didalamnya pekerjaan memotong, membengkok pipa dan fittingnya, testing, penembusan pada dinding/lantai. Untuk fitting diatas diameter 3”, harga satuannya harus dimasukan dalam harga satuan fittingnya. Untuk biaya sumber air (sumur, instalasi kota), harus sudah termasuk semua peralatan, perijinan yang diperlukan,
B-10-10
INSTALASI AIR KOTOR
Instalasi air kotor adalah suatu system untuk menyalurkan semua air kotor didalam/diluar gedung secara lancar dan terarah. Fitting artinya semua asesoris
Panjang pipa harus diukur sepanjang garis sumbunya dalam meter panjang (m’), termasuk panjang fitting nya, untuk pipa dengan diameter dibawah 3” Diameter pipa adalah diameter dalam Untuk pipa diatas diameter 3”, maka fittingnya dihitung tersendiri dengan satuan buah (No.).
Termasuk didalamnya pekerjaan memotong, membengkok pipa dan fittingnya, testing, penembusan pada dinding/lantai. Untuk fitting diatas diameter 3”, harga satuannya harus dimasukan dalam harga satuan fittingnya.
27
yang digunakan untuk penyambungan pipa misalnya elbow, bends, tes, unions, sockets, nipples dll. Semua pipa dan fittingnya harus diklasifikasikan sesuai dengan tipe, diameter, metode penyambungan dan pemasangannya.
Untuk pipa/saluran beton , dihitung sepanjang garis sumbunya dalam m’ Untuk sanitair fittings dihitung tersendiri dalam satuan unit sesuai gambar dan spesifikasi.
B-10-11
(WWTP/STP)
WWTP /STP (waste water treatment plant / sewerage treatment plant) adalah : unit pengolah air limbah menjadi air yang layak dibuang ke perairan umum
Dihitung dalam satuan unit dan sub unit
Termasuk didalamnya bangunan, instalasi pengolah dan alat bantu lainnya serta manual operasional & pemeliharaan
7.11. PEKERJAAN LISTRIK: (B-11)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-11-01
INSTALASI LISTRIK
Instalai listrik adalah pemasangan peralatan instalasi dalam gedung mulai dari Panel distribusi atau papan hubung bagi (kotak MCB) sampai ke titik lampu, stop kontak atau titik beban lainnya
Panjang kabel diukur sesuai dengan diagram pengkabelan, dipisahkan sesuai diameter dan jenis kabel yang digunakan, dalam satuan meter panjang (m’). Untuk lampu, sakelar, stop kontak, dihitung terpisah sesuai jenis dan ukurannya dalam satuan buah (No.), cable trunking dalam meter panjang (m’)
Termasuk didalamnya semua penghantar dan peralatan lainnya yang diperlukan, as built drawing, operation dan manual, merger, dan commissioning test.
28
B-11-02
INSTALASI PENANGKAL PETIR
Instalasi penangkal petir adalah suatu instalasi yang dipasang diluar gedung untuk menangkal petir., dapat dengan system Franklin ataupun dengan system radio aktif atau lainnya
Diukur dalam satuan unit
Lengkap dengan instalasi pengkabelan beserta peralatan penangkal petir, pembumian serta commissioning test.
B-11-03
SOUND SYSTEM
Sound system adalah suatu system tata suara didalam dan diluar gedung yang memungkinkan suara/bunyi tersalurkan didalam ataupun diluar gedung
Diukur dalam satuan unit sesuai gambar dan spesifikasi
Lengkap dengan segala kelengkapan yang diperlukan, dan pemasangan pada tempatnya sesuai rencana.
B-11-04
INSTALASI IT
Instalasi IT adalah instalasi terpadu jaringan Informasi dan Teknologi yang memungkinkan terjalinnya informasi dengan menggunakan teknologi
Diukur dalam satuan unit sesuai gambar dan spesifikasi
Lengkap dengan segala perijinan dan kelengkapan yang diperlukan dan dipasang pada posisi yang direncanakan.
29
7.12. PEKERJAAN LUAR: (B-12)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-12-01
PAGAR KELILING
Pagar keliling adalah pagar sekeliling bangunan yang dipasang untuk keperluan keamanan dan kenyamanan gedung., yang dapat terdiri dari batu, besi atau kombinasi batu dan besi
Pagar dihitung dalam satuan panjang m’ Pintu pagar dihitung dalam satuan unit
Termasuk semua konstruksi pembantu (pondasi rel, kunci, pengecatan dll, pengangkutan dan pemasangan di posisi yang sesuai gambar dan spesifikasi.
B-12-02
JALAN DAN PARKIR
Jalan dan parkir dalam halaman banguan
Jalan dan parkir diukur dalam m2 sesuai gambar dan spesifikasi. Batu pinggir (kerb) diukur dalam m’.
Termasuk pemberian tanda-tanda lalu lintas yang diperlukan
B-12-03
LANDSCAPING
Pekerjaan pertamanan didalam halaman
Diukur luas dalam m2 sesuai gambar dan spesifikasi untuk rumput dipisahkan dari bunga-bunga dan pohon yang dihitung dalam buah/unit
Termasuk pemberian pupuk dan pemeliharaan agar dapat tumbuh dengan baik
B-12-04
FITTING DAN PERALATAN
Fitting dan peralatan penunjang, misalnya alat-alat bermain, banku-banku tempat duduk dan alat main lainnya
Dihitung per-unit sesuai macam dan jenisnya
Termasuk konstruksi pendukung, dan peralatan penunjang lainnya.
B-12-05
DRAINAGE
Suatu system pembuangan air kotor dan air hujan diluar gedung yang terintegras dengan saluran drainage dalam gedung
Saluran dan gorong-gorong dihitung dalam satuan m’, manhole dan sejenisnya dihitung dalam unit
Termasuk pekerjaan galian, pasangan dan timbunan yang diperlukan
30
B-12-06 WWTP/STP WWTP/STP adalah pekerjaan pengolahan air kotor ataupun kotoran septictank
Dihitung dalam satuan unit dan sub unit
Termasuk pekerjaan sipil, mekanikal, elektrikal yang diperlukan dan septictanknya. Serta saluran penghubung ke drainage kota.
7.13. PEMBERSIHAN AKHIR LAPANGAN: (B-13)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-13-01
PEMBERSIHAN AKHIR LAPANGAN
Adalah pekerjaan pembersihan setelah bangunan selesai dibangun dan lapangan disiapkan untuk melanjutkan pekerjaan diluar bangunan
Diukur luasnya dalam m2 , lapangan yang disiapkan untuk membangun fasilitas luar gedung antara lain parkir, taman dll
Termasuk didalamnya menggali, mengurug dan meratakan lapangan agar siap dibangun diatasnya bangunan/fasilitas luar gedung dan juga membuang keluar segala sampah konstruksi dan material sisa yang berada dilapangan.
7.14. FURNITURE: (B-14)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-14-01
FURNITURE
Furniture adalah pengadaan dan pemasangan semua peralatan furniture yang diperlukan untuk setiap ruangan
Dihitung dalam satuan unit sesuai gambar dan spesifikasi
Termasuk peralatan bantu yang diperlukan dan mendudukannya pada posisi yang ditentukan.
7.15. PERALATAN: (B-15)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN
SATUAN PEKERJAAN
CAKUPAN
PENGUKURAN
B-15-01
PERALATAN
Adalah semua peralatan khusus
Dihitung dalam satuan unit lengkap
Termasuk semua peralatan pendukung
31
yang tidak tercantum dalam item pekerjaan lain misalnya, peralatan dapur, gondola,peralatan kesehatan, boiler dan lainnya
yang diperlukan, agar peralatan tersebut dapat terpasang pada tempatnya dan berfungsi dengan baik, termasuk testing dan commisioningnya.
7.16. BIAYA UMUM: (B-16)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-16-01
BIAYA UMUM
Biaya Umum adalah biaya yang dikeluarkan selain biaya fisik proyek agar proyek dapat berjalan lancar selama masa pembangunan
Diuraikan secara jelas biaya apa saja antara lain : biaya asuransi, biaya peresmian, biaya social, biaya keamanan, biaya jaminan bank, dan biaya lain yang diperlukan
Semua biaya umum harus dinyatakan secara jelas dalam struktur biaya proyek dan diberlakukan sebagi pay item.
7.17. PROFIT (B-18)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-17-01
PROFIT
Profit adalah keuntungan Penyedia Jasa Konstruksi yang nilainya ditetapkan oleh Pemerintah
Profit dihitung dalam satuan % sesuai dengan Ketetapan Pemerintah.
TOTAL NET BIAYA PROYEK, dapat dilihat pada : 7.0. METODE PENGUKURAN
7.18. PROVISIONAL SUM (B-18)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-18-01
PROVISIONAL SUM
Adalah suatu nilai tertentu yang
Ditetapkan oleh owner dalam nilai USD, dan termasuk dalam nilai total
Hanya dapat digunakan atas perintah tertulis oleh
32
dicadangkan untuk suatu pekerjaan tertentu tapi belum dapat dihitung biayanya pada saat kontrak
kontrak owner.
7.19. CONTINGENCY (B-19)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-19-01
CONTINGENCY
Contingency adalah suatu nilai tertentu yang dicadangkan untuk suatu pekerjaan yang belum diketahui penggunaannya.
Ditetapkan oleh owner dalam nilai USD, dan termasuk dalam nilai total kontrak
Hanya dapat digunakan atas perintah tertulis oleh owner.
7.20. FEE KONSULTAN: (B-20)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-20-01
FEE KONSULTAN
Fee konsultan adalah fee konsultan perencana ataupun konsultan pengawas yang nilainya dicantumkan dalam kontrak
Dihitung sesuai dengan standar fee untuk konsultan
Untuk konsultan perencana, dimulai dari studi kelayakan, pra design, detail design, spesifikasi, BOQ, gambar detail, cost estimate, dan pendampingan pada saat pre-bid meeting. Untuk konsultan pengawas, termasuk laporan pengawasan harian, mingguan dan bulanan, memeriksa semua gambar kerja, gambar as buit dan laporan akhir proyek,
33
7.21. PMU COST: (B-21)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-21-01
PMU COST
PMU cost adalah suatu dana tertentu yang dialokasikan dalam proyek untuk keperluan Project Management Unit, dalam melaksanakan tugas pengelolaan proyek tersebut.
PMU cost dihitung berdasarkan prosentase tertentu dikalikan dengan TOTAL NET BIAYA PROYEK. Daftar prosentase PMU cost untuk berbagai jenis bangunan dapat dilihat dalam STANDARD FEE UNTUK KONSULTANT
TOTAL NET BIAYA PROYEK, dapat dilihat pada: 7.0. METODE PENGUKURAN
7.22. PAJAK: (B-22)
NOMOR KODE
JENIS
PEKERJAAN
DEFINISI
PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN
PENGUKURAN
B-22-01 PAJAK Pajak disini adalah pajak penghasilan sesuai peraturan pemerintah Timor Leste
Dihitung dalam satu kesatuan (terintegrasi) dalam Total Gross Biaya Proyek.
Termasuk dalam Total Gross Biaya Proyek yang akan dicantumkan sebagai Total Budget Proyek (Orsamento)
34
8.0. JUDUL DOKUMEN
Judul Dokumen ini adalah TIMOR LESTE STANDARD METHOD OF MEASUREMENT – 2 untuk Bangunan Jalan dan Jembatan, Edisi Pertama (Januari 2015), disingkat TL-SMM - 2 TL-SMM -2 dibuat untuk dipakai dalam hubungannya dengan General Condition of Contract, General Specifications atau aturan tambahan lain yang tertera didalam Dokumen Kontrak. Pekerjaan-pekerjaan harus diberi nomor dan diuraikan dalam Bill of Quantity secara detail agar memudahkan Kontraktor memberikan harga yang akurat dan metode pengukuran harus dicantumkan dalam Pembukaan dari Bill of Quantity Dalam Pembukaan harus mencantumkan metode pengukuran yang lain dari TL-SMM – 2, jika ada, yang dipakai dalam menghitung Bill of Quantity, khususnya pekerjaan-pekerjaan yang tidak tercakup dalam TL-SMM - 2.
9.0. TUJUAN
Tujuan dari TL-SMM – 2 adalah mengatur prosedur menghitung Bill of Quantity dan harga satuan dari suatu proyek konstruksi.
10.0. DEFINISI
10.1. Dalam dokumen ini dan dalam Bill of Quantity yang disusun sesuai dengan prosedur yang ditetapkan ini, kata-kata maupun pernyataan berikut mempunyai arti yang mengacu pada prosedur ini, kecuali ditetapkan lain.
10.2. “Condition of Contract” artinya “General Condition of Contract” yang tertera dalam Bidding/Contract Documents yang disediakan oleh Owner
10.3. Kata-kata dan pernyataan yang ditetapkan dalam Condition of Contract selanjutnya mempunyai arti yang sama.
10.4. Semua referensi ke klausul adalah referensi klausul yang diberi nomor dalam Condition of Contract dan referensi ke paragraph adalah referensi ke nomor yang ada disini
10.5. Kata “Pekerjaan” termasuk didalamnya pekerjaan yang dikerjakan, barang, material dan jasa yang diperlukan, dan kewajiban, pertanggungan serta risiko yang diperlukan oleh Kontraktor sesuai Kontrak.
10.6. Pernyataan “Yang diperlukan” berarti seperti yang tercantum dalam gambar dan Spesifikasi, atau atas perintah Pengawas/Engineer yang sesuai dan relevan dengan Condition of Contract
10.7. “Day work” berarti metode dalam menilai pekerjaan berdasarkan waktu yang digunakan oleh pekerja, material yang digunakan pada tempat yang disediakan.
10.8. “Original Ground Surface” berarti permukaan tanah sebelum suatu pekerjaan dimulai 10.9. “Final Excavated Surface” berarti suatu permukaan yang ditandai dalam gambar dimana
pekerjaan galian dikerjakan 10.10. “Commencing Ground Surface” untuk suatu item dalam Bill of Quantity berarti,
permukaan tanah dimana item tersebut dimulai 10.11. “Excavated Ground Surface” untuk suatu item dalam Bill of Quantity berarti, permukaan
dari suatu galian dari item pekerjaan yang akan dikerjakan.
35
11.0. KETENTUAN UMUM
11.1. Satuan Pengukuran Satuan Pengukuran untuk setiap item harus sesuai dengan item yang tercantum dalam TL-SMM-2. Satuan Pengukuran yang ditetapkan terhadap suatu jenis pekerjaan dalam TL-SMM-2 harus diterapkan juga pada semua item yang berkaitan dengan item tersebut. Sistem: Meter, Kilogram, Second (MKS) yang akan digunakan dalam TL-SMM -2 ini.
Didalam menulis dimensi atau mendiskripsikan suatu pekerjaan, urutan penulisannya harus dimulai dari panjang, kemudian lebar, dan tinggi.atau tebal.
Setiap pekerjaan harus dihitung volumenya secara neto, tanpa menambah sisa/buangan, overlapping, pemadatan, penekanan, perluasan/pelebaran dan lain-lain. Hal-hal yang tercantum disini ataupun yang tidak tercantum tapi nyata-nyata mengeluarkan biaya misalnya angkutan, gudang, perijinan, bongkar muat dll akan dihitung dalam harga satuan pekerjaannya.
Satuan dari setiap pekerjaan, mengikuti satuan yang tercantum dalam butir 5.0
Volume dihitung pembulatan sampai 2 digit di belakang titik, contoh 1,234.78, bukan 1,234.7765
11.2. Kode TL-SMM – 2
Pekerjaan-pekerjaan akan diklasifikasikan dalam berbagai “Sections”, dan selanjutnya dijabarkan lagi dalam “sub section” dan jenis pekerjaannya seperti yang tercantum dalam TL-SMM – 2, Bill of Quantity. Tatacara pengkodean seperti yang tertera dibawah ini:
. Digit Pertama menunjukan “Department”
. Dua digit berikutnya menunjukan“Section”
. Dua digit berikutnya lagi menunjukan“Sub Section”
. Digit selanjutnya menunjukan level pekerjaan yang lebih detail selanjutnya
36
11.3. Sub Seksi
Pekerjaan yang termasuk dalam Sub Seksi ini digunakan untuk keperluan pembayaran (pay item).
11.4. Aturan Pengukuran
Aturan Pengukuran menjadi pedoman untuk bagaimana cara mengukur suatu pekerjaan,
dan bagaimana metode untuk menghitung kuantitinya. Sebagai tambahan, General
Condition dibawah ini perlu diterapkan juga:
a) Kuantiti dari suatu pekerjaan yang diakui berkaitan dengan spesifikasi harus dihitung
dalam dimensi neto sesuai gambar dan dengan metode yang ditetapkan dalam
dokumen ini, kecuali dicantumkan secara khusus dalam penjelasan tambahan dalam
dokumen kontrak. Tidak diijinkan untuk memperhitungkan bulking, shrinkage
ataupun wastage, dalam menghitung kuantiti.
b) Semua pekerjaan harus diukur sesuai dengan gambar dan spesifikasi, dan jika
diperlukan, harus diklasifikasikan dan diukur tersendiri sesuai Bill of Quantities.
c) Kontraktor tidak boleh mengklaim perbedaan kuantiti yang dihitung berdasarkan TL-
SMM -2 dengan kuantiti actual dilapangan, kecuali ada pengecualian untuk item-item
yang spesifik yang tercantum dalam dokumen kontrak.
DEPARTMENT : Building (B) Road & Bridge (R) Irrigation (I) Harbour (H) Airport (A) Transmition Line (T)
SECTION : Preliminaries Sub Structures Upper Structures Etc………………. (01 to 99)
SUB SECTION: Foundation Concrete Column Brick wall Etc………………. (01 to 99)
SUBSEQUENT LEVELS
37
11.5. Definisi
Definisi menjelaskan batasan dan fungsi dari suatu item dalam klasifikasi pekerjaan dan
dalam Bill of Quantities yang disusun menurut TL-SMM – 2.
11.6. Cakupan Pengukuran
Cakupan pengukuran menjelaskan tentang cakupan pekerjaan atau material dari suatu
item pekerjaan yang tercantum dalam Kontrak. Sebagai tambahan pada aturan
cakupan ini, kondisi berikut perlu diterapkan:
a) Bongkar muat dan transportasi material yang berhubungan dengan item pekerjaan
tersebut
b) Semua item pekerjaan dalam TL-SMM – 2 harus dianggap termasuk didalamnya
semua operasi yang diperlukan untuk mewujudkan pekerjaan tersebut sesuai
dokumen kontrak.
c) Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh TL-
SMM – 2 ini akan diberikan terhadap item pekerjaan yang relevan.
11.7. Penjelasan Tambahan
Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh
pekerjaan yang tercakup dalam TL-SMM – 2 ini, akan disediakan terhadap pekerjaan
tertentu yang diperlukan.
12.0. SATUAN DAN SINGKATAN
Berikut ini adalah satuan dan singkatan yang akan digunakan:
Satuan Singkatan Millimeter mm Meter m Square millimeter mm2 or mm2 Square meter m2 or m2 Hectare ha Cubic meter m3 or m3 Kilogram kg Tone ton Metric Tone m.ton Summary sum Number no. Horse Power hp Week wk Litre ltr Lump Sum ls Jam jam Hari hr
38
13.0. TABEL KONVERSI : Dari Ke Dikalikan PANJANG Millimeter Inch 0.03937 Inch Millimeter 25.40005 Meter Foot 3.28084 Foot Meter 0.3048 Meter Yard 1.09361 Yard Meter 0.9144 Kilometer Mile 0.62137 Mile Kilometer 1.60935 BERAT MASSA Kilogram Pound 2.20462 Pound Kilogram 0.45359 Gram Ounce 0.03527 Ounce Gram 28.34949 Kilogram Quintal 0.01 Milligram Grain 0.01543 Kilogram Hundred Weight 0.01968 Hundred weight Tone 0.0508 Kilogram Tone 0.001 Kilogram Ton 0.00098 Pound Ton 0.00045 Tone Ton 0.98421 Kilogram Seer 1.01605 Kilogram Maund 0.02679 Gram Tola 0.08573 VOLUME Litre Pint (UK) 1.75975 Litre Gallon (imperial) 0.21997 Litre Gallon (US) 0.26417 Litre Cubic Foot 0.3531 Litre Cubic Meter 0.001 Cubic Foot Liter 28.31682 Milliliter Fluid ounce 0.0352 Gallon Imperial Liter 4.5461 Gallon US Liter 3.78541 Gallon Imperial Gallon US 1.20095 Cubic millimetre Cubic inch 0.00006 Cubic meter Cubic foot 35.31472 Cubic foot Cubic meter 0.02832 Cubic meter Cubic Yard 1.30795 Cubic yard Cubic meter 0.76456 LUAS Square millimeter Square inch 0.00155 Square inch Square millimeter 645.1613 Square meter Square foot 10.76392 Square foot Square meter 0.0929 Square meter Square yard 1.19599 Square yard Square meter 0.83613
39
Square meter Acre 0.00025 Hectare Acre 2.47105 Acre Hectare 0.40469 Square meter Hectare 0.0001 Square kilometer Square mile 0.3861 Square mile Square kilometer 2.58999 Hectare Square mile 0.00386 Square mile Hectare 258.9989 MASSA/UNIT LUAS Kilogram per square kilometer
Ton per square mile 0.00255
Kilogram per square meter Pound per square foot 0.20482 Pound per square foot Kilogram per square
meter 4.88243
MASSA PER UNIT VOLUME
Kilogram per cubic meter Pound per cubic foot 0.06243 Grams per liter Pound per cubic foot 0.06243 Pound per cubic foot Kilogram per cubic meter 16.01845 Pound per cubic foot Grams per liter 10.01845
Dalam mengkonversi satuan dari system yang satu ke system yang lain, pengukuran harus diambil 3 digit yang terdekat dalam system MKS, dan 2 digit yang terdekat dalam system FPS.
40
14.0. METODE PENGUKURAN
Seksi 01: Umum
Seksi 02: Drainase
Seksi 03: Pekerjaan tanah
Seksi 04: Pelebaran Perkerasan dan Bahu Jalan
Seksi 05: Pondasi Perkerasan Jalan lapis Pondasi Material Berbutir
Seksi 06: Lapisan Pondasi Berbasis Stabilisasi
Seksi 07: Perkerasan Beraspal (Bituminous Pavement)
Seksi 08: Struktur
Seksi 09: Pengembalian Kondisi dan Pekerjaan Minor
Seksi 10: Pekerjaan Harian
Seksi 11: Pekerjaan Pemeliharaan Rutin
TOTAL NET BIAYA BANGUNAN, …………………….. (A)
Section 12: Pembersihan Lapangan
TOTAL NET BIAYA PROYEK, …………………………… (B = A + 12)
Seksi 13: Biaya Umum
Seksi 14: Profit
Seksi 15: Provisional Sum
Seksi 16: Contingency
Seksi 17: Fee Konsultan
Seksi 18: PMU Cost
Seksi 19: Pajak
TOTAL GROSS BIAYA PROYEK, …….. C = B+(13+14+15+16+17+18+19)
41
14.1. UMUM: (R-01)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-01-01
MOBILISASI
Mobilisasi adalah suatu kegiatan awal untuk memobilisasi alat, tenaga kerja, fasilitas, perijinan yang diperlukan sebelum proyek dimulai secara fisik.
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci quantity, serta specificationnya sedemikian rupa agar memudahkan dalam menghitung harga/biaya mobilisasinya. Satuan unitnya adalah ls
Dalam menghitung harga /biaya mobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya social lainnya.
R-01-02
DEMOBILISASI
Demobilisasi adalah suatu kegiatan akhir untuk mendemobilisasi alat, tenaga kerja, fasilitas yang sudah tidak digunakan lagi di proyek
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci quantity, serta specificationnya sedemikian rupa agar memudahkan dalam menghitung harga/biaya demobilisasinya. Satuan unitnya adalah ls
Dalam menghitung harga /biaya demobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya social lainnya
R-01-03
PENGADAAN LAHAN UNTUK BASE CAMP
Pengadaan lahan untuk base camp adalah pengadaan lahan yang di perlukan untuk membangun base camp dengan luas sesuai kontrak.
Pengadaan lahan untuk base camp sesuai dengan luas yang di perlukan dengan satuan ls.
Termasuk biaya sewa dan perijinan yang diperlukan.
R-01-04
PEMBANGUNAN BASE CAMP
Base camp adalah fasilitas sementara yang harus dibangun oleh kontraktor untuk pelaksanaan proyek sesuai Kontrak, meliputi
Masing-masing: fasilitas harus dirinci:
a. Field Office (m2)
b. Tempat tinggal (m2)
c. Laboratorium (m2)
Termasuk furniture, peralatan dan perlengkapan yang diperlukan
42
antara lain : a. Field Office b. Tempat tinggal c. Laboratorium d. Bengkel e. Gudang f. Crushing
Plant g. Instalasi
pencampur aspal
h. Instalasi pencampur beton
i. Casting Yard j. Accsess
Road
d. Bengkel (m2) e. Gudang (m2) f. Crushing Plant
(unit) g. Instalasi
pencampur aspal (unit)
h. Instalasi pencampur beton (unit)
i. Casting Yard (m2)
j. Accsess Road (m2)
Diperhitungkan dalam satuan ls.
R-01-05
PEMBONGKARAN
Pembongkaran adalah pekrjaan membongkar bangunan lama yang terdapat dalam lokasi bangunan yang akan dibangun
Jika dalan BOQ diuraikan jenis pekerjaan bongkaran, maka dalam memberikan harga satuan dipisahkan menurut BOQ, dengan satuan ls
Harga satuan sudah termasuk peralatan, tenaga kerja serta perijinan, pengamanan, serta pembuangan ketempat pembuangan yang ditetapkan
R-01-06
RELOKASI UTILITAS
Relokasi utilitas adalah pemindahan utilitas yang menghambat pelaksanan perkerjaan ke lokasi yang ditetapkan.
Relokasi utilitas meliputi antara lain : a. Tiang dan
kabel telpon b. Tiang dan
kabel Listrik c. Jaringan
pipa air bersih
d. Jaringan pipa gas
e. Jaringan kabel bawah tanah
f. Traffic light
Dirinci dalam jenis dan jumlah dengan satuan ls.
Termasuk biaya transport, akomodasi dan perijinan yang di perlukan.
43
g. Rambu lalulintas
h. Pagar pembatas
14.2. DRAINASE: (R-02)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-02-01
SELOKAN TEPI JALAN (SIDE DITCH) DAN SALURAN AIR (DRAINAGE CHANNEL)
Selokan tepi jalan (side ditch) adalah saluran yang menyalurkan air yang jatuh di atas permukaan jalan. Saluran air (drainage channel) adalah saluran yang menampung dan menyalurkan air dari selokan tepi jalan.
Selokan tepi jalan dan saluran air dihitung dalam satuan m3.
Termasuk pembuangan tanah galian ke lokasi yang ditetapkan (disposal area).
R-02-02
PASANGAN BATU DENGAN ADUKAN SEMEN DAN PASIR (MORTARED STONE WORKS)
Pasangan batu dengan adukan semen dan pasir adalah pekerjaan pemasangan penutup dasar dan dinding selokan dan saluran air dengan menggunakan batu dan adukan semen dan pasir dengan bentuk dan dimensi sesuai gambar serta material yang memenuhi spesifikasi (mortar stone work lined ditch).
Pengukuran volume pekerjaan dengan satuan m3.
a. Pasangan batu
dengan adukan semen dan pasir meliputi :
• Kedua sisi dinding selokan dan saluran
• Dasar selokan dan saluran
b. Pekerjaan ini tidak termasuk pekerjaan galian.
R-02-03
GORONG – GORONG (CULVERT)
Gorong – gorong adalah bangunan persilangan
Volume pekerjaan gorong – gorong dihitung dalam
Termasuk pekerjaan perletakan dan sambungan gorong-
44
saluran air di bawah permukaan jalan dengan tipe, bentuk dan dimensi sesuai gambar, yang berfungsi mengalirkan air dari sisi yang satu ke sisi lainnya. Jenis gorong - gorong, antara lain : a. Gorong –
gorong pipa beton tanpa tulangan.
b. Gorong – gorong pipa beton bertulang.
c. Gorong – gorong beton bertulang tipe “Box”.
d. Gorong – gorong pelat beton bertulang di atas struktur stone masonry.
e. Gorong-gorong plat baja gelombang
satuan m. gorong.
R-02-04
DRAINASE BAWAH PERMUKAAN (SUB - SURFACE DRAINAGE)
Drainase bawah permukaan adalah sistem drainase yang dibangun dibawah permukaan jalan, dengan tipe, bentuk, dimensi, dan kedalaman sesuai gambar serta material sesuai spesifikasi.
Volume pekerjaan drainase bawah permukaan dihitung setiap jenis material yang digunakan dengan ketentuan sebagai berikut :
• Material timbunan kembali (backfill) dalam m3.
• Material penyaring (filter) dalam
Termasuk pemasangan pipa dan pemadatan timbunan kembali (backfill), tidak termasuk pekerjaan galian dan pembuangan sisa galian (disposal).
45
m3. • Geotekstil
adalah m2 • Pipa
berlubang-lubang (Perforated Pipe) dalam m.
14.3. PEKERJAAN TANAH: (R-03)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-03-01
GALIAN (EXCAVATION)
Galian adalah pekerjaan penggalian tanah, batuan, lumpur dan perkerasan jalan dengan geometrik, bentuk dan dimensi sesuai gambar.
Pekerjaan ini dihitung dengan satuan m3.
Pekerjaan galian termasuk angkutan pembuangan disposal.
R-03-02
TIMBUNAN
Timbunan adalah pekerjaan penimbunan dengan menggunakan material sesuai spesifikasi dan gambar perencanaan.
Pekerjaan ini dihitung dengan satuan m3 padat.
Pekerjaan timbunan termasuk antara lain :
a. Pengangkutan, penghamparan, dan pemadatan.
b. Uji mutu material dan kepadatan.
R-03-03
PENYIAPAN TANAH DASAR (SUBGRADE PREPARATION)
Pekerjaan ini adalah pekerjaan yang akan digunakan sebagai perletakan struktur perkerasan jalan.
Pekerjaan ini dihitung dengan satuan m2.
Penyiapan tanah dasar termasuk antara lain :
a. Perataan, pembentukan (profiling) dan pemadatan.
b. Uji daya dukung
46
R-03-04
PEKERJAAN PEMBERSIHAN DAN PERATAAN (CLEARING AND GRUBBING)
Pekerjaan ini adalah pengupasan tanah permukaan dengan ketebalan sesuai spesifikasi.
Pekerjaan ini dihitung selebar daerah milik jalan (Damija/ROW) sepanjang trase jalan dengan satuan m2.
Pekerjaan ini termasuk antara lain:
a. Pengupasan permukaan tanah, termasuk rumput dan tumbuh-tumbuhan serta tanaman dengan diameter batang kurang dari 15cm.
b. Membuang material kupasan kelokasi yang telah ditentukan.
R-03-05
PENEBANGAN DAN PENCABUTAN AKAR POHON (TREE REMOVAL)
Pekerjaan ini adalah penebangan dan pencabutan akar pohon diameter 15cm atau lebih yang tumbuh pada daerah milik jalan (Damija/ROW) sepanjang trase rencana jalan.
Pekerjaan ini dihitung dalam satuan buah dan diatur sebagai berikut :
a. Pohon diklasifikasikan dengan :
• Diameter 15 -30 cm
• Diameter 30 – 50 cm
• Diameter 50-75 cm
• Diameter > 75cm
b. Pada prinsipnya diameter pohon diukur pada ketinggian 1.00m. Khusus pohon Tali (sejenis Palm) yang tumbuh di Timor Leste diukur 0.30 m dari permukaan tanah
Pekerjaan ini termasuk pembuangannya ke lokasi yang ditetapkan.
47
14.4. PELEBARAN PERKERASAN DAN BAHU JALAN: (R-04)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-04-01
PELEBARAN PERKERASAN
Pekerjaan ini adalah memperlebar perkerasan sesuai gambar rencana.
Pekerjaan ini dihitung dengan ketentuan sebagai berikut :
a. Galian perkerasan dalam satuan m2.
b. Lapisan pondasi aggregat dalam satuan m3 padat.
c. Konstruksi lapisan aspal beton dalam satuan m3 padat.
d. Konstruksi jalan bitumen baru : m2
e. Penyemprotan bitumen tack coat dan prime coat m2.
Pekerjaan ini termasuk antara lain: a. Pengupasan
lapisan perkerasan
b. Membuang material kupasan ke lokasi tertentu.
c. Memadatkan dasar kupasan.
d. Menghampar dan memadatkan lapis pondasi aggregate.
e. Menghampar dan memadatkan lapis aspal beton.
f. Menghampar dan memadatkan lapisan bitumen baru
g. Menghampar bitumen tack coat.
h. Pengujian mutu. R-04-02
BAHU JALAN (SHOULDERS)
a. Pekerjaan ini
adalah bagian dari jalan yang terletak sepanjang sisi luar jalur lalulintas dengan elevasi, lebar dan kemiringan sesuai gambar.
b. Ada dua tipe struktur bahu jalan, yaitu : • Granular
shoulder • Bitumino
us paved shoulder.
Pekerjaan ini dihitung dengan satuan sebagai berikut :
a. Granular shoulder padat dalam m3.
b. Bituminous paved shoulder padat dalam m2.
Pekerjaan ini termasuk antara lain: a. Granular shoulder
Pengadaan dan pengangkutan material, pengham paran dan pemadatan
b. Bituminous paved shoulder Pencampuran, pengangkutan penghamparan dan pemadatan.
c. Uji mutu material dan uji mutu hasil pelaksanaan
48
14.5. PONDASI PERKERASAN JALAN LAPIS PONDASI MATERIAL BERBUTIR (GRANULAR BASE COURSE): (R-05)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-05-01
LAPISAN PONDASI BAWAH (SUB BASE COURSE)
Lapisan pondasi bawah adalah lapis material berbutir yang jenis dan sifatnya memenuhi persyaratan /spesifikasi, yang dihampar dan dipadatkan di atas tanah dasar dengan tebal, lebar, elevasi dan kemiringan sesuai gambar dan menggunakan material yang memenuhi spesifikasi
Volume pekerjaan lapis pondasi bawah dihitung dengan satuan m3.
Pekerjaan lapis pondasi bawah meliputi : a. Pengadaan,
pengangkutan, penghamparan, dan pemadatan.
b. Uji mutu material dan uji mutu pelaksanaan.
R-05-02
LAPISAN PONDASI ATAS (BASE COURSE)
Lapis pondasi atas adalah lapisan material berbutir yang jenis dan sifatnya memenuhi persyaratan / spesifikasi, yang di hampar dan di padatkan diatas lapis pondasi bawah dengan tebal, lebar elevasi dan kemiringan sesuai gambar dan menggunakan material yang memenuhi spesifikasi
Volume pekerjaan lapis pondasi atas dihitung dengan satuan m3.
Pekerjaan lapis pondasi atas meliputi : a. Pengadaan,
pengangkutan, penghamparan, dan pemadatan.
b. Uji mutu material dan mutu pelaksanaan.
49
R-05-03
LAPIS PONDASI JALAN TANPA PENUTUP ASPAL
Pekerjaan lapis pondasi jalan tanpa penutup aspal adalah pemasangan lapis pondasi agregat yang memenuhi persyaratan/spesifikasi, diatas permukaan tanah dasar yang telah disiapkan.
Pengukuran volume pekerjaan menggunakan satuan m3.
Pekerjaan ini mempunyai lingkup a. Pengadaan,
pengangkutan, penghamparan dan pemadatan material.
b. Uji mutu material dan mutu pelaksanaan.
14.6. LAPISAN PONDASI BERBASIS STABILISASI (R-06)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-06-01
LAPIS PONDASI SEMEN TANAH (SOIL CEMENT BASE)
Pekerjaan ini adalah pembuatan lapis pondasi perkerasan dengan menggunakan tanah yang memenuhi persyaratan/ spesifikasi, dicampur dengan semen Portland dengan komposisi tertentu setelah dicampur dan dipadatkan mempunyai kekuatan sesuai spesifikasi.
Pengukuran volume pekerjaan menggunakan metoda sebagai berikut: a. Lapisan pondasi
tanah semen: m3.
b. Jumlah semen: tons
Pekerjaan ini mempunyai lingkup a. penggemburan,
pencampuran, penghamparan, pembentukan (profiling), pemadatan.
b. Uji mutu material dan mutu control pelaksanaan
R-06-02
LAPIS PONDASI AGREGAT SEMEN
Pekerjaan ini adalah pembuatan lapis pondasi perkerasan dengan menggunakan agregat dicampur Portland cement
Pengukuran volume pekerjaan ini menggunakan satuan : - Agregat
material m3. - Semen
Portland : tons
Lingkup pekerjaan ini meliputi
a. Pengadaan, pencampuran, penghamparan, pemadatan;
b. Uji mutu material dan mutu control
50
yang memenuhi persyaratan dan setelah dihampar dan dipadatkan mempunyai kekuatan sesuai spesifikasi.
pelaksanaan.
R-06-03
STABILISASI KAPUR (LIME STABILIZATION)
Stabilisasi kapur adalah lapis pondasi yang dibuat dari material tanah kohesif dicampur kapur (lime) yang mempunyai sifat sesuai spesifikasi dengan komposisi tertentu, dihampar dan dipadatkan dengan tabal, elevasi dan kemiringan sesuai gambar.
Volume pekerjaan lapis pondasi stabilisasi kapur diukur dengan satuan a. Tanah : m3. b. kapur : ton
Pekerjan lapis pondasi stabilisasi kapur meliputi :
a. Pengadaan material, pencam puran, pengham paran, pema datan dan perawatan.
b. Uji mutu material dan uji mutu pelaksanaan.
R-06-04
STABILISASI ASPAL (BITUMINOUS STABILIZATION)
Stabilisasi aspal adalah lapis pondasi yang dibuat dari material granular yang mempunyai sifat sesuai spesifikasi dicampur dengan aspal (proses panas atau dingin) dengan komposisi tertentu dihampar dan dipadatkan dengan tebal, elevasi, dan kemiringan sesuai gambar.
Volume lapis pondasi stabilisasi aspal diukur dengan satuan a. Material
granular m3. b. Bitumen : ton
Pekerjaan lapis pondasi stabilisasi aspal meliputi :
a. Pengadaan material,pencampuran, peng hamparan,dan pemadatan,
b. Uji mutu material dan diuji mutu pelaksanaan.
51
R-06-05
STABILISASI KIMIA (CHEMICAL - STABILIZATION)
Stabilisasi kimia adalah tanah yang dicampur bahan kimia tertentu yang ditujukan untuk meningkatkan kekuatan dan kinerja, baik untuk tanah dasar (Improved Subgrade), lapisan pondasi bawah ataupun lapis pondasi atas.
Lapis stabilization tanah dengan bahan kimia volumenya dihitung satuan m3.
Pekerjaan stabisasi tanah dengan bahan dengan bahan kimia meliputi :
a. Pengadaan material, pencampuran, pengham -paran dan pemadatan serta perawatan.
b. Pengujian mutu material dan uji mutu pelaksanaan.
14.7. PERKERASAN BERASPAL BUTIMINOUS PAVEMENT) : (R-07)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-07-01
LAPISAN RESAP PENGIKAT (PRIME COAT)
Lapisan resap pengikat adalah pekerjaan pemberian / pema sangan lapis tipis cairan berbasis bitumen yang di semprotkan pada permukaan lapis pondasi sebelum lapis perkerasan beraspal dihampar.
Volume pekerjaan lapis resap pengikat diukur dengan satuan m2 terpasang yang di setujui oleh pemberi tugas.
Pekerjaan pemasangan lapis resap pengikat meliputi : a. Membersihkan
permukaan lapis pondasi.
b. Menyemprotkan cairan bahan lapis resap pengikat secara merata keseluruh permukaan dengan porsi sesuai spesifikasi.
c. Uji mutu bahan dan hasil pelaksanaan.
R-07-02
LAPIS PEREKAT (TACK COAT)
Lapis perekat adalah pekerjaan pemberian / pemasangan cairan berbasis bitumen yang jenis dan sifatnya memenuhi spesifikasi, yang di semprotkan diseluruh permukaan
Volume pekerjaan perekat diukur dengan satuan m2 terpasang dan disetujui oleh pemberi tugas.
Pekerjan pemasangan lapis perekat meliputi : a. Pembersihan
seluruh permukaan b. Penyemprotan
lapis perekat secara merata keseluruh permukaan.
c. Uji mutu material dan pelaksana an.
52
beraspal, sebelum lapis bersaspal berikutnya dihampar.
R-07-03
LAPIS TIPIS ASPAL PASIR (SAND SHEET)
Lapis tipis aspal pasir (terminologi Indonesia disebut latasir) adalah memberikan lapis diatas permukaan perkerasan beraspal atau permukaan beton dengan menggunakan pasir dan aspal yang dicampur melalui proses pemanasan pada suhu tertentu, sesuai spesifikasi.
Volume latasir diukur dengan satuan m2.
Pekerjaan latasir meliputi : a. Pengadaan
material pencampuran, penghamparan dan pemadatan.
b. Sebelum penghamparan dilakukan penyiapan permukaan perkerasan yang Akan dilapis. • Pembersihan. • Pemberian
lapis tack coat. • Uji mutu bahan
dan uji mutu pelaksanaan.
R-07-04
HOT ROLLED SHEET WEARING COARSE (HRS - WC)
a. HRS-WC adalah
pekerjaan pemasangan lapisan aus yang bersifat lentur dengan menggunakan komponen bahan, terdiri dari aggregat kasar, aggregate halus dan aspal dengan komposisi tertentu, yang dicampur, dihampar dan dipadatkan dalam kondisi panas.
b. Tebal padat lapisan HRS-WC adalah 40mm.
Volume pekerjaan lapis HRS –WC diukur dengan satun m2.
Pekerjaan HRS –WC meliputi : a. Penyiapan
permukaan yang Akan dilapis. • Pembersihan. • Lapis tack
coat. b. Pengadaan
material, pencampuran, penghamparan dan pemadatan.
c. Uji mutu material dan pelaksanaan.
53
R-07-05
ASPAL BETON CAMPURAN PANAS (HOTMIX ASPHALTIC CONCRETE)
Aspal beton campuran panas adalah pekerjaan pembuatan dan pemasangan lapisan perkerasan beraspal diatas lapis pondasi. Komposisi terdiri dari agregat kasar, agregat halus, filler dan aspal dengan komposisi tertentu yang dicampur, dihampar dan dipadatkan dalam kondisi panas dengan tebal sesuai gambar.
Volume pekerjaan aspal beton diukur dan dihitung dengan satuan :
• AC – Base, dalam m3
• AC - Binder (AC – BC), dalam m2
• AC – Wearing (AC – WC) dalam m2
Pekerjaan lapis aspal beton meliputi : a. Pengadaan
material, pencampuran, penhamparan dan pemadatan.
b. Uji mutu bahan dan uji mutu pelaksanaan.
R-07-06
LAPISAN PONDASI ASPAL CAMPURAN PANAS (ASPHALT TREATED BASE = ATB, DAN ASPHALT TREATED SUB BASE = ATSB)
a. Lapis pondasi
aspal campuran panas adalah lapis pondasi perkerasan yang dibuat dari agregat kasar, agregat halus dan aspal dengan komposisi tertentu serta dicampur, dihampar dan dipadatkan dalam kondisi panas.
b. Tebal lapis pondasi campuran panas sesuai gambar.
Volume pekerjaan lapis pondasi aspal panas diukur dengan satuan m3 lapisan padat dan disetujui oleh pemberi tugas.
Pekerjaan lapis pondasi campuran panas meliputi : a. Pengadaan
material, pencampuran, peng hamparan dan pemadatan.
b. Uji mutu bahan dan uji mutu pelaksanaan.
R-07-07
PEKERJAAN LAPISAN CAMPURAN BERASPAL PANAS (HOT MIX)
Pelapisan campuran beraspal panas adalah pelaksanaan pekerjaan yang meliputi pengadaan lapis padat yang awet, baik untuk lapis perata (leveling), lapis pondasi (base), dan lapis aus (wearing),
Pengukuran volume pekerjaan lapisan campuran beraspal panas dilakukan dengan metoda sebagai berikut: a. Latasir kelas
A, Latasir kelas B, HRS-WC, AC-WC,
Pelapisan campuran beraspal panas mempunyai lingkup pekerjaan:
a. Latasir kelas A (Sand Sheet Class A-SSA) tebal minimum 15mm.
b. Latasir kelas B (Sand Sheet
54
yang terdiri dari agregat dan bahan aspal yang memenuhi persyaratan/ spesifikasi, yang dicampur secara panas di pusat instalasi pencampur (Instalasi Asphalt Mixing Plant) serta menghampar dan memadatkan dengan tebal tertentu dan memenuhi garis, ketinggian dan potongan memanjang sesuai gambar rencana.
dihitung dengan satuan meter persegi luas terpasang dalam kondisi padat.
b. HRS-Base, AC-BC, dan AC-Base dihitung dengan satuan meter kubik, yaitu tebal dalam kondisi padat dikalikan dengan luas permukaan terpasang.
c. HRS-WC, AC-WC, AC-BC dan AC-Base untuk leveling dihitung dengan satuan ton, yaitu jumlah volume terpasang dikalikan dengan berat per satuan volume padat.
Class B-SSB) tebal minimum 20mm.
c. Latastan sebagai lapis aus (HRS-WC), tebal minimum 30mm.
d. Latastan sebagai lapis pondasi (HRS-Base), tebal minimum 35mm.
e. Laston sebagai lapis aus (Asphaltic Concrete Wearing Course; AC-WC) tebal minimum 40mm.
f. Laston sebagai lapis Antara (Asphaltic Concrete Binder Course, AC-BC) tebal minimum 50mm.
g. Laston sebagai lapos pondasi (Asphaltic Concrete Base, AC-Base) tebal minimum 60mm.
R-07-08
PEKERJAAN LABURAN ASPAL (SURFACE DRESSING)
Pelaburan aspal adalah pelaksanaan pekerjaan pelaburan aspal pada permukaan lapis pondasi agregat kelas A yang sudah diberi lapis resap pengikat, atau pada permukaan aspal lama, yang
Pengukuran volume pekerjaan dilakukan dengan satuan sebagai berikut: a. Agregat
Penutup Single dan Double Surface Dressing
Pekerjaan laburan aspal mempunyai lingkup sebagai berikut: a.Laburan aspal 1 lapis (Single surface dressing), yaitu laburan aspal yang ditutup dengan satu lapis agregat (chipping).
55
kemudian ditutup dengan butiran agregat yang mutu dan gradasinya memenuhi persyaratan/spesifikasi.
dalam satuan meter persegi luas permukaan terpasang.
b.Bahan aspal untuk pelaburan dihitung volume yang dibutuhkan setiap meter persegi dikalikan dengan berat per satuan volume padat.
b.Laburan aspal dua lapis (Double surface dressing), yaitu laburan aspal yang ditutup dengan dua lapis agregat (chipping), setiap lapis diberi pengikat aspal.
R-07-09
PERKERASAN ASPAL CAMPURAN DINGIN (BITUMINOUS COLD MIX)
Perkerasan aspal campuran dingin adalah pekerjaan pembuatan lapis perkerasan dengan menggunakan agregat dan aspal cair yang dicampur, dihampar dan dipadatkan dalam keadaan dingin.
Volume Pekerjaan lapis perkerasan campuran dingin diukur dengan satuan m3 padat dan disetujui oleh pemberi tugas.
Pekerjaan lapis perkerasan campuran dingin meliputi : a. Pengadaan
material, pencampuran, pemeraman, penghamparan dan pemadatan.
b. Uji mutu bahan dan uji mutu pelaksanaan
R-07-10
PENETRASI MACADAM (LAPEN)
Penetrasi macadam lapis perkerasan dengan tebal sesuai gambar, terdiri dari lapis agregat pokok, lapis agregat pengunci dan lapis agregat penutup, setiap lapis di padatkan dan disemprot dengan aspal cair yang sejenis, mutu dan jumlah yang disemprotkan sesuai spesifikasi. Lapis penetrasi macadam dapat berfungsi sebagai pondasi (tanpa agregat penutup).
Volume pekerjaan lapis penetrasi diukur / dihitung dengan satuan m3 terpasang dan padat serta disetujui oleh pemilik proyek.
Pekerjaan lapis penetrasi macadam meliputi : a. Pengadaan
material peng hamparan, dan pemadatan.
b. Penyemprotan aspal cair pada setiap lapisan yang selesai dipadatkan.
c. Uji mutu material dan mutu pelaksanaan.
56
R-07-11
SURFACE DRESSING
a. Surface dressing
adalah : Pemasangan lapis tipis pada Permukaan perkerasan beraspal lama (Existing Pavement), dengan cara penyemprotan cairan Aspal Panas,kemudian langsung ditaburi agregat (Chipping)yang sifatnya sesuai spesifikasi .
b. Ada 2 tipe Struktur Surface Dressing : • Surface
Dressing satu lapis (Single Surface Dressing).
• Surface dressing dua Lapis (Double Surface Dressing).
Volume pekerjaan surface dressing dihitung dengan satuan m2.
Pekerjaan surface dressing meliputi : a. Pembersihan
permukaan perkerasan yang akan dilapis.
b. Pengadaan Material
c. Penyemprotan cairan aspal panas.
d. Penaburan, perataan dan pemadatan agregat (Chipping).
e. Uji mutu Material dan uji mutu Pelaksanaan.
R-07-12
PELABURAN ASPAL (SANDING)
Pelaburan aspal adalah pekerjaan permukaan perkerasan lama yang bersifat non structural dengan cara meyemprot cairan aspal panas merata keseluruh permukaan, kemudian ditaburi dengan pasir kering.
Velume Pekerjaan sanding diukur dengan satuan m2.
Pekerjaan laburan aspal meliputi : a. Pengadaan bahan,
pemanasan aspal, penyemprotan dan penebaran pasir.
b. Uji mutu material dan uji mutu pelaksanaan.
57
14.8. STRUKTUR: (R-08)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-08-01
BETON SEMEN (CEMENT CONCRETE
Beton semen adakah pembuatan struktur yang dibuat dari agregat kasar, agregat halus,semen Portland dengan atau tanpa bahan tambah dan air dicampur dengan komposisi tertentu, dicor, dipadatkan dengan bentuk dan dimensi sesuai gambar.
Volume pekerjaan beton semen diukur dengan satuan m3 terpasang dan disetujui oleh pemberi tugas.
Pekerjaan beton semen meliputi : a. Pengadaan
material, pencampuran, pengecoran, pemadatan dan perawatan struktur beton. • Tidak bertulang • Bertulang • Pratekan
Yang dicor ditempat maupun pracetak.
b. Uji mutu bahan dan uji mutu pelaksanaan
R-08-02
BETON PRATEKAN (PRESTRESSED CONCRETE)
Beton pratekan adalah pekerjaan pembuatan struktur dengan menggunakan komponen / elemen beton pretekan pracetak pretension atau postension dengan tipe, bentuk dan dimensi sesuai dengan gambar serta mutu bahan sesuai spesifikasi.
Volume pekerjaan beton pratekan dihitung dengan satuan sebagai berikut : a. Komponen
jembatan / Girder: Buah (Each).
b. Diafragma : m3.
c. Stressing wire : kg
Pekerjaan beton pratekan Meliputi :
a. Fabrikasi, Pengangkutan, Penyimpanan, Pemasangan, Penyambungan dan Erection / Launching
b. Uji mutu bahan dan uji mutu Pelaksanaan.
58
R-08-03
BAJA TULANGAN (REINFORC ING-STEEL)
Baja tulangan adalah pembuatan baja tulangan dengan jenis, bentuk diameter dan panjang sesuai dengan gambar dan mutu sesuai spesifikasi.
Volume pekerjaan baja tulangan diukur dengan satuan kg.
Pekerjaan baja tulangan meliputi : a. Pengadaan,
pengangkutan dan penyimpanan.
b. Fabrikasi (Pemotongan pembengkokan)
c. Pemasangan d. Uji mutu bahan.
R-08-04
BAJA STRUKTUR (STRUCTURAL STEEL)
Struktur baja adalah pekerjaan pembuatan gelegar baja (Steel Girder) untuk struktur komposit dengan bentuk, panjang dan dimensi sesuai gambar serta mutu Sesuai Spesifikasi.
Volume pekerjaan struktur baja dengan satuan kg.
Pekerjaan struktur baja meliputi : a. Pengadaan,
Pengangkutan, Fabrikasi dan penyimpanan.
b. Pemasangan (Erection / Launching)
R-08-05
JEMBATAN RANGKA BAJA (STEEL TRUSSES BRIDGE)
Jembatan rangka baja adalah pekerjaan pembangunan jembatan struktur rangka baja dengan bentuk dan jenis dan mutu baja sesuai spesifikasi.
Volume Pekerjaan Jembatan baja dihitung dengan satuan kg.
Pekerjaan jembatan rangka meliputi : a. Pengadaan
• Fabrikasi • Pengangkutan • Penyimpanan
b. Pemasangan (Erection / Launching)
R-08-06
PONDASI TIANG/PILE FOUNDATION
Pondasi tiang. adalah pembangunan pondasi untuk mendukung struktur berupa : a.Tiang Pancang
• Beton Pracetak
• Baja • Kayu
b.Tiang beton yang dicor setempat. Dengan dimensi, bentuk dan
Volume pekerjaan pondasi tiang dihitung dengan satuan sebagai berikut :
a. Penyediaan tiang kayu: m3.
b. Penyediaan tiang beton bertulang pracetak: m.
c. Penyediaan tiang beton Prestress Pracetak: m.
d. Penyediaan Tiang Pancang baja : kg
Pekerjaan Pondasi Tiang meliputi : a. Penyediaan
material, pemancangan, pembuatan casting place.
b. Uji mutu Material dan uji mutu pelaksanaan.
59
konfigurasi sesuai gambar serta mutu bahan sesuai spesifikasi.
e. Pemancang tiang : m
f. Pembuatan tiang beton casting place : m2.
g. Pembuatan turap Kayu dan beton : m2.
h. Pembuatan turap baja m2.
R-08-07
PONDASI SUMURAN
Pondasi sumuran adalah satu Pondasi beton bertulang dengan Penampang bulat atau persegi, dan dimensi serta diletakkan dalam tanah pada kedalaman sesuai gambar dan mutu bahan sesuai Spesifikasi.
Volume Pekerjaan sumuran di hitung dengan satuan m.
Pekerjaan Pondasi sumuran Meliputi : a. Penyediaan dinding
sumuran : • Pracetak
segmental. • Cor ditempat
b. Penurunan dinding sumuran
R-08-08
ADUKAN SEMEN (MORTAR CEMENT)
Adukan semen adalah pekerjaan pembuatan mortar, terdiri dari pasir, semen hidrolis dan air yang dicampur merata dengan komposisi dan mutu material sesuai spesifikasi.
Di ukur dalam satuan m3
Pekerjaan adukan semen meliputi : a. Pengadaan dan
penyimpanan material dan pencampuran.
b. Uji mutu Material dan uji mutu pelaksanaan.
R-08-9
PASANGAN BATU (STONE MASONRY)
Pasangan batu adalah pekerjaan pembuatan struktur dengan bentuk dan dimensi sesuai gambar, dibuat dari butiran batu ukuran 10 – 20 cm yang rongga – rongganya diisi dengan semen mortar yang berfungsi sebagai pengikat.
Volume pekerjaan pasangan batu dihitung dengan satuan m3 termasuk semen mortarnya.
Pekerjaan pasangan batu meliputi : a. pengadaan material. b. Pemasangan batu
dengan semen mortar
c. Pekerjaan pasamgan batu tidak termasuk galian
60
R-08-10
PASANGAN BATU KOSONG
Pasangan batu kosong adalah pembuatan struktur pelindung bangunan di aliran air, terdiri dari susunan batu dengan ukuran dan mutu memenuhi spesifikasi, serta bentuk dan dimensi struktur sesuai sesuai gambar.
Volume pekerjaan batu kosong di ukur dengan satuan m3 terpasang dan disetujui pemilik Proyek.
Pekerjaan batu kosong meliputi : a. Pengadaan
material. b. Pemasangan /
penyusunan batu
R-08-11
BRONJONG (GABION)
Bronjong adalah pekerjaan pembuatan struktur dengan bentuk dan dimensi sesuai gambar, serta menggunakan susunan kotak kawat yang setiap kotak diisi sepenuhnya dengan butiran batu yang memenuhi spesifikasi.
Volume pekerjaan bronjong ihitung dengan satuan m3 terpasangdan disetujui oleh pemilik proyek.
Pekerjaan bronjong meliputi : a. Pengadaan material b. Pemasangan
struktur
R-08-12
BLINDING STONE
Blinding stone adalah pekerjaan pembuatan lapisan alas dibawah pondasi struktur, berupa lapisan batu dan semen mortar yang mutunya sesuai spesifikasi, bentuk dan dimensinya sesuai gambar.
Volume pekerjaan blinding stone diukur dengan satuan m3 terpasang dan disetujui oleh pemberi tugas.
Pekerjaan blinding stone meliputi :
a. Pengadaan material
b. Pemasangan blinding stone
.
61
R-08-13
SAMBUNGAN EKSPANSI (EXPANSION JOINT)
Sambungan ekspansi adalah pekerjaan pemasangan sambungan lantai jembatan (Concrete Bridge Deck), terbuat dari logam, elastomeric, bahan pengisi (Filler) dan bahan penutup (Sealer) yang mutunya sesuai spesifikasi dan dimensinya sesuai gambar.
Volume pekerjaan sambungan ekspansi dihitung dengan satuan m terpasang dan disetujui pemilik Proyek.
Pekerjaan ekspansi meliputi : a. Pengadaan dan pemasangan
b. Uji mutu bahan
R-08-14
PERLETAKAN JEMBATAN (BRIDGE BEARING)
Perletakan jembatan adalah pekerjaan pemasangan landasan penopang girder atau pelat yang jenis dn mutunya sesuai dengan spesifiksai serta bentuk dan dimensinya sesuai gambar.
Volume pekerjaan perletakan jembatan dihitung dengan satuan sebagai berikut :
a. Perletakan
elastomeric dan logam: buah (bh).
b. Strip Bearing : m.
Perletakan jembatan meliputi :
a. Pengadaan dan pemasangan.
b. Uji mutu bahan.
R-08-15
SANDARAN (RAILING)
Sandaran adalah pekerjaan pemasangan pagar pengaman yang dipasang pada kedua sisi sepanjang jembatan, berupa struktur beton bertulang dan baja Galvanised, yang memenuhi Spesifikasi serta bentuk dan dimensi sesuai gambar.
Volume pekerjaan dihitung dengan satuan meter terpasang dan di setujui pemilik Proyek.
Pekerjaan sandaran jembatan meliputi pengadaan material, fabrikasi dan pemasangan.
R-08-16
PAPAN NAMA JEMBATAN / PRASASTI
Papan nama jembatan adalah pekerjaan pembuatan dan pemasangan
Volume pekerjaan papan nama jembatan dihitung dengan satuan buah (bh).
Pekerjaan imi meliputi pembuat dan pemasangan pada lokasi yang disetujui pemilik Proyek.
62
pelat nama yang dibuat, bentuk dan dimensinya sesuai gambar.
R-08-17
PEMBONGKARAN STRUKTUR (DEMOLITION OF EXISTING STRUCTURE)
Pembongkaran struktur adalah pekerjaan pembongkaran struktur jembatan, tembok penahan, gorong –gorong, termasuk apron serta struktur bangunan lainnya, serta membuang material bongkaran kelokasi yang telah ditetapkan.
Volume pekerjaan pembongkaran dihitung sebagai berikut : a. Pasangan batu
dalam meter kubik (m3).
b. Plain concrete ,RC dan prestressed concrete dalam m3
c. Struktur rangka baja dalam kg. d. Steel Girder
dalam meter panjang.
e. Bangunan gedung dalam m2.
f. Struktur jembatan kayu dalam m2.
Pembongkaran struktur meliputi : a. Pembongkaran b. Pengangkutan disposal
R-08-18
PERKERASAN BETON SEMEN ( PCC PAVEMENT)
Perkerasan beton semen adalah pekerjaan pembuatan perkerasan kaku dengan menggunakan beton semen yang memenuhi spesifikasi dengan tebal, elevasi dan grade sesuai gambar.
Volume pekerjaan perkerasan beton semen dihitung dengan satuan : a. Concrete : m3. b. Steel tie bar
dan dowels : kg c. Joint sealant :
m.
Pekerjaan Perkerasan beton semen meliputi : a. Pengadaan
material, pencampuran, pemadatan dan perawatan.
b. Instalasi dowel bar dan tie bar
c. Cutting and sealing of expansion/construction joint.
d. Uji mutu material dan uji mutu pelaksanaan.
63
R-08-19
LEAN CONCRETE
Lean concrete adalah pekerjaan pembuat lapis perata di bawah struktur dengan material agregat semen dan air yang mutunya sesuai spesifikasi dengan tebal sesuai gambar.
Volume pekerjaan Lean Concrete di hitung dengan satuan m3.
Pekerjaan lean concrete meliputi : a. Pengadaan
material, pencampuran, penghamparan dan pemadatan.
b. Uji mutu material dan uji mutu pelaksanaan.
14.9. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR: (R-09)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-09-01
PENGEMBALIAN KONDISI PERKERASAN LAMA
Pengembalian kondisi perkerasan lama adalah perbaikan kerusakan berupa lubang, kerusakan tepi perkerasan, corrugasi, retak-retak, deformasi dan kerusakan lainnya dalam rangka memberikan jaminan perkerasan dapat dilalui kendaraan dengan aman dan nyaman.
Pengukuran volume pekerjaan menggunakan satuan sebagai berikut: a. Lapis pondasi
agregat A untuk pekerjaan minor: m3
b. Lapis pondasi agregat B untuk pekerjaan minor: m3
c. Lapis pondasi agregat untuk perkerasan tanpa penutup aspal: m3
d. Water bound macadam untuk pekerjaan minor m2
e. Campuran aspal panas untuk pekerjaan minor: m3
f. Penetrasi macadam untuk pekerjaan minor: m3
g. Campuran aspal dingin untuk pekerjaan minor: m3
h. Laburan aspal: m2
Lingkup pekerjaan ini adalah: Perbaikan minor lapis pondasi agregat A atau agregat B. a. Perbaikan minor
dengan lapis agregat tanpa penutup aspal.
b. Perbaikan minor dengan lapis water bound macadam.
c. Perbaikan minor dengan lapis aspal campuran panas.
d. Perbaikan minor dengan penetrasi macadam.
e. Pekerjaan minor dengan lapis aspal campuran dingin.
f. Pekerjaan minor dengan laburan aspal
64
R-09-02
PENGEMBALIAN KONDISI DRAINASE
Pengembalian kondisi drainase adalah pekerjaan perbaikan minor drainage jalan agar kondisinya seperti semula sehingga berfungsi kembali mengalirkan air.
Volume pekerjaan pengembalian kondisi drainase diukur dengan satuan sebagai berikut : a. Pelebaran /
Pendalaman saluran drainase:m.
b. Perbaikan dinding / dasar saluran: m.
Pekerjaan pengembalian kondisi Drainase meliputi : a. Pengadaan material
b. Pelaksanaan pelebarandan atau pendalamn dasar saluran
c. Perbaikan dinding dan dasar saluran: m.
R-09-03
PENGEMBALIAN KONDISI BAHU JALAN
Pengembalian kondisi bahu jalan adalah pekerjaan perbaikan minor bahu jalan pada perkerasan beraspal sebagai upaya mengembalikan fungsi bahu jalan
Volume pekerjaan pengembalian kondisi jalan diukur dengan satuan sebagai berikut : a. Pembersihan vegetasi : m2 b. Galian minor : m3 c. Pelapisan
tambahan agregat : m3
d. Pembersihan pohon: buah
Pekerjaan pengembalian kondisi bahu jalan meliputi : a. Pembersihan
vegetasi b. Galian minor c. Pelapisan Tambahan d. Pembersihan pohon
R-09-04
PENGEMBALIAN KONDISI SAMPING JALAN
Pekerjaan pengembalian kondisi samping jalan adalah pekerjaan minor untuk mengembalikan kondisi samping jalan, termasuk lereng timbunan dan lereng galian.
Kuantitas pekerjaan pengembalian kondisi samping jalan dihitung sebagai berikut : a. Perbaikan minor
lereng timbunan : m3
b. Perbaikan minor lereng galian : m3
c. Penanaman rumput : m2
Pekerjaan pengembalian kondisi samping jalan termasuk : a. Penyediaan,
penghamparan dan pemadatan material
b. Pembuangan sisa material ke disposal area.
R-09-05
PENGEMBALIAN KONDISI PERLENGKAPAN JALAN DAN RAMBU LALULINTAS
Pengembalian kondisi perlengkapan jalan dan rambu lalulintas adalah pekerjaan perbaikan minor dan pemasangan kembali perlengkapan jalan dan rambu lalu lintas.
Volume pekerjaan dihitung dengan satuan sebagai berikut : a. Pemasangan
marka dengan Thermoplastic Paint : m2
b. Rambu lalulintas : buah (bh)
c. Guide post :
Pekerjaan ini meliputi : a. Penyediaan dan
pengangkutan material
b. Pemasangan. c. Pengelolaan
keselamatan lalulintas.
65
buah (bh) d. Km dan hm
post : buah (bh) e. Guard Rail : m f. Precast
concrete curb : m
R-09-06
PENGEMBALIAN KONDISI JEMBATAN
Pengembalian kondisi jembatan adalah pekerjaan perbaikan minor terhadap elemen jembatan dalam rangka memperpanjang umur pelayanan
Volume pekerjaan
dihitung dengan satuan sebagai berikut : a. Lantai
jembatan beton: m2
b. Lantai jembatan kayu : m2
c. Lapis permukaan baja struktur :m2
d. Railing : m
Pekerjaan ini meliputi : a. Perbaikan minor
Lantai Jembatan. b. Perbaikan lapis
permukaan baja struktur.
c. Perbaikan railing
R-09-07
PERBAIKAN CURB PRACETAK PEMISAH JALUR
Perbaikan curb pracetak pemisah jalur adalah pekerjaan penggantian / perbaikan curb pracetak pembatas jalur lalulintas.
Volume pekerjaan ini dihitung dengan satuan m.
Pekerjaan ini meliputi : a. pengadaan dan
pemasangan curb.
b. Uji mutu material.
R-09-08
PERBAIKAN PENERANGAN JALAN
Perbaikan penerangan jalan adalah pekerjaan perbaikan instalasi penerangan jalan, sesuai spesifikasi dan gambar.
Volume pekerjaan perbaikan penerangan dihitung dengan satuan unit.
Pekerjaan ini meliputi : a. Pengadaan
materal dan pemasangan.
b. Perijinan dan koordinasi dengan instansi terkait.
R-09-09
PAGAR PEMISAH PEDESTRIAN
Pagar pemisah pedestrian adalah pekerjaan perbaikan pagar pemisah jalur lalu lintas dan jalur pejalan kaki dengan menggunakan
Volume pekerjaan pagar pemisah dihitung dengan satuan m.
Pekerjaan ini meliputi pengadaan material, fabrikasi, pemasangan.
66
material sesuai spesifikasi serta bentuk dan dimensi sesuai gambar.
14.10. PEKERJAAN HARIAN: (R-10)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-10-01
PEKERJAAN HARIAN (DAY LY WORKS)
Pekerjaan harian adalah pekerjaan tertentu yang tidak termasuk dalam BOQ tetapi atas instruksi Pemilik Proyek dianggap penting untuk dikerjakan agar memuaskan dalam pelaksanaan dan penyelesaian proyek.
Kuantitas pekerjaan harian dibayar berdasarkan prestasi harian dan jam kerja efektif selama pelaksanaan pekerjaan harian meliputi : a. Kuantitas
sebenarnya material yang digunakan dan berdasarkan sertifikat dari supplier yang disetujui dan diatur pada bagian 1 sampai 9.
b. Penggunaan tiap jenis alat yang dicatat setiap hari dan disetujui dalam satuan jam.
c. Jumlah pekerja yang aktual setiap hari selama jam kerja efektif dalam satuan jam.
Pekerjaan harian termasuk :
a. Pekerjaan drainase tambahan.
b. Pekejaan galian, timbunan dan stabilisasi.
c. Pekerjaan tambahan perkerasan.
d. Uji mutu. e. Tambahan
overlay. f. Pekerjaan
struktur tambahan.
67
14.11. PEKERJAAN PEMELIHARAAN RUTIN (R-11)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-11-01
PEMELIHARAAN RUTIN PERKERASAN, BAHU JALAN, DRAINASE, DAN PERLENGKAPAN JALAN DAN JEMBATAN
Pemeliharaan rutin adalah pekerjaan yang secara rutin harus dilaksanakan sebagai upaya mempertahankan kinerja perkerasan, bahu jalan, drainase, jembatan dan perlengkapannya sehingga tercapai Service life dan Standar pelayanan minimum.
Pengukuran volume pekerjaan pemeliharaan rutin menggunakan satuan ls.
Lingkup pekerjaan ini
adalah : a. Pemeliharaan rutin
perkerasan jalan. b. Pemeliharaan rutin
bahu jalan. c. Pemeliharaan rutin
saluran drainase. d. Pemeliharaan rutin
perlengkapan jalan dan jembatan.
R-11-02 PEMELIHARAAN JALAN SAMPING DAN JEMBATAN (RUTINE MAINTENANCE OF TEMPORARY ROAD AND BRIDGE
Pemeliharaan jalan samping dan jembatan adalah melakukan pemeliharaan jalan dan jembatan yang dilewati peralatan, mesin dan angkutan material dari dan ke lokasi pekerjaan, sehingga dijamin selama pelaksanaan pekerjaan, lalu lintas dapat melewati dengan aman dan lancar.
Volume pekerjaan dihitung dengan satuan ls.
Lingkup Pekerjaan ini adalah :
a. Memelihara jalan akses dan jalan kerja (Detour) serta jembatan selama masa pelaksanaan pekerjaan (Proyek), lalulintas tetap dijamin kelancarannya.
b. Melakukan perkuatan jembatan pada jalan akses dan detour, agar dapat dilalui kendaraan dengan aman.
68
14.12 PEMBERSIHAN LAPANGAN: (R12)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-12-01
PEMBERSIHAN LAPANGAN
Pembersihan lapangan adalah pekerjaan pembersihan setelah bangunan jalan / jembatan selesai dibangun.
Diukur dalam satuan ls
Mencakup segala puing dan kotoran yang tersisa disepanjang bangunan jalan/jembatan.
14.13. BIAYA UMUM: (R13)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-13-01
BIAYA UMUM
Biaya Umum adalah biaya yang dikeluarkan selain biaya fisik agar proyek dapat berjalan lancar selama masa pembangunan
Diuraikan secara jelas antara lain : biaya asuransi, biaya peresmian, biaya sosial, biaya keamanan, biaya jaminan bank, dan biaya lain yang diperlukan.
Semua biaya umum harus dinyatakan secara jelas dalam struktur biaya proyek dan diberlakukan sebagai pay item.
69
14.14. PROFIT: (R 14)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-14-01
PROFIT
Profit adalah keuntungan Penyedia Jasa Konstruksi yang nilainya ditetapkan oleh Pemerintah
Profit dihitung dalam satuan persen (%) sesuai dengan Ketetapan Pemerintah.
TOTAL NET BIAYA PROYEK, dapat dilihat pada: 7.0. METODE PENGUKURAN
14.15. PROVISIONAL SUM: (R15)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-15-01
PROVISIONAL SUM
Provisional sum adalah suatu nilai tertentu yang dicadangkan untuk suatu pekerjaan tertentu tapi belum dapat dihitung biayanya pada saat kontrak
Ditetapkan oleh owner dalam nilai USD, dan termasuk dalam nilai total kontrak
Hanya digunakan atas perintah tertulis Owner
14.16. CONTINGENCY: (R16)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-16-01
CONTINGENCY
Contigency adalah suatu nilai tertentu yang dicadangkan untuk suatu pekerjaan yang belum diketahui penggunaannya.
Ditetapkan oleh Owner dalam nilai USD dan termasuk dalam nilai total kontrak
Hanya digunakan atas perintah tertulis Owner.
70
14.17. FEE KONSULTAN: (R17)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-17-01
FEE KONSULTAN
Fee konsultan adalah fee konsultan perencana ataupun konsultan pengawas yang nilainya dicantumkan dalam kontrak
Dihitung sesuai dengan standar fee untuk konsultan
Untuk konsultan perencana meliputi studi kelayakan, pra design, detail design, spesifikasi, BOQ, gambar detail, cost estimate, dan pendampingan pada saat pre-bid meeting. Untuk konsultan pengawas meliputi laporan pengawasan harian, mingguan dan bulanan, memeriksa semua gambar kerja, gambar as-built dan laporan akhir proyek.
14.18. PMU COST: (R 18)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN
CAKUPAN PENGUKURAN
R-18-01
PMU cost
PMU cost adalah suatu dana tertentu yang dialokasikan dalam proyek untuk keperluan Project Management Unit, dalam melaksanakan tugas pengelolaan proyek tersebut.
PMU cost dihitung berdasarkan prosentase tertentu dikalikan dengan TOTAL NET BIAYA PROYEK. Daftar prosentase PMU cost untuk berbagai jenis bangunan dapat dilihat dalam STANDARD FEE UNTUK KONSULTANT
TOTAL NET BIAYA PROYEK, dapat dilihat pada: 7.0. METODE PENGUKURAN
71
14.19. PAJAK: (R19)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
R-19-01
PAJAK
Pajak disini adalah pajak penghasilan sesuai peraturan pemerintah Timor Leste
Dihitung dalam satu kesatuan (terintegrasi) dalam Total Gross Biaya Proyek.
Termasuk dalam Total Gross Biaya Proyek yang akan dicantumkan sebagai Total Budget Proyek (Orsamento)
72
8.0. JUDUL DOKUMEN
Judul Dokumen ini adalah TIMOR LESTE STANDARD METHOD OF MEASUREMENT – 3 untuk Bangunan Irigasi dan Sungai, Edisi Pertama (Januari 2015), disingkat TL-SMM - 3 TL-SMM -3 dibuat untuk dipakai dalam hubungannya dengan General Condition of Contract, General Specifications atau aturan tambahan lain yang tertera didalam Dokumen Kontrak. Pekerjaan-pekerjaan harus diberi nomor dan diuraikan dalam Bill of Quantity secara detail agar memudahkan Kontraktor memberikan harga yang akurat dan metode pengukuran harus dicantumkan dalam Pembukaan dari Bill of Quantity Dalam Pembukaan harus mencantumkan metode pengukuran yang lain dari TL-SMM – 3, jika ada, yang dipakai dalam menghitung Bill of Quantity, khususnya pekerjaan-pekerjaan yang tidak tercakup dalam TL-SMM - 3.
9.0. TUJUAN
Tujuan dari TL-SMM – 3 adalah mengatur prosedur menghitung Bill of Quantity dan harga satuan dari suatu proyek konstruksi.
10.0. DEFINISI 10.1. Dalam dokumen ini dan dalam Bill of Quantity yang disusun sesuai dengan prosedur
yang ditetapkan ini, kata-kata maupun pernyataan berikut mempunyai arti yang mengacu pada prosedur ini, kecuali ditetapkan lain.
10.2. “Condition of Contract” artinya “General Condition of Contract” yang tertera dalam Bidding/Contract Documents yang disediakan oleh Owner
10.3. Kata-kata dan pernyataan yang ditetapkan dalam Condition of Contract selanjutnya mempunyai arti yang sama.
10.4. Semua referensi ke klausul adalah referensi klausul yang diberi nomor dalam Condition of Contract dan referensi ke paragraph adalah referensi ke nomor yang ada disini
10.5. Kata “Pekerjaan” termasuk didalamnya pekerjaan yang dikerjakan, barang, material dan jasa yang diperlukan, dan kewajiban, pertanggungan serta risiko yang diperlukan oleh Kontraktor sesuai Kontrak.
10.6. Pernyataan “Yang diperlukan” berarti seperti yang tercantum dalam gambar dan Spesifikasi, atau atas perintah Pengawas/Engineer yang sesuai dan relevan dengan Condition of Contract
10.7. “Day work” berarti metode dalam menilai pekerjaan berdasarkan waktu yang digunakan oleh pekerja, material yang digunakan pada tempat yang disediakan.
10.8. “Original Ground Surface” berarti permukaan tanah sebelum suatu pekerjaan dimulai 10.9. “Final Excavated Surface” berarti suatu permukaan yang ditandai dalam gambar
dimana pekerjaan galian dikerjakan 10.10. “Commencing Ground Surface” untuk suatu item dalam Bill of Quantity berarti,
permukaan tanah dari mana item tersebut dimulai 10.11. “Excavated Ground Surface” untuk suatu item dalam Bill of Quantity berarti,
permukaan dari suatu galian dari item pekerjaan yang akan dikerjakan.
73
11.0. KETENTUAN UMUM
11.1. Satuan Pengukuran Satuan Pengukuran untuk setiap item harus sesuai dengan item yang tercantum dalam TL-SMM-3. Satuan Pengukuran yang ditetapkan terhadap suatu jenis pekerjaan dalam TL-SMM-3 harus diterapkan juga pada semua item yang berkaitan dengan item tersebut. Sistem: Meter, Kilogram, Second (MKS) yang akan digunakan dalam TL-SMM -3 ini.
Didalam menulis dimensi atau mendiskripsikan suatu pekerjaan, urutan penulisannya harus dimulai dari panjang, kemudian lebar, dan tinggi.atau tebal. Setiap pekerjaan harus dihitung volumenya secara neto, tanpa menambah sisa/buangan, overlapping, pemadatan, penekanan, perluasan/pelebaran dan lain-lain. Hal-hal yang tercantum disini ataupun yang tidak tercantum tapi nyata-nyata mengeluarkan biaya misalnya angkutan, gudang, perijinan, bongkar muat dll akan dihitung dalam harga satuan pekerjaannya. Satuan dari setiap pekerjaan, mengikuti satuan yang tercantum dalam butir 5.0 Volume dihitung pembulatan sampai 2 digit di belakang titik, contoh 1,234.78, bukan 1,234.7765
11.2. KODE TL-SMM - 3
Pekerjaan-pekerjaan akan diklasifikasikan dalam berbagai “Sections”, dan selanjutnya dijabarkan lagi dalam “sub section” dan jenis pekerjaannya seperti yang tercantum dalam TL-SMM – 3, Bill of Quantity . Tatacara pengkodean seperti yang tertera dibawah ini:
. Digit Pertama menunjukan “Department”
. Dua digit berikutnya menunjukan“Section”
. Dua digit berikutnya lagi menunjukan“Sub Section”
. Digit selanjutnya menunjukan level pekerjaan yang lebih detail selanjutnya
74
11.3. Sub Seksi
Pekerjaan yang termasuk dalam Sub Section ini yang digunakan untuk keperluan pembayaran (pay item)
11.4. Aturan Pengukuran
Aturan Pengukuran menjadi pedoman untuk bagaimana cara mengukur suatu pekerjaan,
dan bagaimana metode untuk menghitung kuantitinya. Sebagai tambahan, General
Condition dibawah ini perlu diterapkan juga:
a) Kuantiti dari suatu pekerjaan yang diakui yang berkaitan dengan spesifikasi harus
dihitung dalam dimensi neto sesuai gambar dan dengan metode yang ditetapkan
dalam dokumen ini, kecuali dicantumkan secara khusus dalam penjelasan tambahan
dalam dokumen kontrak. Tidak diijinkan untuk memperhitungkan bulking, shrinkage
ataupun wastage, dalam menghitung kuantiti.
b) Semua pekerjaan harus diukur sesuai dengan gambar dan spesifikasi, dan jika
diperlukan, harus diklasifikasikan dan diukur tersendiri sesuai Bill of Quantity.
c) Kontraktor tidak boleh mengklaim perbedaan volume yang dihitung berdasarkan TL-
SMM -3 dengan volume actual dilapangan, kecuali ada pengecualian untuk item-item
yang spesifik yang tercantum dalam dokumen kontrak.
DEPARTMENT : Building (B) Road & Bridge (R) Irrigation (I) Harbour (H) Airport (A) Transmition Line (T)
SECTION : Preliminaries Sub Structures Upper Structures Etc………………. (01 to 99)
SUBSEQUENT LEVELS
SUB SECTION: Foundation Concrete Column Brick wall Etc………………. (01 to 99)
75
11.5. Definisi
Definisi menjelaskan batasan dan fungsi dari suatu item dalam klasifikasi pekerjaan dan
dalam Bill of Quantity yang disusun menurut TL-SMM - 3
11.6. Cakupan Pengukuran
Cakupan pengukuran menjelaskan tentang cakupan pekerjaan atau material dari suatu
item pekerjaan yang tercantum dalam Kontrak. Sebagai tambahan pada aturan cakupan
ini, kondisi berikut perlu diterapkan:
a) Bongkar muat dan transportasi material yang berhubungan dengan item pekerjaan
tersebut
b) Semua item pekerjaan dalam TL-SMM – 3 harus dianggap termasuk didalamnya
semua operasi yang diperlukan untuk mewujudkan pekerjaan tersebut sesuai
dokumen kontrak.
c) Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh TL-
SMM – 3 ini akan diberikan terhadap item pekerjaan yang relevan.
1.1. Penjelasan Tambahan
Tambahan aturan cakupan yang diperlukan untuk dapat memahami secara utuh
pekerjaan yang tercakup dalam TL-SMM – 3 ini, akan disediakan terhadap pekerjaan
tertentu yang diperlukan.
12.0. SATUAN DAN SINGKATAN
Berikut ini adalah satuan dan singkatan yang akan digunakan:
Satuan Singkatan Millimeter mm Meter m Millimeter persegi mm2 atau mm2 Meter persegi m2 atau m2 Hektar ha Meter kubik m3 atau m3 Kilogram kg Ton ton Metrik Ton m.ton Summary sum Nomor no. Horse Power hp Minggu m. Liter ltr. Lump Sum ls Jam jam. Hari hr.
76
13.0. TABEL KONVERSI : Dari Ke Dikalikan
PANJANG Millimeter Inch 0.03937 Inch Millimeter 25.40005 Meter Foot 3.28084 Foot Meter 0.3048 Meter Yard 1.09361 Yard Meter 0.9144 Kilometer Mile 0.62137 Mile Kilometer 1.60935 BERAT MASSA Kilogram Pound 2.20462 Pound Kilogram 0.45359 Gram Ounce 0.03527 Ounce Gram 28.34949 Kilogram Quintal 0.01 Milligram Grain 0.01543 Kilogram Hundred Weight 0.01968 Hundred weight Tone 0.0508 Kilogram Tone 0.001 Kilogram Ton 0.00098 Pound Ton 0.00045 Tone Ton 0.98421 Kilogram Seer 1.01605 Kilogram Maund 0.02679 Gram Tola 0.08573 VOLUME Litre Pint (UK) 1.75975 Litre Gallon (imperial) 0.21997 Litre Gallon (US) 0.26417 Litre Cubic Foot 0.3531 Litre Cubic Meter 0.001 Cubic Foot Liter 28.31682 Milliliter Fluid ounce 0.0352 Gallon Imperial Liter 4.5461 Gallon US Liter 3.78541 Gallon Imperial Gallon US 1.20095 Cubic millimetre Cubic inch 0.00006 Cubic meter Cubic foot 35.31472 Cubic foot Cubic meter 0.02832 Cubic meter Cubic Yard 1.30795 Cubic yard Cubic meter 0.76456 LUAS Square millimeter Square inch 0.00155 Square inch Square millimeter 645.1613 Square meter Square foot 10.76392 Square foot Square meter 0.0929 Square meter Square yard 1.19599 Square yard Square meter 0.83613
77
Square meter Acre 0.00025 Hectare Acre 2.47105 Acre Hectare 0.40469 Square meter Hectare 0.0001 Square kilometer Square mile 0.3861 Square mile Square kilometer 2.58999 Hectare Square mile 0.00386 Square mile Hectare 258.9989 MASSA/UNIT LUAS Kilogram per square kilometer
Ton per square mile 0.00255
Kilogram per square meter Pound per square foot
0.20482
Pound per square foot Kilogram per square meter
4.88243
MASSA PER UNIT VOLUME
Kilogram per cubic meter Pound per cubic foot
0.06243
Grams per liter Pound per cubic foot
0.06243
Pound per cubic foot Kilogram per cubic meter
16.01845
Pound per cubic foot Grams per liter 10.01845
Dalam mengkonversi satuan dari system yang satu ke system yang lain, pengukuran harus diambil 3 digit yang terdekat dalam system MKS, dan 2 digit yang terdekat dalam system FPS.
78
14.0. METODE PENGUKURAN
Seksi 01: Persiapan
Seksi 02: Pekerjaan Galian
Seksi 03: Pekerjaan Timbunan
Seksi 04: Pekerjaan Pengeringan (dewatering)
Seksi 05: Pekerjaan Pasangan Batu
Seksi 06: Pekerjaan Suling-Suling (Weephole)
Seksi 07: Pekerjaan Beton
Seksi 08: Pekerjaan Gebalan Rumput (Sodding)
Seksi 09: Pekerjaan Pintu Air
Seksi 10: Pekerjaan Pemasangan Trash Rack
Seksi 11: Pekerjaan Pemasangan Bronjong
Seksi 12: Pekerjaan Pemasangan Geotextile
Seksi 13: Pekerjaan Tiang Pancang
Seksi 14: Pekerjaan Pemecah/penahan gelombang
(Break water)/APO (Alat Pemecah Ombak)
Seksi 15: Pekerjaan Pemasangan Papan Duga Air (Staff Gauge)
Seksi 16: Pekerjaan Tanggul
Seksi 17: Pekerjaan Krib
Seksi 18: Pekerjaan Pemasangan Waterstop
TOTAL NET BIAYA BANGUNAN, ………………. (A)
Seksi 19: Pekerjaan Pembersihan Lapangan
TOTAL NET BIAYA PROYEK,……………. B = (A+19)
Seksi 20: Biaya Umum
Seksi 21: Profit
Seksi 22: Provisional sum
Seksi 23: Contingency
Seksi 24: Fee Konsultan
Seksi 25: PMU cost:
Seksi 26: Pajak
TOTAL GROSS BIAYA PROYEK, C = B +( 20+21+22+23+24+25+26)
79
21.1. PEKERJAAN PERSIAPAN: (I-01)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-01-01
MOBILISASI
Mobilisasi adalah suatu kegiatan awal untuk memobilisasi alat, tenaga kerja, fasilitas, perijinan yang diperlukan sebelum proyek dimulai secara fisik.
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci kuantiti, serta spesifikasinya sedemikian rupa agar memudahkan dalam menghitung harga/biaya mobilisasinya. Satuan unitnya adalah ls.
Dalam menghitung harga /biaya mobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya sosial lainnya.
I-01-02
DEMOBILISASI
Demobilisasi adalah suatu kegiatan akhir untuk mendemobilisasi alat, tenaga kerja, fasilitas yang sudah tidak digunakan lagi di proyek
Setiap jenis alat, tenaga kerja, fasilitas dan perijinan harus dirinci kuantiti, serta spesifikasinya sedemikian rupa agar memudahkan dalam menghitung harga/biaya
Dalam menghitung harga /biaya demobilisasi dari setiap item, harus sudah termasuk didalamnya biaya transport, bongkar muat, ijin-ijin, biaya sewa/beli, serta biaya sosial lainnya
I-01-03
PEKERJAAN ACCES ROAD
Pekerjaan acces road (jalan masuk) adalah pekerjaan membuat jalan baru atau memanfaatkan jalan yang sudah ada atau meningkatkan fungsi jalan yang sudah ada untuk kebutuhan lalu lintas masuk dan keluar lokasi proyek termasuk pemeliharaannya.
Aturan pengukuran pekerjaan membuat acces road (jalan masuk) adalah harus sesuai dengan persyaratan yang ditulis di dalam Dokumen Kontrak, gambar perencanaan, dan spesifikasi teknis. Satuan pengukuran adalah km.
Seluruh item jenis pekerjaan acces road dan pemeliharaannya termasuk: perijinan, pembebasan lahan, pembersihan lahan, stripping, gorong-gorong, jembatan, side drain, dll.
80
I-01-04
PAPAN NAMA
Papan nama pekerjaan adalah papan nama yang berisi informasi tentang pekerjaan yang akan dilaksanakan. Hal-hal yang diinformasikan antara lain : Nama pekerjaan, pemilik proyek, biaya, tanggal mulai dan tanggal berakhir kontrak, nama kontraktor, nama konsultan supervisi, nomor kontrak.
Papan nama harus sesuai dengan yang dicantumkan pada spesifikasi teknis. Satuan pengukuran adalah unit.
Perijinan, pemasangan dan peralatan pendukung.
I-01-05
PEMBERSIHAN LAHAN
Pembersihan lahan adalah pekerjaan membersihkan lahan dari pohon berdiameter ≤ 15 cm, semak- belukar, rumput liar yang tumbuh di lokasi bangunan yang direncanakan.
Areal pembersihan lahan harus bersih sesuai spesifikasi teknis, satuan pengukuran adalah m2
- Termasuk
pembuangan ke disposal area.
- Peralatan pendukung.
I-01-06
STRIPPING
Stripping adalah mengupas lapisan tanah bagian atas termasuk perataan tanah.
Areal yang distripping harus bersih dan rata sesuai syarat pada spesifikasi teknis, satuan pengukuran adalah m2
- Termasuk
pembuangan ke disposal area.
- Peralatan pendukung.
I-01-07
PEMINDAHAN FASILITAS UMUM
Relokasi utilitas dan pelayanan yang ada adalah pekerjaan pemindahan semua jaringan instalasi bawah tanah yang terkena oleh pembangunan jalan baru atau pelebaran jalan lama dengan
Pengukuran volume pekerjaan dilakukan secara lumpsum,
Pekerjaan ini mempunyai lingkup: a. Merelokasi
jaringan bawah tanah, meliputi: pipa distribusi air bersih, kabel listrik, kabel telpon.
b. Merelokasi tiang listrik (electrical pole), tiang telpon, tiang
81
persyaratan dan gambar rencana.
lampu penerangan jalan, tiang lampu pengatur lalu lintas dan rambu-rambu jalan.
21.2. PEKERJAAN GALIAN: (I-02)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-02-01
GALIAN TANAH BIASA
Galian tanah adalah galian tanah pada lapisan tanah yang dapat digali dengan alat cangkul.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang,
- Satuan pengukuran adalah m3.
- Pembuangan
material galian ke disposal area,
- Peralatan pendukung pekerjaan galian tanah biasa.
I-02-02
GALIAN TANAH BERBATU
Galian tanah berbatu adalah galian tanah pada lapisan tanah yang mengandung batu yang dapat dikerjakan dengan bantuan alat pemecah.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang,
- Satuan pengukuran adalah m3.
- Pembuangan
material galian ke disposal area,
- Peralatan pendukung pekerjaan galian tanah berbatu.
I-02-03
GALIAN TANAH CADAS
Galian tanah cadas adalah galian tanah pada lapisan cadas yang hanya dapat digali dengan bantuan alat pemecah.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang,
- Satuan pengukuran adalah m3.
- Pembuangan
material galian ke disposal area,
- Peralatan pendukung pekerjaan galian tanah cadas.
I-02-04
GALIAN TANAH LUMPUR
Galian tanah lumpur adalah galian tanah pada lapisan tanah lunak dan berair.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang,
- Satuan pengukuran adalah m3.
- Pembuangan
material galian ke disposal area,
- Peralatan pendukung pekerjaan galian tanah lumpur.
82
I-02-05 GALIAN DEPOSIT SUNGAI
Galian deposit sungai adalah galian pada badan sungai atau daerah tertentu di sungai yang material galiannya merupakan endapan sungai yang terdiri dari tanah berbatu, pasir, kerikil, kerakal.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang,
- Satuan pengukuran adalah m3.
- Pembuangan
material galian ke disposal area,
- Peralatan pendukung pekerjaan galian deposit sungai.
21.3. PEKERJAAN TIMBUNAN: (I-03)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-03-01
TIMBUNAN TANAH BIASA
Timbunan tanah biasa adalah pekerjaan timbunan dari bahan tanah biasa yang disyaratkan.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang.
- Satuan pengukuran adalah m3.
- Pengadaan bahan
timbunan, pengamparan, pemadataan.
- Peralatan pendukung pekerjaan timbunan tanah biasa.
I-03-02
TIMBUNAN MATERIAL PILIHAN (SELECTED MATERIAL)
Timbunan material pilihan adalah pekerjaan timbunan dari bahan terpilih dengan parameter tertentu, dan diangkut dari lokasi tertentu (borrow area) sesuai dengan yang disyaratkan pada spesifikasi teknis.
- Harus sesuai
dengan gambar perencanaan, profil melintang dan profil memanjang.
- Satuan pengukuran adalah m3.
- Pengadaan bahan
timbunan, pengamparan, pemadataan.
- Peralatan pendukung pekerjaan timbunan material pilihan.
83
21.4. PEKERJAAN PENGERINGAN (DEWATERING) : (I-04)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-04-01
PEKERJAAN PENGERINGAN (DEWATERING)
Pekerjaan pengeringan (dewatering) adalah pekerjaan memindahkan air dari galian pada pekerjaan galian konstruksi bangunan di sungai atau di tempat yang mengandung air sehingga lokasi konstruksi dijamin kering sebelum dan selama pelaksanaan konstruksi.
- Satuan pengukuran adalah ls.
- Peralatan untuk pengeringan
- Komponen peralatan pendukung lainnya
21.5. PEKERJAAN PASANGAN BATU: (I-05)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-05-01
PEKERJAAN PASANGAN BATU KOSONG (RIP-RAP)
Pekerjaan pasangan batu kosong adalah menempatkan batu-batu tanpa dilapisi adukan disusun sedemikian rupa di lokasi tertentu sebagai pelindung dari gerusan air, sesuai yang disyaratkan pada spesifikasi teknis.
- Pengukuran
pekerjaan pasangan batu kosong harus sesuai dengan gambar perencanaan,
- Satuan pengukuran adalah m3.
- Pengadaan,
pengangkutan, penempatan dan pemasangan.
I-05-02
PEKERJAAN PASANGAN BATU BELAH DENGAN ADUKAN
Pekerjaan pasangan batu belah adalah menempatkan batu-batu yang sudah dibelah (bukan batu bulat/lonjong)
- Sesuai yang
disyaratkan pada spesifikasi teknis.
- Satuan pengukuran adalah m3.
- Pengadaan,
pengangkutan, penempatan dan pemasangan.
84
dilapisi adukan tertentu sesuai yang disyaratkan pada spesifikasi teknis.
I-05-03
I-05-04
PEKERJAAN PASANGAN BATU MUKA
Pasangan batu muka adalah bagian pasangan batu struktural pada permukaan pasangan, yang disusun sedemikian rupa, sehingga nampak estetis sesuai yang disyaratkan pada spesifikasi teknis.
Satuan pengukuran adalah m3.
Pemilihan batu dan pemasangannya.
PEKERJAAN PLESTERAN
Plesteran adalah bagian pekerjaan penutup pasangan dinding batako/bata/beton. Acian adalah bagian pekerjaan penghalusan permukaan pekerjaan plesteran agar siap dicat dasar/plamur
- Plesteran
dihitung dalam satuan m2
- Pekerjaan acian dipisahkan dari item plesteran dan dihitung dalam satuan m2.
Termasuk didalamnya semua peralatan dan tenaga kerja yang diperlukan untuk mengaduk mortar, mengangkut dan memasang plesteran pada posisinya sesuai gambar dan spesifikasi
I-05-05
PEKERJAAN SIAR
Pekerjaan siar adalah pekerjaan pasangan pada pekerjaan pasangan batu, dipasang menjorok ke dalam sedalam 1 – 2 cm, pada celah antara batu dengan batu lainnya.
Satuan pengukuran adalah m2.
Pengupasan pasangan pada celah batu untuk di siar.
I-05-06
LANTAI KERJA
Lantai kerja adalah pekerjaan pasangan adukan tertentu merata sepanjang pekerjaan
Satuan pengukuran adalah m3.
- Perataan tanah, - Pemasangan lantai
kerja.
85
pondasi, sebelum dimulai pekerjaan pondasi dengan tebal dan elevasi sesuai gambar perencanaan.
21.6. PEKERJAAN SULING-SULING (WEEPHOLE): (I-06)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-06
PEKERJAAN SULING-SULING (WEEPHOLE)
Pekerjaan suling-suling adalah pekerjaan memasang lubang-lubang buangan air resapan pada pasangan dinding penahan dari pasangan batu maupun dari pasangan beton. Pada pangkalnya dipasang filter, fungsinya untuk meloloskan tekanan air Material dan penempatannya sesuai dengan spesifikasi teknis dan gambar perencanaan.
Satuan pengukuran adalah unit.
Memasang filter.
86
21.7. PEKERJAAN BETON: (I-07)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-07-01
BETON SIKLOP
Pekerjaan beton siklop adalah pasangan yang terdiri dari campuran batu dan beton dengan komposisi volume batu 60% dan beton 40%. Diameter batu dan mutu beton sesuai dengan spesifikasi teknis.
Satuan pengukuran adalah m3.
Pemasangan dan komponen peralatan pendukung lainnya
I-07-02
BETON
Struktur beton semen adalah pembuatan beton semen untuk struktur jembatan, tembok penahan dan struktur beton lainnya dengan bentuk dan dimensi sesuai gambar dan menggunakan material yang memenuhi spesifikasi.
Pengukuran volume pekerjaan sebagai berikut : a. Beton diukur
sesuai gambar dengan satuan m3
b. Bekisting sesuai dengan gambar dan metode kerja dengan luasan bersih diukur sesuai bidang sentuh dengan beton dalam satuan m2
c. Besi tulangan dihitung dalam satuan kg dan dipisah per-diameter. Panjang besi tulangan termasuk pembengkokan. Penyambungan tidak dihitung.
Lingkup pekerjaan ini adalah: a. Penyediaan dan
penyimpanan material yang sesuai spesifikasi.
b. Pembuatan Job Mix Formula.
c. Pembuatan bekisting dengan menggunakan material kedap air, bentuk dimensi, elevasi dan lokasi sesuai gambar.
d. Pencampuran komponen bahan sesuai JMF dan pengecoran campuran dengan prosedur sesuai spesifikasi.
e. Perawatan beton dengan prosedur sesuai spesifikasi.
f. Pelepasan form work.
87
I-07-03
PEKERJAAN PENULANGAN
Pekerjaan penulangan adalah pekerjaan pengadaan, pengangkutan, fabrikasi dan pemasangan besi tulangan dengan diameter dan mutu baja sesuai spesifikasi.
Pekerjaan ini meliputi: a. Pengadaan,
pengangkutan dan penyimpanan besi tulangan dengan diameter dan mutu sesuai spesifikasi.
b. Fabrikasi besi tulangan diameter, panjang, bentuk dan jumlah sesuai gambar.
Pemasangan besi tulangan pada lokasi, konfigurasi jarak, jumlah sesuai gambar.
I-07-04
PEKERJAAN BEKISTING (FORMWORK)
Bekisting adalah cetakan pembentukan konstruksi beton yang dapat terbuat dari kayu, besi atau lainnya
Luas bidang bekisting adalah luas bidang kontak antara beton dan bekisting dalam satuan m2 Lubang pada bekisting yang lebih kecil dari satu m2 tidak dihitung sebagai pengurang luasan
Termasuk semua konstruksi pendukung agar bekisting kuat, kaku dan bersih dari kotoran, sampai terpasang pada posisinya.
21.8. PEKERJAAN GEBALAN RUMPUT ( SODDING): (I-08)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-08-01
PEKERJAAN GEBALAN RUMPUT (SODDING)
Pekerjaan gebalan rumput adalah pekerjaan memasang, menanam gebalan rumput pada
- Kualitas dan lokasi
pemasangan gebalan rumput harus sesuai dengan spesifikasi teknis
Pengangkutan, pemupukan pemasangan, pemeliharaan sampai tumbuh dan komponen
88
dinding saluran tanah, dinding tebing tanah dan pada tanah sebagai upaya untuk mencegah erosi.
dan gambar detail perencanaan,
- Satuan pengukuran adalah adalah m2.
peralatan pendukung lainnya.
21.9. PEKERJAAN PINTU AIR: (I-09)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-09-01
PEKERJAAN PINTU AIR
Pekerjaan pintu air adalah pembuatan dan pemasangan pintu air untuk keperluan pengaturan aliran air sesuai dengan fungsinya.
Satuan pengukuran adalah unit.
- DED, pembuatan,
pengangkutan, pemasangan dan testing lapangan.
- Kelengkapan komponen pintu,
- Lapisan pelindung pintu.
21.10. PEKERJAAN PEMASANGAN TRASH RACK: (I-10)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-10-02
PEKERJAAN PEMASANGAN TRASH RACK
Pekerjaan pemasangan trash rack adalah membuat dan memasang konstruksi rangka besi sebagai saringan pada inlet, fungsinya untuk menahan sampah agar tidak masuk ke saluran irigasi sesuai gambar detail perencanaan.
Satuan pengukuran adalah unit.
Pembuatan, pengangkutan dan pemasangan konstruksi trash rack beserta dengan komponen dan alat pendukungnya.
89
21.11. PEKERJAAN PASANGAN BRONJONG: (I-11)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-11-01
PASANGAN BRONJONG
Pasangan bronjong adalah kotak yang dibuat dari anyaman kawat baja anti karat diameter tertentu, anyaman berbentuk heksagonal, lilitan kawat minimum tiga lilitan, yang dibuat secara manual atau pabrikasi. Kotak bronjong diisi batu-batu. Diameter kawat, dimensi lubang anyaman dan dimensi batu-batu harus sesuai spesifikasi teknis.
- Pengukuran
pekerjaan bronjong adalah harus sesuai dengan yang ditulis pada gambar detail perencanaan,
- Satuan pengukuran adalah m3.
. Pembuatan, pengangkutan dan pemasangan konstruksi beserta dengan komponen dan alat pendukungnya.
21.12. PEKERJAAN PEMASANGAN GEOTEXTILE: (I-12)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-12-01
PEKERJAAN PEMASANGAN GEOTEXTILE
Pekerjaan pemasangan geotextile adalah memasang/menghampar lapisan geotextile pada tempat-tempat yang ditunjukan pada gambar detail perencanaan. Salah satu fungsi geotextile adalah untuk menahan butiran material sedangkan air dapat lolos mengalir.
- Areal yang
dihitung adalah luas bersih sesui dengan spesifikasi teknis dan gambar detail perencanaan.
- Satuan pengukuran adalah m2.
Termasuk pengangkutan, pemasangan, overlapping sambungan yang diperlukan dan komponen alat pendukung lainnya.
90
21.13. PEKERJAAN TIANG PANCANG: (I-13)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-13-01
PEKERJAAN TIANG PANCANG
Pekerjaan tiang pancang adalah pembuatan tiang-tiang pondasi untuk mendukung struktur (pilar, kepala jembatan, tembok penahan) dan struktur lainnya, baik berupa tiang kayu, tiang beton pra cetak, tiang baja, ataupun tiang beton yang dicor ditempat dengan menggunakan material yang memenuhi spesifikasi serta dimensi, jumlah dan panjang sesuai gambar.
Volume pekerjaan pandasi tiang dihitung dengan satuan sebagai berikut :
a. Penyediaan tiang kayu: m3.
b. Penyediaan tiang beton bertulang pracetak: m3.
c. Penyediaan tiang beton Prestress Pracetak: m3.
d. Penyediaan Tiang Pancang baja : kg
e. Pemancang tiang : m
f. Pembuatan tiang beton casting place : m
g. Pembuatan turap kayu dan beton : m2
h. Pembuatan turap baja : m2
Pekerjaan pondasi tiang pancang meliputi : a. Penyediaan
material, pemancangan dan pembuatan casting place.
b. Uji mutu material dan uji mutu pelaksanaan.
21.14. PEKERJAAN PEMECAH / PENAHAN GELOMBANG LAUT: (I-14)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-14-01
PEKERJAAN PEMECAH / PENAHAN GELOMBANG LAUT (WAVE BREAKER) / APO (ALAT PEMECAH OMBAK)
Pekerjaan pemecah/penahan gelombang laut adalah membuat dan memasang konstruksi untuk memecahkan dan melemahkan pengaruh, konsentrasi dan energi ombak / gelombang sehingga dapat mengurangi erosi
- Dimensi, bentuk
dan tipe APO harus sesuai dengan gambar detail perencanaan dan spesifikasi teknis.
- Material dari batu alam Satuan adalah m3.
- Material dari beton satuannya unit.
Pembuatan,pengangkutan, pemasangan APO di lokasi dan komponen peralatan pendukung lainnya.
91
dan abrasi pantai. Dimensi, bentuk dan jumlahnya harus sesuai dengan yang ditunjukan pada gambar detail perencanaan. Bahan APO bisa dari tumpukan batu (armour) dan dari beton bertulang.
21.15. PEKERJAAN PEMASANGAN PAPAN DUGA AIR (STAFF GAUGE): (I-15)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-15-01
PEKERJAAN PEMASANGAN PAPAN DUGA AIR (STAFF GAUGE)
Pekerjaan pemasangan papan duga air adalah memasang papan duga air pada lokasi tertentu untuk mengetahui elevasi permukaan air.
- Kualitas, Jumlah
dan lokasi pemasangan papan duga air, harus sesuai dengan spesifikasi teknis dan gambar detail perencanaan,
- Satuan adalah unit.
Pengangkutan, pemasangan dan komponen peralatan pendukung lainnya.
21.16. PEKERJAAN TANGGUL: (I-16)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-16-01
PEKERJAAN TANGGUL
Pekerjaan tanggul adalah membuat konstruksi untuk menahan luapan air yang bisa dibuat dari timbunan tanah, timbunan batu, pasangan batu, beton, dll.
- Dimensi, lokasi
dan material harus sesuai dengan gambar detail perencanaan dan spesifikasi teknis,
- Satuan adalah adalah m3
Pengangkutan, penghamparan bahan, Pemadatan, pembuatan dan komponen peralatan pendukung lainnya.
92
21.17. PEKERJAAN KRIB: (I-17)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-17-01
PEKERJAAN KRIB
Pekerjaan krib adalah membuat konstruksi untuk mengarahkan dan mengurangi kecepatan aliran air sungai. Jenis konstruksi bisa dibuat dari pasangan batu, beton, bronjong, tiang pancang, dll.
- Dimensi, lokasi
dan material harus sesuai dengan gambar detail perencanaan dan spesifikasi teknis,
- Satuan adalah sesuai dengan jenis konstruksi (beton, pasangan batu, bronjong adalah m3, tiang pancang adalah m.
Pengangkutan, pembuatan, dan komponen peralatan pendukung lainnya.
21.18. PEKERJAAN PEMASANGAN WATERSTOP: (I-18)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-18-01
PEKERJAAN PEMASANGAN WATERSTOP
Pekerjaan pemasangan waterstop adalah memasang waterstop (material penahan air) pada sambungan pengecoran beton supaya tidak terjadi infiltrasi air pada sambungan tersebut.
- Kualitas, dimensi,
bentuk dan lokasi pemasangan waterstop ditentukan pada spesifikasi teknis dan gambar detail perencanaan,
- Satuan adalah m
Pemasangan, overlapping waterstop dan komponen peralatan pendukung lainnya
21.19. PEKERJAAN PEMBERSIHAN LAPANGAN: (I-19)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-19-01
PEKERJAAN PEMBERSIHAN LAPANGAN
Pekerjaan pembersihan lapangan adalah pekerjaan pembersihan lahan setelah
Diukur dalam satuan ls
Mencakup segala puing dan kotoran yang tersisa disepanjang bangunan irigasi /sungai yang harus
93
bangunan irigasi/sungai selesai dibangun
dibuang dan dibersihkan
21.20. BIAYA UMUM: (I-20)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-20-01
BIAYA UMUM
Biaya Umum adalah biaya yang dikeluarkan selain biaya fisik proyek agar proyek dapat berjalan lancar selama masa pembangunan.
Diuraikan secara jelas biaya apa saja antara lain : biaya asuransi, biaya peresmian, biaya sosial, biaya keamanan, biaya jaminan bank, dan biaya lain yang diperlukan
Semua biaya umum harus dinyatakan secara jelas dalam struktur biaya proyek dan diberlakukan sebagai pay item.
21.21. PROFIT: (I-21)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-21-01
PROFIT
Profit adalah keuntungan Penyedia Jasa Konstruksi yang nilainya ditetapkan oleh Pemerintah
Profit dihitung dalam satuan % sesuai dengan Ketetapan Pemerintah.
TOTAL NET BIAYA PROYEK, dapat dilihat pada : 7.0. METODE PENGUKURAN
7.22. PROVISIONAL SUM : (I-22)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-22-01
PROVISIONAL SUM
Provisional sum adalah suatu nilai tertentu yang dicadangkan untuk suatu pekerjaan tertentu tapi belum dapat dihitung biayanya pada saat kontrak
Ditetapkan oleh owner dalam nilai USD, dan termasuk dalam nilai total kontrak
Hanya digunakan atas perintah tertulis Owner
94
21.23. CONTINGENCY: (I-23)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-23-01
CONTINGENCY
Contingency adalah suatu nilai tertentu yang dicadangkan untuk suatu pekerjaan yang belum diketahui penggunaannya.
Ditetapkan oleh owner dalam nilai USD, dan termasuk dalam nilai total kontrak
Hanya dapat digunakan atas perintah tertulis oleh owner.
21.24. FEE KONSULTAN: (I-24)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-24-01
FEE KONSULTAN
Fee konsultan adalah fee konsultan perencana ataupun konsultan pengawas yang nilainya dicantumkan dalam kontrak
Dihitung sesuai dengan standar fee untuk konsultan
Untuk konsultan perencana, dimulai dari studi kelayakan, pra design, detail design, spesifikasi, BOQ, gambar detail, cost estimate, dan pendampingan pada saat pre-bid meeting. Untuk konsultan pengawas, termasuk laporan pengawasan harian, mingguan dan bulanan, memeriksa semua gambar kerja, gambar as-buit dan laporan akhir proyek,
21.25. PMU COST (I-25)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-25-01
PMU COST
PMU cost adalah suatu dana tertentu yang dialokasikan dalam proyek untuk keperluan Project
PMU cost dihitung berdasarkan prosentase tertentu dikalikan dengan TOTAL NET BIAYA PROYEK. Daftar prosentase
TOTAL NET BIAYA PROYEK, dapat dilihat pada: 7.0. METODE PENGUKURAN
95
Management Unit, dalam melaksanakan tugas pengelolaan proyek tersebut.
PMU cost untuk berbagai jenis bangunan dapat dilihat dalam STANDARD FEE UNTUK KONSULTANT
21.26. PAJAK (I-26)
NOMOR KODE
JENIS PEKERJAAN
DEFINISI PEKERJAAN
ATURAN DAN SATUAN
PEKERJAAN CAKUPAN
PENGUKURAN
I-26-01
PAJAK
Pajak disini adalah pajak penghasilan sesuai peraturan pemerintah Timor Leste
Dihitung dalam satu kesatuan (terintegrasi) dalam Total Gross Biaya Proyek.
Termasuk dalam Total Gross Biaya Proyek yang akan dicantumkan sebagai Total Budget Proyek (Orsamento)
I
1.
Seng gelombang 0.2 Lbr. 1.2158
Pasir beton M³ 0.0050
Koral Beton M³ 0.0090
Kayu usuk 5/7 M³ 0.0410
Pekerja Oh 0.2495
Tukang kayu Oh 0.2858
Kepala tukang Oh 0.0200
Mandor Oh 0.0200
2.
Kayu usuk 5/7 M³ 0.0177
Paku biasa 2"-5" Kg. 0.0200
Kayu papan 3/20 M³ 0.0070
Pekerja Oh 0.1000
Tukang kayu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050
3.
Dolken kayu Ø 8-10/4m Btg. 1.7000
Kayu M³ 0.2074
Paku biasa 2"-5" Kg. 0.3000
Semen Portland Kg. 10.5000
Pasir beton M³ 0.0300
Koral Beton M³ 0.0500
Seng gelombang BJLS 28 Lbr. 1.5306
Pekerja Oh 1.0000
Tukang kayu Oh 2.0000
Kepala tukang Oh 0.2000
Mandor Oh 0.0500
Semen Portland Kg. 2.5000
Paku biasa 2"-5" Kg. 0.0829
STANDAR KOEFISIEN ANALISA HARGA SATUAN PEKERJAAN
(AHSP)
PEKERJAAN PERSIAPAN
KEBUTUHAN UNIT KOEFISIEN
1 M' Pagar sementara dari seng gelombang, tinggi 2m
Bahan
Tenaga
Kerja
Bahan
Tenaga
Kerja
1 M' Pengukuran & pemasangan bouwplank.
Bahan
Tenaga
Kerja
1 M² Pembuatan gudang semen dan alat-alat.
96
4.
Dolken kayu Ø 8-10/4m Btg. 3.0500
Kayu M³ 0.2807
Paku biasa 2"-5" Kg. 0.7117
Seng gelombang BJLS 28 Lbr. 1.7090
Pekerja Oh 1.0167
Tukang kayu Oh 1.5250
Kepala tukang Oh 0.1527
Mandor Oh 0.0510
5.
Pekerja Oh 0.1000
Mandor Oh 0.0500
6.
Papan nama proyek Bh 1.0000
Usuk 5/7 kayu kelas II M³ 0.0235
Paku biasa 2"-5" Kg. 0.1665
Pekerja Oh 0.2503
Mandor Oh 0.0443
7.
Dolken kayu Ø 8-10/4m Btg. 1.2500
Kayu M³ 0.1860
Paku biasa 2"-5" Kg. 0.3000
Semen Portland Kg. 18.0000
Pasir beton M³ 0.0300
Koral Beton M³ 0.0500
Seng gelombang BJLS 28 Lbr. 1.5401
Plywood 4 mm Lbr. 0.5883
Pekerja Oh 1.0000
Tukang kayu Oh 2.0000
Kepala tukang Oh 0.2000
Mandor Oh 0.0500
Bahan
Tenaga
Kerja
1 M² Membersihkan lapangan dan perataan.
Ten Kerja
1 Buah Pemasangan papan nama proyek.
Bahan
1M² Pembuatan rumah jaga/konstruksi kayu.
Bahan
Tenaga
Kerja
Ten Kerja
1 M² Pembuatan bedeng buruh
KEBUTUHAN UNIT KOEFISIEN
97
8.
Kayu terentang M³ 0.0370
Paku biasa 2"-5" Kg. 0.0820
Kaso 5/7 - 4m Btg. 1.0250
Tukang kayu Oh 0.3075
Mandor Oh 0.0020
9.
Batu belah 15/20 M³ 0.1500
Batu pecah 5/7 M³ 0.0900
Pasir pasang M³ 0.0100
Pekerja Oh 1.0000
Mandor Oh 0.0500
10.
Pekerja Oh 6.6670
Mandor Oh 0.3330
11.
Pekerja Oh 6.6670
Mandor Oh 0.0330
1 M³ Bongkaran beton bertulang.
Tenaga
Kerja
1 M³ Bongkaran dinding tembok bata merah.
Tenaga
Kerja
1M² Pembuatan jalan sementara
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 buah pembuatan bak takaran (40x50x20) cm.
Bahan
Tenaga
Kerja
98
II
1.
Pekerja Oh 0.6700
Mandor Oh 0.0320
2.
Pekerja Oh 0.7500
Mandor Oh 0.0470
3.
Pekerja Oh 0.8900
Mandor Oh 0.0685
4.
Pekerja Oh 0.9500
Mandor Oh 0.0530
5.
Pekerja Oh 1.5000
Mandor Oh 0.0600
6.
Pekerja Oh 0.9163
Mandor Oh 0.0700
7.
Pekerja Oh 0.4230
Mandor Oh 0.0260
8.
Pekerja Oh 0.3300
Mandor Oh 0.0126
9.
Pekerja Oh 0.2142
Mandor Oh 0.0143
1 M2 Pekerjaan Stripping tebing setinggi 1 meter.
Tenaga
Kerja
1 M³ Membuang tanah sejauh 30 meter.
Tenaga
Kerja
Menimbun kembali 1 m3 galian
Tenaga
Kerja
1 M³ Galian tanah keras sedalam 1 meter.
Tenaga
Kerja
1 M³ Galian tanah cadas sedalam 1 meter.
Tenaga
Kerja
1 M³ Galian tanah lumpur sedalam 1 meter.
Tenaga
Kerja
1 M³ Galian tanah biasa sedalam 2 meter.
Tenaga
Kerja
1 M³ Galian tanah biasa sedalam 3 meter.
Tenaga
Kerja
PEKERJAAN TANAH
KEBUTUHAN UNIT KOEFISIEN
1 M³ Galian tanah biasa sedalam 1 meter.
Tenaga
Kerja
99
10.
Pekerja Oh 0.5000
Mandor Oh 0.0500
11.
Bahan Pasir Urug M³ 1.2000
Pekerja Hr. 0.3023
Mandor Hr. 0.0127
12.
Bahan Ijuk M³ 2.7577
Pekerja Oh 0.1500
Mandor Oh 0.0150
13.
Bahan Sirtu M³ 1.2000
Pekerja Oh 0.3046
Mandor Oh 0.0379
Tenaga
Kerja
1 M³ Pemasangan lapisan ijuk tebal 10 Cm
Tenaga
Kerja
1 M³ Penimbunan sirtu padat untuk peninggian lantai bangunan.
Tenaga
Kerja
1 M³ Pemadatan tanah (Per 20 Cm).
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M³ Timbunan pasir.
100
III
1.
Batu belah 15/20 cm M³ 1.1490
Semen Portland Kg. 202.0000
Pasir pasangan M³ 0.4850
Pekerja Oh 1.5000
Tukang Batu Oh 0.6000
Kepala Tukang Oh 0.0905
Mandor Oh 0.0973
2.
Batu belah 15/20 cm M³ 1.2000
Semen Portland Kg. 163.0000
Pasir pasangan M³ 0.5348
Pekerja Oh 1.8313
Tukang Batu Oh 0.8404
Kepala Tukang Oh 0.0991
Mandor Oh 0.0750
3.
Batu belah 15/20 cm M³ 1.2000
Semen Portland Kg. 136.0000
Pasir pasangan M³ 0.5440
Pekerja Oh 1.7141
Tukang Batu Oh 0.7130
Kepala Tukang Oh 0.1095
Mandor Oh 0.1919
Tenaga
Kerja
Bahan
Tenaga
Kerja
1 M³ Pasang pondasi batu belah 1 Pc : 5 Ps
Bahan
KEBUTUHAN UNIT KOEFISIEN
1 M³ Pasang pondasi batu belah 1 Pc : 3 Ps
Bahan
PEKERJAAN PONDASI
Tenaga
Kerja
1 M³ Pasang pondasi batu belah 1 Pc :4 Ps
101
4
Batu belah 15/20 cm M³ 1.2000
Pasir urug M³ 0.3033
Pekerja Oh 0.7800
Tukang Batu Oh 0.3900
Kepala Tukang Oh 0.0579
Mandor Oh 0.0579
5
Batu belah 15/20 cm M³ 0.4500
Semen portland Kg 213.4000
Pasir beton M³ 0.3837
Kerikil/koral M³ 0.5670
Pekerja Oh 2.2353
Tukang Batu Oh 0.4580
Kepala Tukang Oh 0.0457
Mandor Oh 0.0900
1 M³ Pasangan pondasi sumuran Ф 1 m.
Bahan
Tenaga
Kerja
1 M³ Pasang pondasi batu kosong
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
102
IV
1
Besi beton (polos/ulir) Kg. 10.5000
Kawat Beton Kg. 0.1500
Pekerja Oh 0.0949
Tukang besi Oh 0.0757
Kepala Tukang Oh 0.0109
Mandor Oh 0.0223
2
Paku biasa 5' - 10' Kg. 0.1586
Minyak bekisting Ltr 0.0168
Pekerja Oh 0.5200
Tukang kayu Oh 0.2600
Kepala Tukang Oh 0.0260
Mandor Oh 0.0260
3
Plywood 9mm Lbr. 0.3500
Kayu klas III M³ 0.0450
Paku biasa 5' - 10' Kg. 0.3000
Minyak bekisting Ltr 0.0256
Pekerja Oh 0.5200
Tukang kayu Oh 0.2600
Kepala Tukang Oh 0.0260
Mandor Oh 0.0260
4
Kayu klas III M³ 0.0400
Paku biasa 5' - 12' Kg. 0.4000
Minyak bekisting Ltr 0.0555
balok kayu klas II M³ 0.0150
Plywood tebal 9 mm Lbr. 0.3500
Dolken kayu 8"-10"/4 m Btg. 2.0000
Pekerja Oh 0.6600
Tukang kayu Oh 0.3300
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
Kayu klas III M³ 0.0329
1 M² Pasang bekisting untuk sloof
Bahan
Tenaga
Kerja
1 M² Pasang bekisting untuk kolom
Bahan
Tenaga
Kerja
Tenaga
Kerja
1 M² Pasang bekisting untuk pondasi
Bahan
Tenaga
Kerja
PEKERJAAN BETON
KEBUTUHAN UNIT KOEFISIEN
Pembesian 10 kg dengan besi polos / ulir
Bahan
103
5
Kayu klas III M³ 0.0400
Paku biasa 5' - 12' Kg. 0.4000
Minyak bekisting Ltr 0.0536
balok kayu klas II M³ 0.0360
Plywood tebal 9 mm Lbr. 0.3500
Dolken kayu 8"-10"/4 m Btg. 2.0000
Pekerja Oh 0.6600
Tukang kayu Oh 0.3300
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
6
Kayu klas III M³ 0.0400
Paku biasa 5' - 12' Kg. 0.4000
Minyak bekisting Ltr 0.0536
balok kayu klas II M³ 0.0360
Plywood tebal 9 mm Lbr. 0.3500
Dolken kayu 8"-10"/4 m Btg. 2.0000
Pekerja Oh 0.6600
Tukang kayu Oh 0.3300
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
7
Kayu klas III M³ 0.0300
Paku biasa 5' - 12' Kg. 0.4000
Minyak bekisting Ltr 0.1500
balok kayu klas II M³ 0.0183
Plywood tebal 9 mm Lbr. 0.3455
Dolken kayu 8"-10"/4 m Btg. 2.0000
Pekerja Oh 0.6600
Tukang kayu Oh 0.3300
Kepala Tukang Oh 0.0330
Mandor Oh 0.0161
1 M² Pasang bekisting untuk lantai
Bahan
Tenaga
Kerja
1 M² Pasang bekisting untuk tangga
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M² Pasang bekisting untuk balok
Bahan
Tenaga
Kerja
104
8
Kayu klas III (papan) M³ 0.0260
Paku biasa 5' - 12' Kg. 0.6000
Dolken kayu 8"-10"/4 m Btg. 0.5000
Pekerja Oh 0.1500
Tukang kayu Oh 0.0500
Kepala Tukang Oh 0.0051
Mandor Oh 0.0080
9
Kayu klas III M³ 0.2000
Paku biasa 5' - 12' Kg. 1.5000
Minyak bekisting Ltr 0.0667
Besi beton polos Kg. 150.0000
Kawat beton Kg. 2.2500
Semen portland Kg. 323.0000
Pasir beton M³ 0.5200
Koral beton M³ 0.7800
Pekerja Oh 4.2108
Tukang batu Oh 0.3093
Tukang kayu Oh 1.0842
Tukang besi Oh 1.0500
Kepala tukang Oh 0.2450
Mandor Oh 0.1922
Tenaga
Kerja
1 M³ membuat pondasi beton bertulang K 175 , F'c =14.5 Mpa
(150 Kg besi + bekisting).
Bahan
KEBUTUHAN UNIT KOEFISIEN
1 M² Pasang jembatan untuk pengecoran beton
Bahan
Tenaga
Kerja
105
10
Kayu klas III M³ 0.2700
Paku biasa 5' - 12' Kg. 2.0000
Minyak bekisting Ltr 0.1000
Besi beton polos Kg. 200.0000
Kawat beton Kg. 3.0000
Semen portland Kg. 323.0000
Pasir beton M³ 0.5200
Koral beton M³ 0.7800
Pekerja Oh 4.9152
Tukang batu Oh 0.3093
Tukang kayu Oh 1.5600
Tukang besi Oh 1.4000
Kepala tukang Oh 0.3270
Mandor Oh 0.2013
11
Kayu klas III M³ 0.4000
Paku biasa 5' - 12' Kg. 4.0000
Minyak bekisting Ltr 2.0000
Besi beton polos Kg. 300.0000
Kawat beton Kg. 4.5000
Semen portland Kg. 323.0000
Pasir beton M³ 0.5200
Koral beton M³ 0.7800
Kayu klas II balok M3 0.1500
Plywood tebal 9 mm Lbr. 3.5000
Dolken kayu 8"/4 m Btg. 16.0000
Pekerja Oh 7.1750
Tukang batu Oh 0.3093
Tukang kayu Oh 2.7920
Tukang besi Oh 2.1000
Kepala tukang Oh 0.4883
Mandor Oh 0.2747
1 M³ membuat kolom beton bertulang K 175 , F'c =14.5 Mpa
(300 Kg besi + bekisting).
Bahan
Tenaga
Kerja
1 M³ membuat sloof beton bertulang K 175 , F'c =14.5 Mpa
(200 Kg besi + bekisting).
Bahan
KEBUTUHAN UNIT KOEFISIEN
Tenaga
Kerja
106
12
Kayu klas III M³ 0.3200
Paku biasa 5' - 12' Kg. 3.2000
Minyak bekisting Ltr 2.0000
Besi beton polos Kg. 200.0000
Kawat beton Kg. 3.0000
Semen portland Kg. 323.0000
Pasir beton M³ 0.5200
Koral beton M³ 0.7800
Kayu klas II balok M³ 0.1500
Plywood tebal 9 mm Lbr. 3.5000
Dolken kayu 8"/4 m Btg. 16.0000
Pekerja Oh 7.1750
Tukang batu Oh 0.3093
Tukang kayu Oh 1.6500
Tukang besi Oh 1.4000
Kepala tukang Oh 0.4883
Mandor Oh 0.2747
13
Kayu klas III M³ 0.1350
Paku biasa 5' - 12' Kg. 1.3497
Minyak bekisting Ltr 0.6750
Besi beton polos Kg. 157.5000
Kawat beton Kg. 2.2500
Semen portland Kg. 323.0000
Pasir beton M³ 0.5200
Koral beton M³ 0.7800
Kayu klas II balok M³ 0.0505
Plywood tebal 9 mm Lbr. 2.1810
Dolken kayu 8"/4 m Btg. 16.0000
Pekerja Oh 6.7690
Tukang batu Oh 0.3093
Tukang kayu Oh 1.3000
Tukang besi Oh 1.0500
Kepala tukang Oh 0.2650
Mandor Oh 0.2650
1 M³ membuat balok beton bertulang K 175 , F'c =14.5 Mpa (200 Kg besi + bekisting).
Bahan
Tenaga
Kerja
1 M³ membuat plat beton bertulang K175, f*c 14.5 Mpa
(150 Kg besi + bekisting).
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
107
14
Kayu klas III M³ 0.0025
Paku biasa 5' - 12' Kg. 0.0452
Besi beton polos Kg. 3.0000
Kawat beton Kg. 0.4500
Semen portland Kg. 4.1750
Pasir beton M³ 0.0063
Koral beton M³ 0.0093
Pekerja Oh 0.1588
Tukang batu Oh 0.0473
Tukang kayu Oh 0.0113
Tukang besi Oh 0.0118
Kepala tukang Oh 0.0108
Mandor Oh 0.0100
15
Semen Porland Kg. 254.0000
Batu koral Beton m3 0.8197
Pasir beton m3 0.6200
Pekerja Oh 1.6500
Tukang batu Oh 0.2890
Kepala Tukang Oh 0.0290
Mandor Oh 0.0200
16
Semen Porland Kg. 284.5500
Batu koral Beton m3 0.8273
Pasir beton m3 0.6175
Pekerja Oh 1.6820
Tukang batu Oh 0.2805
Kepala Tukang Oh 0.0280
Mandor Oh 0.0200
1 M³ membuat beton mutu f*c = 7.4 Mpa ( K 100 )
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 9.8 Mpa ( K 125 )
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M' membuat kolom praktis beton bertulang (11 x 11) cm.
Bahan
Tenaga
Kerja
108
17
Semen Porland Kg. 315.7000
Batu koral Beton m3 0.8180
Pasir beton m3 0.5845
Pekerja Oh 1.6915
Tukang batu Oh 0.2820
Kepala Tukang Oh 0.0285
Mandor Oh 0.0200
18
Semen Porland Kg. 323.0000
Batu koral beton m3 0.7800
Pasir beton m3 0.5200
Pekerja Oh 1.6500
Tukang batu Oh 0.2675
Kepala Tukang Oh 0.0267
Mandor Oh 0.0200
19
Semen Porland Kg. 325.0000
Batu koral Beton m3 0.8100
Pasir beton m3 0.5400
Pekerja Oh 1.6500
Tukang batu Oh 0.2750
Kepala Tukang Oh 0.0380
Mandor Oh 0.0300
20
Semen Porland Kg. 377.0200
Batu koral Beton m3 0.8200
Pasir beton m3 0.5000
Pekerja Oh 1.6694
Tukang batu Oh 0.3050
Kepala Tukang Oh 0.0456
Mandor Oh 0.0400
1 M³ membuat beton mutu f*c = 19.3 Mpa ( K 225 )
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 14.5 Mpa ( K 175 )
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 16.9 Mpa ( K 200 )
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M³ membuat beton mutu f*c = 12.2 Mpa ( K 150 )
Bahan
Tenaga
Kerja
109
21
Semen Portland Kg. 384.0000
Batu koral Beton m3 0.7368
Pasir beton m3 0.4697
Pekerja Oh 1.6500
Tukang batu Oh 0.2750
Kepala Tukang Oh 0.0458
Mandor Oh 0.0400
22
Semen Porland Kg. 412.0000
Batu koral Beton m3 0.7800
Pasir beton m3 0.5560
Pekerja Oh 1.6820
Tukang batu Oh 0.3125
Kepala Tukang Oh 0.0500
Mandor Oh 0.0500
23
Semen Porland Kg. 413.0000
Batu koral Beton m3 0.7206
Pasir beton m3 0.4769
Pekerja Oh 1.6500
Tukang batu Oh 0.2750
Kepala Tukang Oh 0.0459
Mandor Oh 0.0400
24
Semen Porland Kg. 464.3500
Batu koral Beton m3 0.7800
Pasir beton m3 0.4867
Pekerja Oh 2.1000
Tukang batu Oh 0.3500
Kepala Tukang Oh 0.0717
Mandor Oh 0.0700
1 M³ membuat beton mutu f*c = 26.4 Mpa ( K 300 )
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 31.2 Mpa ( K 350)
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 21.7 Mpa ( K 250 )
Bahan
Tenaga
Kerja
1 M³ membuat beton mutu f*c = 24 Mpa ( K 275 )
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
110
25
Kayu klas III M³ 0.2770
Paku biasa 5' - 12' Kg. 2.0500
Minyak bekisting Ltr. 0.6150
Besi beton polos Kg. 150.0000
Kawat beton Kg. 2.2500
Semen portland Kg. 464.3500
Pasir beton M³ 0.4867
Koral beton M³ 0.7800
Plywood tebal 9 mm Lbr 2.9160
Pekerja Oh 4.3460
Tukang batu Oh 0.2820
Tukang kayu Oh 1.3325
Tukang besi Oh 1.0765
Kepala tukang Oh 0.2700
Mandor Oh 0.2000
26
Kayu klas III M³ 0.3280
Paku biasa 5' - 12' Kg. 3.2800
Minyak bekisting Ltr 1.6400
Besi beton polos Kg. 175.0000
Kawat beton Kg. 2.6250
Semen portland Kg. 464.3500
Pasir beton M³ 0.4867
Koral beton M³ 0.7800
Kayu klas II balok M³ 0.1500
Plywood tebal 9 mm Lbr. 4.0000
Dolken kayu 8"/4 m Btg. 16.0000
Pekerja Oh 5.4325
Tukang batu Oh 0.3415
Tukang kayu Oh 1.6500
Tukang besi Oh 1.4000
Kepala tukang Oh 0.3330
Mandor Oh 0.3000
1 M³ membuat balok beton bertulang mutu K 350, f*c = 31.2 Mpa
(175Kg besi + bekisting).
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M³ membuat sloof beton bertulang K 350 ,F*c =31.2 Mpa
(150 Kg besi + bekisting).
Bahan
Tenaga
Kerja
111
27
Kayu klas III M³ 0.3280
Paku biasa 5' - 12' Kg. 3.2800
Minyak bekisting Ltr 1.6400
Besi beton polos Kg. 175.0000
Kawat beton Kg. 2.6250
Semen portland Kg. 412.0000
Pasir beton M³ 0.5560
Koral beton M³ 0.7800
Kayu klas II balok M³ 0.1400
Plywood tebal 9 mm Lbr. 4.0000
Dolken kayu 8"/4 m Btg. 16.0000
Pekerja Oh 5.4325
Tukang batu Oh 0.3415
Tukang kayu Oh 1.6500
Tukang besi Oh 1.4000
Kepala tukang Oh 0.3330
Mandor Oh 0.3000
1 M³ membuat balok beton bertulang mutu K 275, f*c 24 Mpa
(175Kg besi + bekisting).
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
112
V
1
Steel truss Box
60x10x1.5mmx600mmKg. 1.0250
Self Drilling Screws 12-14x20mm buah 1.0250
Pekerja oh 0.0410
Tukang oh 0.0200
Kepala Tukang oh 0.0100
Mandor oh 0.0100
2
Steel Purlin 50x20x10x1.5x600mm Kg. 1.0250
Self Drilling Screws 12-14x20mm buah1.0250
Pekerja oh 0.0205
Tukang oh 0.0105
Kepala Tukang Oh 0.0011
Mandor oh 0.0005
3
RHS 100.50.5 Btg 0.2050
Kawat las Kg. 0.0105
Pekerja Oh 0.0615
Tukang Las Oh 0.0615
Kepala Tukang Oh 0.0060
Mandor Oh 0.0030
4
Canal C 75.35.15.1.5 Btg 0.2050
Kawat las Kg. 0.0105
Pekerja Oh 0.0585
Tukang Las Oh 0.0300
Kepala Tukang Oh 0.0060
Mandor Oh 0.0030
1 M Pekerjaan rangka atap
Bahan
Tenaga
Kerja
1 M Pasang Gording Canal C 75.45.15.1.6
Bahan
Tenaga
Kerja
1 kg Pekerjaan kuda-kuda baja (Truss Steel Works)
Bahan
Tenaga
Kerja
1 kg Purlin Steel Works
Bahan
Tenaga
Kerja
PEKERJAAN PENUTUP ATAP
KEBUTUHAN UNIT KOEFISIEN
113
5
Light Steel Profile M 4.5600
Screw Ls 1.0000
Dynabolt Ls 1.0000
Pekerja Oh 0.0770
Tukang Oh 0.1540
Kepala Tukang Oh 0.0155
Mandor Oh 0.0040
6
Seng gelombang Lbr. 0.7000
Paku Seng Kg. 0.0200
Pekerja Oh 0.1409
Tukang kayu Oh 0.1256
Kepala tukang Oh 0.0510
Mandor Oh 0.0067
7
Seng plat 3" x 6" BJLS 28 Lbr. 0.4000
Paku ½" - 1" Kg. 0.0600
Paku 2" - 5" Kg. 0.0500
Kayu papan 3 cm M³ 0.0060
Pekerja Oh 0.1250
Tukang kayu Oh 0.2500
Kepala tukang Oh 0.0420
Mandor Oh 0.0063
8
Bahan Genteng plentong Bh 23.0770
Pekerja Oh 0.1500
Tukang kayu Oh 0.0656
Kepala tukang Oh 0.0070
Mandor Oh 0.0070
1 M' Pasang nok atap sirap
Bahan
Tenaga
Kerja
1 M² Pasang atap seng gelombang
Bahan
Tenaga
Kerja
1 M² Baja Ringan
Bahan
Tenaga
Kerja
1 M² Pasang atap genteng plentong besar
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
114
9
Bubungan plentong Bh 4.4351
Semen portland Kg. 8.0000
Pasir pasang M³ 0.0320
Pekerja Oh 0.4000
Tukang kayu Oh 0.2000
Kepala tukang Oh 0.0200
Mandor Oh 0.0020
10
Asbes gelombang Lbr. 0.7577
Paku pancing 60 x 230 Kg. 0.1200
Pekerja Oh 0.1400
Tukang kayu Oh 0.0670
Kepala tukang Oh 0.0070
Mandor Oh 0.0070
11
Genteng sirap Bh 61.0000
Paku biasa ½" - 1" Kg. 0.2033
Pekerja Oh 0.1687
Tukang kayu Oh 0.2543
Kepala tukang Oh 0.0253
Mandor Oh 0.0080
12
Alang-alang Lbr. 6.6625
Tali Pengikat Kg. 0.5125
Pekerja Kg. 0.2050
Mandor M³ 0.0105
Bahan
Tenaga
Kerja
1 M² Pasang atap alang-alang
Bahan
Tenaga
Kerja
Bahan
Tenaga
Kerja
1 M² Pasang atap sirap
Bahan
Tenaga
Kerja
1 M² Pasang atap asbes gelombang 1,80 x 0,92m x 5mm
KEBUTUHAN UNIT KOEFISIEN
1 M' Pasang bubungan plentong besar
115
VI
1
Batako Bh. 12.5000
Semen Portland Kg. 12.0000
Pasir pasang M³ 0.0380
Pekerja Oh 0.3518
Tukang Batu Oh 0.1131
Kepala Tukang Oh 0.0193
Mandor Oh 0.0288
2
Paving block Bh. 20.6000
Semen Portland Kg. 8.3200
Pasir pasang M³ 0.0620
Pekerja Oh 0.3210
Tukang Batu Oh 0.4370
Kepala Tukang Oh 0.0220
Mandor Oh 0.0175
3
Paving block Bh. 51.5000
Semen Portland Kg. 8.3200
Pasir pasang M³ 0.0620
Pekerja Oh 0.3210
Tukang Batu Oh 0.4370
Kepala Tukang Oh 0.0220
Mandor Oh 0.0175
4
Batu kali M³ 1.1000
Bronjong Unit 0.5000
Pekerja Oh 0.6667
Mandor Oh 0.0240
1 M³ Pasang Bronjong (2 x 1 x 1 m)
Bahan
Tenaga
Kerja
1 M² Pasangan Paving block 25x20x6cm
Bahan
Tenaga
Kerja
1 M² Pasangan Paving block 20x10x6 cm
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
1 M² Pasangan Batako 40x20x10 cm, camp speci 1PC : 4Ps
Bahan
Tenaga
Kerja
PEKERJAAN DINDING
116
VII
1
Semen Portland Kg. 7.0521
Pasir pasang M³ 0.0200
Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
2
Semen Portland Kg. 6.2400
Pasir pasang M³ 0.0214
Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
3
Semen Portland Kg. 12.7500
Pasir pasangan M³ 0.0270
Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
4
Semen Portland Kg. 10.3500
Pasir pasang M³ 0.0310
Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
5
Semen Portland Kg. 8.3200
Pasir pasang M³ 0.0320
Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
1 M² Plesteran 1 Pc : 4 Ps, tebal 20 mm
Bahan
Tenaga
Kerja
1 M² Plesteran 1 Pc : 2 Ps, tebal 20 mm
Bahan
Tenaga
Kerja
1 M² Plesteran 1 Pc : 3 Ps, tebal 20 mm
Bahan
Tenaga
Kerja
1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm
Bahan
Tenaga
Kerja
1 M² Plesteran 1 Pc : 4 Ps, tebal 15 mm
Bahan
Tenaga
Kerja
PEKERJAAN PLESTERAN
KEBUTUHAN UNIT KOEFISIEN
117
6
Semen Portland Kg. 5.6080
Pasir pasang M³ 0.0110
Pekerja Oh 0.2559
Tukang Batu Oh 0.1270
Kepala Tukang Oh 0.0130
Mandor Oh 0.0150
7
Semen Portland Kg. 4.7751
Pasir pasang M³ 0.0220
Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
8
Semen Portland Kg. 6.4490
Pasir pasang M³ 0.0230
Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
1 M² Plesteran 1 Pc : 5 Ps, tebal 20 mm
Bahan
Tenaga
Kerja
1 M² Plesteran Ciprat, 1 Pc : 2 Ps
Bahan
Tenaga
Kerja
1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
118
VIII
1
Bahan Semen Portland Kg. 3.8220
Pekerja Oh 0.1500
Tukang Batu Oh 0.0731
Kepala Tukang Oh 0.0074
Mandor Oh 0.0069
2
Bahan Semen Portland Kg. 1.6400
Pekerja Oh 0.0720
Tukang Batu Oh 0.0360
Kepala Tukang Oh 0.0040
Mandor Oh 0.0040
3
Semen Portland Kg. 6.3400
Pasir pasang M³ 0.0120
Pekerja Oh 0.3000
Tukang Batu Oh 0.1500
Kepala Tukang Oh 0.0150
Mandor Oh 0.0270
4
Bahan Semen Portland Kg. 3.4988
Pekerja Oh 0.1753
Tukang Batu Oh 0.1057
Kepala Tukang Oh 0.0146
Mandor Oh 0.0146
Tenaga
Kerja
1 m2 Acian
Tenaga
Kerja
Memasang 1 m2 finishing siar pasangan dinding bata merah
Tenaga
Kerja
Memasang 1 m2 finishing siar pasangan dinding conblock ekspose
Tenaga
Kerja
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 Ps
Bahan
PEKERJAAN FINISHING SIAR PASANGAN
KEBUTUHAN UNIT KOEFISIEN
119
IX
1
Balok kayu M³ 1.1080
Paku 10 cm Kg. 1.0031
Lem kayu Kg. 1.0000
Pekerja Oh 6.9380
Tukang Kayu Oh 20.8140
Kepala Tukang Oh 2.1521
Mandor Oh 0.4283
2
Balok kayu M³ 1.1080
Paku 10 cm Kg. 1.0031
Lem kayu Kg. 1.0000
Pekerja Oh 6.0000
Tukang Kayu Oh 18.0000
Kepala Tukang Oh 2.0000
Mandor Oh 0.3890
3
Papan kayu M³ 0.0400
Paku 5-7 cm Kg. 0.4750
Pekerja Oh 0.5725
Tukang Kayu Oh 1.5508
Kepala Tukang Oh 0.1551
Mandor Oh 0.0956
4
Papan kayu M³ 0.0400
Paku 5-7 cm Kg. 0.4750
Pekerja Oh 0.5725
Tukang Kayu Oh 1.5508
Kepala Tukang Oh 0.1551
Mandor Oh 0.0956
Membuat dan memasang1 M² pintu klamp standar, Kayu kelas II
Bahan
Tenaga
Kerja
Membuat dan memasang1 M² Pintu klamp sederhana, Kayu kelas III
Bahan
Tenaga
Kerja
Membuat dan memasang1 M³ kusen pintu dan jendela kayu kelas I
Bahan
Tenaga
Kerja
Membuat dan memasang1 M³ kusen pintu dan jendela kayu kelas II/III
Bahan
Tenaga
Kerja
PEKERJAAN KAYU
KEBUTUHAN UNIT KOEFISIEN
120
5
Papan kayu M³ 0.0400
Lem kayu Kg. 0.5000
Pekerja Oh 1.0000
Tukang Kayu Oh 2.5543
Kepala Tukang Oh 0.2556
Mandor Oh 0.0500
6
Papan kayu M³ 0.0240
Lem kayu Kg. 0.1593
Pekerja Oh 0.8000
Tukang Kayu Oh 2.1006
Kepala Tukang Oh 0.2043
Mandor Oh 0.0400
7
Papan kayu M³ 0.0385
Lem kayu Kg. 0.5000
Pekerja Oh 1.0000
Tukang Kayu Oh 3.0000
Kepala Tukang Oh 0.3000
Mandor Oh 0.0500
8
Papan kayu M³ 0.0250
Paku 1 - 2,5 cm Kg. 0.0300
Lem kayu Kg. 0.5000
Plywood 4 mm uk.90x220cm Lbr. 1.0000
Pekerja Oh 0.6359
Tukang Kayu Oh 2.0127
Kepala Tukang Oh 0.2000
Mandor Oh 0.0546
Membuat 1 M² daun pintu plywood rangkap,rangka tertutup kayu kelas II
(lebar sampai 90 cm)
Bahan
Tenaga
Kerja
Membuat dan memasang1 M² pintu dan jendela kaca, kayu kelas I/II
Bahan
Tenaga
Kerja
Membuat dan memasang1 M² pintu dan jendela jalusi, kayu kelas I/II
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
Membuat dan memasang1 M² daun pintu panel, kayu kelas I/II
Bahan
Tenaga
Kerja
121
9
Papan kayu M³ 0.0260
Paku 1 - 2,5 cm Kg. 0.0300
Lem kayu Kg. 0.5000
Plywood 4 mm uk.90x220cm Lbr. 1.0000
Pekerja Oh 0.6651
Tukang Kayu Oh 2.1006
Kepala Tukang Oh 0.2043
Mandor Oh 0.0560
10
Papan kayu M³ 0.0600
Paku 1 - 2,5 cm Kg. 0.1500
Pekerja Oh 0.5743
Tukang Kayu Oh 2.0000
Kepala Tukang Oh 0.2000
Mandor Oh 0.0764
11
Papan kayu M³ 0.0217
Paku 1 - 2,5 cm Kg. 0.0300
Lem kayu Kg. 0.3000
Teakwood 4 mm uk.90x220cm Lbr. 1.0000
Pekerja Oh 0.6366
Tukang Kayu Oh 2.0434
Kepala Tukang Oh 0.2043
Mandor Oh 0.0560
12
Balok kayu M³ 1.1000
Besi strip tebal 5mm. Kg. 15.0000
Paku 12 cm Kg. 3.4460
Pekerja Oh 4.4054
Tukang Kayu Oh 10.1540
Kepala Tukang Oh 1.0154
Mandor Oh 0.2000
Memasang 1 M² teakwood rangkap, rangka expose kayu klas I
Bahan
Tenaga
Kerja
Memasang 1 M³ Konstruksi kuda-kuda konvensional, kayu klas I, II dan III bentang 6
m'
Bahan
Tenaga
Kerja
Membuat 1 M² daun pintu plywood rangkap, rangka expose kayu kelas I/II
Bahan
Tenaga
Kerja
Memasang 1 M² jalusi kusen, kayu kelas I/II
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
122
13
Balok kayu M³ 1.1150
Besi strip tebal 5mm. Kg. 15.0000
Paku 12 cm Kg. 2.4260
Pekerja Oh 4.7508
Tukang Kayu Oh 20.1000
Kepala Tukang Oh 2.0100
Mandor Oh 0.2375
14
Balok kayu M³ 1.1000
Besi strip tebal 5mm. Kg. 15.0000
Paku 12 cm Kg. 3.0000
Pekerja Oh 2.4000
Tukang Kayu Oh 7.2000
Kepala Tukang Oh 0.7200
Mandor Oh 0.1200
15
Kaso-kaso (5x7)cm M³ 0.0140
Reng (2x3)cm m3 0.0038
Paku 5 dan 10 cm Kg. 0.2500
Pekerja Oh 0.1000
Tukang Kayu Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
16
Kaso-kaso (5x7)cm M³ 0.0140
Reng (3x4)cm M³ 0.0070
Paku 5 dan 10 cm Kg. 0.2500
Pekerja Oh 0.1000
Tukang Kayu Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
Memasang 1 M² rangka atap genteng beton, kayu kelas II
Bahan
Tenaga
Kerja
Memasang 1 M³ Konstruksi gording,kayu klas II
Bahan
Tenaga
Kerja
Memasang 1 M² rangka atap genteng keramik, kayu kelas II
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
Memasang 1 M³ Konstruksi kuda-kuda expose, kayu klas I
Bahan
Tenaga
Kerja
123
17
Kayu klas II M³ 0.1690
Paku 5 sampai 10 cm Kg. 0.2050
Pekerja Oh 0.1230
Tukang Kayu Oh 0.1230
Kepala Tukang Oh 0.0123
Mandor Oh 0.0060
18
Kaso-kaso (5x7)cm M³ 0.0150
Paku 7 dan 10 cm Kg. 0.2000
Pekerja Oh 0.1500
Tukang Kayu Oh 0.3000
Kepala Tukang Oh 0.0300
Mandor Oh 0.0750
19
Kaso-kaso (5x7)cm M³ 0.0163
Paku 7 dan 10 cm Kg. 0.2543
Pekerja Oh 0.2033
Tukang Kayu Oh 0.3050
Kepala Tukang Oh 0.0305
Mandor Oh 0.0750
20
Papan kayu M³ 0.0100
Paku 5 sampai 7 cm Kg. 0.0759
Pekerja Oh 0.1194
Tukang Kayu Oh 0.2390
Kepala Tukang Oh 0.0239
Mandor Oh 0.0050
21
Papan kayu M³ 0.0110
Paku 5 sampai 7 cm Kg. 0.0759
Pekerja Oh 0.1194
Tukang Kayu Oh 0.2390
Kepala Tukang Oh 0.0239
Mandor Oh 0.0050
Memasang 1M' lisplank uk. 3x30 cm, kayu kelas I/II
Bahan
Tenaga
Kerja
Memasang 1 M² rangka langit-langit, (60x60) cm kayu kelas II/III
Bahan
Tenaga
Kerja
Memasang 1M' lisplank uk. 3x20 cm, kayu kelas I/II
Bahan
Tenaga
Kerja
Memasang 1 M² rangka atap sirap, kayu kelas II
Bahan
Tenaga
Kerja
Memasang 1 M² rangka langit-langit, (50x100) cm kayu kelas II/III
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
124
22
Balok kayu M³ 0.0283
Paku 5 sampai 7 cm Kg. 0.1527
Pekerja Oh 0.1527
Tukang Kayu Oh 0.4577
Kepala Tukang Oh 0.0473
Mandor Oh 0.0080
23
Balok kayu 6/12 cm M³ 0.0275
Paku 5 dan 10 cm Kg. 0.1500
Teakwood 4 mm uk.120x240cm Lbr. 0.8451
Lem kayu Kg. 0.4500
Pekerja Oh 0.1436
Tukang Kayu Oh 0.4307
Kepala Tukang Oh 0.0431
Mandor Oh 0.0077
24
Balok kayu 6/12 cm M³ 0.0280
Paku 5 dan 10 cm Kg. 0.1440
Plywood 4 mm uk.120x240cm Lbr. 0.8451
Lem kayu Kg. 0.4500
Pekerja Oh 0.1914
Tukang Kayu Oh 0.5742
Kepala Tukang Oh 0.0574
Mandor Oh 0.0096
25
Papan kayu M³ 0.0070
Paku 5 dan 10 cm Kg. 0.1025
Paku skrup 10 cm Kg. 0.1538
Pekerja Oh 0.6150
Tukang Kayu Oh 1.8450
Kepala Tukang Oh 0.1845
Mandor Oh 0.0308
Memasang 1 M² dinding pemisah plywood rangkap, kayu kelas II
Bahan
Tenaga
Kerja
Memasang 1 M² dinding lambriziring papan kayu klas I
Bahan
Tenaga
Kerja
Memasang 1 M² rangka dinding pemisah, 60x120 cm, kayu kelas II/III
Bahan
Tenaga
Kerja
Memasang 1 M² dinding pemisah teakwood rangkap, kayu kelas II
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
125
26
Lambrizing plywood 4 mm ukuran
120x240 cmLbr. 0.4100
Paku 1 dan 2.5 cm Kg. 0.0515
Pekerja Oh 0.0255
Tukang Kayu Oh 0.0770
Kepala Tukang Oh 0.0077
Mandor Oh 0.0010
KEBUTUHAN UNIT KOEFISIEN
Memasang M² dinding lambriziring plywood
Bahan
Tenaga
Kerja
126
X
1
Ubin abu-abu 20 x 20 cm Bh 25.3588
Semen portland Kg. 10.4000
Pasir pasang M³ 0.0450
Colour cement Kg. 0.3467
Pekerja Oh 0.3228
Tukang batu Oh 0.1966
Kepala tukang Oh 0.0197
Mandor Oh 0.0197
2
Plint ubin Bh 6.1554
Semen portland Kg. 1.2724
Pasir pasang M³ 0.0033
Pekerja Oh 0.0900
Tukang batu Oh 0.0900
Kepala tukang Oh 0.0090
Mandor Oh 0.0045
3
Lantai kayu (gym floor) M² 1.1177
Lem Kg. 0.6100
Pekerja Oh 0.7000
Tukang kayu Oh 0.3560
Kepala tukang kayu Oh 0.0407
Mandor Oh 0.0407
4
Karpet M² 1.0500
Lem Kg. 0.3500
Pekerja Oh 0.1710
Tukang Kayu Oh 0.1270
Kepala tukang kayu Oh 0.0127
Mandor Oh 0.0091
Tenaga
Kerja
1 M² Pasang lantai karpet
Bahan
Tenaga
Kerja
Tenaga
Kerja
1 M' pasang plint ubin pc abu-abu 15 x20 cm
Bahan
Tenaga
Kerja
1 M² Pasang lantai kayu
Bahan
PEKERJAAN PENUTUP LANTAI & DINDING
KEBUTUHAN UNIT KOEFISIEN
1 M² pasang lantai ubin pc abu-abu 20 x20 cm
Bahan
127
5
Batu koral sikat Kg. 10.0000
Semen portland Kg. 3.8950
Pasir pasang M³ 0.0665
Pekerja Oh 0.5125
Tukang batu Oh 0.2050
Kepala tukang batu Oh 0.0205
Mandor Oh 0.0205
6
Papan kayu klas II M³ 0.0023
Paku skrup 5 cm Kg. 0.0500
Pekerja Oh 0.1200
Tukang batu Oh 0.1200
Kepala tukang Oh 0.0120
Mandor Oh 0.0060
7
Keramik Bh 11.8700
Semen portland Kg. 8.0000
Pasir pasang M³ 0.0450
Semen warna Kg. 1.5000
Pekerja Oh 0.7000
Tukang batu Oh 0.3500
Kepala tukang Oh 0.0350
Mandor Oh 0.0350
8
Keramik Bh 6.6250
Semen portland Kg. 8.0000
Pasir pasang M³ 0.0450
Semen warna Kg. 0.9400
Pekerja Oh 0.7000
Tukang batu Oh 0.3500
Kepala tukang Oh 0.0350
Mandor Oh 0.0350
Memasang 1 m2 lantai keramik ukuran 40 x 40 cm
Bahan
Tenaga
Kerja
Memasang 1 m2 lantai keramik ukuran 30 x 30 cm
Bahan
Tenaga
Kerja
1 M² Pasang batu koral sikat campuran 1 : 2
Bahan
Tenaga
Kerja
Memasang 1 m plint kayu kelas II ukuran (2 x 10) cm
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
128
9
Keramik Bh 3.0000
Semen portland Kg. 8.0000
Pasir pasang M³ 0.0450
Semen warna Kg. 0.9321
Pekerja Oh 0.7000
Tukang batu Oh 0.3500
Kepala tukang Oh 0.0350
Mandor Oh 0.0350
10
Batu alam M² 1.1000
Semen portland Kg. 11.5453
Pasir pasang M³ 0.0193
Pekerja Oh 2.3360
Tukang batu Oh 0.3047
Kepala tukang Oh 0.0117
Mandor Oh 0.0138
Memasang 1 m2 batu alam
Bahan
Tenaga
Kerja
Memasang 1 m2 lantai keramik ukuran 60 x 60 cm
Bahan
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
129
XI
1
Plat asbes M² 1.1000
Paku biasa ½" - 1" Kg. 0.0100
Pekerja Oh 0.0300
Tukang kayu Oh 0.0700
Kepala tukang Oh 0.0070
Mandor Oh 0.0400
2
Tripleks Lbr. 0.3750
Paku biasa ½" - 1" Kg. 0.0300
Pekerja Oh 0.1000
Tukang kayu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050
3
Kayu papan M³ 0.0155
Paku biasa ½" - 1" Kg. 0.0105
Pekerja Oh 0.8200
Tukang kayu Oh 0.8200
Kepala tukang Oh 0.0820
Mandor Oh 0.0410
4
Lis kayu profil M' 1.0500
Paku lis Kg. 0.0329
Pekerja Oh 0.0500
Tukang kayu Oh 0.0500
Kepala tukang Oh 0.0050
Mandor Oh 0.0030
5
Gypsum board Lbr. 0.3646
Paku skrup Kg. 0.1100
Pekerja Oh 0.2280
Tukang kayu Oh 0.4158
Kepala tukang Oh 0.0416
Mandor Oh 0.0140
Memasang 1 M² langit-langit gypsum board ukuran (1200x2400x9)mm
Bahan
Tenaga
Kerja
Memasang 1 M² langit-langit lambriziring kayu 9cm
Bahan
Tenaga
Kerja
Memasang 1 M' list langit-langit kayu profil
Bahan
Tenaga
Kerja
Memasang 1 M² langit-langit asbes semen 4/5/6mm
Bahan
Tenaga
Kerja
Memasang 1 M² langit-langit tripleks
Bahan
Tenaga
Kerja
PEKERJAAN LANGIT-LANGIT
KEBUTUHAN UNIT KOEFISIEN
130
XII
1
Besi profil Kg 1.1000
Meni Besi kg 0.0710
Pekerja Oh 0.0600
Tukang besi Oh 0.0600
Kepala tukang Oh 0.0060
Mandor Oh 0.0023
2
Rangka + kaca 5 mm M2 1.1000
Paku skrup 1 cm – 2,5 cm Bh 10.0000
Besi strip M' 7.0000
Pekerja Oh 0.2000
Tukang besi Oh 0.2000
Kepala tukang Oh 0.0200
Mandor Oh 0.0010
3
Seng plat M' 1.0500
Paku 1 cm – 2,5 cm kg 0.0150
Papan kayu klas II atau III M3 0.0190
Pekerja Oh 0.2310
Tukang besi Oh 0.4000
Kepala tukang Oh 0.0400
Mandor Oh 0.0100
4
Seng plat M' 1.0500
Paku 1 cm – 2,5 cm kg 0.010
Papan kayu klas II atau III M3 0.0125
Pekerja Oh 0.1500
Tukang besi Oh 0.3000
Kepala tukang Oh 0.0300
Mandor Oh 0.0080
Memasang 1 m talang datar/ jurai seng bjls 28 lebar 90 cm
Bahan
Tenaga
Kerja
Memasang 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30
Bahan
Tenaga
Kerja
Memasang 1 kg besi profil
Bahan
Tenaga
Kerja
Memasang 1 m2 jendela nako & tralis
Bahan
Tenaga
Kerja
PEKERJAAN BESI DAN ALUMINIUM
KEBUTUHAN UNIT KOEFISIEN
131
XIII
1
Bahan Kunci tanam biasa Bh 1.0000
Pekerja Oh 0.0100
Tukang besi Oh 0.5000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050
2
Bahan Engsel pintu Bh 1.0000
Pekerja Oh 0.0150
Tukang besi Oh 0.1500
Kepala tukang Oh 0.0150
Mandor Oh 0.0010
3
Bahan Engsel jendela Bh 1.0000
Pekerja Oh 0.0100
Tukang besi Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0010
4
Bahan Kait angin Bh 1.0000
Pekerja Oh 0.0150
Tukang besi Oh 0.1500
Kepala tukang Oh 0.0150
Mandor Oh 0.0010
5
Bahan Kunci slot Bh 1.0000
Pekerja Oh 0.0098
Tukang besi Oh 0.0683
Kepala tukang Oh 0.0068
Mandor Oh 0.0010
6
Bahan Kaca Bh 1.1000
Pekerja Oh 0.0150
Tukang besi Oh 0.1500
Kepala tukang Oh 0.0150
Mandor Oh 0.0010
1 Bh. pasang kunci slot
Tenaga
Kerja
1 M² pasang kaca, tebal 3 - 5 mm
Tenaga
Kerja
1 Bh. pasang engsel pintu
Tenaga
Kerja
1 Bh. pasang engsel jendela kupu-kupu
Tenaga
Kerja
1 Bh. pasang kait angin
Tenaga
Kerja
PEKERJAAN KUNCI DAN KACA
KEBUTUHAN UNIT KOEFISIEN
1 Bh. pasang kunci tanam biasa
Tenaga
Kerja
132
XIV
1
Bahan Kloset duduk lengkap Bh. 1.0000
Pekerja Oh 1.4501
Tukang batu Oh 1.2366
Kepala tukang Oh 0.1236
Mandor Oh 0.1600
2
Kloset jongkok porselen Bh. 1.0000
Semen portland Kg. 6.1000
Pasir pasang M³ 0.0103
Pekerja Oh 1.0000
Tukang batu Oh 1.5250
Kepala tukang Oh 1.5000
Mandor Oh 0.1627
3
Bahan Urinoir lengkap Bh. 1.0000
Pekerja Oh 1.0000
Tukang batu Oh 1.0000
Kepala tukang Oh 0.1000
Mandor Oh 0.1000
4
Bahan Wastafel lengkap Bh. 1.0000
Pekerja Oh 1.2000
Tukang batu Oh 1.2366
Kepala tukang Oh 0.1236
Mandor Oh 0.1000
Memasang 1 buah urinoir
Tenaga
Kerja
Memasang 1 buah wastafel
Tenaga
Kerja
Memasang 1 buah kloset duduk/monoblok lengkap
Tenaga
Kerja
Memasang 1 buah kloset jongkok porselen
Bahan
Tenaga
Kerja
PEKERJAAN SANITASI
KEBUTUHAN UNIT KOEFISIEN
133
5
Bahan Bak fibreglass 220 ltr lengkap Bh. 1.0000
Pekerja Oh 1.9474
Tukang batu Oh 2.7000
Kepala tukang Oh 0.5400
Mandor Oh 0.1189
6
Batu bata Bh 53.0000
Semen portland Kg. 44.0000
Pasir pasang M³ 0.0700
Koral beton M³ 0.0700
Besi beton Kg. 1.4150
Pasir beton M³ 0.0600
Pekerja Oh 3.2000
Tukang batu Oh 1.0150
Kepala tukang Oh 0.1015
Mandor Oh 0.0160
7
Pipa galvanis M' 1.2000
Asesories (% dari harga pipa) % 35.0000
Pekerja Oh 0.0540
Tukang batu Oh 0.0900
Kepala tukang Oh 0.0090
Mandor Oh 0.0270
8
Bahan Pipa galvanis M' 1.2000
Asesories (% dari harga pipa) % 35.0000
Pekerja Oh 0.1080
Tukang batu Oh 0.1800
Kepala tukang Oh 0.0180
Mandor Oh 0.0054
Bahan
Tenaga
Kerja
Memasang 1 M' pipa galvanis Ø ½" - 1"
Tenaga
Kerja
Memasang 1 M' pipa galvanis Ø 1½" - 3"
Tenaga
Kerja
Bahan
KEBUTUHAN UNIT KOEFISIEN
Memasang 1 buah bak mandi Fibreglass, volume 220 ltr
Tenaga
Kerja
Pasang 1 bh bak kontrol pasangan batu bata 30 x 30/T35 cm
134
9
Pipa PVC M' 1.2000
Asesories (% dari harga pipa) % 35.0000
Pekerja Oh 0.0360
Tukang batu Oh 0.0706
Kepala tukang Oh 0.0075
Mandor Oh 0.0043
10
Pipa PVC M' 1.2000
Asesories (% dari harga pipa) % 35.0000
Pekerja Oh 0.0450
Tukang batu Oh 0.0750
Kepala tukang Oh 0.0090
Mandor Oh 0.0025
11
Bahan Pipa PVC M' 1.2000
Pekerja Oh 0.0810
Tukang batu Oh 0.1879
Kepala tukang Oh 0.0189
Mandor Oh 0.0070
12
Kran air Bh 1.0000
Seal tape Bh 0.0245
Pekerja Oh 0.0100
Tukang batu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050
Tenaga
Kerja
Memasang 1 M' pipa PVC tipe AW Ø 3"-4"
Tenaga
Kerja
Memasang 1 buah kran Ø ½" atau ¾"
Bahan
Tenaga
Kerja
Memasang 1 M' pipa PVC tipe AW Ø ½" - 1½"
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
Memasang 1 M' pipa PVC tipe AW Ø 2"
Bahan
KEBUTUHAN UNIT KOEFISIEN
Bahan
135
XV
1
Cat meni Kg. 0.1850
Dempul/plamir Kg. 0.1380
Cat dasar Kg. 0.1700
Cat penutup 2 x Kg. 0.2730
Kuas bh 0.0294
Pekerja Oh 0.0847
Tukang cat Oh 0.0890
Kepala tukang Oh 0.0139
Mandor Oh 0.0051
2
Vernis Kg. 0.2930
Dempul/plamir Kg. 0.0934
Amplas Lbr. 0.8924
Kuas Bh. 0.0294
Pekerja Oh 0.0539
Tukang cat Oh 0.0806
Kepala tukang Oh 0.0129
Mandor Oh 0.0046
3
Plamir Kg. 0.1154
Cat dasar Kg. 0.0920
Cat penutup 2 x Kg. 0.2600
Kuas bh 0.0294
Pekerja Oh 0.0362
Tukang cat Oh 0.0630
Kepala tukang Oh 0.0064
Mandor Oh 0.0064
Tenaga
Kerja
Tenaga
Kerja
1 M² pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup).
PEKERJAAN PENGECATAN
KEBUTUHAN UNIT KOEFISIEN
1 M² pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup).
Tenaga
Kerja
1 M² pengecatan bidang kayu dengan vernis
Bahan
Bahan
Bahan
136
4
Cat dasar Kg. 0.1200
Cat penutup 2 x Kg. 0.1839
Kuas bh 0.0294
Pekerja Oh 0.0361
Tukang cat Oh 0.0420
Kepala tukang Oh 0.0051
Mandor Oh 0.0037
5
Meni besi/cat besi Kg. 0.1230
Minyak cat ltr 0.0136
Kuas Bh. 0.0227
Pekerja Oh 0.0636
Tukang cat Oh 0.2000
Kepala tukang Oh 0.0204
Mandor Oh 0.0114
6
Meni Besi Kg. 0.1000
Kuas Bh. 0.0100
Perancah kayu M³ 0.0020
Pekerja Oh 0.2500
Tukang cat Oh 0.2250
Kepala tukang Oh 0.0230
Mandor Oh 0.0080
1 M² pengecatan permukaan baja dengan meni besi
Bahan
Tenaga
Kerja
1 M² pengecatan permukaan baja, 1 lapis dengan meni besi dan perancah.
Bahan
Tenaga
Kerja
1 M² pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup).
Tenaga
Kerja
KEBUTUHAN UNIT KOEFISIEN
Bahan
137
138
PROJECT : UNIT OF MEASUREMENT LOCATION : cubic meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Excavator Wheel loader Dump truck Motor grader Water tank truck Vibratory roller Rubber tire roller Helping tools
- - - - - - - -
- - - - - - - -
- - - - - - - -
MATERIALS 1.
Fill material in accordance with specification
-
-
-
LABOR 1. 2.
3.
Common labor Foreman Skilled Labor
- - -
- - -
- - -
WORK ORDER 1.
2.
3. 4.
5.
6.
7.
8.
9.
Construction shall be performed mechanically. Effective work hour per day for equipment. Material loose factor. Layer thickness of dense material. Average hauling distance to project location. Excavation of material at borrowed pit performed by excavator, loaded by wheel loader and hauled to project by dump truck. At project site, material unloaded and spreaded by motor grader. Before compacted by vibrator roller and tire roller, water tank truck sprayed amount of water. During spreading and compacting, group of labors set up the edge of spreading and level the surface using helping tools.
-
TE
FL d
L - - - -
- - - - - - - - -
-
hour -
m
km - - - -
EMBANKMENT WITH MATERIAL FROM BORROW EXCAVATION
139
COEFFICIENT ANALISYS OF EQUIPMENT 1. EXCAVATOR
1.1. Bucket capacity 1.2. Bucket factor 1.3. Efficiency factor 1.4. Cycle time
a. Excavation b. Other
1.5. Productivity per hour 1.6. Coefficient of equipment
V
FB FE TC T1 T2 Q
E10
- - - - - - - -
cum
- -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E10 = 1Q
2. WHEEL LOADER 2.1. Bucket factor 2.2. Capacity 2.3. Efficiency factor 2.4. Cycle time
a. Loading b. Unloading
2.5. Productivity per hour 2.6. Coefficient of equipment
FB V FE TC T1 T2 Q
E15
- - - - - - - -
-
cum -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E015 = 1Q
3. DUMP TRUCK 3.1. Capacity 3.2. Efficiency factor 3.3. Average loading trip velocity 3.4. Average unloading trip
velocity 3.5. Cycle time a. Loading time b. Unloading time c. Other 3.6. Productivity per hour 3.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 T3 Q
E09
- - - - - - - - - -
cum
- km/h km/h
min min min min
cum/h hour
TC = T1 + T2 + T3
T1 =L
V1x60
T2 =L
V2x60
Q = V. FE. 60
TC. FL
E09 = 1Q
4. MOTOR GRADER 4.1. Spreading length 4.2. Effective width 4.3. Efficiency factor 4.4. Average velocity 4.5. No of passing 4.6. Cycle time a. Time for one passing b. Other 4.7. Productivity per hour 4.8. Coefficient of equipment
LS b
FE V1 n
TC T1 T2 Q
E13
- - - - - - - - - -
m m -
km/h -
min min min
cum/h hour
TC = T1 + T2
T1 = LH. 60
V1.1000
Q = LH. b. t. FE. 60
n. TC
E013 = 1Q
5.
WATER TANK TRUCK 5.1. Volume
V
-
cum
EMBANKMENT WITH MATERIAL FROM BORROW EXCAVATION
140
5.2. Water required per cum of dense material
5.3. No of passing 5.4. Efficiency factor 5.5. Productivity per hour 5.6. Coefficient of equipment
WC
n FE Q
E23
- - - - -
cum - -
cum/h hour
Q = V. n. FE
WC
E023 = 1Q
6. VIBRATORY ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
V b n
FE Q
E19
- - - - - -
km/h
m nos
- cum/h hour
Q = v. 1000. b. t. FE
n
E019 = 1Q
7. RUBBER TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor 7.5. Productivity per hour 7.6. Coefficient of equipment
V b n
FE Q
E05
- - - - - -
km/h
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E05 = 1Q
8. HELPING TOOLS 8.1. Shovel 8.1. Fork
Lump sum
COEFFICIENT ANALYSIS FOR LABOR 1.
2.
3.
4.
Productivity motor grader per hour. Productivity motor grader per day. Labor required a. Common labor b. Foreman Coefficient of labor: 4.1. Common labor 4.2. Foreman
Q
Q�
CL FO
L01 L03
- - - - - -
cum/h
cum/d
man man
day day
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
COEFFICIENT ANALYSIS OF MATERIAL 1.
Fill material W10 -
cum
W10 = 1.FL
EMBANKMENT WITH MATERIAL FROM BORROW EXCAVATION
141
PROJECT : UNIT OF MEASUREMENT LOCATION : cubic meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Excavator Wheel loader Dump truck Motor grader Water tank truck Vibratory roller Rubber tire roller Helping tools 8.1. Push cart 8.2. Shovel 8.3. Fork
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
MATERIALS 1.
Common excavation -
-
-
LABOR 1. 2.
Common labor Foreman
CL FO
- -
man man
WORK ORDER 1.
2.
3. 4. 5.
6.
7.
8.
Embankment shall be performed mechanically. Effective work hour per day for equipment. Material loose factor. Dense thickness of each layer Wheel loader load material to dump truck and haul at distant to project location. At project location, material spreaded by motor grader. Before compacted by vibro roller and rubber tire roller, spreded material sprayed with water by water tank truck. During spreading and compacting, group of labors set up the edge of spreading and level of surface usingh helping tools.
TE
FL t
L - - -
- - - - - - -
hour -
m
km - - -
EMBANKMENT WITH
COMMON MATERIAL
142
COEFFICIENT ANALISYS OF EQUIPMENT 1. WHEEL LOADER
1.1. Bucket factor 1.2. Capacity 1.3. Efficiency factor 1.4. Cycle time
c. Loading d. Unloading
1.5. Productivity per hour 1.6. Coefficient of equipment
FB V FE TC T1 T2 Q
E15
- - - - - - - -
-
cum -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E015 = 1Q
2. DUMP TRUCK 2.1. Capacity 2.2. Efficiency factor 2.3. Average loading trip velocity 2.4. Cycle time a. Loading time b. Loading trip c. Unloading trip d. Other 2.5. Productivity per hour 2.6 Coefficient of equipment
V FE V1 TC T1 T2 T3 T4 Q
E08
- - - - - - - - - -
cum
- km/h min min min min min
cum/h hour
TC = T1 + T2 + T3 + T4
T1 =V
Q�x60
T2 =L
V1x60
T3 =L
V2x60
Q = V. FE. 60
TC. FL
E08 = 1Q
3. MOTOR GRADER 3.1. Spreading length 3.2. Effective width 3.3. Efficiency factor 3.4. Average velocity 3.5. No of passing 3.6. Cycle time a. Time for one passing b. Other 3.7. Productivity per hour 3.8. Coefficient of equipment
LS b
FE V n
TC T1 T2 Q
E13
- - - - - - - - - -
m m -
km/h -
min min min
cum/h hour
TC = T1 + T2
T1 = LS. 60
V1.1000
Q = LS. b. t. FE. 60
n. TC
E013 = 1Q
4.
WATER TANK TRUCK 4.1. Volume 4.2. Water required per cum of
dense material 4.3. No of passing 4.4. Efficiency factor 4.5. Productivity per hour 4.6. Coefficient of equipment
V
WC
n FE Q
E23
- - - - - -
cum cum
- -
cum/h hour
Q = V. n. FE
WC
E023 = 1Q
5. VIBRATORY ROLLER 5.1. Average velocity
V
-
km/h
EMBANKMENT WITH
COMMON MATERIAL
143
5.2. Effective width 5.3. No of passing 5.4. Efficiency factor 5.5. Productivity per hour 5.6. Coefficient of equipment
b n
FE Q
E19
- - - - -
m nos
- cum/h hour
Q = v. 1000. b. t. FE
n
E019 = 1Q
6. RUBBER TIRE ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
V b n
FE Q
E018
- - - - - -
km/h
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E018 = 1Q
7. HELPING TOOLS 7.1. Push cart 7.2. Shovel 7.3. Fork
Lump sum
COEFFICIENT ANALYSIS FOR LABOR 1.
2. 3.
4.
Group of labors serve rubber tire roller operation. Productivity RTR per day. Labor required 3.1. Common labor 3.2. Foreman Coefficient of labor: 4.1. Common labor 4.2. Foreman
Q�
CL FO
L01 L03
- - - - -
cum/d
man man
md md
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
COEFFICIENT ANALYSIS OF MATERIAL 1.
Common material required for 1 m3 of dense layer
Q� -
cum
Q� = Q.FL
EMBANKMENT WITH
COMMON MATERIAL
144
PROJECT : UNIT OF MEASUREMENT LOCATION : cubic meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2.
Excavator Dump truck
- -
- -
- -
MATERIALS 1.
Not used -
-
-
LABOR 1. 2.
Foreman Common labor
FO CL
- -
man man
WORK ORDER 1.
2.
3. 4.
5.
6.
7.
Excavation shall be performed mechanically. Effective work hour per day for equipment. Material loose factor. Average distance of disposal to project Excavator excavates and load material to dump truck. Dump truck hauls material to disposal location. Group of labors serve excavator operation.
TE
FL L - - - -
- - - - - - -
hour -
km - - - -
COEFFICIENT ANALISYS OF EQUIPMENT 1. EXCAVATOR
1.1. Bucket capacity 1.2. Bucket factor 1.3. Efficiency factor 1.4. Cycle time
a. Excavation b. Other
1.5. Productivity per hour 1.6. Coefficient of equipment
V
FB FE TC T1 T2 Q� E10
- - - - - - - -
cum
- -
min min min
cum/h hour
TC = T1 + T2
Q� = V. FB. FE. 60
TC. FL
E10 = 1
Q�
2. DUMP TRUCK
COMMON EXCAVATION
145
2.1. Capacity 2.2. Efficiency factor 2.3. Average loading trip velocity 2.4. Average unloading trip
velocity 2.5. Cycle time a. Loading time b. Unloading time c. Unloading travel time d. Other 2.6. Productivity per hour 2.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 T3 T4 Q
E08
- - - - - - - - - - -
cum -
km/h km/h
min min min min
cum/h hour
TC = T1 + T2 + T3
T1 =V
Q�x60
T2 =L
V1x60
T3 =L
V2x60
Q = V. FE. 60
TC. FL
E08 = 1Q
COEFFICIENT ANALYSIS FOR LABOR 1. 2.
3.
Productivity excavator per day. Labor required a. Common labor b. Foreman Coefficient of labor: a. Common labor b. Foreman
Q�
CL FO
L01 L03
- - - - -
cum
man man
m.d m.d
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
COMMON EXCAVATION
146
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3.
Bulldozer Excavator Dump truck
- - -
- - -
- - -
MATERIALS 1.
Not used -
-
-
LABOR 1. 2. 3.
Foreman Skill labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3. 4. 5.
6.
7.
Clearing and grubbing shall be performed mechanically. Effective work hour per day for equipment. Material loose factor. Clearing and grubbing thickness. Location of disposal at average distance. Clearing and grubbing area along the project by using bulldozer. Excavator load disposal material and haul by dump truck.
-
TE
FL d
L - -
- - - - - - -
-
hour -
m
km - -
COEFFICIENT ANALISYS OF EQUIPMENT 1. BULLDOZER
1.7. Blade factor 1.8. Efficiency factor 1.9. Blade width 1.10. Blade height 1.11. Forward velocity 1.12. Backward velocity 1.13. Clearing distance 1.14. Clearing production per
time 1.15. Cycle time
c. Forward d. Backward e. Other
1.16. Productivity per hour 1.17. Coefficient of equipment
FB FE B h
v1 v2 LC V
E15 TC T1 T2 T3 Q
E04
- - - - - - - - - - - - - -
-
cum -
min min min
cum/h hour min min min min
cum/h hour
V = H.2B.FB TC = T1 + T2 + T3
T1 = L. 60V1
T2 = L. 60V2
Q = V. 60. FETC. FL. d
E04 = 1Q
2. EXCAVATOR 2.1. Bucket capacity
V
-
cum
TC = T1 + T2
CLEARING AND GRUBBING
147
2.2. Bucket factor 2.3. Efficiency factor 2.4. Cycle time
c. Excavation d. Other
2.5. Productivity per hour 2.6. Coefficient of equipment
FB FE TC T1 T2 Q
E10
- - - - - - -
- -
min min min
cum/h hour
Q = V. FB. FE. 60
TC. FL. d
E10 = 1Q
3. DUMP TRUCK 3.1. Capacity 3.2. Efficiency factor 3.3. Average loading trip velocity 3.4. Average unloading trip
velocity 3.5. Cycle time a. Loading time b. Unloading time c. Other 3.6. Productivity per hour 3.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 T3 Q
E08
- - - - - - - - - -
cum
- km/h km/h
min min min min
cum/h hour
TC = T1 + T2 + T3
T1 =L
V1x60
T2 =L
V2x60
Q = V. FE. 60TC. FL. d
E08 = 1Q
COEFFICIENT ANALYSIS FOR LABOR 1.
2.
3.
4.
Group of labor serve bulldozer operation. Productivity motor grader per day. Labor required c. Common labor d. Foreman Coefficient of labor: 4.1. Common labor 4.2. Foreman
Q�
CL FO
L01 L03
- - - - -
cum
man man
m.d m.d
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
CLEARING AND GRUBBING
148
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Bulldozer Motor grader Wheel loader Dump truck Water tank truck Vibratory roller Rubber tire roller Helping tools
- - - - - - - -
- - - - - - - -
- - - - - - - -
MATERIALS 1.
Material used shall be complied with specification
-
-
-
LABOR 1. 2.
Foreman Common labor
FO CL
- -
man man
WORK ORDER 1.
2.
3. 4. 5.
6.
7.
8.
9.
10.
11.
Preparation of subgrade shall be performed mechanically. Effective work hour per day for equipment. Material loose factor. Dense thickness of sub base. Excavation and loosing material by bulldozer at borrow area and load to dump truck by wheel loader. Material haul from borrow area by dump truck and unloaded to project location. Average distance of borrow area to project location. At project location material spreaded by motor grader. Before compacting, material is watered with amount of water by water tank truck. Compacting of material to specified MMD performed by vibro roller and tire roller. During spreading and compacting, group of labors put edge of spread and level of surface using helping tools.
TE
FL t - -
L - - - -
- - - - - - - - - -
hour -
m - -
km - - - -
COEFFICIENT ANALISYS OF EQUIPMENT
SUB GRADE PREPARATION
149
1. BULLDOZER 1.18. Blade factor 1.19. Blade width 1.20. Blade height 1.21. Forward velocity 1.22. Backward velocity 1.23. Clearing distance 1.24. Clearing production per
time 1.25. Cycle time
f. Forward g. Backward h. Other
1.26. Productivity per hour 1.27. Coefficient of equipment
FB B h
v1 v2 LC V
E15 TC T1 T2 T3 Q
E04
- - - - - - - - - - - - - -
-
cum -
min min min
cum/h hour min min min min
cum/h hour
V = (h)2.B.FB TC = T1 + T2 + T3
T1 = L. 60
V1.1000
T2 = L. 60
V2.1000
Q = V. 60. FE
TC
E04 = 1Q
2. WHEEL LOADER
2.7. Bucket factor 2.8. Capacity 2.9. Efficiency factor 2.10. Cycle time
e. Loading f. Unloading
2.11. Productivity per hour 2.12. Coefficient of equipment
FB V FE TC T1 T2 Q
E15
- - - - - - - -
-
cum -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E015 = 1Q
3. DUMP TRUCK 3.1. Capacity 3.2. Efficiency factor 3.3. Average loading trip velocity 3.4. Average unloading trip
velocity 3.5. Cycle time a. Loading travel time b. Unloading travel time 3.6. Productivity per hour 3.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 Q
E09
- - - - - - - - -
cum
- km/h km/h
min min min
cum/h hour
TC = T1 + T2 + T3
T1 =L
V1x60
T2 =L
V2x60
Q = V. FE. 60
TC. FL
E09 = 1Q
4. MOTOR GRADER 4.1. Spreading length
LH
-
m
TC = T1 + T2
SUB GRADE PREPARATION
150
4.2. Effective width 4.3. Efficiency factor 4.4. Average velocity 4.5. No of passing 4.6. Cycle time a. Time for one passing b. Other 4.7. Productivity per hour 4.8. Coefficient of equipment
b FE V1 n
TC T1 T2 Q
E13
- - - - - - - - -
m -
km/h -
min min min
cum/h hour
T1 = LH. 60
V1.1000
Q = LH. b. t. FE. 60
n. TC
E13 = 1Q
5.
WATER TANK TRUCK 5.1. Volume 5.2. Water required per m3 of
dense material 5.3. Water filling per hour 5.4. Efficiency factor 5.5. Productivity per hour 5.6. Coefficient of equipment
V
Wc
n FE Q
E23
- - - - - -
cum cum
- -
cum/h hour
Q = V. n. FE
Wc
E23 = 1Q
6. VIBRATORY ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
V1 b n
FE Q
E19
- - - - - -
km/h
m - -
cum/h hour
Q = V1.1000. b. t. FE
n
E019 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor 7.5. Productivity per hour 7.6. Coefficient of equipment
V b n
FE Q
E18
- - - - - -
km/h
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E018 = 1Q
8. HELPING TOOLS 8.1. Push cart 8.2. Shovel 8.3. Fork
Lump sum
COEFFICIENT ANALYSIS FOR LABOR 1.
During spreading, group of labor put edge of spreaded material
Q� = Q.TE
SUB GRADE PREPARATION
151
2.
3.
4.
5.
and level the surface of sub grade. Productivity motor grader per hour. Productivity motor grader per day. Labor required c. Common labor d. Foreman Coefficient of labor: 5.1. Common labor 5.2. Foreman
Q
Q�
CL FO
L01 L03
- - - - - -
cum/h
cum/d
man man
day day
L01 = CLQ�
L03 = FOQ�
COEFFICIENT ANALYSIS OF MATERIAL 1. 2. 3.
Volume of material Loose factor Volume of material required
Q FL Qr
- - -
cum -
cum
Q = 1 cum Qr = 1.FL
SUB GRADE PREPARATION
152
PROJECT : UNIT OF MEASUREMENT LOCATION : cubic meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7.
Wheel loader Dump truck Motor grader Water tank truck Vibratory roller Pneumatic tire roller Helping tools: 7.1. Push cart 7.2. Shovel 7.3. Fork
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
MATERIALS 1.
Crushed rock aggregate class with quality in accordance with specification
-
-
-
LABOR 1. 2.
Foreman Common labor
FO CL
- -
man man
WORK ORDER 1.
2.
3. 4. 5.
6.
7.
8.
9.
10.
Construction shall be performed mechanically. Average distance of base camp to project site. Dense thickness of sub base. Material loose factor. Effective work hour per day for equipment. Wheel loader mix and load aggregate to dump truck at base camp. Dump trucks haul aggregate to project site, then spreaded by motor grader. Before compaction, aggregate sprayed water by water tank truck. Compaction of aggregate performed by tandem steel roller and pneumatic tire roller. During spreading and compacting, group of labors set up the edge of spreaded aggregate and surface level using helping tools.
L t
FL TE
- - - - -
- - - - - - - - -
Km
m -
hour - - - - -
COEFFICIENT ANALISYS OF EQUIPMENT
SUB BASE AGGREGATE B
153
1. WHEEL LOADER 1.28. Bucket factor 1.29. Capacity 1.30. Efficiency factor 1.31. Cycle time
g. Loading h. Unloading
1.32. Productivity per hour 1.33. Coefficient of equipment
FB V FE TC T1 T2 Q
E15
- - - - - - - -
-
cum -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E15 = 1Q
2. DUMP TRUCK 2.1. Capacity 2.2. Efficiency factor 2.3. Average loading trip velocity 2.4. Average unloading trip
velocity 2.5. Cycle time a. Loading travel time b. Unloading travel time c. Other 2.6. Productivity per hour 2.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 T3 Q
E09
- - - - - - - - - -
cum
- km/h km/h
min min min min
cum/h hour
TC = T1 + T2 + T3
T1 =L
V1x60
T2 =L
V2x60
Q = V. FE. 60
TC
E09 = 1Q
3. MOTOR GRADER 3.1. Spreading length 3.2. Effective width 3.3. Efficiency factor 3.4. Average velocity 3.5. No of passing 3.6. Cycle time a. Time for one passing b. Other 3.7. Productivity per hour 3.8. Coefficient of equipment
LS b
FE V1 n
TC T1 T2 Q
E13
- - - - - - - - - -
m m -
km/h -
min min min
cum/h hour
TC = T1 + T2
Q = LS. b. t. FE. 60
n. TC
E13 = 1Q
4.
WATER TANK TRUCK 4.1. Volume 4.2. Water required per m3 of
dense material 4.3. Water filling per hour 4.4. Efficiency factor 4.5. Productivity per hour 4.6. Coefficient of equipment
V
Wc
n FE Q
E23
- - - - - -
cum cum
- -
cum/h hour
Q = V. n. FE
Wc
E23 = 1Q
5. VIBRATORY ROLLER 5.1. Average velocity
v
-
km/h
SUB BASE AGGREGATE B
154
5.2. Effective width 5.3. No of passing 5.4. Efficiency factor 5.5. Productivity per hour 5.6. Coefficient of equipment
b n
FE Q
E19
- - - - -
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E19 = 1Q
6. PNEUMATIC TIRE ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n
FE Q
E18
- - - - - -
km/h
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E018 = 1Q
7. HELPING TOOLS 7.1. Push cart 7.2. Shovel 7.3. Fork
Lump sum
COEFFICIENT ANALYSIS FOR LABOR 1.
2.
3.
Productivity motor grader per hour. Productivity motor grader per day. Coefficient of labor: 3.1. Common labor 3.2. Foreman
Q
Q�
L01 L03
- - - -
cum/h
cum/d
day day
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
COEFFICIENT ANALYSIS OF MATERIAL
1. 2.
Volume of material Quantity of material required
V W104
- -
cum cum
W104 = V.FL
SUB BASE AGGREGATE B
155
PROJECT : UNIT OF MEASUREMENT LOCATION : cubic meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7.
Wheel loader Dump truck Motor grader Water tank truck Vibratory roller Pneumatic tire roller Helping tools: 7.1. Push cart 7.2. Shovel 7.3. Fork
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
MATERIALS 1.
Crushed rock aggregate class with quality in accordance with specification
-
-
-
LABOR 1. 2.
Common Labor Foreman
CL FO
- -
man man
WORK ORDER 1.
2.
3. 4. 5.
6.
7.
8.
9.
10.
Construction shall be performed mechanically. Average distance of base camp to project site. Dense thickness of sub base. Material loose factor. Effective work hour per day for equipment. Wheel loader mix and load aggregate to dump truck at base camp. Dump trucks haul aggregate to project site, than spreaded by motor grader. Before compaction, aggregate sprayed water by water tank truck. Compaction of aggregate performed by tandem steel roller and pneumatic tire roller. During spreading and compacting, group of labors set up the edge of spreaded aggregate and surface level using helping tools.
L t
FL TE
- - - - -
- - - - - - - - -
Km
m -
hour - - - - -
COEFFICIENT ANALISYS OF EQUIPMENT
BASE AGGREGATE A
156
1. WHEEL LOADER 1.34. Bucket factor 1.35. Capacity 1.36. Efficiency factor 1.37. Cycle time
i. Loading j. Unloading
1.38. Productivity per hour 1.39. Coefficient of equipment
FB V FE TC T1 T2 Q
E15
- - - - - - - -
-
cum -
min min min
cum/h hour
TC = T1 + T2
Q = V. FB. FE. 60
TC
E15 = 1Q
2. DUMP TRUCK 2.1. Capacity 2.2. Efficiency factor 2.3. Average loading trip velocity 2.4. Average unloading trip
velocity 2.5. Cycle time a. Loading travel time b. Unloading travel time c. Other 2.6. Productivity per hour 2.7. Coefficient of equipment
V FE V1 V2
TC T1 T2 T3 Q
E09
- - - - - - - - - -
cum
- km/h km/h
min min min min
cum/h hour
TC = T1 + T2 + T3
T1 =L
V1x60
T2 =L
V2x60
Q = V. FE. 60
TC
E09 = 1Q
3. MOTOR GRADER 3.1. Spreading length 3.2. Effective width 3.3. Efficiency factor 3.4. Average velocity 3.5. No of passing 3.6. Cycle time a. Time for one passing b. Other 3.7. Productivity per hour 3.8. Coefficient of equipment
LS b
FE V1 n
TC T1 T2 Q
E13
- - - - - - - - - -
m m -
km/h -
min min min
cum/h hour
TC = T1 + T2
Q = LS. b. t. FE. 60
n. TC
E13 = 1Q
4.
WATER TANK TRUCK 4.1. Volume 4.2. Water required per m3 of
dense material 4.3. Water filling per hour 4.4. Efficiency factor 4.5. Productivity per hour 4.6. Coefficient of equipment
V
Wc
n FE Q
E23
- - - - - -
cum cum
- -
cum/h hour
Q = V. n. FE
Wc
E23 = 1Q
5. VIBRATORY ROLLER 5.1. Average velocity
v
-
km/h
BASE AGGREGATE A
157
5.2. Effective width 5.3. No of passing 5.4. Efficiency factor 5.5. Productivity per hour 5.6. Coefficient of equipment
b n
FE Q
E19
- - - - -
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E19 = 1Q
6. PNEUMATIC TIRE ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n
FE Q
E18
- - - - - -
km/h
m - -
cum/h hour
Q = v. 1000. b. t. FE
n
E18 = 1Q
7. HELPING TOOLS 7.1. Push cart 7.2. Shovel 7.3. Fork
Lump sum
COEFFICIENT ANALYSIS FOR LABOR 1.
2.
3.
Productivity motor grader per hour. Productivity motor grader per day. Coefficient of labor: 3.1. Common labor 3.2. Foreman
Q
Q�
L01 L03
- - - -
cum/h
cum/d
day day
Q� = Q.TE
L01 = CLQ�
L03 = FOQ�
COEFFICIENT ANALYSIS OF MATERIAL
1. 2.
Volume of material Quantity of material required
V W104
- -
cum cum
W104 = V.FL
BASE AGGREGATE A
158
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3.
Asphalt sprayer Compressor Dump truck
- - -
- - -
- - -
MATERIALS 1.
Bituminous cut back or emulsified asphalt in accordance specification
-
-
-
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
8.
9.
10.
11.
12.
13.
Construction shall be performed mechanically. Average distance of base camp to project site. Effective work hour per day for equipment. Loose factor of materials. Type of material: bituminous cut back. Composition of mixtures: a. Asphalt cement b. Kerosene Unit weight of material: a. Asphalt cement b. Kerosene All material provided at base camp and transported to project location. Asphalt cement and kerosene mixed homogeneously and heated to be bituminous cut back. Before bituminous cut back sprayed, surface shall be cleaned from dust, dirty and other materials by air compressor. Asphalt cement and kerosene transported to project by dump truck. Cut back asphalt sprayed by asphalt sprayer. Group of labors are required to serve asphalt sprayer and air
L
TE
FL -
AS KE
D1 D2 - - - - - -
- - - - - - - - - - - - - -
Km
hour - -
% %
Kg/liter Kg/liter
- - - - - -
PRIME COAT
159
compressor.
COEFFICIENT ANALYSIS OF EQUIPMENT 1. ASPHALT SPRAYER
1.1. Capacity 1.2. Efficiency factor 1.3. Cycle time 1.4. Application of prime coat 1.5. Productivity per hour 1.6. Coefficient of equipment
V EF TC PC Q
E05
- - - - - -
sq.m
- hour
liter/sq.m liter hour
Q =V. EF. PC
TC
E05 =1Q
2. AIR COMPRESSOR 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V EF Q
E05
- - - -
sq/hour
- -
hour
Q = V.EF
E05 =1Q
3. DUMP TRUCK
3.1. Dump truck serve asphalt sprayer and air compressor
3.2. Productivity dump truck = productivity asphalt sprayer
3.3. Coefficient of equipment
Q
E08
- -
-
hour
Q =V. EF. PC
TC
E08 =1Q
COEFFICIENT ANALYSIS OF LABOR 1. 2. 3.
4.
Foreman Common labor Productivity asphalt sprayer per hour Coefficient of labor: 4.1 Foreman 4.2 Common Labor
FO CL Q�
L03 L01
- - - - -
man man liter
m.d m.d
Q� =V. EF. PC. TE
TC
L03 =FOQ�
L01 =CLQ�
COEFFICIENT ANALYSIS OF MATERIALS
1. For one liter of prime coat required: 1.1. Asphalt cement 1.2. Kerosene
M10 M11
- -
Kg liter
M10 = As.PC.D1 M11 = KE.PC.D2
PRIME COAT
160
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3.
Asphalt sprayer Compressor Dump truck
- - -
- - -
- - -
MATERIALS 1.
Bituminous cut back or emulsified asphalt in accordance specification
-
-
-
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
8.
9.
10.
11.
12.
13.
Construction shall be performed mechanically Average distance of base camp to project site Effective work hour per day for equipment Loose factor of materials Type of material: bituminous cut back Composition of mixtures: c. Asphalt cement d. Kerosene Weigh unit of material: c. Asphalt cement d. Kerosene All material provided at base camp and transported to project location. Asphalt cement and kerosene mixed homogeneously and heated to be bituminous cut back. Before bituminous cut back sprayed, surface shall be cleaned from dust, dirty and other materials by air compressor. Asphalt cement and kerosene transported to project by dump truck. Cut back asphalt sprayed by asphalt sprayer. Group of labors are required to serve asphalt sprayer and air
L
TE
FL -
AS KE
D1 D2 - - - - - -
- - - - - - - - - - - - - -
Km
hour - -
% %
Kg/liter Kg/liter
- - - - - -
TACK COAT
161
compressor.
COEFFICIENT ANALYSIS OF EQUIPMENT 1. ASPHALT SPRAYER
1.7. Capacity 1.8. Efficiency factor 1.9. Cycle time 1.10. Application of prime coat 1.11. Productivity per hour 1.12. Coefficient of equipment
V EF TC PC Q
E05
- - - - - -
sq.m
- hour
liter/sq.m liter hour
Q =V. EF. PC
TC
E05 =1Q
2. AIR COMPRESSOR 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V EF Q
E05
- - - -
sq/hour
- -
hour
Q = V.EF
E05 =1Q
3. DUMP TRUCK
3.1. Dump truck serve asphalt sprayer and air compressor
3.2. Productivity dump truck = productivity asphalt sprayer
3.3. Coefficient of equipment
Q
E08
- -
-
hour
Q =V. EF. PC
TC
E08 =1Q
COEFFICIENT ANALYSIS OF LABOR 1. 2. 3.
4.
Foreman Common labor Productivity asphalt sprayer per hour Coefficient of labor: 4.1 Foreman 4.2 Common Labor
FO CL Q�
L03 L01
- - - - -
man man liter
m.d m.d
Q� =V. EF. PC. TE
TC
L03 =FOQ�
L01 =CLQ�
COEFFICIENT ANALYSIS OF MATERIALS
1. For one liter of tack coat required: 1.3. Asphalt cement 1.4. Kerosene
M10 M11
- -
Kg liter
M10 = As.PC.D1 M11 = KE.PC.D2
TACK COAT
162
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: a. Control stick of spreading
thickness b. Thermometer asphalt c. Push cart d. Shovel e. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials a. Aggregate b. Asphalt cement Mixer composition e. Coarse aggregate f. Fine aggregate g. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
ASPHALT CONCRETE BASE
AC - BASE
163
8.
9.
10.
11.
12.
h. Asphalt cement Unit density of materials a. Asphalt concrete b. Coarse & Fine Aggregate c. Filler d. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.1. Bucket capacity 1.2. Bucket factor 1.3. Efficiency factor 1.4. Cycle time
a. Loading b. Others
1.5. Productivity per hour 1.6. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR
3.1. Generator is required to supply electrical power to AMP
3.2. Productivity of generator is same with productivity of AMP
3.3. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
4. DUMP TRUCK 4.1. Capacity
V
-
cum
TC = T1 + T2 + T3 + T4
ASPHALT CONCRETE BASE
AC - BASE
164
4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to product one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - -
- km/h
km/h
ton min min min min min min
cum/h hour
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
NO DESCRIPTION CODE COEFF. UNIT CALCULTATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
ASPHALT CONCRETE BASE
AC - BASE
165
W102 = ��.��.�.�����
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.1 Common labor 1.2 Skilled Labor 1.3 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
ASPHALT CONCRETE BASE
AC - BASE
166
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: f. Control stick of spreading
thickness g. Thermometer asphalt h. Push cart i. Shovel j. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials c. Aggregate d. Asphalt cement Mixer composition i. Coarse aggregate j. Fine aggregate k. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
ASPHALTIC CONCRETE
BINDER COURSE
167
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
8.
9.
10.
11.
12.
l. Asphalt cement Unit density of materials e. Asphalt concrete f. Coarse & Fine Aggregate g. Filler h. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.7. Bucket capacity 1.8. Bucket factor 1.9. Efficiency factor 1.10. Cycle time
c. Loading d. Others
1.11. Productivity per hour 1.12. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR 3.4. Generator is required to
supply electrical power to AMP
3.5. Productivity of generator is same with productivity of AMP
3.6. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
4. DUMP TRUCK 4.1. Capacity
V
-
cum
TC = T1 + T2 + T3 + T4
ASPHALTIC CONCRETE
BINDER COURSE
168
4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to product one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - -
- km/h
km/h
ton min min min min min min
cum/h hour
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
ASPHALTIC CONCRETE
BINDER COURSE
169
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
W102 = ��.��.�.���
��
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.4 Common labor 1.5 Skilled Labor 1.6 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
ASPHALTIC CONCRETE
BINDER COURSE
ASPHALTIC CONCRETE
BINDER COURSE
170
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: k. Control stick of spreading
thickness l. Thermometer asphalt m. Push cart n. Shovel o. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials e. Aggregate f. Asphalt cement Mixer composition m. Coarse aggregate n. Fine aggregate o. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
ASPHALTIC CONCRETE
WEARING COURSE
171
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
8.
9.
10.
11.
12.
p. Asphalt cement Density unit of materials i. Asphalt concrete j. Coarse & Fine Aggregate k. Filler l. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.13. Bucket capacity 1.14. Bucket factor 1.15. Efficiency factor 1.16. Cycle time
e. Loading f. Others
1.17. Productivity per hour 1.18. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR 3.7. Generator is required to
supply electrical power to AMP
3.8. Productivity of generator is same with productivity of AMP
3.9. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
4. DUMP TRUCK 4.1. Capacity
V
-
cum
TC = T1 + T2 + T3 + T4
ASPHALTIC CONCRETE
WEARING COURSE
172
4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to produce one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - -
- km/h
km/h
ton min min min min min min
cum/h hour
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
ASPHALTIC CONCRETE
WEARING COURSE
173
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
W102 = FA. D1. t. FL1
D2
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.7 Common labor 1.8 Skilled Labor 1.9 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
ASPHALTIC CONCRETE
WEARING COURSE
174
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: p. Control stick of spreading
thickness q. Thermometer asphalt r. Push cart s. Shovel t. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials g. Aggregate h. Asphalt cement Mixer composition q. Coarse aggregate r. Fine aggregate s. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
HOT ROLLED SHEET WEARING
HRS - WC
175
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
8.
9.
10.
11.
12.
t. Asphalt cement Density unit of materials m. Asphalt concrete n. Coarse & Fine Aggregate o. Filler p. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.19. Bucket capacity 1.20. Bucket factor 1.21. Efficiency factor 1.22. Cycle time
g. Loading h. Others
1.23. Productivity per hour 1.24. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR 3.10. Generator is required to
supply electrical power to AMP
3.11. Productivity of generator is same with productivity of AMP
3.12. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
4. DUMP TRUCK 4.1. Capacity
V
-
cum
TC = T1 + T2 + T3 + T4
HOT ROLLED SHEET WEARING
HRS - WC
176
4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to produce one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - -
- km/h
km/h
ton min min min min min min
cum/h hour
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
HOT ROLLED SHEET WEARING
HRS - WC
177
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
W102 = FA. D1. t. FL1
D2
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.10 Common labor 1.11 Skilled Labor 1.12 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
HOT ROLLED SHEET WEARING
HRS - WC
178
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: u. Control stick of spreading
thickness v. Thermometer asphalt w. Push cart x. Shovel y. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials i. Aggregate j. Asphalt cement Mixer composition u. Coarse aggregate v. Fine aggregate w. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
HOT ROLLED SHEET BASE
HRS - BASE
179
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
8.
9.
10.
11.
12.
x. Asphalt cement Unit density of materials q. Asphalt concrete r. Coarse & Fine Aggregate s. Filler t. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.25. Bucket capacity 1.26. Bucket factor 1.27. Efficiency factor 1.28. Cycle time
i. Loading j. Others
1.29. Productivity per hour 1.30. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR 3.13. Generator is required to
supply electrical power to AMP
3.14. Productivity of generator is same with productivity of AMP
3.15. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
4. DUMP TRUCK
HOT ROLLED SHEET BASE
HRS - BASE
180
4.1. Capacity 4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to produce one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
V FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - - -
cum -
km/h
km/h
ton min min min min min min
cum/h hour
TC = T1 + T2 + T3 + T4
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
HOT ROLLED SHEET BASE
HRS - BASE
181
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
W102 = FA. D1. t. FL1
D2
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.13 Common labor 1.14 Skilled Labor 1.15 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
HOT ROLLED SHEET BASE HRS - BASE
182
PROJECT : UNIT OF MEASUREMENT LOCATION : square meter
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
EQUIPMENT 1. 2. 3. 4. 5. 6. 7. 8.
Wheel Loader Asphalt Mixing Plant Generator Dump Truck Asphalt Finisher Tandem Steel Roller Pneumatic Tire Roller Helping Tools: z. Control stick of spreading
thickness aa. Thermometer asphalt bb. Push cart cc. Shovel dd. Fork
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Bituminous material The quality of all materials shall be complied with requirements in specification
CA FA FF AS
- - - -
% % % %
LABOR 1. 2. 3.
Foreman Skilled labor Common labor
FO SK CL
- - -
man man man
WORK ORDER 1.
2.
3.
4. 5.
6.
7.
Construction shall be performed mechanically All material provided and mixing process in base camp Average distance of base camp to project site Layer thickness Effective work hour per day for equipment Loose factor of materials k. Aggregate l. Asphalt cement Mixer composition y. Coarse aggregate z. Fine aggregate aa. Filler
L t
TE
FL1 FL2
CA FA FF
- - - - - - - -
Km
m hour
- -
% % %
ASPHALT TREATED BASE
ATB
183
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
8.
9.
10.
11.
12.
bb. Asphalt cement Unit density of materials u. Asphalt concrete v. Coarse & Fine Aggregate w. Filler x. Asphalt cement Wheel loader load aggregate to cold bin and labor load asphalt cement to asphalt kettle. Aggregate and asphalt cement mixed and heated in AMP and load in to dump truck and transported to project site. Hot aggregate-asphalt cement mix spreaded by asphalt finisher, than compacted by tandem roller and pneumatic roller. During spreading and compacting, group of labors set up the edge and level using helping tools.
AS
D1 D2 D3 D4 - - - -
- - - - - - - - -
%
ton/m3 ton/m3 ton/m3 ton/m3
- - - -
COEFFICIENT ANALYSIS OF EQUIPMENT 1. WHEEL LOADER
1.31. Bucket capacity 1.32. Bucket factor 1.33. Efficiency factor 1.34. Cycle time
k. Loading l. Others
1.35. Productivity per hour 1.36. Coefficient of equipment
V FB FE TC T1 T2 Q
E15
- - - - - - - -
cum
-
min min min
cum/h cum
TC = T1 + T2
Q =V. FB. FE. 60
TC
E15 =1Q
2. ASPHALT MIXING PLANT 2.1. Capacity 2.2. Efficiency factor 2.3. Productivity per hour 2.4. Coefficient of equipment
V FE Q
E01
- - - -
ton/h
- cum/h hour
Q =V. FE
D1
E01 =1Q
3. GENERATOR 3.16. Generator is required to
supply electrical power to AMP
3.17. Productivity of generator is same with productivity of AMP
3.18. Coefficient of equipment
-
Q
E12
- - -
-
cum/h
hour
E12 =1Q
4. DUMP TRUCK
ASPHALT TREATED BASE
ATB
184
4.1. Capacity 4.2. Efficiency factor 4.3. Average loading trip
velocity 4.4. Average unloading trip
velocity 4.5. AMP productivity per bath 4.6. Time to produce one bath 4.7. Cycle time a. Loading time b. Hauling, waiting c. Queuing, waiting d. Unloading, return 4.8. Productivity per hour 4.9. Coefficient of equipment
V FE V1
V2
Q� T� TC T1 T2 T3 T4 Q
E09
- - - - - - - - - - - - -
cum -
km/h
km/h
ton min min min min min min
cum/h hour
TC = T1 + T2 + T3 + T4
T1 =V. T�
Q�
T2 =L
V1x60
T4 = L
V2x60
Q = V. FE. 60D1. TC
E09 = 1Q
5. ASPHALT FINISHER
5.1. Capacity 5.2. Efficiency factor 5.3. Productivity per hour 5.4. Coefficient of equipment
V FE Q
E05
- - - -
ton/h
- cum/h hour
Q = V. FE
D1
E05 = 1Q
6. TANDEM STEEL ROLLER 6.1. Average velocity 6.2. Effective width 6.3. No of passing 6.4. Efficiency factor 6.5. Productivity per hour 6.6. Coefficient of equipment
v b n FE Q
E17
- - - - - -
km/h
m - -
cum/h hour
Q = v. t. 1000. b. FE
n
E17 = 1Q
7. PNEUMATIC TIRE ROLLER 7.1. Average velocity 7.2. Effective width 7.3. No of passing 7.4. Efficiency factor
v b n FE
- - - -
km/h
m - -
8. HELPING TOOLS 8.1. Control stick of spreading
thickness 8.2. Thermometer asphalt 8.3. Push cart 8.4. Shovel 8.5. Fork
Lump sum
ASPHALT TREATED BASE
ATB
185
NO DESCRIPTION CODE COEFF. UNIT CALCULATION FORMULA
COEFFICIENT ANALYSIS OF MATERIALS 1. 2. 3. 4.
Coarse aggregate Fine aggregate Filler Asphalt cement
W101 W102 W105 M10
- - - -
cu.m cu.m
kg kg
W101 = CA. D1. t. FL1
D2
W102 = FA. D1. t. FL1
D2
W105 = FF. D1. t. FL1 M10 = AS. D1. t. FL2
COEFFICIENT ANALYSIS OF LABOR 1.
2. 3. 4.
Labor required at AMP 1.16 Common labor 1.17 Skilled Labor 1.18 Foreman Productivity of AMP per hour Productivity of AMP per day Coefficient of Labor 4.1 Common Labor 4.2 Skilled Labor 4.3 Foreman
CL SK FO Q Q�
L01 L02 L03
- - - - - - - -
man man man
cum/h cum/d
md md md
Q� = Q. TE
L01 = CLQ�
L02 = SKQ�
L03 = FOQ�
ASPHALT TREATED BASE
ATB
CONTOH ANALISIS ALAT BERAT
•HSD upah tenaga kerja :
Besarnya biaya komponen tenaga kerja (dalam satuan waktu) untuk memproduksi pekerjaan tertentu.
Keterampilan sebagaitenaga upah : Pekerja , L1Tukang, L2Mandor, L3Operator, L4Pembantu Operator, L5Sopir, L6Pembantu Sopir, L7Mekanik, L8Pembantu Mekanik, M9Kepala Tukang, M10 (A)Upah Minimum Regional (UMR) HSD upah/jam :L = A + B + Cn (B)Hasil Survai(C)Tenaga dari luar daerah + biaya nginap + transportasiStruktur analisisHarga Satuan Dasar (HDS) upah A. BiayaLangsung
Alat
B. Biaya TidakLangsung
Upah Bahan B1: Biaya
Umum
B2: Keuntung
an
AnalisisHSD
•UMR, transport, K3• Harga alat, bungabank, asuransi• Harga bahan, jarakke lokasi, urutankerja, dll.
• Metode kerja, jarakke lokasi, kondisijalan• Spesifikasiumum/khusus, RKS, Gbr, dll.
AnalisisProduktivi
tas HSP
AnalisisProduktivi
tas HSP
AnalisisProduktivi
tas HSP
Harga Satuan Pekerjaan= (A + B) + Pajak
A + B
AnalisisHSDAnalisis
HSD
Struktur AnalisisHarga Satuan
Pekerjaan
Keterampilan sebagaitenaga upah : Pekerja , L1Tukang, L2Mandor, L3Operator, L4Pembantu Operator, L5Sopir, L6Pembantu Sopir, L7Mekanik, L8Pembantu Mekanik, M9Kepala Tukang, M10
(A)Upah Minimum Regional (UMR)
HSD upah/jam :
L = A + B + Cn
(B)Hasil Survai
(C)Tenaga dari luardaerah + biaya
menginap + transportasi
Struktur analisisHarga Satuan Dasar (HDS)
upah
186
•HSD alat :
Besarnya biaya komponen alat (Biaya Pasti & Biaya Operasi) dalam satuan waktu untuk memproduksi
pekerjaan tertentu.
Besarnya biaya komponen alat (Biaya Pasti & Biaya Operasi) dalam satuan waktu untuk
•HSD alat :
•HSD bahan :
Besarnya biaya komponen bahan (dalam satuan tertentu) untuk memproduksi
pekerjaan tertentu.
Spesifikasi alat :- Tenaga mesin (Pw)- Kapasitas (Cp)- Jam kerja alat per
tahun (W)- Umur ekonomis (A)
Investasi alat :
- Suku bunga (i)
- Harga alat (B)
- Asuransi (Ins)
Harga :
-Upah operator/
driver (U1)
- Pembantu
operat-or /driver
(U2)
Consumables :
-Bahan bakar
bensin (Mben)
- Bahan bakar
solar (Msol)
- Pelumas (Mpel)
BIAYA PASTI PER JAM [G] :
- Nilai sisa alat (C)
- Faktor angsuran (D)
- Biaya pengembalian modal (E)
- Biaya asuransi (F)
BIAYA OPERASI PER JAM [P] :
-Bahan bakar (H)
- Biaya pelumas (I)
- Biaya bengkel (J)
- Biaya perawatan/perbaikan (K)
- Biaya operator (L)
- Biaya pembantu operator (M)
HSD alat atau
Harga Sewa alat
per jam,
S = G + P
Struktur analisisHarga Satuan Dasar (HSD) alat
Harga satuanbahan baku
di quarry (m3)($M01)
- Jarak dari quarryke lokasi (L)
-Kondisi jalan, kec (v)- Berat isi bahan (D)
HSD Alat/jam, Rp EHSD Alat/jam, Rp EHSD Alat/jam,
$ E
- Kapasitas alat (V)- Faktor efisiensi alat (Fa)- Faktor lain (Fb, Fv , Fk)- Waktu siklus produksi (Ts)
Kap. Produksi/jam (Q)
Biaya alat/sp. ($En=1->$n)
HSD bahan di base camp/lokasi :$M01 + $En=1 + …… +$En
Struktur analisisHarga Satuan Dasar (HSD) bahan
187
No
1 Nomor Paket Kontrak : ………………………………………………………
2 Nama Paket : ………………………………………………………
3 Distrik : ………………………………………………………
4 Lokasi Pekerjaan
5 Kondisi jalan eksisting
6 Panjang efektif (lihat sketsa di bawah)
7 Lebar jalan eksisting (bahu + perkerasan + bahu)
8 Lebar rencana (bahu + perkerasan + bahu)
9 Lihat lampiran
10 Jangka waktu pelaksanaan pekerjaan 360 hari kalender
11 Jarak rata-rata Base Camp ke lokasi pekerjaan, L L = {(c+a/2) x a + (c+b/2)} / (a+b)
L = 8.75 Kilometer
Sketsa di bawah ini sebagai dasar perhitungan :
A a = 7.50 Km C b = 7.50 Km BA B
c = 5 Km
Base Camp
12 7 jam
13 0.002 x Harga Pokok Alat
14 6.00%
15 RINGKASAN METODE PELAKSANAAN
Penampang jalan, jenis dan volume pekerjaan pokok
Jam kerja efektif dalam 1 hari :
Tingkat Suku Bunga Investasi Alat :
D
Asuransi, Pajak, dan lai-lain untuk Peralatan :
ANALISIS HARGA SATUAN DASAR (HSD)
Contoh Lembar Informasi Kegiatan Pekerjaan
Uraian Informasi
Periksa lampiran
15 kilometer (Leff = a + b)
(0.50 + 4.50 + 0.50) meter
(1.00 + 6.00 + 1.00) meter
188
No.1
2
3
4
5
6
7
8
No Kode
1 L1 0.71
2 L2 1.14
3 L3 1.71
4 L4 1.71
5 L5 2.86
6 L6 1.71
7 L7 2.29
8 L8 0.71
9 L9 2.86
10 L10 1.71
Note : Harga satuan upah sudah termasuk biaya peralatan kesehatan dan keselamatan kerja.
Biaya pemakaian per jam = 32.00 / (180 x 8)
Satuan
Jam
Jam
Jam
Jam
Jam
Uraian Harga Satuan (USD)
Buah
Buah
0.02
4.00
3.00
32.00
Hari
USD
Keterangan
Jam
Jam
Jam
Jam
Jam
Tabel – 1 Contoh daftar harga satuan dasar (HSD) upah per jam
Jumlah jam pemakaian per hari
Contoh analisis biaya untuk peralatan kesehatan dan keselamatan kerja
A. Analisis Harga Satuan Dasar (HSD) Upah Tenaga Kerja
Data upah tenaga kerja bervariasi sesuai dengan lokasi pekerjaan, besarnya tergantung dari harga pasaran atau harga
yang telah ditetapkan oleh Pemerintah Daerah setempat.
Harga (USD)6.00
7.00
Upah tersebut belum termasuk peralatan kesehatan dan keselamatan kerja seperti helm, rompi, sepatu, jas hujan, dan
lain-lain.
Pembantu Sopir / Driver
Pembantu Operator
Periode konstruksi
Pekerja
Tukang
Kepala Tukang
Mandor
Operator
Jenis PeralatanHelmet
Rompi
Sopir / Driver
Buah
8.00
8.00
0.50
2.00
1.50Buah
180.00
Buah
Sepatu
Masker
Topi
Sarung tangan
Kacamata pelindung
Jas hujan
Total
Buah
Mekanik
Pembantu Mekanik
Buah
SatuanBuah
189
B. Analisis Harga Satuan Dasar (HSD) Alat (biaya sewa alat per jam)
Dalam memperhitungkan HSD alat, diperlukan data-data :
1. Upah tenaga kerja
2. Harga perolehan alat
3. Harga bahan bakar / pelumas dan lainnya
No1 120,3772 84,6673 3,3414567 63,58789 26,825
101112 130,00013 47,7611415 39,8481617 84,45718 63,58719 64,929202122232425 2,473262728293031323334353637 7,77238 14,6253940 7,41841424344454647
Pile Driver + HammerCrane On Track 35 Ton
Generator SetWater Pump 70-100 Mm
Fulvi MixerVibrating Rammer
Trailer 20 Ton
Bore Pile Machine
Dump Truck 10 TonExcavator 80 – 140 Hp
Compressor 4000 – 6500 L/M
Crane 10 – 15 Ton
Tabel – 2 : Contoh daftar harga perolehan alat
Nama AlatAsphalt Mixing PlantAsphalt FinisherAsphalt Sprayer
Buldozer 100 – 150 Hp
Motor Grader >100 Hp
Concrete Pump
Flat Bed Truck 3-4 m3Stone Crusher
Concrete Mixer 0.3 – 0.6 M3Concrete Vibrator
Concrete Pan Mixer
Concrete Mixer (350)
Excavator 200 Hp
Slip Form Paver
Vibratory Roller 5-8 T
Wheel Loader 1.0 – 1.6 M3Three Wheel Roller
Dump Truck 110 Hp, 4 Tires, 5.2 Ton, Long chassis
Tire Roller 8-10 T
KeteranganTahun perolehan
Asphalt DistributorCold Milling
Dump Truck 3.5 Ton
Asphalt Liquid Mixer
Harga Perolehan (USD)
TamperAggregate (chip) Spreader
Pedestrian RollerJack Hammer
Water Tanker 3000-4500 L
Cold RecyclerHot Recycler
Truck Mixer
Concrete Breaker
Tandem Roller 6-8 T
Track Loader 75-100 Hp
Rock Drill Breaker
190
Harga (USD) Satuan
200 Hp
1 M3
5 Tahun
1,600 Jam
130,000 USD
II. LAIN-LAIN
Harga (USD) Keterangan
6.00
2.86
1.71
1.29
1.25
4.00
0.20
III. BIAYA PASTI PER JAM KERJA
Satuan Keterangan
13,000.00 USD
0.24 -
17.36 USD
0.16 USD
17.52 USD
IV BIAYA OPERASI PER JAM KERJA
Kode Harga Satuan
USD
USD
USD
K 4.06 USD
L 2.86 USD
M 1.71 USD
P 54.57 USD
S 72.09 USD
Pw
Cp
Alat Baru : a. Umur Ekonomis A
Asuransi dan lain-lain
Contoh Analisis Harga Satuan Dasar (HSD) Excavator 200 HpI. URAIAN PERALATAN
Uraian Kode Keterangan
Tenaga
b. Jam Kerja Dalam 1 Tahun W
Uraian Kode
Note : Taxes diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Harga
Upah Pembantu Operator / Pembantu Sopir
Biaya Bengkel = (2.5% - 5%) x B/WJ 2.44
Jka W< 1500, ambil 2.5%
U2 $ / Jam
Nilai Sisa Alat = 10% x B C
Faktor Angsuran Modal D
Biaya Pasti per Jam :
Bahan Bakar Bensin Mpet Liter
Bahan Bakar Solar Mdf Liter
Minyak Pelumas Mlub Liter
i % / Tahun
Uraian
Kapasitas
c. Harga Alat B
Ins %
Kode Satuan
Tingkat Suku Bunga
a. Biaya Pengembalian ModalE
b. Asuransi, dan lain-lain F
Biaya Pasti per Jam = (E + F) G
Uraian
Bahan Bakar = (10% - 12%) x Pw x MdfH 27.50
Jika W < 1500, ambil 10%
Pelumas = (1.5% - 2.5%) x Pw x MlubI 16.00
Jika W < 1500 ambil 1.5%
Upah Operator / Sopir U1 $ / Jam
Perawatan dan perbaikan = 5% x B / W
Operator = (1 orang / jam) x U1
Pembantu Operator = (1 orang / jam) x U2
Biaya Operasi per Jam = (H + I + J + K + L + M)
TOTAL BIAYA SEWA ALAT / HSD ALAT EXCAVATOR 200 HP / JAM = (G + P)
=𝑖 𝑥 1 + 𝑖 𝐴
1 + 𝑖 𝐴 − 1
=𝐵 − 𝐶 𝑥 𝐷
𝑊
=𝐼𝑛𝑠 𝑥 𝐵
𝑊 =
𝐼𝑛𝑠 𝑥 𝐵
𝑊
191
I. URAIAN PERALATAN
Harga (USD) Keterangan
110
3.25
5
1,600
26,825
II. LAIN-LAIN
Harga (USD) Keterangan
6.00
2.29
0.71
1.29
1.25
4.00
0.20
III. BIAYA PASTI PER JAM KERJA
Kode Harga Keterangan
C 2,682.50
D 0.24
E 3.58
F 0.03
G 3.62
IV BIAYA OPERASI PER JAM KERJA
Kode Harga Satuan
H 15.13 USD
I 8.80 USD
J 0.50 USD
K 0.84 USD
L 2.29 USD
M 0.71 USD
P 28.27 USD
S 31.88 USD
Uraian
Satuan
Hp
M3
Tahun
Jam
USD
Tingkat Suku Bunga i
Alat Baru :
a. Umur Ekonomis A
U1 $ / Jam
Upah Pembantu Operator / Pembantu Sopir U2 $ / Jam
Bahan Bakar Bensin Mpet Liter
Bahan Bakar Solar
Tenaga Pw
Kapasitas Cp
%
Kode Satuan
USD
-
c. Harga Alat B
% / Tahun
Contoh Analisis Harga Satuan Dasar (HSD) Dump Truck 110 Hp, 5.2 Ton
Uraian Kode
b. Jam Kerja Dalam 1 Tahun W
Uraian Satuan
Nilai Sisa Alat = 10% x B
Faktor Angsuran Modal
Biaya Pasti per Jam :
c. Biaya Pengembalian Modal
d. Asuransi, dan lain-lain
Biaya Pasti per Jam = (E + F)
Biaya Operasi per Jam
Jika W< 1500, ambil 2.5%
Perawatan dan perbaikan = 5% x B / W
Driver = (1 orang / jam) x U1
= (1 orang / jam) x U2Pembantu Driver
= (H + I + J + K + L + M)
Note : Prosentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung jumlah jam kerja dalam
1 tahun serta tergantung dari berat-ringannya pekerjaan, maka makin berat pekerjaannya, diambil nilai tertinggi.
TOTAL BIAYA SEWA ALAT / HSD ALAT DUMP TRUCK 10 TON / JAM = (G + P)
Jika W < 1500, ambil 10%
Pelumas = (1.5% - 2.5%) x Pw x Mlub
Jka W < 1500 ambil 1.5%
Ins
Biaya Bengkel = (2.5% and 5%) x B/W
Note : Taxes diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
USD
Upah Operator / Sopir
Mdf
USD
USD
Liter
Minyak Pelumas Mlub Liter
Asuransi dan lain-lain
Uraian
Bahan Bakar = (10% - 12%) x Pw x Mdf
=
=𝐼𝑛𝑠 𝑥 𝐵
𝑊
=(𝑖 𝑥 (1+𝑖)𝐴)/((1+𝑖)𝐴 −1)
=𝐵 − 𝐶 𝑥 𝐷
𝑊
192
No. Kode HP Kapasitas Unit Harga, $ Harga Sewa
1 E1 294 50.0 T/hr 120,377 90.76
2 E2 72.4 10.0 Ton 84,667 35.96
3 E3 4 850.0 Liter 3,341 6.06
4 E4 5 20,000.0 Liter
5 E5 115 4,000.0 Liter
6 E6 248 1,000.0 m
7 E7 155 - - 63,587 50.03
8 E8 100 3.5 Ton
9 E8a 110 5.2 Ton 26,825 33.45
10 E9 190 10.0 Ton
11 E10 133 0.9 m3
12 E10 133 0.9 m3 130,000 72.09
13 E11 135 10,800.0 - 47,761 42.76
14 E12 70 0.8 m3
15 E13 96 1.5 m3 39,848 32.81
16 E14 55 8.0 Ton
17 E15 82 8.1 Ton 84,457 38.01
18 E16 100.5 9.0 Ton 63,587 38.48
19 E17 82 7.1 Ton 64,929 34.40
20 E18 4.7 121.0 Ton
21 E19 115 3.5 m
22 E20 190 10.0 Ton
23 E21 220 50.0 T/Jam
24 E22 8.8 835.0 Ton
25 E23 0 1,330.0 - 2,473 5.68
26 E24 3 - -
27 E25 900 2.2 m
28 E26 400 3.0 m
29 E27 105 2.5 m
30 E28 134 500.0 Liter
31 E29 5.5 25.0 -
32 E30 100 8.0 m3
33 E31 134 600.0 Liter
34 E32 290 20.0 m3/jam
35 E33 20 350.0 Liter
36 34 220 5.0 m3
37 E35 60 5,000.0 CPM/(L/m) 7,772 19.06
38 E36 180 135.0 KVA 14,625 46.42
39 E37 6 - -
40 E38 100 4,000.0 Liter 7,418 27.69
41 E39 345 2,005.0 -
42 E40 4.2 80.0 kg
43 E41 138 15.0 Ton
44 E42 175 20.0 Ton
45 E43 25 2.5 Ton
46 E44 125 35.0 Ton
47 E45 150 60.0 CM
Truck Mixer (Agitator)
Crane 10 – 15 Ton
Wheel Loader 1.0 – 1.6 M3
Three Wheel Roller 6-8 Ton
Vibrating Rammer
Nama Alat
Tabel – 3 : Contoh Harga Sewa Alat / HSD Alat
Concrete Vibrator
Flat Bed Truck 3-4 m3
Jack Hammer
Tandem Roller 6-8 T
Tire Roller 8-10 T
Vibratory Roller 5-8 T
Tamper
Aggregate (chip) Spreader
Cold Recycler
Asphalt Mixing Plant
Asphalt Finisher
Asphalt Sprayer
Asphalt Liquid Mixer
Asphalt Distributor
Cold Milling
Buldozer 100 – 150 Hp
Dump Truck 3.5 Ton
Dump Truck 10 Ton
Excavator 80 – 140 Hp
Motor Grader >100 Hp
Track Loader 75-100 Hp
Hot Recycler
Slip Form Paver
Concrete Mixer 0.3 – 0.6 M3
Concrete Pump
Concrete Pan Mixer
Concrete Breaker
Concrete Mixer (350)
Trailer 20 Ton
Pile Driver + Hammer
Fulvi Mixer
Crane On Track 35 Ton
Bore Pile Machine
Compressor 4000 – 6500 L/M
Generator Set
Water Pump 70-100 Mm
Water Tanker 3000-4500 L
Stone Crusher
Pedestrian Roller
Rock Drill Breaker
Dump Truck 5.2 Ton
Excavator 200 Hp
193
No Satuan
1 m3
2 m3
3 M3 - Sirtu m3
4 m3
5 m3
6 m3
7 m3
8 m3
9 m3
10 ton
$ / SatuanJumlah
($)
1 $ / ton 150.00
2 - -
3 $ / ton -
4 $ / ton 2.30
5 $ / ton 4.50
$ / ton 155.30
6 $ / ton
$ / ton
7 $ / zak
8 $ / kg
Total (USD)
Uraian
No
M4 - Pasir Urug
M5 - Gravel
16.00
- bahan baku di sumber bahan (quarry), harganya merupakan harga royalty setempat yang sudah ' termasuk biaya
retribusi daerah;
164.57
Bahan atau material yang dipakai dalam pelaksanaan suatu pekerjaan dapat dikatagorikan menjadi 3 jenis, yaitu :
Total
Harga per zak, 50 kg
150.00
Harga royalty, $
Harga di pabrik
Handling
Transport ke lokasi pekerjaan
Pembongkaran, gudang
Waste 3%
Sub total
-
156.80
Uraian Kegiatan
M9 - Material Pilihan 8.00 10
12.00
Biaya
15.00
-
Ke Lokasi Pek
Ke Base Camp
M8 - Tanah Timbun
M10 - Asphalt Cement
Note : Harga semen diterima di base camp dengan memperhitungkan biaya handling, transport, pembongkaran, dan
bahan terbuang (waste) 2% - 3%.
Harga per kg
2.30
Keuntungan & Overhead 5% (hanya untuk Pekerjaan
harian)
4.50
8.23
0.16
Tabel - 5 : Contoh analisis HSD semen
- bahan jadi di lokasi pekerjaan, harganya terdiri dari bahan jadi tersebut ditambah biaya pengangkutan ke lokasi
pekerjaan.
- bahan olahan di base camp, harganya dipengaruhi juga oleh jaraknya dari quarry;
Ke Lokasi Pek.
M6 - Batu Kali
8.00
8.00
8.00
90.00
20
25
10
150
Jarak dari quarry (Km)
Ke Base Camp
Oleh karena itu harga bahan baku di quarry, jarak dari quarry ke base camp atau ke lokasi pekerjaan, biaya sewa alat atau
HSD alat per jam, dan kapasitas produksi alat akan menentukan harga bahan di lokasi pekerjaan.
8.00
C. Analisis Harga Satuan Dasar (HSD) bahan dan bahan olahan
Tabel - 4 : Contoh harga bahan baku di Quarry
M7 - Batu Belah
7.77
10
20 Ke Lokasi Pek.
Ke Lokasi Pek15
25
M1 - Pasir Pasang
M2 - Pasir Beton
2010.00
Ke Base Camp
Ke Lokasi Pek
Ke Lokasi Pek
Ke Lokasi Pek
Keterangan
194
Alat yang dipergunakan adalah Excavator 200 Hp dan pengangkutan dengan Dump Truck 5.2 Ton.
I. ASUMSI
Koefisien Satuan
5 Km
1 M3
1 Jam
1 Jam
1.4 Ton/m3
II. URUTAN KERJA
1). Pasir digali dengan Excavator, sekaligus memuat pasir hasil galian ke dalam Dump Truck
2). Dump Truck mengangkut pasir ke lokasi Base Camp
III. PERHITUNGAN BIAYA ALAT PER M3
III.1 EXCAVATOR
III.2 DUMP TRUCK
L
T4
Menit
Menit
Menit
32.26
-Waktu tempuh isi
-Muat
Ts2
Satuan
Ton
Kondisi sedang
BUP 5.2 Ton Dump Truck
Berat volume pasir
v1Kecepatan rata-rata bermuatan
T1
Biaya Excavator / M3
15.00
10.00T3
Koefisien
-
Menit
Menit
Kap. Prod. / jam
v2
5.50
0.75
20.00
30.00
0.9
0.75
Ts1
Fa
Kode
33.45
- Lain-lain
5.48
6.10
Lain-lain
Jumlah
Q2
Menit
Menit
M3 / Jam
USD
1.00
Kapasitas produksi/jam
Biaya Dump Truck / m3 S2
Ts1
Q1
Jarak quarry ke base camp
Harga satuan pasir beton (harga baku)
BUP Excavator 200 Hp
- Menggali / memuat
Waktu siklus
Faktor Efisiensi Alat
Faktor Bucket
Kapasitas Bucket
Uraian
T2
-Waktu tempuh kosong
V
0.5
0.5
1
37.665
T1
Waktu siklus
$M2
$1
Menit
M3 / Jam
USD
Jumlah
Ts2
Fa
6.26
Km/jam
Km/jam
$E10
$E9
D
Contoh analisis HSD pasir beton dari quarry ke lokasi atau base camp
V
Uraian
Kondisi jalan : sedang
Fb
KeteranganKode
Uraian
Kapasitas bak
Faktor efisiensi alat
Kode
T2
Satuan
M3
-
Kecepatan rata-rata kosong
Koefisien
0.93
1.91
10.00
72.09
=𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60
𝑇𝑠1
= 𝑉 𝑥 60
𝑄1 𝑥 𝐷
= 𝐿
𝑉1
x 60
= 𝐿
𝑉2
𝑥 60
=1
𝑄1
𝑥 𝐻𝑆𝐷 𝑎𝑙𝑎𝑡
= 𝑉 𝑥 𝐹𝑎 𝑥 60
𝑇𝑠2 𝑥 𝐷
= 1
𝑄2
𝑥 𝐸9
195
IV. HARGA SATUAN DASAR (HSD) BAHAN Pasir beton di LOKASI BASE CAMP
Kode Harga Satuan
18.02 USD
M2 22.00 USD
Kesimpulan :
I. ASUMSI
Kode Keterangan
D
Sama dengan pada analisis HSD pasir beton.
III.1 EXCAVATOR
III.2 DUMP TRUCK
Koefisien
Faktor efisiensi alat
0.95
Biaya Excavator / M3
Uraian
-Muat
-Waktu tempuh isi
HSD Pasir beton = (SM2 + S1 + S2)
0.5
1.25
30.53
2.36
Menit
Koefisien
0.76
4
Menit
Menit
Kode
T1
III. PERHITUNGAN BIAYA ALAT PER M3
T1
T2
Ts1
Q1
S1
0.75
10Pasir beton
Jarak ke Base Camp
5
2.5 12.00
16.00
Alat yang dipergunakan untuk memproduksi bahan di quarry adalah Excavator 80 – 140 Hp dan Dump Truck 10 Ton.
Harga bahan di lokasi pekerjaan atau di base camp ditentukan oleh harga bahan baku di quarry, kapasitas produksi alat
(m3), harga sewa alat (HSD alat) per jam, dan jarak dari quarry ke base camp.
Dengan beberapa asumsi yang sama pada contoh perhitungan harga satuan dasar (HSD) pasir beton, urutan kerja sebagai
berikut :
Uraian
Ts1
Harga di Base Camp
22.00
Dibulatkan
BahanHarga baku di
quarry
CONTOH Analisis harga satuan dasar (HSD) bahan baku BATU KALI di Base Camp
Kondisi sedang
Uraian
-Waktu tempuh kosong
Lain-lain
Jumlah
Kapasitas produksi/jam :
Biaya Dump Truck / m3
10.00
M3 / jam
USD
T4
Ts2
Q2
USD
1.00
46.68
Waktu siklus :
Satuan
Menit
T2
Koefisien
S2
M3 / Jam
T3
208.42
0.16
15.00
5
Satuan
Ton/m3
II. URUTAN KERJA
-Menggali / memuat
20.68
Satuan
Menit
Menit
Dari tabel di atas dapat disimpulkan, bahwa jarak angkut dari quarry ke base camp sangat mempengaruhi besarnya harga
bahan.
Kode
Fa
Jumlah
Berat volume batu kali
Uraian
-Lain-lain
Kap. Prod. / jam,
Pasir pasang
= 𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60
𝑇𝑠1
= 1
𝑄1
x E10
= 𝑉 𝑥 60
𝑄1 𝑥 𝐷
= 𝐿
𝑣1
x 60
= 𝐿
𝑣2
x 60
= 𝑉 𝑥 𝐹𝑎 𝑥 60
𝑇𝑠1 𝑥 𝐷
= 1
𝑄2
x E9
196
Agregat kasar atau halus dibuat dari batu kali yang dipecah dan pasir.
Diperlukan data-data sebagi berikut :
1) Harga bahan baku batu kali.
2) Biaya sewa alat (HSD alat) pemecah batu per jam.
3) Biaya sewa alat (HSD alat) Wheel Loader.
4) Harga upah pekerja.
I. ASUMSI
Kode Koef. Satuan Keterangan
H 30.00 %
K 70.00 %
D1 1.20 Ton/m3 Berongga
D3 1.35 Ton/m3 Berongga
S1 20 $/m3 Tabel 4 & 5
S2 13.73$/Jam
Tabel 3
S3 10.86 $/Jam
Cp1 50.00 Ton/Jam
Cp2 1.50 M3 Kap. Bucket
Fa1 0.70 - Kondisi buruk
Fa2 0.83 - Kondisi baik
Fh 1.08 -
II. METODE PELAKSANAAN1)
2)
III. PERHITUNGANKode Koef. Satuan Keterangan
III.1
1.a.
Tst 1 Jam
Qb 25.926 M3/jam Batu pecah
Qg 29.167 M3/jam
1.b
Ka 1.245 M3
Ts 2 Menit
Tw 0.78 Jam
1.c.
Bp 0.7456 $/m3
1.d
HSb 25.046 $/m3
Biaya Operasi Alat :
Contoh Pekerjaan pengadaan agregat kasar/halus (HSD bahan olahan)
Wheel loader mengangkut batu/gravel dari tempat/tumpukannya dan menuangkannya ke Alat Pemecah Batu.
Satuan
USD
Bahan dasar (batu dan pasir) diterima di lokasi alat
Faktor Efisiensi Alat :
- Wheel Loader
-Batu/Gravel
- Wheel Loader
Faktor Kehilangan Material
Uraian
Harga Satuan Batu Pecah Produksi St. Crusher / m3
Harga Satuan Dasar Bahan
- Produksi Stone Crusher 1 jam = (Fa1 x Cp1) : D3
IV. HARGA SATUAN DASAR (HSD) BAHAN BATU KALI DI LOKASI BASE CAMPUraian
-Batu Pecah
- Agregat Halus
-Agregat Kasar
Pemecah batu (di Base Camp)
Kegiatan dilakukan di lokasi Base Camp
M1
Harga, $
= ((Tst x $3) + (Tw x $3)) : Qb
-Kap. Angkut / rit = (Fa2 x Cp2)
Kapasitas Alat :
Kode
Hasil produksi Alat
14.52HSD Batu kali = (SM6 + S1 + S2)
- Kebutuhan batu/gravel 1 jam = (Fa1 x Cp1) : D1
Berat Isi Bahan
Pemecah Batu :
- Batu Kali
- Pemecah Batu (Stone Crusher)
- Wheel Loader
- Pemecah Batu (Stone Crusher)
HARGA SATUAN AGREGAT PRODUKSI ST CRUSHER
- Pemecah Batu (Stone Crusher)
Batu/gravel dipecah dengan Alat Pemecah Batu (Stone Crusher) sehingga menghasilkan Agregat Batu Pecah Kasar
dan Halus.
Kerja Wheel Loader melayani Stone Crusher
Kerja Stone Crusher memecah gravel
= ((Qg : Qb) x Fh x $1) + Bp
-Waktu Siklus (muat, tuang, tunggu, dll)
Waktu kerja W. Loader memasok gravel = ((Qg : Ka) x Ts) :
60 menit
Biaya Produksi Batu Pecah / M3
Uraian
- Waktu kerja Stone Crusher
197
No. Kode Satuan Harga, $ Lokasi
1 M1 m3 12 Base Camp
2 M2 m3 18.02 Base Camp
3 m3
4 m3
5 m3
6 M6 m3 14.52 Base Camp
7 m3
8 m3
9 Material Pilihan m3
10 m3
11 kg
12 liter
13 zak
14 kg
15 kg
16 kg
17 kg
18 kg
19 kg
20 kg
21 m3
22 liter
23 liter
24 liter
25 m2
26 batang
27 m'
28 M28 m3 25.05 Base Camp
29 M29 m3 25.05Proses/Base
Camp
30 m3
31 m3
32 m3
33 m2
34 M34 kg 2.00 Base Camp
Pipa Galvanis Dia. 1.6”
Cat Marka (Thermoplas)
P a k u
Agregat Halus
Agregat Kasar
Kawat Bronjong
Cat Marka (Non Thermoplas)
Bahan Agregat Base Kelas A
Bahan Agregat Base Kelas B
Bahan Agregat Base Kelas C
Aspal
Pipa Porus
Plastik Filter
Nama Bahan
Pasir Pasang (Sedang)
Pasir Beton (Kasar)
Geotextile
Kayu Perancah
Sirtu (pasir bercampur kerikil)
Pasir Urug (ada unsur lempung)
Bahan Tanah Timbunan
Asphal Cement
F i l l e r
Kerosin / Minyak Tanah
Semen PC (50 kg)
Semen / PC (kg)
Besi Beton
Kawat Beton
Gravel
Batu Kali
Batu Belah / Kerakal
Minyak Pelumas / Oli
Contoh HSD bahan dan bahan olahan
Bensin
Solar
198
Pemindahan tanah asli sebesar 1.000 m3 :
Berapa volume tanah sesudah digali (kondisi lepas) untuk diangkut.?
Berapa volume tanah sesudah dipadatkan?
Dengan mengambil faktor konversi diperoleh hasil sebagai berikut :
1.11 x 1,000 = 1,110 m3 0.86 x 1,100 = 935 m3
1.25 x 1,000 = 1,250 m3 0.72 x 1,250 = 900 m3
1.13 x 1,000 = 1,130 m3 0.91 x 1,030 = 1,030 m3
1.65 x 1,000 = 1,650 m3 0.74 x 1,650 = 1,220 m3
I. ASUMSIKoefisien Satuan
7 Jam
1.2 -
1.6 Ton/m3
0.5 Km
II. URUTAN KERJA
1) Tanah yang dipotong umumnya berada di sisi jalan;
2) Penggalian dilakukan dengan menggunakan excavator;
3) Excavator menuangkan material hasil galian ke dalam dump truck;
4) Dumptruck membuang material hasil galian ke luar lokasi jalan sejauh L = 0.5 km.
III. PEMAKAIAN ALAT DAN TENAGA
1) ALAT
Koefisien Satuan
0.9300 M3
1.0000
0.6700
1.5000 Maksimum 6.37
0.3200 Menit
0.1000 Menit
0.4200
71.2114 M3/jam
0.0140 jam
Contoh Analisis Harga Satuan Pekerjaan Tanah (Galian dan Timbunan)
Contoh 1a : Pekerjaan Galian Tanah Biasa (1 m3)
Contoh Perhitungan Volume bahan pada pekerjaan tanah
Jarak lokasi ke pembuangan
1a) Excavator
Kapasitas bucket
Kapasitas Produksi/jam :
Koefisien Alat / m3 = 1/Q1 = 1/147.03
V
Fb
Fa
Fv
Ts1
T1
T2
Ts1
Q1
Faktor Bucket
Faktor efisiensi alatFaktor konversi, kedalaman <40%: 0.47 x 6.37 m
= 3 m
Waktu Siklus :
-Menggali, memuat
-Lain-lain (waktu tunda, dll)
Uraian
Berat volume tanah (lepas)
Tk
Keterangan
Lepas – Padat
Material tanah liat dan pasir masing-masing digali dan diangkut dalam kondisi lepas, lalu dihamparkan dan dipadatkan
1,000 m3
Jenis Tanah Asli Asli - Lepas
Pasir
Tanah Biasa (tanah liat berpasir)
Batu split (kerikil)
Cadas lunak (pecahan cadas atau batuan
lunak)
Fk
D
L
1,000 m3
1,000 m3
1,000 m3
Kode
Keterangan
Jam kerja efektif per hari
Lokasi sepanjang jalan
Kode
ANALISIS HARGA SATUAN PEKERJAAN
Faktor pengembangan bahan
Uraian
Kondisi jalan : buruk
Menggunakan alat secara mekanis
= 𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60 𝑥 𝐹𝑘
𝑇𝑠1 𝑥 𝐹𝑣
199
1b) Dump Truck
Koefisien Satuan
5.5 m3
0.75 -
20 km/jam
30 km/jam
2.90 Menit
1.5 Menit
1 Menit
2 Menit
7.40 Menit
20.91 M3/jam
0.0478 Jam
1) TENAGA
Koefisien Satuan
71.2114 M3/jam
498.4800 M3
2.0000 Orang
1.0000 Orang
0.1966 Jam
0.0983 Jam
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Pekerjaan Galian Tanah Biasa (Per m3)
No Koefisien Jumlah Harga ($)
A.
1 0.1966 0.14
2 0.0983 0.17
0.31
B. - -
0.00
C.
1 0.0140 1.01
2 0.0478 1.60
2.61
D. 2.92
Ts2
Q2
T3
Uraian
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
V
Fa
V1
V2
-
72.09
33.45
Jumlah harga peralatan
Uraian
Tenaga :
Dump Truck
Jumlah bahan
Harga Satuan Pekerjaan (A + B + C)
Harga Satuan ($)
0.71
1.71
Jumlah tenaga
Bahan -
Peralatan :
Excavator Jam
Pekerja
Mandor
Satuan
Jam
Jam
Jam
-Pekerja = (Tk x P) / Q1
-Mandor = (Tk x M) / Q1
Kode
Q1
Qt
P
M
L1
L3
Keterangan
Produksi menentukan : Excavator
Produksi galian/hari = Tk x Q1 = 7 x Q1
Kebutuhan tenaga :
-Pekerja
Uraian
-Mandor
Koefisien tenaga/m3 :
Kode Keterangan
Kondisi buruk
T4
T1
T2
Waktu Siklus :
-Muat = (V x 60) / (D x Q1)
-Waktu tempuh isi = (L / v2) x 60
-Waktu tempuh kosong = (L / v2) x 60
-Lain-lain
Kapasitas produksi/jam :
Koefisien alat/m3 = 1/Q2
Ts2
= 𝑉 𝑥 𝐹𝑎 𝑥 60
𝐷 𝑥 𝑇𝑠2
200
I. ASUMSI
Koefisien Satuan
7 Jam
1.2 -
1.6 Ton/m3
2 Km
II. URUTAN KERJA
1) Tanah yang dipotong umumnya berada di sisi jalan;
2) Penggalian dilakukan dengan menggunakan excavator;
3) Excavator menuangkan material hasil galian ke dalam dump truck;
4) Dumptruck membuang material hasil galian ke luar lokasi jalan sejauh L = 2 km.
III. PEMAKAIAN ALAT DAN TENAGA
1) ALAT
Koefisien Satuan
0.9300 M3
1.0000
0.6700
1.5000 Maksimum 6.37
0.3200 Menit
0.1000 Menit
0.4200
71.2114 M3/jam
0.0140 jam
1b) Dump Truck
5.5 m3
0.75
20
30 Menit
2.90 Menit
6 Menit
4 Menit
2 Menit
14.90 Menit
10.38 M3/jam
0.0963 Jam
Contoh Analisis Harga Satuan Pekerjaan Tanah (Galian dan Timbunan)
Contoh 1b : Pekerjaan Galian Tanah Biasa (1 m3)
Koefisien alat/m3 = 1/Q2
V1
Uraian Kode Keterangan
Kondisi jalan : baik
Menggunakan alat secara mekanis
Ts2
-Waktu tempuh kosong = (L / v2) x 60 T3
-Lain-lain T4
Keterangan
Ts1
Kapasitas Produksi/jam :Q1
Koefisien Alat / m3 = 1/Q1
Kapasitas bak V
T2
T1
Jarak lokasi ke pembuangan L
Uraian Kode
1a) Excavator
Kapasitas bucket V
-Lain-lain (waktu tunda, dll)
Tk
Faktor pengembangan bahan
Kecepatan rata-rata kosong V2
Waktu Siklus :
Faktor efisiensi alat Fa
Ts2
Tanah biasa
Kurang
-Muat = (V x 60) / (D x Q1)
Kecepatan rata-rata bermuatan
Faktor Bucket Fb
-Menggali, memuat T1
Kapasitas produksi/jam :Q2
-Waktu tempuh isi = (L / v2) x 60 T2
Faktor konversi, kedalaman <40%: 0.47 x 6.37 m
= 3 mFv
Waktu Siklus : Ts1
Fk
Berat volume tanah (lepas)
Faktor efisiensi alat Fa
D
Lokasi sepanjang jalan
Jam kerja efektif per hari
Q1 = (𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60 𝑥 𝐹𝑘)/(𝑇𝑠1 𝑥 𝐹𝑣)
Q1 = (𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐷 𝑥 𝑇𝑠2)
201
1) TENAGA
Koefisien Satuan
71.2114 M3/jam
498.4800 M3
2.0000 Orang
1.0000 Orang
0.1966 Jam
0.0983 Jam
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Pekerjaan Galian Tanah Biasa (Per m3)
No Koefisien Jumlah Harga ($)
A.
1 0.1966 0.14
2 0.0983 0.17
0.31
B. - -
0.00
C.
1 0.0140 1.01
2 0.0963 3.22
3
4.23
D. 4.54
I. ASUMSI
Koefisien Keterangan
7
1.2
1.8
1
II. URUTAN KERJA
1) Batu yang digali/dipotong umumnya berada disisi jalan
3) Dump Truck membuang material hasil galian keluar lokasi jalan sejauh (L) Km.
Dump Truck Jam 33.45
Jumlah harga peralatan
Harga Satuan Pekerjaan (A + B + C)
Jam 0.71
Satuan
-
Jumlah bahan
Contoh 2 : Pekerjaan Galian Batu
Peralatan :
Excavator Jam 72.09
Jumlah tenaga
Bahan -
Kondisi jalan : Baik
Lokasi : sepanjang jalan
Uraian Kode
Produksi yang menentukan : Excavator Q1
-Mandor = (Tk x M) / Q1 L3
Uraian Satuan Harga Satuan ($)
Tenaga :
Keterangan
Uraian
Pekerjaan dilakukan secara mekanis
2) Penggalian dilakukan dengan excavator, compressor, dan jack hammer, dimuat dalam truck dengan Loader.
-Pekerja = (Tk x P) / Q1
Mandor Jam 1.71
P
-Mandor M
Km
Jam kerja efektif per hari
Faktor pengembangan bahan
Berat volume material (lepas)
Jarak lokasi ke pembuangan
D
L
Jam
-
Ton/m3
Tk
Fk
Koefisien tenaga/m3 :
L1
Pekerja
Kode
Produksi galian/hari = Tk x Q1 = 7 x Q1 Qt
Kebutuhan tenaga :
-Pekerja
202
III. PEMAKAIAN ALAT DAN TENAGA
1) ALAT
Kode Satuan
M3/jam
(E5/26) Jam
Ton
V
Fa -
v1 Km/jam
v2 Km/jam
Ts2
T1 Menit
T2 Menit
T3 Menit
T4 Menit
Ts2 Menit
M3/jam
E8 Jam
Q1 M3/jam
Qt M3
P Orang
M Orang
L1 Jam
L3 Jam
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAANPekerjaan Galian Batu (Per m3)
No. Koefisien Jumlah Harga ($)
A.
1 1.000 0.71
2 0.125 0.21
0.92
B. - -
0.00
C.
1 0.125 2.38
2 0.125 0.71
3 0.125 4.10
4 0.125 9.01
5 0.204 6.82
23.03
D. 23.95
4.9025
29.92
Jam
0.125
Jam
Bahan -
1.00
Jam
Jumlah harga peralatan
Harga Satuan Pekerjaan (A+B+C)
Excavator (E10)
Dump Truck 5.2 Ton (E8)
Jam
Koefisien alat/m3 = 1/Q2
8.00
2.00-Waktu tempuh kosong = (L/v2) x 60
-Lain-lain
Jam
Jam
0.71
1.71
Jumlah tenaga
-
Jumlah bahan
Harga Satuan ($)Uraian
Tenaga
Pekerja (L1)
-Pekerja
Mandor (L4)
Satuan
2) TENAGA
19.06
5.68
-Mandor
Koefisien tenaga/m3
72.09
33.45
Jam
8.00
0.1250
1b) Dump Truck 5.2 Ton (E8) :
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
-Muat = (V x 60)/(D x Q1)
Kapasitas produksi/jam : Q2
5.50
0.80
20.00
30.00
Koefisien alat/m3 = 1/Q1
32.81
Peralatan
Compressor (E35)
Jack hammer (E23)
Wheel loader (E15)
22.92
3.00-Waktu tempuh isi = (L/v1) x 60
Uraian
-Pekerja = (Tk x P) / Qt
-Mandor = (Tk x M) / Qt
8.00
56.00
2.00
1a) Compressor, excavator, jack hammer, dan loader
Produksi per jam, Q1
Kebutuhan tenaga
Produksi galian/hari = Tk x Q1 = 7 x Q1
Produksi menentukan : Jack Hammer
1.00
0.2040
Koefisien
Q2 = (𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐷 𝑥 𝑇𝑠2)
203
Lokasi : di sekitar jembatan
Alat yang dipergunakan Excavator dan Buldozer.
I. ASUMSI
Satuan Keterangan
Jam
-
%/m3
II. URUTAN KERJA
1) Tanah yang digali/dipotong berada di sekitar lokasi
2) Penggalian dilakukan dengan alat Excavator
3) Buldozer mengangkut/menggusur hasil galian ke tempat pembuangan di sekitar lokasi pekerjaan.
4) Bahan pengaman tebing galian dari bahan kayu.
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1) BAHAN
Kode Satuan
M3
V M3
Fb
Fa
Fv
Bim
T1 Menit
Ts1 Menit
Q1 M3/jam
(E10) Jam
Fb -
Fa -
Vf Km/jamVr Km/jam
q M3
Fm -
Ts -
T1 Menit
T2 Menit
T3 Menit
Ts Menit
Q2 M3/jam
(E7) Jam
Uk
Uraian
Kondisi jalan : baik
Pekerjaan dilakukan secara mekanis
Koefisien
0.5
Contoh Pekerjaan Galian Struktur dengan kedalaman 0 – 2 meter
Tk
Fk
Koefisien
120.26
0.0083
0.7
0.75
20
30
Kap. Prod./jam :
Koefisien alat/m3 = 1 / Q1
5.4
1b) Buldozer (E7)
Faktor pisau (blade)
Berat isi material
Koefisien alat/m3 = 1/Q2
0.9
0.85
Faktor efisiensi kerja
Kap. Produksi/jam :
Waktu siklus = T1 x Fv
-Menggali, memuat, lain-lain (standar)
Waktu siklus
Kapasitas bucket
1a) Excavator (E10)
1.2
50
Uraian
Faktor pengembangan bahan
Pengurugan kembali (backfill) untuk struktur
Kode
Kecepatan mundur
Urugan pilihan (untuk backfill) = Uk x 1 m3
0.93
1
0.75
Kecepatan mengupas
Faktor kemiringan (grade)
Kapasitas pisau
2) ALAT
0.32
0.29
Faktor konversi, kedalaman < 40%, 0.4 x 6.37 m = 2.55 m
Faktor efisiensi alat
Faktor bucket
-Waktu lain-lain
Jam kerja efektif per hari 7
1
2
1.2
0.05
3.25
7.51
0.1331
-Waktu kembali = (L x 60) / Vr
-Waktu gusur = (L x 60) / Vf
Waktu siklus
Q1 = (𝑉 𝑥 𝐹𝑎 𝑥 𝐹𝑏 𝑥 60)/(𝑇𝑠1 𝑥 𝐹𝑘)
Q2 = (𝑉 𝑥 𝐹𝑎 𝑥 𝐹𝑏 𝑥 60)/(𝑇𝑠2 𝑥 𝐹𝑘)
204
Kode Satuan
Q1 M3/jam
Qt M3
P Orang
M Orang
(L1) Jam
(L3) Jam
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Pekerjaan galian struktur dengan kedalam 0 – 2 meter (Per m3)
No. Satuan Koefisien Jumlah Harga ($)
A.
1 Jam 0.0333 0.024
2 Jam 0.0083 0.014
0.038
M3 0.5 -
0.000
C.
1 Jam 0.0083 0.599
2 Jam 0.1331 6.660
7.26
D. 7.30
3) TENAGA
Excavator
Peralatan
Urugan pilihan
BahanB.
-Mandor = (Tk x M) / Qt
Koefisien tenaga/m3
-Mandor
Produksi galian/hari = Tk x Q1
Produksi menentukan : excavator
Tenaga
Uraian
-Pekerja = (Tk x P) / Qt
120.26
4
1
-Pekerja
Kebutuhan tenaga
0.0333
Jumlah harga peralatan
Jumlah tenaga
Mandor (L4)
Pekerja (L1)
Tenaga
Uraian
72.09
50.03
Harga Satuan ($)
0.71
1.71
Harga Satuan Pekerjaan (A+B+C)
Jumlah bahan
Koefisien
841.81
0.0083
Buldozer
-
205
I. ASUMSI
Koefisien Keterangan
7
1.2
0.15
5
II. URUTAN KERJA1) Wheel loader memuat material ke dalam dump truck
2) Dump Truck mengangkut material dari quarry ke lokasi pekerjaan sejauh L.
3) Material diratakan dengan menggunakan motor grader
4) Material dipadatkan dengan menggunakan vibrator roller
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
Koefisien Ket.
1.2 Borrow pit
2) ALATSatuan
M3
Menit
Menit
M3/jam
Jam
Ton
-
Km/jam
Km/jam
Menit
Menit
Menit
Menit
Menit
M3/jam
Jam
m3
Unit
Contoh Pekerjaan Timbunan Biasa
5) Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan menggunakan alat
bantu.
2b) Dump Truck 5.2 Ton (E8) :
1) BAHAN
Uraian Kode
Uraian Satuan
Jam
-
m
Pekerjaan dilaksanakan dengan menggunakan alat berat berupa Excavator, Dump Truck 5.2 ton, Motor Grader, Vibrator
Roller, dan Water Tank Truck.
2a) WHEEL LOADER (E13)
Kapasitas bucket
Kap. Prod./jam :
-Lain-lain
-Menggali, memuat
Waktu siklus, Ts1 :
Koefisien
1.50
1.00
0.60
0.50
Kecepatan rata-rata kosong
Tebal hamparan padat t
L
Tk
Jarak lokasi ke pembuangan
Kode
Kecepatan rata-rata bermuatan
Fa
V
Fk
Waktu Siklus :
Faktor bucket
Faktor efisiensi alat
Waktu siklus
V
Uraian
V1
Material timbunan = 1 x Fk
Km
Pekerjaan dilakukan secara mekanis
Kondisi jalan : sedang / buruk
Jam kerja efektif per hari
Faktor pengembangan bahan
0.50
1.00
45.00
0.0222
Q1
(E13)
Fa 0.80
T1
20.00
30.00
15.00
5.50
Ts1
V2
Kode
Fb
T1
T2
Ts1
0.1273E8
Kapasitas produksi/jam :
Koefisien alat/m3 = 1/Q2
-Muat =
-Waktu tempuh isi = L/v1 x 60
Faktor efisiensi alat
Kapasitas bak
Koefisien alat/m3 = 1 / Q1
T2
T3
Ts2
-Waktu tempuh kosong = L/v2 x 60
-Lain-lain
10.00
3.00
28.00
7.86Q2
Q1 = (𝑉 𝑥 𝐹𝑎 𝑥 𝐹𝑏 𝑥 60)/(𝑇𝑠1 𝑥 𝐹𝑘)
Q2 = (𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝑇𝑠2 𝑥 𝐹𝑘)
(𝑉 𝑥 60)/(𝐷 𝑥 𝐹𝑘 𝑥 𝑄1)
206
m
-
Km/jam
lintasan
Menit
Menit
Menit
M3/jam
Jam
-
M3/jam
Jam
-
M3/jam
Jam
Lump sum
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Pekerjaan timbunan tanah biasa (per m3)
No. Koefisien .Jumlh Harga, $
A.
1 0.0435 0.0309
2 0.0109 0.0186
0.0495
1.2 0.00
C.
1 0.0109 0.79
2 0.1273 4.26
3 0.0037 0.16
4 0.0042 0.14
5 0.0070 0.19
5.54
D. 5.59
2e) Water tank truck (E 38)
2d) Vibrator Roller (E17)
Jam
Jam
-
Water tank truck (E38)
Jumlah tenaga
Excavator (E10)
Peralatan
42.76
34.40
27.69
33.45
Q5
E 38
4
0.07
4
0.0073
Q4
E17
-Lain-lain
Kapasitas produksi/jam :
Ts3
Q3
Panjang hamparan
Faktor efisiensi alat
Kecepatan rata-rata alat
Koefisien alat/m3 = 1/Q2
0.3
E11
50
0.8
4
2
Waktu Siklus :
-Peralatan 1 kali lintasan = (Lh x 60)/(v x 1000)
0.9
480.00
2c) Motor Grader (E11)
5
1.2
0.0021
0.6
v
b
137.14
Koefisien alat/m3 = 1/Q4
Kapasitas produksi/jam :
Faktor efisiensi alat
1
0.6
540.00
Jumlah lintasan
Lh
Fa
v
n
Ts3
T1
T2
0.6
n
Fa
Mengisi tangki/jam
Kebutuhan air/m3 material padat
Volume tangki air
Koefisien alat/m3 = 1/Q5
V
Wc
n
Fa
B.
Harga Satuan ($)
0.71
Bahan
0.0019
Jumlah lintasan
Lebar efektif pemadatan
Kecepatan rata-rata
1.71
SatuanUraian
Tenaga
Pekerja (L1)
Mandor (L4)
Kapasitas produksi/jam =
Faktor efisiensi alat
Jam
Jam
Jam
Jam
Jam
Dump truck (E8)
Motor grader (E11)
Vibro roller (E17)
Jumlah harga peralatan
Harga Satuan Pekerjaan (A+B+C)
Bahan timbunan M3
72.09
Sekop = 3 buah
2f) Tools
Lebar efektif kerja Blade b 2.4
Q3 = (𝐿ℎ 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎 𝑥 60)/(𝑇𝑠3 𝑥 𝑛)
Q4 = (𝑣 𝑥 1000 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎)/𝑛
Q5 = 𝑣 𝑥 𝑛 𝑥 𝐹𝑎
𝑊𝑐
207
I. ASUMSIKoefisien Keterangan
4.00
0.04
7.00
1.20
1.05
40.00
52.80
1.00
6.20
- AC-BC 2.25
- 1.80
- 2.00
1.03
II. URUTAN KERJA
1. Wheel Loader memuat agregat ke dalam Cold Bin AMP
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1) Bahan
Koefisien Keterangan
0.0240
0.0317
1.0800
5.8590
2) Alat
1.5
0.9
0.65
3
1
4
263.25
0.0038
- Asphalt
4)Jarak rata-rata dari base camp ke lokasi
pekerjaan
5)Tebal padat lapis perkerasan AC-WC
-
-
V
T2
Ts1
Q1
E13
Uraian
FA %
- Fraksi Filler FF %
- Asphalt ( Minimum 5%) As %
menit
menit
menit
Ton
Jam
M..
%
- Agr Pch Mesin 0 – 5 mm (Fine Agregate)
Agregat Kasar
-
M3
Agregat Halus
2. Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke dalam Dump Truck dan diangkut
ke lokasi pekerjaan
1)Menggunakan alat (cara mekanis)
Fh2
D1 ton/m3
D2 ton/m3
2)Kondisi jalan eksisting : sedang
- Agr Pch Mesin 5 – 10 & 10 – 20 mm (Coarse
Agregate)CA
-
3)Lokasi pekerjaan : sepanjang jalan
Satuan
Fh1
6)Jam kerja efektif per hari
7)Faktor kehilangan material :
- Agregat
Contoh analisis harga satuan Lapis Aus Aspal Beton AC-WC (Gradasi kasar / halus), m2
- Fraksi Filler
Kode
Km
M
Jam
D4
9)Berat isi bahan :
=(FF x (D1 x t M3) x Fh1) x 1000
=(As x (D1 x tM3) x Fh2) x 1000
M..
M..
Uraian
3. Campuran panas AC dihampar dengan Finisher dan dipadatkan dengan Tandem & Pneumatic Tire Roller
4. Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan menggunakan Alat Bantu.
L
t
Tk
Faktor bucket
Fa
Ts
Koefisien Alat/ton = 1 / Q1
T1
Faktor efiensi alat
Waktu siklus
ton/m3
ton/m3
D3
Coarse Agregat & Fine Agregat
Fb
Fraksi Filler
- Memuat
- Lain-lain
Jumlah
Kap. Prod. / jam,
=(CA x (D1 x t M3) x Fh1) /D2
=(FA x (D1 x t M3) x Fh1) / D2
Kg
2a) WHEEL LOADER (E13)
Kapasitas bucket
- Aspal
8)Komposisi campuran AC-WC
- Aspal
Satuan
M3
M3
Kg
Kode
M..
Q
Q
Q1 = (𝐷2 𝑥 𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60)/(𝐷1 𝑥 𝑡 𝑥 𝑇𝑠1)
208
50.00
0.65 Kondisi baik
361.11
0.0028
361.11
0.0028
5.50
0.65 Kondisi sedang
20.00
30.00
0.50
1.00
11.00
12.00
15.00
8.00
46.00
51.81
0.0193
10
0.65 Kondisi baik
72.22
0.0138
2.5
1.2
4
0.75
562.50
0.0018
3.5
1.2
4
0.65
682.50
0.0015E16Koefisien alat / ton = 1 / Q7
Kap. Prod. / jam :
Faktor efisiensi alat
Jumlah lintasan
Lebar efektif pemadatan
2g) PNEUMATIC TIRE ROLLER (E16)
Koefisien Alat/ton = 1/Q6
n
Fa
Lintasan
-
M2Q7
Jam
M
Kecepatan rata-rata
Lebar efektif pemadatan
km/jam
m
-
Km/jam
Km/jam
Menit
Menit
-
m2
v
Q5
E2
Kapasitas bak
Km/jam
v1
v
b
Lintasan
Ts2
T1
b
n
Fa
E15
Kecepatan maju rata-rata alat
2f) TANDEM ROLLER (E15)
Kap. Prod. / jam :
Q4
- Angkut = (L : v1) x 60
- Mengisi bak = (V : Q2b) x Tb
E36
Q6
Jumlah
- Kembali = (L : v2) x 60
-Tunggu + dump + putar
Tb
T2
Jam
V
Fa
2d) DUMP TRUCK (DT) (E8)
Faktor efisiensi alat
Kap. Prod. / jam : Q5 = (V x Fa) / (t x D1)
Koefisien Alat / ton = 1 / Q5
v2
m3V
Fa
Kecepatan maju rata-rata kosong
Kecepatan maju rata-rata bermuatan
Faktor efisiensi alat
ton
Jam
V
Fa
Q2
E01
2b) ASPHALT MIXING PLANT (AMP) (E1)
Kapasitas Produksi
Faktor efisiensi alat
Kap. Prod. / jam = (V x Fa) / (D1 x t)
Koefisien Alat / ton = 1 / Q2
Menit
2e) ASPHALT FINISHER (E2)
M3
Jam
M3
Jam
Q3
E36
2c) GENERATOR SET (E36)
Kap. Prod. / jam = AMP
Faktor efisiensi alat
Jumlah lintasan
jam
Kapasitas Produksi ton / jam
T3
T4
Ts2
Ton/jam
-
-
Waktu siklus
Waktu menyiapkan 1 batch AC-WC
Menit
Menit
Menit
Kap. Prod. / jam :
Koefisien Alat / ton = 1 / Q3
Koefisien Alat / ton = 1 / Q4
Kapasitas AMP / batch Q2b Ton
Q
=
Q
Q
=
Q4= (𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐷1 𝑥 𝑡 𝑥 𝑇𝑠2)
Q6= {(𝑣 𝑥 1000)𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎}/(𝑛 𝑥 𝑡)
𝑄7=((𝑣 𝑥 1000) 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎)/(𝑛 𝑥 𝑡)
209
3) TenagaQ2 m2 / jamQt m2
P Orang
M Orang
(L1) Jam
(L4) Jam
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Laston lapis aus (AC-WC) gradasi halus/kasar per Ton
No. Koefisien Jumlah Harga, $
A
1 L1 0.0277 0.020
2 L4 0.0028 0.005
0.024
B
1 0.0240 0.600
2 0.0317 0.792
3 1.0800 0.173
4 5.8590 11.718
13.283
C
1 0.0038 0.125
2 0.0028 0.251
3 0.0028 0.129
4 0.0193 0.646
5 0.0138 0.498
6 0.0018 0.068
7 0.0015 0.056
8 1.0000 0.010
1.78
D 15.09
Dump Truck
Genset
AMP
Wheel Loader
- Sekop = 3 buah
- Garpu = 2 buah
Aspal
Pneumatic Tire Roller
Alat Bantu
Jam
- Mandor
- Pekerja
Jumlah harga peralatan
JamTandem Roller
Asp. Finisher
2.00
Jam
Jam
Jam
Harga Satuan, $
0.71
Ls
Kg
JUMLAH HARGA BAHAN
32.81
90.76
46.42
33.45
35.96
38.01
38.48
0.01
25.00
0.16
Jam
Agregat Kasar
PERALATAN
Agregat Halus
Filler
0.0277
0.0028
= (Tk x P) / Qt
= (Tk x M) / Qt
1.71
BAHAN
- Rambu = 2 buah
Koefisien tenaga / m2
Satuan
Jam
2527.78
10
1
Produksi menentukan : Asphalt Mixing Plant
Produksi AC-WC / hari = Tk x Q2
- Pekerja
- Mandor
Jam
2h) ALAT BANTU (Lumpsum)
M3
M3
Kg
jam
Uraian
TENAGA
Pekerja
Mandor
- Tongkat control ketebalan hamparan
JUMLAH HARGA TENAGA
25.00
Kebutuhan tenaga :
- Kereta dorong = 2 buah
361.11
Harga Satuan Pekerjaan (A+B+C)
210
Koefisien Keterangan
3.0
0.151.40
7.00
55.00
45.00
II . SEQUENCE OF WORK
1. Wheel Loader mencampur dan memuat Agregat kedalam Dump Truck di Base Camp
2. Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan Motor Grader
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN0.7700
0.6300
1.50
0.90 Light loading
0.80
3.00
2.00
5.00
9.26
Coefficient of equipment / M3 = 1/Q1 0.1080
5.50
0.80
45.00
60.00
- Waktu memuat = V : Q1 x 60 35.65
- Waktu tempuh isi = (L : v1) x 60 menit 4.00
- Waktu tempuh kosong = (L : v2) x 60 menit 3.00
- Lain-lain termasuk menurunkan Agregat 5.00
47.65
3.96
0.2527
2. ALAT
1) Menggunakan alat berat (cara mechanik)
menit
3. Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller & PTR
T2 menit
Satuan
Kapasitas bak m3
Faktor Efisiensi alat Fa -
Kapasitas Prod. Q2 m3
(E09) jam
km
V
6 ) Faktor kembang material (Padat-Lepas) Fk
Contoh : Analysis Lapis Pondasi Agregat Kls. A, CBR Minimum 80%
I. ASUMSIUraian Kode
- Agregat halus Ah %
4. Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan
alat bantu.
- Agregat Kasar = Ak x 1 m3 x Fk M03 m3
- Agregat Halus = Ah x 1 m3 x Fk M04 m3
2a) WHEEL LOADER (E13)
2 ) Lokasi pekerjaan : sepanjang jalan
3) Kondisi eksisting jalan : sedang/buruk
-
7 ) Jam kerja efektif per-hari Tk jam
8 ) Proporsi campuran :
- Agregat kasar Ak %
4 )Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 ) Tebal lapis Agregat padat t m
Kapasitas bucket V m3
Faktor bucket Fb -
Faktor Efisiensi alat Fa -
Waktu siklus Ts1
- Mencampur T1 menit
- Memuat dan lain-lain
2b) DUMP TRUCK
Kap. Prod. / jam =Q1 m3
(E13) jam
Ts1
(E09)
Kecepatan rata-rata bermuatan v1 km/jam
Kecepatan rata-rata kosong v2 km/jam
Waktu Siklus :
T1 menit
T2 menit
T3 menit
Koefisien Alat / M3 = 1/Q2
T4 menit
Ts2 menit
(𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐹𝑘 𝑥 𝑇𝑠2)
(𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60)/(𝐹𝑘 𝑥 𝑇𝑠1)
211
50.00
2.40
0.80
1.00 3 kali pp
3.00
1.00
1.00
2.00
Kapasitas Produksi =432.00
Koefisien Alat / M3 = 1/Q3 0.0023
2d) TANDEM ROLLER
3.00
1.20
4.00
0.75
101.25
0.0099
2e) WATER TANK TRUCK
4.00
0.07
1.00
0.80
45.71
0.0219
ALAT BANTU
Lump Sum
9.26
64.80
10.00
1.00
1.0802
0.1080
2c) MOTOR GRADER
(E38)
TENAGA
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
Q1 m3/jam
- Pekerja
Qt
Lh m
- Perataan 1 lintasan = (Lh x 60) : (v x 1000)
T2 menit- Lain-lain
Ts3 menit
(E11) jam
(E15)
Panjang hamparan
b mLebar efektif kerja blade
Fa -Faktor Efisiensi alat
n lintasanJumlah lintasan
Ts3Waktu Siklus
T1 menit
Q3 m3
Kecepatan rata-rata
Kecepatan rata-rata v km/jam
Lebar efektif pemadatan b m
Jumlah lintasan n lintasan
Faktor Efisiensi alat Fa -
(E15) hour
Kap.Prod. / jam = Q4 m3
Koefisien Alat / M3 = 1 / Q4
Diperlukan :
(E38) jam
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
Volume tangki air
Kebutuhan air / M3 agregat padat
V m3
Pengisian tangki / jam
Wc m3
Faktor Efisiensi alat
n kali
Kap.Prod. / jam =
Fa -
Produksi menentukan : WHEEL LOADER
m3/jam
- Mandor
Koefisien tenaga / M3 :
P orang
- Pekerja = ( Tk x P ) : Qt
M orang
v km/jam
Q5 m3
Koefisien Alat / M3 = 1/Q5
(L01) jam
(L03) jam- Mandor = ( Tk x M ) : Qt
Q
Q
(𝑉 𝑥 𝑛 𝑥 𝐹𝑎)/𝑊𝑐
(𝑣 𝑥 1000) 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎
𝑛
(𝐿ℎ 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎 𝑥 60)/(𝑛 𝑥 𝑇𝑠3)
212
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Koefisien Keterangan
A TENAGA
1 1.0802 0.77
2 0.1080 0.18
0.95
B
1 0.7700 19.25
2 0.6300 15.75
35.00
C
1 0.1080 3.54
2 0.2527 8.45
3 0.0023 0.10
4 0.0099 0.38
5 0.0219 0.61
6 1.0000 0.01
13.09
D 49.04
Wheel Loader (E13) hour 32.81
hour 0.71
hour
Ls 0.01
JUMLAH HARGA BAHAN
Uraian
PERALATAN
1.71
M3 25.00
M3 25.00
Pekerja (L1)
Mandor (L4)
JUMLAH HARGA TENAGA
BAHAN
Agregat Kasar (M03)
Agregat Halus (M04)
hour 27.69
Alat bantu
Jumlah harga peralatan
Harga Satuan Pekerjaan (A+B+C)
Dump Truck (E9) hour 33.45
Motor Grader (E11) hour 42.76
Tandem Roller (E15) hour 38.01
Water Tank Truck (E38)
Analysis Lapis Pondasi Agregat Kls. B, CBR Minimum 80%
Kode Satuan
Q
Q
213
Koefisien Keterangan
3.0
0.15
1.20
7.00
35.00
20.00
45.00
II. URUTAN KERJA
1. Wheel Loader mencampur & memuat Agregat ke dalam Dump Truck di Base Camp
2. Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan Motor Grader
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
0.4200
0.2400
0.5400
2. ALAT
2a) WHEEL LOADER
1.50
0.90 Light loading
0.80
3.00
2.00
5.00
10.80
0.0926
2b) DUMP TRUCK
5.50
0.80
45.00
60.00
30.56
4.00
3.00
- Lain-lain termasuk menurunkan Agregat 3.00
40.56
Koefisien Alat / M3 = 1 : Q2 0.1843
t
Kapasitas bak
-Agregat Kasar = Ak x 1 M3 x Fk
- Agregat Halus = Ah x 1 M3 x Fk
- Sirtu
Kapasitas bucket
Ts2 menit
(E13)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
- Memuat dan lain-lain
Ah %
Faktor bucket
Faktor Efisiensi alat
Fa -
- Loading and others
Faktor Efisiensi alat
4. Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan
-
Ts1
T1 menit
T2 menit
V M3
Fb -
Fa
Kode
m
St %
Ts1 menit
Q1 M3
Kecepatan rata-rata kosongWaktu Siklus :
- Waktu memuat = V : Q1 x 60
- Waktu tempuh isi = (L : v1) x 60 menit
Waktu siklus
- Mencampur
V M3
jam
(E09)
Q2 5.42 M3
(E09) jam
v1 km/jam
v2 km/jam
T3 menit
T4 menit
T1 menit
T2 menit
Kecepatan rata-rata bermuatan
- Waktu tempuh kosong = (L : v2) x 60 menit
M16
Kap. Prod. / Jam =
Satuan
L km
Contoh : Analysis Lapis Pondasi Agregat Kls. B, CBR Minimum 35%
Jarak rata-rata Base Camp ke lokasi pek.
Tebal lapis Agregat padat
Faktor kembang material (Padat-Lepas)
Jam kerja efektif per-hari
Proporsi Campuran :
3. Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller
(E13)
Fk -
Tk jam
Ak %
M03 M3
M04 M3
Uraian
Menggunakan alat berat (cara mekanik)
Koefisien Alat / M3 = 1/Q1
Kap. Prod. / jam =
- Agregat Kasar
- Agregat Halus
- Sirtu
I. ASUMSI
(𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐹𝑘 𝑥 𝑇𝑠2)
(𝑉 𝑥 𝐹𝑏 𝑥 𝐹𝑎 𝑥 60)/(𝐹𝑘 𝑥 𝑇𝑠1)
214
2c) MOTOR GRADER
50.00
2.40
0.83
4.00
6.00
3 times round-
trip
0.75
1.00
1.75
Kap.Prod. / jam =
Koefisien Alat / M3 = 1/Q3 0.0117
2d) TANDEM ROLLER
3.00
1.20
4.00
0.80
Kap. Produksi
108.00
Koefisien Alat / M3 = 1/Q4 0.0093
2e) WATER TANK TRUCK
4.00
0.07
1.00
0.80
Kapasitas Produksi
Koefisien Alat / M3 = 1/Q5 0.0219
2f) ALAT BANTU
Lump Sum
3. TENAGA
10.80
75.60
7.00
1.00
- Pekerja = ( Tk x P ) : Qt 0.6481
0.0926
V M3
45.71 M3
M3
(E38)
Waktu Siklus
- Perataan 1 lintasan = (Lh x 60) : (v x 1000)
- Lain-lain
(E11)
Faktor Efisiensi alat
Kecepatan rata-rata
(E38)
Wc
Lebar efektif kerja blade
Ts3
hour
(E15)
Volume Tangki air
(E11)
Jumlah lintasan
b M
Fa -
85.37 M3
Q4
Lh M
hour
n times
Fa -
Q5
M3
diperlukan :
v kms/hr
- Kereta dorong = 2 buah
n passes
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
T1 minute
Panjang hamparaan
v kms/hr
b m
n passes
Fa -
(E15) hour
T2 minute
Ts3 minute
Q3
Q1 m3/hr
Qt m3/hr
P person
M person
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
- Pekerja
Lebar efektif pemadatan
Koefisien tenaga / M3 :
Kebutuhan tenaga :
- Mandor
(L01) hour
(L03) hour
- Garpu = 2 buah
Kebutuhan air / M3 agregat padat
Pengisian tangki / Jam
Faktor efisiensi alat
- Sekop = 3 buah
- Mandor = ( Tk x M ) : Qt
(𝐿ℎ 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎 𝑥 60)/(𝑛 𝑥 𝑇𝑠3)
(𝑣 𝑥 1000 𝑥 𝑏 𝑥 𝑡 𝑥 𝐹𝑎
𝑛
(𝑉 𝑥 𝑛 𝑥 𝐹𝑎)/𝑊𝑐
215
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Koefisien Keterangan
A TENAGA
1 Pekerja 0.6481 0.46
2 Mandor 0.0926 0.16
0.62
B BAHAN
1 0.4200 10.50
2 0.2400 6.00
16.50
C ALAT
1 0.0926 3.04
2 0.1843 6.17
3 0.0117 0.50
4 0.0093 0.35
5 0.0219 0.61
6 1.0000 0.01
10.67
D 27.79
Water Tank Truck (E38)
Alat bantu
25.00
Agregat kasar
Agregat halus
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
32.81
hour 33.45
hour 42.76
hour 38.01
hour 27.69
Ls 0.01
Wheel Loader (E13)
Dump Truck (E9)
Motor Grader (E11)
Tandem Roller (E15)
Kode Satuan
hour 0.71
Analysis Lapis Pondasi Agregat Kls. B, CBR Minimum 35%
Uraian
JUMLAH HARGA PERALATAN
Harga Satuan Pekerjaan (A+B+C)
hour 1.71
M3 25.00
M3
hour
216
I. ASUMSI
Koefisien Keterangan
8
7
1.05
0.003 Spesifikasi
1.3
3.9
II. URUTAN KERJA
1. Permukaan jalan dibersihkandari debu/kotoran
2. Permukaan jalan yang akan dicat diukur dan diberi tanda
3. Cat marka dimasukkan ke dalam mesin, dipanaskan sampai mencair
4. Pengecatan dilakukan sambil ditaburi glass bead
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1) BAHAN
Koefisien Keterangan
4.095
0.45
2) ALAT
Koefisien Keterangan
40
10.26
0.0975
10.26
0.0975
kg/liter
kg
Kg
Kode Satuan
Kg
jam
-
L
Tk
Fh
t
E..
kg/jam
m2
jam
E..
BJ cat
km
Satuan
Q2
m2
jam
Kode
E..
V
Q1
E..
m
Berat cat per m2 = 1 m2 x 0.003 m x 1000 x BJ
cat
Kode Satuan
Contoh analisis harga satuan pekerjaan pengembalian kondisi dan pekerjaan minor :
Contoh Pekerjaan marka jalan termoplastik (per m2)
Uraian
Pekerjaan dilakukan menggunakan mesin cat
marka
Bc
Koefisien Alat / m2 = 1 / Q1
Uraian
Cat marka thermoplastic = Bc x Fh
Glass bead
Uraian
2a) MESIN CAT MARKA
Kapasitas pengecatan
Kapasitas produksi / jam = V / Bc
2c) ALAT BANTU
Koefisien Alat / m2 = 1 / Q2
Lokasi pekerjaan : sepanjang jalan kenangan
Bahan dasar (cat marka dan glass bead)
seluruhnya diterima di lokasi pekerjaan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per hari
Faktor kehilangan material
Tebal lapisan cat secara manual
Berat jenis bahan cat
Mesin ini digunakan bersama-sama mesin cat
marka
2b) DUMP TRUCK 5.2 TON
Diperlukan :
Rol meter 5 m = 2 buah
Sapu lidi = 3 buah
Sikat ijuk = 3 buah
Rambu-rambu pengaman = 2 buah
217
3) TENAGA
71.79
8
3
1
0.7800
0.2925
0.0975
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Marka jalan thermoplastic per m2
No Koefisien Jumlah Harga, $
A TENAGA
1 0.7800 0.55
2 0.2925 0.33
3 0.0975 0.17
1.05
B
1 4.0950 …
2 0.4500 …
…
C
0.0975 …
0.0975 3.26
………..
D ………..
Qt
P
T
M
Jam 0.71
L1
L2
jam
Jam
jam
Harga Satuan, $
M2
Orang
Orang
Orang
Kg
Jam
Kg
Jam
Jam
Jam
Satuan
L4
…
…
1.14
1.71
Jumlah harga bahan
…
33.45
Produksi pekerjaan per hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga :
- Pekerja = ( P x Tk ) / Qt
- Tukang = ( T x Tk ) / Qt
- Mandor = ( M x Tk ) / Qt
Uraian
Pekerja L1
Tukang cat L2
Mandor L4
BAHAN
Cat marka M..
Glass bead M..
PERALATAN
Mesin cat marka
Dump Truck
Jumlah harga tenaga
Jumlah harga peralatan
Harga Satuan Pekerjaan ( A + B + C )
218
I. ASUMSI
Koefisien Keterangan
7
3
0.9
0.5
II. URUTAN KERJA
1. Pemotongan pohon menggunakan Chainsaw, Kampak dan Parang;
2. Pohon ditebang dimulai dari atas;
3. Penggalian akar pohon dilakukan oleh pekerja;
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1) BAHAN
2) ALAT
5.2
0.83
20
30
15
1.5
1
5
22.5
4.26
0.2346
7
1
1
T4
Ts1
Q1
Km/jam
Jam
M3
Ton/m3
Menit
Menit
Menit
Menit
M3/jam
Jam
V
Fa
Ton
Tk
Vp
D
L
v1
v2
Ts1
T1
T2
T3
Km/jam
Menit
Menit
km
- Muat
- Waktu tempuh isi = (L/V1) x 60
- Waktu tempuh kosong = (L/V2) x 60
- Lain-lain
Kapasitas Produksi / jam, Q1
(E..)
4. Pohon yang sudah ditebang dipotong-potong dan dimuat kedalam Dump Truck oleh pekerja; dan Dump Truck
membuang material hasil penebangan keluar lokasi pekerjaan.
Kode Satuan
Q2
E..
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kapasitas bak
Contoh Pekerjaan penebangan pohon, diameter 30 – 50 cm (Buah)
Uraian
H
2c) ALAT BANTU (menggali akar pohon dan
menutup kembali
- Sekop
- Kampak, parang
- Cangkul
- Tali, dan lain-lain
Koefisien Alat / m3 = 1 / Q1
2b) ALAT PEMOTONG (Chainsaw)
Produksi menentukan
Dalam 1 hari dapat memotong
Kapasitas produksi / jam = H / Tk
Koefisien Alat / buah = 1/Q2
1 pohon diameter 30-50 cm setara dengan
volume
Berat Volume Kayu
Jarak lokasi pekerjaan ke tempat pembuangan
material hasil penebangan
Tidak ada
2a) DUMP TRUCK 5.2 Ton ( E..)
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
Kondisi jalan : sedang / baik
Jam kerja efektif per-hari
Buah
Buah
Jam
(E..)
Q1 = (𝑉 𝑥 𝐹𝑎 𝑥 60)/(𝐷 𝑥 𝐹𝑘 𝑥 𝑇𝑠1)
219
3) TENAGA
Koefisien Keterangan
29.8390
1
10
0.2346
2.3459
IV. CONTOH PENGISIAN FORMAT HARGA SATUAN PEKERJAAN
Pekerjaan penebangan pohon, diameter 30 – 50 cm (Buah)
No Koefisien Jumlah Harga, $
A TENAGA
1 2.3459 1.67
2 0.2346 0.40
2.07
B
-
0.00
C
0.2346 7.85
1 2.00
9.85
D 11.91
Jam
Satuan
M2
Orang
Orang
Jam
Jam
Qt
M
P
L4
L1
Kode
Harga Satuan, $
0.71
1.71
Satuan
Jam
Jam
Uraian
Pekerja (L1)
PERALATAN
BAHAN
Jumlah harga peralatan
Harga Satuan Pekerjaan ( A + B + C )
Uraian
Produksi pekerjaan per hari, Qt = Q1 x Tk
Dibutuhkan tenaga :
- Mandor
- Pekerja
Koefisien Tenaga / m2 :
Mandor = ( M x Tk ) / Qt
Pekerja = ( P x Tk ) / Qt
-
33.45
2
Jam
Mandor (L4)
Jumlah harga tenaga
Jumlah harga bahan
Dump Truck (E..)
Chainsaw (E..)
220
221
TABEL FAKTOR EFISIENSI ALAT Tabel 1 : Faktor Efisiensi Alat
Kondisi operasi
Pemeliharaan mesin Baik sekali Baik Sedang Buruk Buruk sekali
Baik sekali 0.83 0.81 0.76 0.70 0.63 Baik 0.78 0.75 0.71 0.65 0.60 Sedang 0.72 0.69 0.65 0.60 0.54 Buruk 0.63 0.61 0.57 0.52 0.45 Buruk sekali 0.53 0.50 0.47 0.42 0.32 Sumber : Rochmanhadi, Ir. 1992. Kapasitas & Produksi alat-alat berat.
Tabel 2 : Faktor Efisiensi Alat BULDOZER (FaBul) Kondisi kerja Efisiensi kerja
Baik 0.83 Sedang 0.75
Kurang baik 0.67 Buruk 0.58
Tabel 3 : Faktor pisau Buldozer Kondisi kerja Kondisi permukaa Faktor pisau
Mudah Tidak keras/padat, tanah biasa, kadar air rendah, bahan timbunan 1.10 – 0.90 Sedang Tidak terlalu keras/padat, sedikit mengandung pasir, kerikil,
aggregate halus 0.90 – 0.70
Agak sulit Kadar air agak tinggi, mengandung tanah liat, berpasir, kering/keras 0.70 – 0.60 Sulit Batu hasil ledakan, batu belah ukuran besar 0.60 – 0.40
Tabel 4 : Faktor efisiensi alat DUMP TRUCK Kondisi kerja Efisiensi kerja
Baik 0.83 Sedang 0.80
Kurang baik 0.75 Buruk 0.70
Sumber : Lamp PAHS No. 008/BM/2010
Tabel 5 : Kecepatan Dump Truck dan Kondisi lapangan Kondisi lapangan Kondisi beban Kecepatan, V (km/h)
Datar Isi 40
Kosong 60
Menanjak Isi 20 Kosong 40
Menurun Isi 20 Kosong 40
Sumber : Lamp PAHS No. 008/BM/2010 Tabel 6 : Faktor bucket (bucket fill factor) / (Fb)
Kondisi operasi Kondisi lapangan Faktor bucket (Fb) Mudah Tanah biasa berpasir, kering 1.0 – 1.1
222
Agak sulit Tanah biasa berbatu 1.0 – 0.9 Sulit Batu pecah hasil ledakan 0.9 – 0.8
Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
Tabel 7 : Faktor Konversi Galian (Fv) nuntuk alat Excavator Kondisi galian (Kedalaman galian / kedalaman
galian maksimum) Kondisi membuang, menumpahkan (dumping) Mudah Normal Agak sulit Sulit
< 40% 0.70 0.9 1.1 1.4 (40 -75)% 0.80 1.0 1.3 1.6 >75% 0.90 1.1 1.5 1.8
Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
Tabel 8 : Faktor efisiensi kerja alat (Fa) Excavator Kondisi operasi Faktor efisiensi
Baik 0.83 Sedang 0.75
Agak kurang 0.67 Kurang 0.58
Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
Tabel 9 : Faktor efisiensi kerja alat (Fa) Motor Grader Kondisi operasi Faktor efisiensi
Perbaikan jalan, perataan 0.8 Pemindahan 0.7
Penyebaran, grading 0.6 Penggalian (trenching) 0.5
Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
Tabel 10 : Faktor bucket (bucket fill factor) / (Fb) Kondisi penumpahan Wheel loader Track loader
Mudah 1.0 – 1.1 1.0 – 1.1 Sedang 0.85 – 0.95 0.95 – 1.1
Agak sulit 0.80 – 0.85 1.0 – 0.9 Sulit 0.75 - 0.80 0.9 – 0.8
Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
223
Tabel 11 : Kecepatan, lebar pemadatan dan jumlah lintasan alat pemadat
Jenis pemadat Kecepatan rata-rata (v) km/jam
Lebar pemadatan efektif (b – b0), m Jumlah lintasan (n)
Road roller ± 2 Lebar roda total – 0.2 4 – 8 Tire roller ± 2.5 Lebar roda total – 0.3 3 – 5 Vibrating roller besar ± 1.5 Lebar roda – 0.2 4 – 12 Vibrating roller kecil Lebar roda – 0.1 Soil compactor 4 – 10 Lebar roda drive – 0.2 4 – 12 Tamper ± 1 Macadam roller Lebar roda total – 0.2 Tandem roller (Lebar sepatu x 2) – 0.2 m Buldozer Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
Tabel 12 : Kapasitas alat pada beberapa jenis bahan Jenis pemadat statis Rock fill Sand and Gravel Silt Clay
T (m) / Q (m3/jam) Vibrating plate compactor, kg
50 – 100 0.15 / 15 100 – 200 0.20 / 20 400 – 500 0.35 / 35 0.25 / 25 600 - 800 0.50 / 60 0.50 / 60 0.35 / 40 0.25 – 20
Vibrating tamper (rammer)
75 0.35 - 10 0.25 - 8 0.20 – 6 Double drum roller
600 - 800 Vibrating plate compactor
1200 - 1500 0.20 / 80 0.15 / 50 0.10 / 30 Sumber : Specification and application hand book. Contoh-contoh perhitungan kapasitas produksi 2005. Komatsu Edition 26
TABEL A1PERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAH YANG SEDERHANA(Menggunakan konsultan pengawas)
Total biaya konstruksi ( (1000 USD) Komponen konstruksi)
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 87,70 87,70 sd 89,29 89,29 sd 90,92 90,92 sd 93,18 93,18 sd 93,79
93,79sd 94,39
94, 39 sd 94,72
94,72 sd 94,97
94,97 sd 95,65
95,65 sd96,22
96,22 sd 96,83
96,83 sd 97,19
2. PERENCANAAN ( %) 7,00 7,00 sd 5,80 5,80 sd 4, 70 4,70 sd 3, 75 3, 75 sd 3,50
3,50 sd 3,25
3,25 sd 3,07
3,07 sd 2,94
2,94 sd 2,57
2,57 sd 2,25
2,25 sd 1,89
1,89 sd 1,66
3. PENGAWASAN ( %) 4,00 4,00 sd 3,70 3,70 sd 3,50 3,50 sd 2,50 2,50 sd 2,24 2,24 sd 2,00
2,00 sd 1,88
1,88 sd 1, 78
1,78 sd 1,53
1,53 sd 1,33
1,33 sd 1,14
1,14 sd 1,03
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,14
0,14 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
SIMPLE GOVERNMENT BUILDING :
* Sekolah, pasar tradisionalpuskesmas, perkantoran di
distrik,
224
TABEL A2PERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAH YANG SEDERHANA(Menggunakan konsultan manajemen konstruksi)
Total biaya konstruksi ( (1000 USD) Komponen konstruksi)
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 86,70 86,70 sd 88,36 88,36 sd 90,04 90,04 sd 92,55 92,55 sd 93,23
93,23 sd 93,89
93, 89 sd 94,25
94,25 sd 94,52
94,52 sd 95,26
95,26 sd 95,88
95,88 sd 96,54
96,54 sd 96,93
2. PERENCANAAN ( %) 7,00 7,00 sd 5,80 5,80 sd 4, 70 4,70 sd 3, 75 3, 75 sd 3,50
3,50 sd 3,25
3,25 sd 3,07
3,07 sd 2,94
2,94 sd 2,57
2,57 sd 2,25
2,25 sd 1,89
1,89 sd 1,66
3. PENGAWASAN ( %) 5,00 5,00 sd 4,63 4,63 sd 4,38 4,38 sd 3,13 3,13 sd 2,80 2,80 sd 2,50
2,50 sd 2,35
2,35 sd 2, 23
2,23 sd 1,92
1,92 sd 1,67
1,67 sd 1,43
1,43 sd 1,29
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,14
0,14 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
SIMPLE GOVERNMENT BUILDING :
* Sekolah, pasar tradisionalpuskesmas, perkantoran di
distrik,
225
TABEL B1PERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAH YANG TIDAK SEDERHANA(Menggunakan konsultan pengawas)
Total biaya konstruksi ( (1000 USD) Komponen konstruksi)
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 86,70 86,70 sd 88,29 88,29 sd 89,92 89,92 sd 92,18 92,18 sd 92,79
92,79 sd 93,39
93, 39 sd 93,72
93,72 sd 93,97
93,97 sd 94,65
94,65 sd 95,22
95,22 sd 95,81
95,81 sd 96,19
2. PERENCANAAN ( %) 7,00 7,50 sd 6,30 6,30 sd 5,20 5,20 sd 4,25 4, 25 sd 4,00
4,00 sd 3,75
3,75 sd 3,57
3,57 sd 3,44
3,44 sd 3 ,07
3,07 sd 2,75
2,75 sd 2,39
2,39 sd 2,16
3. PENGAWASAN ( %) 5,40 4,50 sd 4,20 4,620sd 4,00 4,00 sd 3,00 3,00 sd 2,74 2,74 sd 2,50
2,50 sd 2,38
2,38 sd 2, 28
2,28 sd 2,03
2,03 sd 1,83
1,83 sd 1,64
1,64 sd 1,53
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,16
0,16 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
NOT SIMPLE GOVERNMENT BUILDING :
* Kantor Kementerian, Agency
yang mempunyai instalasi
khusus antara lain, lift, IT,
building automation,
Rumah sakit pusat, Gereja,
226
TABEL B2PERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAH YANG TIDAK SEDERHANA(Menggunakan konsultan manajemen konstruksi)
Total biaya konstruksi ( (1000 USD) Komponen konstruksi)
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 85,58 85,58 sd 87,24 87,24 sd 88,92 88,92 sd 91,43 91,43 sd 92,11
92,11 sd 92,77
92, 77 sd 93,13
93,13 sd 93,40
93,40 sd 94,14
94,14 sd 94,76
94,76 sd 95,40
95,40 sd 95,81
2. PERENCANAAN ( %) 7,00 7,50 sd 6,30 6,30 sd 5,20 5,20 sd 4,25 4, 25 sd 4,00
4,00 sd 3,75
3,75 sd 3,57
3,57 sd 3,44
3,44 sd 3 ,07
3,07 sd 2,75
2,75 sd 2,39
2,39 sd 2,16
3. PENGAWASAN ( %) 5,62 5,62 sd 5,25 5,25 sd 5,00 5,00 sd 3,75 3,75 sd 3,42 3,42 sd 3,12
3,12 sd 2,97
2,97 sd 2, 85
2,85 sd 2,54
2,54 sd 2,29
2,29 sd 2,05
2,05 sd 1,91
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,16
0,16 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
NOT SIMPLE GOVERNMENT BUILDING :
* Kantor Kementerian, Agency
yang mempunyai instalasi
khusus antara lain, lift, IT,
building automation,
Rumah sakit pusat, Gereja,
227
TABEL CPERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAH YANG SPESIAL(Menggunakan manajemen konstruksi konsultan)
Total biaya konstruksi ( (1000 USD) Komponen konstruksi)
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 84,70 84,70 sd 86,39 86,39 sd 88,09 88,09 sd 90,68 90,68 sd 91,39
91,38 sd 92,06
92, 06 sd 92,43
92,43 sd 92,71
92,71 sd 93,47
93,47 sd 94,11
94,11 sd 94,76
94,76 sd 95,18
2. PERENCANAAN ( %) 8,00 8,00 sd 6,80 6,80 sd 5,70 5,70 sd 4,75 4,75 sd 4,50 4,50 sd 4,25
4,25 sd 4,07
4,07 sd 3,94
3,94 sd 3,57
3,57 sd 3,25
3,25 sd 2,89
2,89 sd 2,66
3. PENGAWASAN ( %) 6,00 6,00 sd 5,60 5,60 sd 5,33 5,33 sd 4,00 4,00 sd 3,65 3,65 sd 3,33
3,33 sd 3,17
3,17 sd 3, 04
3,04 sd 2,71
2,71 sd 2,44
2,44 sd 2,19
2,19 sd 2,04
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,16
0,16 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
SPECIAL GOVERNMENT BUILDING :
* Bangunan monumental,
bangunan yang menyangkut
pertahanan dan keamanan
negara, bangunan reaktor
atom/nuklir, lapangan terbang
international, pelabuhan
internasional
228
TABLE DPERSENTASE HARGA KOMPONEN BANGUNANBANGUNAN PEMERINTAHDENGAN DESAIN PROTOTYPE (untuk biaya s/d USD.250,000)
1 2 3 4 51. KONSTRUKSI FISIK - 91,20% - 94,20%
2. PERENCANAAN 50% x 7% 3,50% MaX 60% x 50% x 7%
2,10%
3. PENGAWASAN - 4,00% 60% x 4% 2,40%
4. MANAJEMEN PROYEK - 1,30% - 1,30%
TOTAL 100,00% 100,00%
KOMPONEN BANGUNANPERSENTASE BIAYA KOMPONEN BANGUNAN
DIKERJAKAN OLEH DIKERJAKAN OLEH PU
229
TABEL EPERSENTASE HARGA KOMPONEN BANGUNANUNTUK JALAN, JEMBATAN DAN IRIGASI(Menggunakan manajemen konstruksi konsultan)
Total Construction Cost ( (1000 USD) Construction Component
<= 600 600 - 1,200 1,200 - 2,400 2,400 - 5,0005,000 - 7,500
7,500 - 10,000
10,000 - 12,500
12,500 - 25,000
25,000 - 50,000
50,000 - 125,000
125,000 - 250,000
250,000 - 500,000
1 2 3 4 5 6 7 8 9 10 11 12 13
1. KONSTRUKSI FISIK ( %) 84,70 84,70 sd 86,39 86,39 sd 88,09 88,09 sd 90,68 90,68 sd 91,39
91,38 sd 92,06
92, 06 sd 92,43
92,43 sd 92,71
92,71 sd 93,47
93,47 sd 94,11
94,11 sd 94,76
94,76 sd 95,18
2. PERENCANAAN ( %) 8,00 8,00 sd 6,80 6,80 sd 5,70 5,70 sd 4,75 4,75 sd 4,50 4,50 sd 4,25
4,25 sd 4,07
4,07 sd 3,94
3,94 sd 3,57
3,57 sd 3,25
3,25 sd 2,89
2,89 sd 2,66
3. PENGAWASAN ( %) 6,00 6,00 sd 5,60 5,60 sd 5,33 5,33 sd 4,00 4,00 sd 3,65 3,65 sd 3,33
3,33 sd 3,17
3,17 sd 3, 04
3,04 sd 2,71
2,71 sd 2,44
2,44 sd 2,19
2,19 sd 2,04
4. MANAJEMEN PROYEK ( %) 1,30 1,30 sd 1,21 1,21 sd 0,88 0,88 sd 0,57 0,57 sd 0,47 0,47 sd 0,36
0,36 sd 0,33
0,33 sd 0,31
0,32 sd 0,25
0,25 sd 0,20
0,20 sd 0,16
0,16 sd 0,12
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100
230