Daw Khin Aye Myint Executive Engineer Engineering Department (Water & Sanitation) Yangon City Development Committee

Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Daw Khin Aye MyintExecutive Engineer

Engineering Department(Water & Sanitation)

Yangon City Development Committee

Page 2: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Organizational Set-up

Sanitation Division

Sanitation Branch (1)

Air CompressorStation

Wastewater Treatment Plant

Sanitation Branch (2)

Page 3: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Disposal of sewerage into the river without treatment before establishment of Sewage Treatment Plant

3

Page 4: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Sewerage SystemEstimated population with sewer(conventional sewer system) is 300,000 people . Main content

of system are

1) Air Compressor Station(2) Pneumatic Ejectors(3) Air Pipeline

4) Gravity sewer pipeline(5) Wastewater Treatment Plant

Wastewater treatment plantAir compressor station

Total length of sewer pipe line - (10.75) km(12"CI to 36"CI Pipe)Sewage ejectors - (35) Nos

Manholes - 2114 Nos

Page 5: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Y.C.D.C Manhole in B.D.S Area

Page 6: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

History Of Yangon City Sewerage System Establish -1888 (22 sewage ejector)

Service -for serve 40,000 people

Extension -1929(40 sewage ejector)

Service - for serve 240,000 people

Cover Area -9 sq km(3.5 sq miles) in Central Business District (CBD)

Company - HUGES & LANCASTER (ENGLAND)

- Shone Hydro – Pneumatic Ejector

Page 7: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Main Air Compressor in Botadaung Township, Sewageare driven by air compressing to Treatment Plant

◆Year of Establishment -1888 year

◆ (6) Steam Turbine Engines◆ Change of year to electrical driven -( 1962-1963) ◆(2) Electrical Air Compressors of 200 Horse power were reinstalled◆(2) Electrical Air Compressors of 120 Horse power were reinstalled◆Total land areas - 2.75 acres

Page 8: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Air Compressor Station constructed in 196310th Street Air Compressor in Lanmadaw Township, Sewage are driven by air compressing to Treatment Plant

◆Year of Establishment -(1962-1963) year

◆ (2) Electrical Air Compressors of 200 Horse power have been installed

◆ Total land areas - 0.3 acres

Page 9: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

9

Sanitation and sewerage for the Yangon City area is main responsibility of Engineering Department ( Water and Sanitation) under Yangon City Development Committee.Existing system, conventional sewerage, consists of :-

w Gravity sewers w 39 pneumatic ejector stations w Air distribution main w Two sewage force mains and

outlet

Existing Sewerage System

Page 10: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

5/28/2018

Location of Sewage

Treatment Plant

Yangon City DevelopmentCommittee started to constructwastewater treatment in June 2003by own human resources with theguidance of State Government toprotect the environment.

10

Page 11: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Year of Establishment - 12th April 2003

Year of Completion - 17th January 2005

Year of Opening ceremony - 22nd December 2006

Volume of Daily Treatable sewage - 3.25MGD

Developer - Myanmar Engineers of Yangon City Development

Committee

Cost of Project - US$ 0.96 Millions (Myanmar Kyat -2065.7

Millions)

Areas of Plant – 5.56 Acres

Page 12: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Secondary

Sedimntation Tank

Primary

Sedimentation Tank

Aeriation Tank

Sludge Digester

Sludge

Thickener

Beltpress

Chlorination

Tank

Final Effluent

Design Criteria:

Area of Plant - 5.56 acresDesign population - 300,000Daily wastewater discharge-

- 14775 m3/dayBOD influent - 600mg / lBOD effluent - 20 mg / lSuspended solid influent- 700 mg / lSuspended solid effluent- 40 mg / l

Establishment of Sewage Treatment Plant

q Detail Design q Implementation q Installation q Commissioning q Installationq Training

Programme for Sewage Treatment Project

12

Layout plan of Treatment plant

Manhole 4'× 4'× 4'

Sand Dried Tank 50’ × 50’

Sludge Collecting Tank 100’ × 50’

Page 13: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Sewage Treatment Plant

Location Plan of Sewerage

System & Sewage Treatment

Plants

South DistrictOperate (2006)W.W.T.P (Thanhlatsoon)

Sewerage System

Page 14: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Equalization Tank & Vacuum Truck

Page 15: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Equalization Tank With Pre-sedimentation & Aeration

Page 16: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Raw Wastewater

Page 17: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Auto Bar Screen

Page 18: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Grit Separator

Page 19: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Primary Sedimentation Tank

19

Page 20: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Aeration tank

Wastewater treatment plant was operated in January 2005. Waste are treated by activated sludge process with the aid of surface aerators.

20

Page 21: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Aerated waste are stored for a while to settle and supernatant effluent is discharged to the Yangon River.

Secondary Sedimentation Tank

21

Page 22: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Chlorination Tank

Page 23: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Effluent quality of treatment plant is BOD <20 mg/L and Suspended solid <40 mg/L.After operation of wastewater treatment plant, waste water from City Business Area is

treated before discharge to the Yangon river.

Effluent Waste Water

23

Page 24: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Sundried Tank

Page 25: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Sludge Collecting Tank

Page 26: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Waste Water Treatment Laboratory

Page 27: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Guideline for Waste Water Laboratory

Page 28: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

No Parameter Units

1 BOD (Biochemical Oxygen Demand ) mg/l

2 COD (Chemical Oxygen Demand mg/l

3 TSS (Total Suspended Solid ) mg/l

4 SVI (Sludge Volume Index ) mg/l

5 DSVI (Dilute Sludge Volume Index ) mg/l

6 pH ( Potential of Hydrogen Ion ) -

7 DO ( Dissolved Oxygen ) mg/l

8 TDS ( Total Dissolved Solid) mg/l

9 Turbidity NTU

10 MLSS ( Mixed Liquor Suspended Solids) ml

Measuring Parameter in the Waste Water Treatment Laboratory

Page 29: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Biochemical Oxygen Demand Measurement

Page 30: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Chemical Oxygen Demand (COD) Measurement

Page 31: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Total Suspended Solid(TSS) Measurement

Page 32: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Potential Concentration Of Hydrogen Ion(pH) Measurement

Page 33: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Turbidity Measurement

Page 34: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Total Dissolved Solid Measurement

Page 35: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

Dissolved Oxygen Measurement

Page 36: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

SEWERAGE ZONES AREA

C1 Botahtaung,Puzundaung,Kyauktada,Pebedam,

W1 Lanmadaw,Latha,Alone,a part of Kyeemyintdaing,Dagon,a part of

Bahan,a part of Kamaryut,Sanchaung

C2+E1 a part of Bahan,Mingalartaungnyunt,Yankin,Thingangyun,Tamwe,

S-Okkalapa,a part of Mayangone,N-Okkalapa,N-Dagon

W2 a part of Kamaryut,Hlaing,a part of Mayangone

E3 Taketa,Dawbon,S-Dagon

N1 Insein

E4 Dagon Seikkan

E2 East Dagon

N2 Mingalardon

N3 Shwepyithar

S1 Dala

W3 a part of Kyeemyintdaing,Seikgyi khanaungto,Seikkan

W4 Hlaing Tharyar

Zone Township

Page 37: Yangon City Development Committee · 2018-05-28  · Yangon City Development Committee started to construct wastewater treatment in June 2003 by own human resources with the guidance

THANK YOU