YOUR REF: 11NQ032 OUR REF: DA-2011-91
27 May 2011 SGS PTY LTD C/- Humphreys Reynolds Perkins North Queensland PO Box 244 MACKAY QLD 4740 Dear Sir/Madam DECISION NOTICE
Applicant: SGS PTY LTD
Proposal: Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)
Application Number: DA-2011-91 Address: 13-17 Interlink Court, PAGET QLD 4740 Property Description: Lot 15 on SP193944
Please find enclosed the above Decision Notice with the relevant attachments:
Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to Commence Use If you require any further information, please contact Matthew Ingram.
This is a Mackay Regional Council digitally signed document.
Decision Notice Sustainable Planning Act
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au
Application Number: DA-2011-91
Date of Decision: 27 May 2011
1. APPLICANT/S DETAILS
Name: SGS PTY LTD
Postal Address:
C/- Humphreys Reynolds Perkins North Queensland
PO Box 244
MACKAY QLD 4740
2. PROPERTY DETAILS
Property Address: 13-17 Interlink Court, PAGET QLD 4740
Property Description: Lot 15 on SP193944
3. OWNER’S DETAILS
Mackay Storage A Pty Ltd and Mackay Storage B Pty Ltd
PO Box 1502, FREMANTLE WA 6959
4. PROPOSAL Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)
5. DECISION TYPE
DEVELOPMENT DECISION Material Change of Use Development Permit
Pursuant to the Mackay City Planning Scheme
Approved in Full subject to Conditions
This is a Mackay Regional Council digitally signed document.
Decision Notice Sustainable Planning Act
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au
6. ASSESSMENT MANAGER’S CONDITIONS
The conditions relevant to this decision are attached to this notice. These conditions are clearly identified to indicate whether the assessment manager or a concurrence agency imposed them.
7. IDAS REFERRAL AGENCIES
It is advised that there are no Referral Agencies for this Application.
8. SUBMISSIONS
There were no properly made submissions received on this application.
9. PLANNING SCHEME
This decision is issued under the Mackay City Planning Scheme.
10. SUPERSEDED PLANNING SCHEME
Not Applicable
11. FURTHER APPROVALS REQUIRED
Operational Works - Compliance Permit (Already Lodged) Operational Works - Compliance Certificate (Access, Car Park, Landscaping, Sewer Connections) Building Works - Development Permit (Industrial Building)
12. PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME
Not Applicable
13. RELEVANT PERIOD The standard relevant period states in Section 341 of the Sustainable Planning Act apply to each aspect of development in this approval, if not stated in the conditions of approval attached.
14. APPEALS Attached is an extract from the Sustainable Planning Act which details your appeal rights and the
appeal rights of any submitters regarding this decision. 15. ASSESSMENT MANAGER SIGNATURE
Name Leah Sorohan
Position Principal Planner
Signature Date
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 1 of 8
1. Plan of Development
The approved General Industry development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.
Project Number
Title Sheet Issue Prepared by Date
10020 Site Plan A100 D Doring Design 12.05.11 10020 Ground Floor
Plan A101 D Doring Design 12.05.11
10020 Elevations/ Sections
A102 D Doring Design 12.05.11
2. Maintenance of Development
Maintain the approved development (including landscaping, carparking, driveways and other external spaces) in accordance with the approved drawing(s) and/or documents, and any relevant Council engineering or other approval required by the conditions.
3. Conflict between plans and written conditions
Where a discrepancy or conflict exists between the written condition(s) of the approval and the approved plans, the requirements of the written condition(s) will prevail.
4. Notice of Intention to Commence the Use
Prior to the commencement of the use on the site, written notice must be given to Council that the use (development and/or works) fully complies with the decision notice issued in respect of the use (please see attached notice for your completion).
5. Parkland Contribution
A parkland contribution must be paid in accordance with the Council’s Policy on Developer Contributions for Parkland.
6. Transport Network Contributions
A transport network contribution must be paid in accordance with Councils Policy on Transport Network Contributions.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 2 of 8
7. Stormwater Drainage Contributions
A stormwater drainage contribution must be paid in accordance with the Council’s Policy stormwater drainage contributions policy.
8. Contributions Payment Timing
All contributions and charges must be paid prior to the date of issue of the Development Permit for Building Works at the rate applicable at the time of payment.
9. Acid Sulphate Soils
The proposed works and development may trigger the application and implementation of State Planning Policy 2/02: Planning and Managing Development in Acid Sulphate Soils. Consequently, a site Based Acid Sulphate Soil Management Plan may be required if any of the applicable requirements are triggered. Should this be the case, the management plan must be prepared by a suitably qualified professional and submitted to Council for approval at the time of submission of the Operational Works Application.
10. Invert Crossing
An invert crossing must be constructed in accordance with Council’s Standard Drawing No. PA3-773 and Council’s Policy 024 for access to Interlink Court.
11. Damage
Any damage which is caused to Council’s infrastructure as a result of the proposed development must be repaired immediately.
12. Compliance with Council Standards
All design and construction for the development must be in accordance with Council’s Policies, Engineering Design Guidelines, Standard drawings and standard specifications.
13. Electricity and Telecommunications Services
The approved development must be provided with electricity and telecommunications infrastructure.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 3 of 8
14. Lawful Point of Discharge
Downstream drainage to a lawful and practical point of discharge which has been nominated as stormwater pit 1/1 as shown on the attached annotated Council A3-4529 drawing.
15. Stormwater Drainage
Stormwater from the site (including roofwater) shall be collected within the property boundaries and discharged via an underground system to Council’s stormwater system.
16. Ponding and Diversion of Stormwater
Ponding of stormwater resulting from the development must not occur on adjacent sites and stormwater formerly flowing onto the site must not be diverted onto other sites. The site shall be graded so that it is free draining.
17. Site Based Stormwater Management Plan - High Risk
Council’s Stormwater Quality Risk Classification has classified this development as “High Risk” as defined Mackay City Council’s Engineering Design Guidelines - Soil and Water Quality Management – Planning Scheme Policy No. 15.07.
The SBSMP must be submitted to Council for approval at the time of to submission of the Operational Works applications.
18. Stormwater Quality Improvement Device
Provide a Stormwater Quality Improvement Device (SQID) in the form of a Bio-Retention Basin with a filter media area of at least 112m². All stormwater runoff from the site must pass through this basin.
19. Direct Pumping from Mackay Water’s Reticulation System
Pumping direct from Council water mains for potable or fire fighting supply is not permitted.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 4 of 8
20. Connection to Sewer Services
The sanitary drainage system must discharge to the discharge point shown on the annotated Council A3-4540 drawing. (as attached).
21. Sewers Policy
All building work is to comply with Council’s Policy MW02 – “Building Over and Adjacent to Sewers”.
22. Connection to Water Services
The development must connect to the water service shown on the annotated Council A3-4540 drawing. (as attached).
23. Live Connections
Mackay Water is to carry out all water connection and live sewer work at the developer’s expense.
24. Floor Level
The minimum habitable floor level of the proposed development must be the higher of:
300mm above the Q100 flood level (Q100 flood level = RL 5.62m AHD); 300 mm above the top of kerb; 300 mm above the crown of the road; 225 mm above ground level; or a level which allows the connection of all sanitary fixtures to the designated
sewer connection point by means of sanitary drainage which complies with AS3500.
25. Landscape Plan Required
A detailed site and footpath landscaping plan must be prepared by a qualified Landscape Designer and must be submitted with Operational Works Approval application. The plan must show for all areas identified on the approved plan of development the following:
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 5 of 8
Landscape specification of sufficient detail so that landscape works are to be carried out;
Plant schedule detailing number of plants, species, pot size and height at planting;
Details of soil and mulch types, including depths, areas of turf, garden edges and paving finishes; and
the details of the irrigation system.
Any proposed landscaped works within Council’s Road Reserve must comply with Planning Scheme Policy No.11 – Landscaping.
26. Completion of Landscaping
All of the landscaping works shown on the approved plan must be completed before the development is occupied.
27. Minimum Car Parking Spaces
The car parking area must be constructed, sealed, linemarked and drained for a minimum of 83 car parking spaces in accordance with the approved plan and maintained thereafter. The carparking classification is Class 1 for internal parking and is to be designed in accordance with Australian Standard AS/NZS2890.1 – 2004 – Off street parking. All car parking spaces and isle widths shall be accessible by B99 design vehicles.
28. Disabled Car Parking Space
The car parks designated for disabled persons are to comply with Australian Standard AS/NZ2890.6 – 2009 – Part 6 - Off Street for People with Disabilities.
29. Protection of Landscape areas from Carparking
The landscaped areas adjoining the car parking area must be protected from vehicles by a 125 mm high vertical concrete kerb or similar obstruction.
30. Loading /unloading
The loading and unloading of vehicles and the delivery of goods to and from the premises must at all times be undertaken entirely within the site and be so conducted as to cause minimum interference with other vehicular traffic.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 6 of 8
31. Use of Car Parking areas
The areas set aside for parking, vehicle manoeuvring and loading and unloading, must not be used for the storage or placement of goods or materials.
32. Fencing
Security fencing along the front boundary (if any) is to be constructed of a visually appealing material other than plain chain wire fencing. Minimum acceptable material is coloured/Powder coated chain wire fencing.
33. Aesthetic Screening
The outdoor storage of any equipment or material and any service area must be aesthetically screened so as not to be visible from any road to which the site has frontage
34. Compliance with Conditions
All conditions must be complied with prior to the occupancy of the building for the approved use, unless specified in an individual condition.
ASSESSMENT MANAGER’S ADVICE
1. Local Laws
The approved development must also comply with Council’s Local Laws under the Local Government Act 1993 from time and other controls.
2. Hours of Work
It is the applicant/owner’s responsibility to ensure compliance with Section 440R of the Environmental Protection Act 1994, which prohibits any construction, building and earthworks activities likely to cause audible noise (including the entry and departure of heavy vehicles) between the hours of 6:30pm and 6:30am from Monday to Saturday and at all times on Sundays or Public Holidays.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 7 of 8
3. Dust Control
It is the applicant/owner’s responsibility to ensure compliance with Section 319 General Environmental Duty of the Environmental Protection Act 1994, which prohibits unlawful environmental nuisance caused by dust, ash, fumes, light, odour or smoke beyond the boundaries of the property during all stages of the development including earthworks and construction.
4. Sedimentation Control
It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3C of the Environmental Protection Act 1994 to prevent soil erosion and contamination of the stormwater drainage system and waterways.
5. Noise During Construction and Noise in General
It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3B of the Environmental Protection Act 1994.
6. General Safety of Public During Construction
It is the principal contractor’s responsibility to ensure compliance with Section 31 of the Workplace Health and Safety Act 1995. Section 31(1)(c) states that the principal contractor is obliged on a construction workplace to ensure that work activities at the workplace are safe and without risk of injury or illness to members of the public at or near the workplace.
It is the responsibility of the person in control of the workplace to ensure compliance with Section 30 of the Workplace Health and Safety Act 1995. Section 31(1)(c) states that the person in control of the workplace is obliged to ensure there is appropriate, safe access to and from the workplace for persons other than the person’s workers.
7. Contaminated Land
It is strictly the applicant/owner’s responsibility to source information regarding contaminated land from the Environmental Protection Agency, Contaminated Land Section as Council has not conducted detailed studies and does not hold detailed information pertaining to contaminated land.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD
Decision Date: 27 May 2011
Page 8 of 8
8. Summary of Developer Contributions as at date of approval.
Note: Contributions paid at the time nominated in the relevant condition will be re-calculated at current applicable rate, at that time.
Infrastructure Catchment Number of Units/ET’s/
EP’s/VPD Parks Paget 9.62EP Stormwater Drainage Network
Bakers Creek South West Mackay Main Drain
90% of 0.609ha*
Transport Network Mackay 217.35vpd *A credit towards the applicable stormwater contribution of $24,082 per impervious hectare applies to the site. This figure is correct as of May 2011 and the amount owingat this date is $25,601. In order to calculate the quantum of the contribution at the time of payment, please refer to Council’s website for the indexed Policy Contribution rates.
This is a Mackay Regional Council digitally signed document.
01
A102
01
A102
10° 7°
10°
02
A102
02
A102
TRANFORMER AREAFOR ERGON (3m X 3m)
83 CARPARKS
2500
5500
7000
5500
5500
7000
5450
7400
3000
INTE
RLIN
K CT
LANDS
CAPIN
G
CONCRETEPATH
BOUNDARY 101.43 m
BO
UN
DA
RY
60.0
5 m
BOUNDARY 101.40 m
BO
UN
DA
RY
60.0
5 m
LANDS
CAPIN
G
1 2 3 4 5 6 7 8 9 10
BALCONY AND ROOFOVER CARPARKS
11 12 13 14 15 16 18 19
21 22
17
24 25 26 29 30 31 32 332823 27 34 35 36 37 38 39 40
DESIGN LARGE RIGID TRUCKMinimium Turning Circle : 21.65m
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83
2m WIDE X 76m BIO-RETENTION AREA
62SCREENEDGARBAGEREFUSEAREA
3000
LANDSCAPING AREA131.75m2
10°
LANDSCAPING AREA309.55m2
1200mm WIDE CONC. PATH
1200
1200mm WIDE CONC. PATH
LANDSCAPING AREA
LANDSCAPING AREA98.58m2
WALL UNDER
WALLUNDER
WALLUNDER
LANDSCAPING AREA79.74m2
6000
20
41
COPYRIGHT 2011C
@A1
client\
status\ description\
address\
scale\
issue date\
sheet\
project no\m/ 0404 755250
p/ po box 3387
merewether nsw 2291
residential commercial industrial
consultants\
issuedate desciption
issue\
30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A
DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855
TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577
14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D
LOT 15, 13 INTERLINK CT, PAGET, QLD,4740
As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING
12.05.11
DEVELOPMENT APPLICATION
10020
A100
view to entry view from road view from carpark
1 : 200A100Site Plan1
Area ScheduleName Area Carparking Req
GROUND FLOOR TESTING FACILITY 1128 m²GROUND FLOOR WAREHOUSE 1425 m²UPPER FLOOR PALLET STORAGE 375 m²UPPER FLOOR TRAINING 500 m²Grand total 3428 m²
aerial view of site
subject site
1128/100 =11.3
Site Area = 6090m2Landscaping Area = 619.6m2 which is 10.2% of the site area
1425/100 =14.3
1 space /employee/student = 40
(69.4) 70 CARPARKS REQUIRED
83 CARPARKS PROVIDED
375/100 =3.8
This is a Mackay Regional Council digitally signed document.
UP
UP
01
A102
01
A102
279 m²open office
290 94910
WAREHOUSE
83 CARPARKS
BOUNDARY 101.40 mB
OU
ND
AR
Y60
.05
m
BOUNDARY 101.43 m
BO
UN
DA
RY
60.0
5 m
7400
26125 3000
61060
53750
STAX ATHEIGHTS
71 m²furnace
445 m²lab
reception
48 m²lunch
51 m²coking
107 m²shipping area
62 m²float sink
71 m²crushing
80 m²cool room
40 m
²A
RD
150 m²wet area
57 m²drying
12 m²office 01
12 m²office 02
15 m²office 03
14 m²office 04
14 m²office 05
15 m
²ro
adw
ay
dus
t
36 m²D04
2/D02DRY SIZE
DRY SIZE
DRY SIZE
DRYTUMBLE
13 m²prep sup.
12 m²xray
32 m²drop shatter
18 m²lab super
39 m²meeting
47 m²petrolab
printer
kitchenettelive samplesbalance bench
fume cupboard phos AA
18 m²archive
male female
58 m²gas bottle storage
2521
5500
7000
5500
5500
7000
5450
MEZZANINE OVER
18 m²petro prep
envi room
02
A102
02
A102
06
04
02
6780
5526
6000
1800
0101
A B C
5200 5120 5120 4210 6595 5180 5570
D E F G H I J K L
6009 6009 6009 6096
M N
13138 13225
03
05
07
08
09
10
11
12
EQEQ
EQEQ
EQEQ
EQEQ
1200
4401
1200
2m WIDE X 76m BIO-RETENTION AREA
3000
DRUM
STORAGE
(CONC)
01
A102
01
A102
FIREEXIT
129 m²
OUTDOOR
BREAKOUT
server/store
office 01office 02 office 03
reception
training room 01
training room 03
375 m²mezzanine pallet
02
A102
02
A102
06
04
02
01
G H I J K L5570 6009 6009 6009 6096 M N13138 13225
training room 02
breakout
COPYRIGHT 2011C
@A1
client\
status\ description\
address\
scale\
issue date\
sheet\
project no\m/ 0404 755250
p/ po box 3387
merewether nsw 2291
residential commercial industrial
consultants\
issuedate desciption
issue\
30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A
DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855
TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577
14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D
LOT 15, 13 INTERLINK CT, PAGET, QLD,4740
As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING
12.05.11
DEVELOPMENT APPLICATION
10020
A101 1 : 200A101Ground Floor Plan1
1 : 200A101Upper Floor Plan2
This is a Mackay Regional Council digitally signed document.
RLGround Floor Level10000
RLGround Ceiling Level12550
RLUpper Ceiling Level15850
2700
600255
0
POWDERCOATEDMETAL LOUVRES
PAINT FINISH TOCONCRETE TILT-UPPANELS
COLORBOND KLIPLOKROOF SHEETING
010305070809101112
RLGround Floor Level10000
RLGround Floor Level
10000
RLGround Ceiling Level
12550RL
Upper Floor Level13150
RLUpper Ceiling Level15850
POWDERCOATEDMETAL LOUVRES
PAINT FINISH TOCONCRETE TILT-UPPANELS
CORPORATE SIGNAGEFIXED TO WALL
METAL FRAMEDWINDOWS
COLORBOND CUSTOMORBROOF SHEETING
HORIZONTAL METALSUN SCREEN
ABCDEFGHIJKLMN
RLGround Floor Level
10000
RLGround Ceiling Level
12550RL
Upper Floor Level13150
RLUpper Ceiling Level
15850
POWDERCOATEDMETAL LOUVRES
PAINT FINISH TOCONCRETE TILT-UPPANELS
CORPORATE SIGNAGEFIXED TO WALL
METAL FRAMEDWINDOWS
A B C D E F G H I J K L M N
RLGround Floor Level
10000
RLUpper Floor Level
13150
RLUpper Ceiling Level
15850
2700
600255
0
5850
POWDERCOATEDMETAL LOUVRES
PAINT FINISH TOCONCRETE TILT-UPPANELS
CORPORATE SIGNAGEFIXED TO WALL
METAL FRAMEDWINDOWS
HORIZONTAL METALSUN SCREEN
CORPORATE SIGNAGEFIXED TO WALL
06040201 07 08 09 10 11 12
RLGround Floor Level
10000
RLGround Ceiling Level
12550RL
Upper Floor Level13150
RLUpper Ceiling Level
15850mezzanine pallet
WAREHOUSE
POWDERCOATEDMETAL LOUVRES
PAINT FINISH TOCONCRETE TILT-UPPANELS
STEEL RAFTERS TOENGINEERS FUTURE DETAIL
COLORBOND KLIPLOKROOF SHEETING
R.CONC. SLABTO ENGINEERSFUTURE DETAIL
A B C D E F G H I J K L M N
RLGround Floor Level
10000
RLUpper Floor Level
13150
RLUpper Ceiling Level
15850
lab
2700
600255
0
PAINT FINISH TOCONCRETE TILT-UPPANELS
STEEL TRUSSES TOENGINEERS FUTURE DETAIL
COLORBOND CUSTOMORBROOF SHEETING
R.CONC. SLABTO ENGINEERSFUTURE DETAIL
06040201 07 08 09 10 11 12
WALL
8100
SCREENEDGARBAGE AREA
office 01 server/store femaleOUTDOOR
BREAKOUT
7°
COPYRIGHT 2011C
@A1
client\
status\ description\
address\
scale\
issue date\
sheet\
project no\m/ 0404 755250
p/ po box 3387
merewether nsw 2291
residential commercial industrial
consultants\
issuedate desciption
issue\
30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A
DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855
TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577
14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D
LOT 15, 13 INTERLINK CT, PAGET, QLD,4740
As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING
12.05.11
DEVELOPMENT APPLICATION
10020
A102
1 : 200A102East Elevation1
1 : 200A102North Elevation2
1 : 200A102South Elevation3
1 : 200A102West Elevation4
1 : 200A102Section 101
1 : 200A102Section 202
This is a Mackay Regional Council digitally signed document.
This is a Mackay Regional Council digitally signed document.
This is a Mackay Regional Council digitally signed document.
Decision Notice Sustainable Planning Act
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au
Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court: Division 8 – Appeals to court relating to development applications 1) An applicant for a development application may appeal to the court against any of the following - (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c), or (d) must be started within 20 business days (the applicant’s appeal period) after- (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise-the day a decision notice was required to be given to the applicant.
462 Appeals by submitters - General (1) A submitter for a development application may appeal to the court only against- (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327 (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following- (a) the giving of a development approval; (b) any provision of the approval including- (i) a condition of, or lack of condition for, the approval; or (ii)the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter- (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii) (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.
463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to- (a) if the prescribed concurrence agency is the chief executive (fisheries)-development that is- (i)a material change of use of premises for aquaculture; or (ii)operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment- (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2)
464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about- (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.
This is a Mackay Regional Council digitally signed document.
Decision Notice Sustainable Planning Act
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au
NOTICE OF INTENTION TO COMMENCE USE
Planning Approval DA-2011-91
Date of Approval 27-May-2011
Approved Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)
Location 13-17 Interlink Court, PAGET QLD 4740
Property Description Lot 15 on SP193944 I am hereby notifying you of my intention to commence the approved use on ______________________________ (insert date). I have read the conditions of the above Decision Notice and believe that all the applicable conditions have been complied with. Applicant: SGS PTY LTD Address: C/- Humphreys Reynolds Perkins North Queensland, PO Box 244, MACKAY QLD 4740
_________________________________________ Signature of Applicant Date: ______________
This is a Mackay Regional Council digitally signed document.