CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO Página 1 DISEÑO DE ZAPATA CONECTADA Diseñar la zapata conectada que soportara las columnas mostradas en la figura . La capacidad portante admisible del suelo es qa = 1.90 Kg/cm2. Considere Fy = 4200 kg/cm2 , f'c = 210 kg/cm2 para la cimentación. DATOS * qa = 1.90 Kg/cm2 * Df = 1.20 m * 1.60 Tn/m3 * S/C = 0.20 Tn/m2 * 2.40 Tn/m3 * L = 7.60 m * f'c = 210 Kg/cm2 * Fy = 4200 Kg/cm2 CARGAS MOMENTOS PD = 36.00 Ton MD = 5.00 Ton/m PL = 27.00 Ton ML = 2.00 Ton/m PE (--->) = -15.00 Ton ME (--->) = -7.00 Ton/m PE (<---) = 15.00 Ton ME (<---) = 7.00 Ton/m SECCIÓN 30 x 30 cm CARGAS MOMENTOS PD = 54.00 Ton MD = 2.00 Ton/m PL = 50.00 Ton ML = 1.00 Ton/m PE (--->) = 10.00 Ton ME (--->) = 5.00 Ton/m PE (<---) = 10.00 Ton ME (<---) = -5.00 Ton/m SECCIÓN 40 x 40 cm A) CARGAS DE GRAVEDAD: * P1 = 63.00 Ton * M1 = 7.00 Ton/m * P2 = 104.00 Ton * M2 = 3.00 Ton/m * R = 167.00 Ton A.1) Dimensiones de la Viga: * h (m) = L = 1.086 m 7 * h b (m) = P1 = 2 31 x L * bo = 45 cm ho = ¿? bo x ho3 = b x h3 ho = 0.91 = USAR VIGA: 45 x 90 cm comprobar h = 2 A.2) Dimensión Preliminar de la Zapata Exterior e Interior: PRESIÓN NETA DEL SUELO qn = 16.40 Tn / m2 ÁREA DE LA ZAPATA EXTERIOR: 1.2 * P1 qn ɤ relleno = ɤ concreto = COLUMNA 1 COLUMNA 2 1.- DIMENSIONAMIENTO EN PLANTA: b b ≥ Az 1 =

zapatas-2

Embed Size (px)

DESCRIPTION

cimentaciones

Citation preview

Page 1: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 1

DISEÑO DE ZAPATA CONECTADA

Diseñar la zapata conectada que soportara las columnas mostradas en la figura . La capacidad portante admisible del suelo es qa = 1.90 Kg/cm2.

Considere Fy = 4200 kg/cm2 , f'c = 210 kg/cm2 para la cimentación.

DATOS

* qa = 1.90 Kg/cm2

* Df = 1.20 m

* 1.60 Tn/m3

* S/C = 0.20 Tn/m2

* 2.40 Tn/m3

* L = 7.60 m

* f'c = 210 Kg/cm2

* Fy = 4200 Kg/cm2

CARGAS MOMENTOS

PD = 36.00 Ton MD = 5.00 Ton/m

PL = 27.00 Ton ML = 2.00 Ton/m

PE (--->) = -15.00 Ton ME (--->) = -7.00 Ton/m

PE (<---) = 15.00 Ton ME (<---) = 7.00 Ton/m

SECCIÓN 30 x 30 cm

CARGAS MOMENTOS

PD = 54.00 Ton MD = 2.00 Ton/m

PL = 50.00 Ton ML = 1.00 Ton/m

PE (--->) = 10.00 Ton ME (--->) = 5.00 Ton/m

PE (<---) = 10.00 Ton ME (<---) = -5.00 Ton/m

SECCIÓN 40 x 40 cm

A) CARGAS DE GRAVEDAD:

* P1 = 63.00 Ton

* M1 = 7.00 Ton/m

* P2 = 104.00 Ton

* M2 = 3.00 Ton/m

* R = 167.00 Ton

A.1) Dimensiones de la Viga:

* h (m) =L

= 1.086 m7

*h

b (m) = P1

=2 31 x L

* bo = 45 cm ho = ¿?

bo x ho3 = b x h3 ho = 0.91 =

USAR VIGA:

45 x 90 cm

comprobar h=

2

A.2) Dimensión Preliminar de la Zapata Exterior e Interior:

PRESIÓN NETA DEL SUELO qn = 16.40 Tn / m2

ÁREA DE LA ZAPATA EXTERIOR: 1.2 * P1

qn

ɤ relleno =

ɤ concreto =

COLUMNA 1

COLUMNA 2

1.- DIMENSIONAMIENTO EN PLANTA:

b ≥

b ≥

Az 1 =

Page 2: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 2

CONSIDERAR:

* T = 2S

S x T =

2S^2 = 4.61

S = 1.50 m

* W u = 0.97 Ton / m

BRAZO PALANCA:

* lv =* Pv =* =

* =

=

* Fy =

=

ZAPATA EXTERIOR ZAPATA INTERIOR

R 1= 4.46 m2 *

R 2

qn qn

* S = 1.50 m * B =

* 2.97 m * B x L =

T = 3.00 m B^2 =

* σ1 = 16.25 Tn / m2 B = L =

* σ2 = 16.25

σ1 ≤ qn

σ2

Cumple

B) CARGAS DE GRAVEDAD + SISMO (-->):

PRESIÓN NETA DEL SUELO qn = 22.67 Tn / m2

* P1 = 51.00 Ton

* M1 = 1.40 Ton/m

* P2 = 112.00 Ton

* M2 = 7.00 Ton/m

* R = 163.00 Ton

* = 0

= 58.74 Ton

* Fy = 0

COMPROBACIÓN DE ESFUERZOS

Az 1

X PV

∑ M2

R 1

R 2

R 2

Az 1 = Az 2 =

T ≥

∑ M2

R 1

Page 3: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 3

= 111.99 Ton

* σ1 = 13.05

* σ2 = 17.92

Cumple

B) CARGAS DE GRAVEDAD + SISMO (<--):

PRESIÓN NETA DEL SUELO qn = 22.67 Tn / m2

* P1 = 75.00 Ton

* M1 = 12.60 Ton/m

* P2 = 112.00 Ton

* M2 = -1.00 = 1.00 Ton/m

* R = 187.00 Ton

* = 0

= 87.54 Ton

* Fy = 0

COMPROBACIÓN DE ESFUERZOS

= 101.96 Ton

* σ1 = 19.45

* σ2 = 16.31

Cumple

2.1.) COMBINACIÓN:U = 1.4 D + 1.7 L

* PU 1 = 96.30 Ton

* MU 1 = 10.40 Ton/m

* PU 2 = 160.60 Ton

* MU 2 = 4.50 Ton/m

* PU v = 10.82 Ton

* WU v = 1.36 Ton / m

* ∑ M2 = 0

R 1 = 111.23 Ton

* WNU 1 = 74.15 Ton / m

* Fy = 0

R 2 = 156.49 Ton WNU 2 =

R 2 ≤ P 2

Cumple

* Fuerzas Cortantes y Momentos Flectores:

0.00 ≤ X ≤ 0.15

◊ 74.15 x X ( m ) = 0.00

◊ 72.79 x 0.00

◊ 36.40 x ^ 2 0.00

0.15 ≤ X ≤ 1.50

◊ VU x = 72.79 x - 96.30

◊ MU x = 36.40 x ^ 2 - 96.30 ( x - 0.15 ) -

X ( m ) = 0.15 1.50

VU x (Ton) = -85.38 12.89

R 2

R 2 P 2

∑ M2

R 1

R 2

R 2 P 2

2.- DISEÑO DE VIGA DE CONEXIÓN:

WU x =

VU x = VU x (Ton) =

MU x = MU x (Ton /m) =

Page 4: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 4

MU x (Ton /m) = -9.58 -58.51

* Momento Máximo :

VU x = 72.79 x - 96.30

0 = 72.79 x - 96.30

96.30 = 72.79 x

1.32 = x

1.50 ≤ X ≤ 6.50

◊ VU x = 109.19 - 96.30 - 1.36 ( x -

◊ MU x = 109.19 ( x ) - 96.30 ( x - 0.15

- 0.68 ( x - 1.50 ) ^ 2

X ( m ) = 1.50 6.50

VU x (Ton) = 12.89 6.09

MU x (Ton /m) = 23.38 70.82

6.50 ≤ X ≤ 7.75

◊ VU x = 109.19 - 96.30 - 1.36 ( x -

+ 62.59 ( x - 6.50 )

◊ MU x = 109.19 ( x - 0.15 ) - 96.30

- 10.40 - 0.68 ( x - 1.50

31.30 ( x - 6.50 ) ^ 2

X ( m ) = 6.50 7.75

VU x (Ton) = 6.09 82.63

MU x (Ton /m) = 70.82 109.89

7.75 ≤ X ≤ 9.00

◊ VU x = 109.19 - 96.30 - 1.36 ( x -

+ 62.59 ( x - 6.50 ) - 160.60

◊ MU x = 109.19 ( x - 0.15 ) - 96.30

- 10.40 - 0.68 ( x - 1.50

31.30 ( x - 6.50 ) ^ 2 + 4.50

X ( m ) = 7.75 9.00

VU x (Ton) = -77.97 0.27

MU x (Ton /m) = -86.36 -135.99

M máximo =

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

DIAGRAMA DE CORTANTES / U = 1.4 D + 1.7 L

Page 5: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 5

2.2.) COMBINACIÓN:U = 1.25 (D + L) + E (-->)

* PU 1 = 63.75 Ton

* MU 1 = 1.75 Ton/m

* PU 2 = 140.00 Ton

* MU 2 = 8.75 Ton/m

* PU v = 9.66 Ton

* WU v = 1.22 Ton / m

* ∑ M2 = 0

R 1 = 73.42 Ton

* WNU 1 = 48.95 Ton / m

* Fy = 0

R 2 = 139.99 Ton WNU 2 =

R 2 ≤ P 2

Cumple

* Fuerzas Cortantes y Momentos Flectores:

0.00 ≤ X ≤ 0.15

◊ 48.95 x X ( m ) = 0.00

◊ 47.73 x 0.00

◊ 23.87 x ^ 2 0.00

0.15 ≤ X ≤ 1.50

◊ VU x = 47.73 x - 63.75

◊ MU x = 23.87 x ^ 2 - 63.75 ( x - 0.15 ) -

X ( m ) = 0.15 1.50

VU x (Ton) = -56.59 7.85

MU x (Ton /m) = -1.21 -34.11

* Momento Máximo :

VU x = 47.73 x - 63.75

0 = 47.73 x - 63.75

63.75 = 47.73 x

1.34 = x

1.50 ≤ X ≤ 6.50

◊ VU x = 71.60 - 63.75 - 1.22 ( x -

◊ MU x = 71.60 ( x ) - 63.75 ( x - 0.15

- 0.61 ( x - 1.50 ) ^ 2

WU x =

VU x = VU x (Ton) =

MU x = MU x (Ton /m) =

M máximo =

Page 6: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 6

X ( m ) = 1.50 6.50

VU x (Ton) = 7.85 1.78

MU x (Ton /m) = -24.35 -163.04

6.50 ≤ X ≤ 7.75

◊ VU x = 71.60 - 63.75 - 1.22 ( x -

+ 55.99 ( x - 6.50 )

◊ MU x = 71.60 ( x - 0.15 ) - 63.75

- 1.75 - 0.61 ( x - 1.50

28.00 ( x - 6.50 ) ^ 2

X ( m ) = 6.50 7.75

VU x (Ton) = 1.05 70.25

MU x (Ton /m) = 43.66 77.93

7.75 ≤ X ≤ 9.00

◊ VU x = 71.60 - 63.75 - 1.22 ( x -

+ 55.99 ( x - 6.50 ) - 140.00

◊ MU x = 71.60 ( x - 0.15 ) - 63.75

- 1.75 - 0.61 ( x - 1.50

28.00 ( x - 6.50 ) ^ 2 + 8.75

X ( m ) = 7.75 9.00

VU x (Ton) = -70.66 0.24

MU x (Ton /m) = -88.32 -132.71

2.3.) COMBINACIÓN:U = 1.25 (D + L) + E (<--)

* PU 1 = 93.75 Ton

* MU 1 = 15.75 Ton/m

* PU 2 = 140.00 Ton

* MU 2 = 1.25 Ton/m

* PU v = 9.66 Ton

* WU v = 1.22 Ton / m

* ∑ M2 = 0

R 1 = 109.07 Ton

* WNU 1 = 72.71 Ton / m

* Fy = 0

R 2 = 134.34 Ton WNU 2 =

R 2 ≤ P 2

Cumple

* Fuerzas Cortantes y Momentos Flectores:

0.00 ≤ X ≤ 0.15

◊ 72.71 x X ( m ) = 0.00

◊ 71.50 x 0.00

◊ 35.75 x ^ 2 0.00

0.15 ≤ X ≤ 1.50

WU x =

VU x = VU x (Ton) =

MU x = MU x (Ton /m) =

Page 7: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 7

◊ VU x = 71.50 x - 93.75

◊ MU x = 35.75 x ^ 2 - 93.75 ( x - 0.15 ) -

X ( m ) = 0.15 1.50

VU x (Ton) = -83.03 13.49

MU x (Ton /m) = -14.95 -61.88

* Momento Máximo :

VU x = 71.50 x - 93.75

0 = 71.50 x - 93.75

93.75 = 71.50 x

1.31 = x

1.50 ≤ X ≤ 6.50

◊ VU x = 107.24 - 93.75 - 1.22 ( x -

◊ MU x = 107.24 ( x ) - 93.75 ( x - 0.15

- 0.61 ( x - 1.50 ) ^ 2

X ( m ) = 1.50 6.50

VU x (Ton) = 13.49 7.42

MU x (Ton /m) = 15.11 54.64

6.50 ≤ X ≤ 7.75

◊ VU x = 107.24 - 93.75 - 1.22 ( x -

+ 53.74 ( x - 6.50 )

◊ MU x = 107.24 ( x - 0.15 ) - 93.75

- 15.75 - 0.61 ( x - 1.50

26.87 ( x - 6.50 ) ^ 2

X ( m ) = 6.50 7.75

VU x (Ton) = 6.69 73.07

MU x (Ton /m) = 70.83 105.05

7.75 ≤ X ≤ 9.00

◊ VU x = 107.24 - 93.75 - 1.22 ( x -

+ 53.74 ( x - 6.50 ) - 140.00

◊ MU x = 107.24 ( x - 0.15 ) - 93.75

- 15.75 - 0.61 ( x - 1.50

26.87 ( x - 6.50 ) ^ 2 - 1.25

X ( m ) = 7.75 9.00

VU x (Ton) = -67.83 0.24

MU x (Ton /m) = -71.20 -113.82

2.4.) COMBINACIÓN:U = 0.90 (D ) + E (-->)

* PU 1 = 17.40 Ton

* MU 1 = 2.50 Ton/m

* PU 2 = 58.60 Ton

* MU 2 = 6.80 Ton/m

* PU v = 6.95 Ton

* WU v = 0.87 Ton / m

* ∑ M2 = 0

R 1 = 23.26 Ton

M máximo =

Page 8: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 8

* WNU 1 = 15.50 Ton / m

* Fy = 0

R 2 = 59.70 Ton WNU 2 =

* Fuerzas Cortantes y Momentos Flectores:

0.00 ≤ X ≤ 0.15

◊ 15.50 x X ( m ) = 0.00

◊ 14.63 x 0.00

◊ 7.31 x ^ 2 0.00

0.15 ≤ X ≤ 1.50

◊ VU x = 14.63 x - 17.40

◊ MU x = 7.31 x ^ 2 - 17.40 ( x - 0.15 ) -

X ( m ) = 0.15 1.50

VU x (Ton) = -15.21 4.54

MU x (Ton /m) = -2.34 -9.53

* Momento Máximo :

VU x = 14.63 x - 17.40

0 = 14.63 x - 17.40

17.40 = 14.63 x

1.19 = x

1.50 ≤ X ≤ 6.50

◊ VU x = 21.94 - 17.40 - 0.87 ( x -

◊ MU x = 21.94 ( x ) - 17.40 ( x - 0.15

- 0.44 ( x - 1.50 ) ^ 2

X ( m ) = 1.50 6.50

VU x (Ton) = 4.54 0.17

MU x (Ton /m) = -99.59 -482.30

6.50 ≤ X ≤ 7.75

◊ VU x = 21.94 - 17.40 - 0.87 ( x -

+ 23.88 ( x - 6.50 )

◊ MU x = 21.94 ( x - 0.15 ) - 17.40

- 2.50 - 0.44 ( x - 1.50

11.94 ( x - 6.50 ) ^ 2

X ( m ) = 6.50 7.75

VU x (Ton) = -2.26 28.93

MU x (Ton /m) = 18.71 33.60

7.75 ≤ X ≤ 9.00

◊ VU x = 21.94 - 17.40 - 0.87 ( x -

+ 23.88 ( x - 6.50 ) - 58.60

◊ MU x = 21.94 ( x - 0.15 ) - 17.40

- 2.50 - 0.44 ( x - 1.50

11.94 ( x - 6.50 ) ^ 2 - 6.80

X ( m ) = 7.75 9.00

WU x =

VU x = VU x (Ton) =

MU x = MU x (Ton /m) =

M máximo =

Page 9: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 9

VU x (Ton) = -32.71 0.17

MU x (Ton /m) = -46.45 -65.57

2.5.) COMBINACIÓN:U = 0.90 (D ) + E (<--)

* PU 1 = 47.40 Ton

* MU 1 = 11.50 Ton/m

* PU 2 = 58.60 Ton

* MU 2 = 3.20 Ton/m

* PU v = 6.95 Ton

* WU v = 0.87 Ton / m

* ∑ M2 = 0

R 1 = 56.40 Ton

* WNU 1 = 37.60 Ton / m

* Fy = 0

R 2 = 56.56 Ton WNU 2 =

R 2 ≤ P 2

Cumple

* Fuerzas Cortantes y Momentos Flectores:

0.00 ≤ X ≤ 0.15

◊ 37.60 x X ( m ) = 0.00

◊ 36.72 x 0.00

◊ 18.36 x ^ 2 0.00

0.15 ≤ X ≤ 1.50

◊ VU x = 36.72 x - 47.40

◊ MU x = 18.36 x ^ 2 - 47.40 ( x - 0.15 ) -

X ( m ) = 0.15 1.50

-41.89 7.69

-11.09 -34.17

* Momento Máximo :

VU x = 36.72 x - 47.40

0 = 36.72 x - 47.40

47.40 = 36.72 x

1.29 = x

1.50 ≤ X ≤ 6.50

◊ VU x = 55.09 - 47.40 - 0.87 ( x -

◊ MU x = 55.09 ( x ) - 47.40 ( x - 0.15

- 0.44 ( x - 1.50 ) ^ 2

X ( m ) = 1.50 6.50

7.69 3.31

-58.87 -275.88

6.50 ≤ X ≤ 7.75

◊ VU x = 55.09 - 47.40 - 0.87 ( x -

WU x =

VU x = VU x (Ton) =

MU x = MU x (Ton /m) =

VU x (Ton) =

MU x (Ton /m) =

M máximo =

VU x (Ton) =

MU x (Ton /m) =

Page 10: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 10

+ 22.62 ( x - 6.50 )

◊ MU x = 55.09 ( x - 0.15 ) - 47.40

- 11.50 - 0.44 ( x - 1.50

11.31 ( x - 6.50 ) ^ 2

X ( m ) = 6.50 7.75

0.89 30.50

34.64 47.51

7.75 ≤ X ≤ 9.00

◊ VU x = 55.09 - 47.40 - 0.87 ( x -

+ 22.62 ( x - 6.50 ) - 58.60

◊ MU x = 55.09 ( x - 0.15 ) - 47.40

- 11.50 - 0.44 ( x - 1.50

11.31 ( x - 6.50 ) ^ 2 - 3.20

X ( m ) = 7.75 9.00

-31.14 0.17

-28.94 -47.08

VU x (Ton) =

MU x (Ton /m) =

VU x (Ton) =

MU x (Ton /m) =

Page 11: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 11

DISEÑO DE ZAPATA CONECTADA

REFUERZO

3/4 "

REFUERZO

1 "

0.27 m

0.90 m

45 cm

= 4.61 m2

Page 12: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 12

S = 1.52 cm

7.95 m7.727 Ton3.775 m

0

73.14 Ton

0

101.59 Ton

Cumple

ZAPATA INTERIOR

= 6.19 m2

L

6.19

6.19

2.50 m

Tn / m2

≤ qn

Cumple

COMPROBACIÓN DE ESFUERZOS

P 2

Page 13: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 13

Tn / m2 Cumple

Tn / m2 Cumple

COMPROBACIÓN DE ESFUERZOS

Tn / m2 Cumple

Tn / m2 Cumple

62.59 Ton / m

0.15

10.92

0.82

10.40

Page 14: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 14

-59.65 Ton / m

L (m) L (m)

1.50 ) 0.00 0.00 0.00 0.00

) - 10.40 0.01 0.73 0.00 0.01

0.02 1.46 0.01 0.02

0.03 2.18 0.03 0.03

0.04 2.91 0.06 0.04

0.05 3.64 0.09 0.05

0.06 4.37 0.13 0.06

0.07 5.10 0.18 0.07

0.08 5.82 0.23 0.08

0.09 6.55 0.29 0.09

1.50 ) 0.10 7.28 0.36 0.10

0.11 8.01 0.44 0.11

0.12 8.74 0.52 0.12

( x - 0.15 ) 0.13 9.46 0.62 0.13

) ^ 2 + 0.14 10.19 0.71 0.14

0.15 10.92 0.82 0.15

0.15 -85.38 -9.58 0.15

0.20 -81.74 -13.76 0.20

0.25 -78.10 -17.76 0.25

0.30 -74.46 -21.57 0.30

0.35 -70.82 -25.20 0.35

0.40 -67.18 -28.65 0.40

0.45 -63.54 -31.92 0.45

1.50 ) 0.50 -59.90 -35.01 0.50

0.55 -56.26 -37.91 0.55

0.60 -52.62 -40.63 0.60

( x - 0.15 ) 0.65 -48.98 -43.17 0.65

) ^ 2 + 0.70 -45.34 -45.53 0.70

0.75 -41.70 -47.71 0.75

0.80 -38.07 -49.70 0.80

0.85 -34.43 -51.51 0.85

0.90 -30.79 -53.14 0.90

0.95 -27.15 -54.59 0.95

1.00 -23.51 -55.86 1.00

1.05 -19.87 -56.94 1.05

1.10 -16.23 -57.84 1.10

1.15 -12.59 -58.57 1.15

1.20 -8.95 -59.10 1.20

1.25 -5.31 -59.46 1.25

1.30 -1.67 -59.63 1.30

1.35 1.97 -59.63 1.35

1.40 5.61 -59.44 1.40

1.45 9.25 -59.07 1.45

1.50 12.89 -58.51 1.50

1.50 12.89 23.38 1.50

1.75 12.55 26.56 1.75

2.00 12.21 29.66 2.00

2.25 11.87 32.67 2.25

2.50 11.53 35.59 2.50

2.75 11.19 38.43 2.75

3.00 10.85 41.18 3.00

3.25 10.51 43.85 3.25

3.50 10.17 46.44 3.50

V UX M UX

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

DIAGRAMA DE CORTANTES / U = 1.4 D + 1.7 L

Page 15: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 15

3.75 9.83 48.94 3.75

4.00 9.49 51.35 4.00

4.25 9.15 53.68 4.25

4.50 8.81 55.93 4.50

4.75 8.47 58.09 4.75

5.00 8.13 60.16 5.00

5.25 7.79 62.15 5.25

5.50 7.45 64.05 5.50

5.75 7.11 65.87 5.75

6.00 6.77 67.61 6.00

6.25 6.43 69.26 6.25

6.50 6.09 70.82 6.50

6.50 6.09 54.44 6.50

6.75 21.39 57.88 6.75

7.00 36.70 65.14 7.00

7.25 52.01 76.23 7.25

7.50 67.32 91.15 7.50

7.75 82.63 109.89 7.75

7.75 -77.97 -86.36 7.75

8.00 -62.32 -103.94 8.00

8.25 -46.67 -117.69 8.25

8.50 -31.03 -127.62 8.50

8.75 -15.38 -133.72 8.75

9.00 0.27 -135.99 9.00

55.99 Ton / m

0.15

7.16

0.54

1.75

-34.76 Ton / m

1.50 )

) - 1.75

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

DIAGRAMA DE CORTANTES / U = 1.25 (D + L) + E (-->)

Page 16: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 16

1.50 )

( x - 0.15 )

) ^ 2 +

L (m) L (m)

1.50 ) 0.00 0.00 0.00 0.00

0.01 0.71 0.00 0.01

0.02 1.43 0.01 0.02

( x - 0.15 ) 0.03 2.14 0.03 0.03

) ^ 2 + 0.04 2.86 0.06 0.04

0.05 3.57 0.09 0.05

0.06 4.29 0.13 0.06

0.07 5.00 0.18 0.07

0.08 5.72 0.23 0.08

0.09 6.43 0.29 0.09

0.10 7.15 0.36 0.10

0.11 7.86 0.44 0.11

0.12 8.58 0.52 0.12

0.13 9.29 0.62 0.13

0.14 10.01 0.71 0.14

0.15 10.72 0.82 0.15

0.15 -83.03 -9.58 0.15

0.20 -79.45 -13.76 0.20

0.25 -75.88 -17.76 0.25

0.30 -72.30 -21.57 0.30

0.35 -68.73 -25.20 0.35

0.40 -65.15 -28.65 0.40

0.45 -61.58 -31.92 0.45

0.50 -58.00 -35.01 0.50

0.55 -54.43 -37.91 0.55

0.60 -50.85 -40.63 0.60

0.65 -47.28 -43.17 0.65

0.70 -43.70 -45.53 0.70

0.75 -40.13 -47.71 0.75

53.74 Ton / m 0.80 -36.55 -49.70 0.80

0.85 -32.98 -51.51 0.85

0.90 -29.40 -53.14 0.90

0.95 -25.83 -54.59 0.95

1.00 -22.25 -55.86 1.00

1.05 -18.68 -56.94 1.05

1.10 -15.10 -57.84 1.10

1.15 -11.53 -58.57 1.15

1.20 -7.96 -59.10 1.20

1.25 -4.38 -59.46 1.25

0.15 1.30 -0.81 -59.63 1.30

10.72 1.35 2.77 -59.63 1.35

0.80 1.40 6.34 -59.44 1.40

1.45 9.92 -59.07 1.45

1.50 13.49 -58.51 1.50

1.50 13.49 23.38 1.50

V UX M UX

Page 17: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 17

1.75 13.19 26.56 1.75

15.75 2.00 12.89 29.66 2.00

2.25 12.58 32.67 2.25

2.50 12.28 35.59 2.50

2.75 11.97 38.43 2.75

3.00 11.67 41.18 3.00

3.25 11.37 43.85 3.25

3.50 11.06 46.44 3.50

3.75 10.76 48.94 3.75

4.00 10.46 51.35 4.00

4.25 10.15 53.68 4.25

-63.15 Ton / m 4.50 9.85 55.93 4.50

4.75 9.54 58.09 4.75

5.00 9.24 60.16 5.00

5.25 8.94 62.15 5.25

1.50 ) 5.50 8.63 64.05 5.50

) - 15.75 5.75 8.33 65.87 5.75

6.00 8.03 67.61 6.00

6.25 7.72 69.26 6.25

6.50 7.42 70.82 6.50

6.50 7.42 70.82 6.50

6.75 20.55 72.30 6.75

7.00 33.68 73.69 7.00

7.25 46.81 76.23 7.25

7.50 59.94 91.15 7.50

7.75 73.07 109.89 7.75

7.75 -67.83 109.89 7.75

8.00 -53.49 0.00 8.00

1.50 ) 8.25 -40.06 0.00 8.25

8.50 -26.63 0.00 8.50

8.75 -13.19 0.00 8.75

( x - 0.15 ) 9.00 0.24 0.00 9.00

) ^ 2 +

1.50 )

( x - 0.15 )

) ^ 2 +

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

DIAGRAMA DE CORTANTES / U = 1.25 (D + L) + E (<--)

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-40.00

-30.00

-20.00

-10.00

0.00

10.00

20.00

30.00

40.00

DIAGRAMA DE CORTANTES / U = 0.90 (D) + E (-->)

Page 18: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 18

23.88 Ton / m

0.15

2.19

0.16

2.50

L (m)

0.00 0.00 0.00 0.00 0.00

0.01 0.37 0.00 0.00 0.00

-10.24 Ton / m 0.02 0.73 0.00 0.00 0.00

0.03 1.10 0.01 -0.01 0.01

0.04 1.47 0.01 -0.01 0.01

0.05 1.84 0.02 -0.02 0.02

1.50 ) 0.06 2.20 0.03 -0.03 0.03

) - 2.50 0.07 2.57 0.04 -0.04 0.04

0.08 2.94 0.05 -0.05 0.05

0.09 3.31 0.06 -0.06 0.06

0.10 3.67 0.07 -0.07 0.07

0.11 4.04 0.09 -0.09 0.09

0.12 4.41 0.11 -0.11 0.11

0.13 4.77 0.12 -0.12 0.12

0.14 5.14 0.14 -0.14 0.14

0.15 5.51 0.16 -0.16 0.16

1.50 ) 0.15 -41.89 -2.34 2.34 -2.34

0.20 -40.06 -3.08 3.08 -3.08

0.25 -38.22 -3.78 3.78 -3.78

( x - 0.15 ) 0.30 -36.38 -4.45 4.45 -4.45

) ^ 2 + 0.35 -34.55 -5.08 5.08 -5.08

0.40 -32.71 -5.68 5.68 -5.68

0.45 -30.87 -6.24 6.24 -6.24

0.50 -29.04 -6.76 6.76 -6.76

0.55 -27.20 -7.25 7.25 -7.25

0.60 -25.37 -7.70 7.70 -7.70

0.65 -23.53 -8.11 8.11 -8.11

0.70 -21.69 -8.49 8.49 -8.49

0.75 -19.86 -8.83 8.83 -8.83

1.50 ) 0.80 -18.02 -9.13 9.13 -9.13

0.85 -16.18 -9.40 9.40 -9.40

0.90 -14.35 -9.63 9.63 -9.63

( x - 0.15 ) 0.95 -12.51 -9.82 9.82 -9.82

) ^ 2 + 1.00 -10.68 -9.98 9.98 -9.98

1.05 -8.84 -10.10 10.10 -10.10

1.10 -7.00 -10.18 10.18 -10.18

1.15 -5.17 -10.23 10.23 -10.23

V UX M UX

Page 19: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 19

1.20 -3.33 -10.24 10.24 -10.24

1.25 -1.49 -10.21 -10.21 10.21

1.30 0.34 -10.15 -10.15 10.15

1.35 2.18 -10.05 -10.05 10.05

1.40 4.01 -9.91 -9.91 9.91

1.45 5.85 -9.74 -9.74 9.74

1.50 7.69 -9.53 -9.53 9.53

1.50 7.69 -99.59 -99.59 99.59

1.75 7.47 -118.21 -118.21 118.21

2.00 7.25 -136.88 -136.88 136.88

2.25 7.03 -155.60 -155.60 155.60

2.50 6.81 -174.38 -174.38 174.38

2.75 6.59 -193.22 -193.22 193.22

3.00 6.37 -212.11 -212.11 212.11

3.25 6.16 -231.05 -231.05 231.05

3.50 5.94 -250.05 -250.05 250.05

3.75 5.72 -269.10 -269.10 269.10

4.00 5.50 -288.21 -288.21 288.21

4.25 5.28 -307.38 -307.38 307.38

4.50 5.06 -326.59 -326.59 326.59

4.75 4.84 -345.87 -345.87 345.87

22.62 Ton / m 5.00 4.63 -365.19 -365.19 365.19

5.25 4.41 -384.57 -384.57 384.57

5.50 4.19 -404.01 -404.01 404.01

5.75 3.97 -423.50 -423.50 423.50

6.00 3.75 -443.05 -443.05 443.05

6.25 3.53 -462.65 -462.65 462.65

6.50 3.31 -482.30 -482.30 482.30

6.50 0.89 34.64 34.64 -34.64

6.75 8.75 36.15 36.15 -36.15

7.00 14.19 39.01 39.01 -39.01

7.25 19.62 43.24 43.24 -43.24

7.50 25.06 48.83 48.83 -48.83

7.75 30.50 47.51 47.51 -47.51

0.15 7.75 -31.14 -28.94 -28.94 28.94

5.51 8.00 -22.45 -35.29 -35.29 35.29

0.41 8.25 -16.79 -40.27 -40.27 40.27

8.50 -11.14 -43.90 -43.90 43.90

8.75 -5.48 -46.17 -46.17 46.17

9.00 0.17 -47.08 -47.08 47.08

11.50

-34.98 Ton / m

1.50 )

) - 11.50

1.50 )

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-50.00

-40.00

-30.00

-20.00

-10.00

0.00

10.00

20.00

30.00

40.00

DIAGRAMA DE CORTANTES / U = 0.90 (D) + E (<--)

Page 20: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 20

( x - 0.15 )

) ^ 2 +

1.50 )

( x - 0.15 )

) ^ 2 +

Page 21: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 21

Page 22: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 22

Page 23: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 23

Page 24: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 24

0.00 0.00

0.48 0.00

0.95 0.01

1.43 0.02

1.91 0.04

2.39 0.06

2.86 0.09

3.34 0.12

3.82 0.15

4.30 0.19

4.77 0.24

5.25 0.29

5.73 0.34

6.21 0.40

6.68 0.47

7.16 0.54

-56.59 -1.21

-54.20 -3.98

-51.82 -6.63

-49.43 -9.16

-47.04 -11.58

-44.66 -13.87

-42.27 -16.04

-39.88 -18.10

-37.50 -20.03

-35.11 -21.85

-32.72 -23.54

-30.34 -25.12

-27.95 -26.57

-25.56 -27.91

-23.18 -29.13

-20.79 -30.23

-18.40 -31.21

-16.02 -32.07

-13.63 -32.81

-11.24 -33.43

-8.86 -33.94

-6.47 -34.32

-4.08 -34.58

-1.70 -34.73

0.69 -34.75

3.08 -34.66

5.46 -34.44

7.85 -34.11

7.85 -24.35

7.55 -28.82

7.24 -35.11

6.94 -41.47

6.64 -47.91

6.33 -54.43

6.03 -61.02

5.72 -67.69

5.42 -74.43

V UX M UX

Page 25: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 25

5.12 -81.25

4.81 -88.15

4.51 -95.12

4.21 -102.32

3.90 -109.44

3.60 -116.49

3.29 -123.77

2.99 -131.12

2.69 -138.55

2.38 -146.05

2.08 -153.63

1.78 -161.29

1.78 32.92

15.47 35.07

29.17 40.65

42.86 49.65

56.56 62.08

70.25 77.93

-69.75 -88.32

-55.75 -104.04

-41.75 -116.35

-27.75 -125.22

-13.76 -130.68

0.24 -132.71

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

DIAGRAMA DE CORTANTES / U = 1.25 (D + L) + E (-->)

Page 26: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 26

0.00 0.00

0.15 0.00

0.29 0.01

0.44 0.02

0.59 0.04

0.73 0.06

0.88 0.09

1.02 0.12

1.17 0.15

1.32 0.19

1.46 0.24

1.61 0.29

1.76 0.34

1.90 0.40

2.05 0.47

2.19 0.54

-15.21 -1.21

-14.47 -3.98

-13.74 -6.63

-13.01 -9.16

-12.28 -11.58

-11.55 -13.87

-10.82 -16.04

-10.09 -18.10

-9.35 -20.03

-8.62 -21.85

-7.89 -23.54

-7.16 -25.12

-6.43 -26.57

-5.70 -27.91

-4.97 -29.13

-4.23 -30.23

-3.50 -31.21

-2.77 -32.07

-2.04 -32.81

-1.31 -33.43

-0.58 -33.94

0.16 -34.32

0.89 -34.58

1.62 -34.73

2.35 -34.75

3.08 -34.66

3.81 -34.44

4.54 -34.11

4.54 -22.60

V UX M UX

Page 27: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 27

4.33 -28.82

4.11 -35.11

3.89 -41.47

3.67 -47.91

3.45 -54.43

3.23 -61.02

3.01 -67.69

2.79 -74.43

2.58 -81.25

2.36 -88.15

2.14 -95.12

1.92 -102.17

1.70 -109.29

1.48 -116.49

1.26 -123.77

1.04 -131.12

0.83 -138.55

0.61 -146.05

0.39 -153.63

0.17 -161.29

-2.26 -161.29

5.92 #VALUE!

11.67 -176.83

17.42 -184.71

23.17 -192.67

28.93 #VALUE!

-29.67 -203.20

-23.70 #VALUE!

-17.73 #VALUE!

-11.76 #VALUE!

-5.79 #VALUE!

0.17 #VALUE!

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

DIAGRAMA DE CORTANTES / U = 1.25 (D + L) + E (<--)

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-40.00

-30.00

-20.00

-10.00

0.00

10.00

20.00

30.00

40.00

DIAGRAMA DE CORTANTES / U = 0.90 (D) + E (-->)

Page 28: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 28

Page 29: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 29

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

-50.00

-40.00

-30.00

-20.00

-10.00

0.00

10.00

20.00

30.00

40.00

DIAGRAMA DE CORTANTES / U = 0.90 (D) + E (<--)

Page 30: zapatas-2

CIMENTACIONES UNIVERSDIDAD NACIONAL DE TRUJILLO

Página 30

Page 31: zapatas-2

2.1 DISEÑO POR FLEXION

Mu= 59.65 Tn-mf´c= 210 Kg/cm2fy= 4200 Kg/cm2

1° TanteoAs= 21.9186079102 cm2a= 11.4607100184 cm2

2° Tanteo a= 11.46071As= 21.2487856881 cm2a= 11.1104761768 cm2

Ø 1"= N= 4.16642857 5 BARRAS

bmin= 36.02 cm OKAs= 25.5 cm2d= 82.78 cm ρ= 0.007

Ø Mn- = 73.37 Tn-m Ø Mn+ = 45.56 Tn-ma-= 13.33 cma+= 8.0 cm

Ø Mn+ ≥Ø Mn-/2

Ø Mn= 45.56 Tn-m

Ø Mn+ ≥Ø Mn-/2

3.DISEÑO POR CORTANTE3.1. DISEÑO POR RESISTENCIA

A) SISMO

Wu=ln= 5 mb= 45d= 82.78As= 15.3 cm2 As= 25.5 cm2fs= 5.25 ton/cm2 a= 16.67

Page 32: zapatas-2

a= 10 cm

Mpr1= 62.48 ton-m Mpr2= 99.67 ton-m

Ve= 32.428452

B) SISMO

Mpr1= 62.48 ton-m Mpr2= 99.67 ton-mVe= 32.428452

Page 33: zapatas-2

ZAPATAS AISLADAS

COLUMNA 1 COLUMNA 230X30 40X40

PD= 36 Tn PD= 54 TnPL= 27 Tn PL= 50 TnMD= 5 Tn-m MD= 2 Tn-mML= 2 Tn-m ML= 1 Tn-mPE= -15 Tn PE= 10 TnME= -7 Tn-m ME= 5 Tn-mPE= 15 Tn PE= 10 TnME= 7 Tn-m ME= -5 Tn-m

f´c= 210 Kg/cm2fy= 4200 Kg/cm2

qa= 1.9 Kg/cm2Df= 1.2 ms/c= 0.2 Tn/m2

Ȣ= 2 Tn/m2

1. DIMENSIONAMIENTO EN PLANTA

1.1 POR GRAVEDAD

qn= 16.4 Tn/m2P1= 63 Tn P2= 104 TnM1= 7 Tn-m M2= 3 Tn-m

S= 1.50 m B= 2.50 mT= 3.00 m L= 2.50 m

ơmax1= 16.25 Tn/m3 correcto ơmax2= 16.25 Tn/m3

4 Ø 3/4" 4 Ø 1"

Page 34: zapatas-2

1.1 POR CARGAS DE G+S

a. D+L+E ͢͢

qn= 22.67 Tn/m2P1= 51 Tn P2= 112 TnM1= 1.4 Tn-m M2= 7 Tn-m

S= 1.50 m B= 2.50 mT= 3.00 m L= 2.50 m

ơmax1= 13.05 Tn/m2 correcto ơmax2= 17.92 Tn/m2

b. D+L+E ͢͢

P1= 75 Tn P2= 112 TnM1= 12.6 Tn-m M2= -1 Tn-m

S= 1.50 m B= 2.50 mT= 3.00 m L= 2.50 m

ơmax1= 19.45 Tn/m2 correcto ơmax2= 16.31 Tn/m2

A. CALCULO DE LA DISTRIBUCION DE PRESIONESZAPATA 1

COMBINACION PU MU ơu1 ơu2

1.4D+1.7L 79.1 10.4 8.3333 26.82 0.13147914 17.578 9.24441.25(D+L)+E 63.75 1.75 12.611 15.72 0.02745098 14.167 1.55561.25(D+L)+E 93.75 15.75 6.8333 34.83 0.168 20.833 140.9D+E 17.4 -2.5 1.6444 6.089 -0.14367816 3.8667 2.22220.9D+E 47.4 11.5 0.3111 20.76 0.24261603 10.533 10.222

ZAPATA 2COMBINACION PU MU ơu1 ơu2

1.4D+1.7L 127.3 4.5 18.64 22.1 0.03534957 20.368 1.7281.25(D+L)+E 140 8.75 19.04 25.76 0.0625 22.4 3.361.25(D+L)+E 140 -1.25 21.92 22.88 -0.00892857 22.4 0.480.9D+L 58.6 6.8 6.7648 11.99 0.11604096 9.376 2.61120.9D+L 58.6 -3.2 8.1472 10.6 -0.05460751 9.376 1.2288

Page 35: zapatas-2

ZAPATA 1 ZAPATA 2 ơu average= 23.7222222 Tn/m2 ơu average= 23.84 Tn/m2ơu 1= 29.2777778 Tn/m2 ơu2 = 24.8 Tn/m2

ZAPATA 1B. CALCULO DEL ESPESOR DE LA ZAPATA POR FLEXION

1.- Wu= 87.833 Tn/mMu= 21.519 Tn-m

6.3292

2.-Wu= 43.917 Tn/mMu= 52.755 Tn-m

31.032

Considerando 0.004w= 0.08

bd ^2= 366192.319 cm3b= 3.00 md= 34.937674 cmhz= 44.937674 cmNO menor a 25db= 47.75

hz= 50 cmd= 40 cm

C. COMPROBAR hz POR CORTANTE ACCION DE VIGA

ØVn=ØVc = 78.3403827 TnVud= 70.2666667 OK

D. COMPROBAR hz POR CORTANTE ACCION DE LOSA(PUNZONAM

ơu 1= 29.2777778 Tn/m2X= 70 cmY= 70 cmVu= 79.4038889 Tn

ρ =

ØVc ≥ Vud

Page 36: zapatas-2

Punzonamiento 1.622.08285714

bo= 210 cm 1.06αs= 30βc= 1 ØVn= 109.7 OK

E. VERIFICACION POR APLASTAMIENTO DEL CONCRE

e.1 APLASTAMIENTO DEL CONCRETO DE LA COLUMNA 3

ØPnb= 187.425 Tn OK1.5

e.2 APLASTAMIENTO DEL CONCRETO DE LA ZAPATA

ØPnb= 568.488172 Tn224.91 Tn

ØPnb= 224.91 Tn OK y=0.50

A1= 900A2= 23000

F. CALCULO DEL REFUERZO

αf= 0.042372880.0051544

As= 61.8528398 cm2S= Ø 5/8"= 9.60343942 cm Ø 3/4"= 13.8231325 cm

Ø 1"= 12.3195637 cm

hz min= 30 cmUsar

G. VERIFICANDO LONGITUD DE DESARROLLO

Cb menor= 8.46 cm15 cm

Cb+Ktr =4.42931937db usar 2.5

ρ =

1 Ø 1"@0.30

��/(√(2 ) )&�´� ∗��∗�

Page 37: zapatas-2

ld= 84.133 > 30 cmld= 85 cmldisponible= 102.5 cm > ldOK

Page 38: zapatas-2

correcto

Page 39: zapatas-2

correcto

correcto

Page 40: zapatas-2

ZAPATA 2B. CALCULO DEL ESPESOR DE LA ZAPATA POR FLEXION

1.- Wu= 62 Tn/mMu= 37.51 Tn-m

2.-Wu= 62 Tn/mMu= 37.51 Tn-m

Considerando 0.004w= 0.08

bd ^2= 260371.548 cm3b= 2.50 md= 32.2720652 cmhz= 42.2720652 cmNO menor a 25db= 63.5

hz= 65 cmd= 55 cm

C. COMPROBAR hz POR CORTANTE ACCION DE VIGA

ØVn=ØVc = 89.7650218 TnVud= 34.1 OK

D. COMPROBAR hz POR CORTANTE ACCION DE LOSA(PUNZONAMIENTO)

ơu2 = 24.8 Tn/m2X= 85 cmY= 85 cmVu= 122.082 Tn

Punzonamiento

bo= 340 cm

ρ =

ØVc ≥ Vud

��/(√(2 ) )&�´� ∗��∗�

Page 41: zapatas-2

αs= 40βc= 1 ØVn= 244.160859

E. VERIFICACION POR APLASTAMIENTO DEL CONCRETO

e.1 APLASTAMIENTO DEL CONCRETO DE LA COLUMNA

ØPnb= 333.2 Tn OK

e.2 APLASTAMIENTO DEL CONCRETO DE LA ZAPATA

ØPnb= 1299.48 Tn399.84 Tn

ØPnb= 399.84 Tn OK

F. CALCULO DEL REFUERZO

αf= 0.042372880.00133314

As= 18.3306893 cm2S= Ø 5/8"= 27.0038945 cm Ø 3/4"= 38.8692421 cm

Ø 1"= 34.6413596 cm

hz min= 30 cmUsar

G. VERIFICANDO LONGITUD DE DESARROLLO

Cb menor=

Cb+Ktr =db

ρ =

1 Ø 1"@0.30

Page 42: zapatas-2

ld= 84.132793 > 30ld= 85 cmldisponible= 102.5 cm > ld

Page 43: zapatas-2
Page 44: zapatas-2
Page 45: zapatas-2

B. CALCULO DEL ESPESOR DE LA ZAPATA POR FLEXION

D. COMPROBAR hz POR CORTANTE ACCION DE LOSA(PUNZONAMIENTO)

1.622.28705882

1.06

Page 46: zapatas-2

OK

2.6

2.6

y=0.55

A1= 1600A2= 67600

8.77 cm15 cm

3.45275591usar 2.5

Page 47: zapatas-2

cm

OK