www.chemtronicsindia.com Page 1 of 26

Client:TulsiInfraHeights-Agra

STPCapacity:200KLD

Technology–“GreenSTPAD+”

ZeroDischargeSewageTreatmentPlant

ReuseoftreatedwaterforLandscape,Irrigation&Flushing

Date:06thOctober2017–Agra[INDIA]

www.chemtronicsindia.com Page 2 of 26

Preamble

AsperIndianPollutionControlBoardnormsitismandatorytoreusetreatedwastewaterfornon-potable applications. These applications can be WC flushing, landscape irrigation, cooling towermakeup, floor&glasswashing,diluteanyotherstreamofwastewater,sell tootheragencies,etc.Indian Green Building Council [IGBC] encourages designers to use Energy efficient technology byofferinghigherratingin“LEED”certification.Itisalsomandatorytouseozonetechnology,insteadofchlorine sincedisinfectantsBy-Products [DBPs] arequitenegligible, andozone technology isnon-hazardous&environmentallysafe.

Chemtronicswith alongwith its Switzerland partner has developed a “GREEN STPAD+”which isself-sustained, and conserves water up to the efficiency of more than 95 %. The core treatmentworksonnaturalanaerobicdegradationprocesswithgravityflow&doesnotrequireanyenergytotreatwastewater asperpollutionnorms.Thisunique technologyproduces energy in the formofbiogas to make treated waste comfortably reusable. Ozonation is an integrated as a part of highefficiencytertiarytreatmentproducinghighqualityresults.

Since entire anaerobic tank can bemade underground, it requires very small foot print for plantroomarea.Alsothereisnoneedofanyairhandlingsystemandfoulodormechanismrequiredasalltanksareairtight.TheADtankhasestimatedlifeof100years&issoself-sustainedthatitdoesnotrequire any qualified teamof operators. The processes by product are liquid& gas, due towhichfrequencyofsludgehandlingisonceortwiceayear.

Considering the remote location of the site, we have proposed self-sustained, scientificallydeveloped,naturalrecyclingtreatmentplant,withleastoperation&maintenancecomparedtoanytechnologyintheworld.

Copyright:

“All contents copyright by Chemtronics Technologies (I) Pvt. Ltd. – India & Autark Engineering – Switzerland. All rights reserved. No part of this document or the related files may be reproduced or transmitted in any form, by any means (electronic, photocopying, recording, or otherwise) without the prior written permission of the publisher.

Please note that much of this publication is based on personal experience and anecdotal evidence. Although the author and publisher have made every reasonable attempt to achieve complete accuracy of the content in this Guide, they assume no responsibility for errors or omissions. Also, you should use this information as you see fit, and at your own risk. Your particular situation may not be exactly suited to the examples illustrated here; in fact, it's likely that they won't be the same, and you should adjust your use of the information and recommendations accordingly.

Any trademarks, service marks, product names or named features are assumed to be the property of their respective owners, and are used only for reference. There is no implied endorsement if we use one of these terms.”

www.chemtronicsindia.com Page 3 of 26

INDEX

1. Preamble .......................................................... Page2

2. Index .......................................................... Page3

3. ProjectProponent;Objectives........................................... Page4

4. WaterBalance/Budget ............................................ Page5

4.1 ClientsData,DesignConsideration&Estimation,................... Page5

4.2 WaterQuality–Raw&Treated............................... Page6

5. TreatmentTechnology ............................................ Page6

5.1 Concept ............................................ Page6

5.2 Coretreatment, ............................................ Page7

5.3 SalientFeatures ............................................ Page7

5.4 Advantages ............................................ Page8

6. ProcessDescription ............................................ Page9

6.1 Primary&SecondaryTreatment ...................................Page9

6.2 TertiaryTreatment........................................... Page10,11

7. ProcessFlowDiagram ............................................ Page12

8. TechnicalSpecification ............................................ Page13

8.1 ADTankOption1[Civil–BelowGround]..................... Page14,15,16

8.2 FootPrint–Equipment....................................... Page17

8.3 PowerRating ..................................... Page17

8.4 ReclaimEfficiency ..................................... Page17

8.5 LifeSpan .............................................. Page17

9. Operation&Maintenance ............................................ Page18

10. Consumables ............................................ Page18

10.1 Chemical,Manpower,Electricity................................. Page18

10.2 Spares ............................................ Page19

11. AnnualMaintenanceContract......................................... Page19

12. CapitalCost,OperationalCost&Taxes................................. Page20

13. TimeDuration ................................................... Page21

14. Savings/ROI .................................................. Page22

15. Assumptions........................................................ Page22,23

16. References.......................................................... Page24

17. CertificationofCollaboration........................................ Page25

18. MoreInformation,Hyperlinks&contactdetails....................... Page26

www.chemtronicsindia.com Page 4 of 26

ProjectProponent

Nameoftheproject : TulsiInfraHeightsatAgra

Requirement : SewageTreatmentPlant

Typeofproject : Residential

ApplicationofTreatedWater : Landirrigation,Gardening,WCflushing&anyother

non-potableapplications

Locationoftheproject : Agra.

Objective

ü NaturalSelf-Sustaineddesign

ü UndergroundSTP

ü LeastpossibleOperation&Maintenance

ü MostEnergyefficienttechnology

ü Maximumrecoveryofwater

ü LowerFootprint

ü EnvironmentalFriendly

ü Nofoulodor

ü Longlifespan

ü Economical–CapitalCost

ü Economical–OperationalCost

ü Simpletooperate

ü MeetsInternationalPollutionStandards

www.chemtronicsindia.com Page 5 of 26

WaterBalance/Budget

Theplantisdesignedtotreatsewagegeneratedofhavingfollowingdetails.

(Weneedbelowlisteddetailsorwaterbalance&recycledwaterreusecalculation)

SourceofSewage : Residential

No.ofunits/flats/Villas : 165nos.

Kitchen : Yes

Bathroom[Bathing] : Yes

WashingMachine : Yes

WashBasin : Yes

WaterCloset[WC] : Yes

Misc./Anyothersource : [Specify]

ClientData

SourceofWasteWater : DomesticWasteWatergeneratedfromResidents,Kitchen,Washingmachine,Bathroom,WC,Washbasin,etc.

CapacityofSTP : 200KLD

NumberofUnits/Villas : 165nos.

NumberofStaff/Servant : N.A.

ApplicationofTreatedWater : Landirrigation,Gardening,flushing&othernon-potable

application

DesignConsideration&Estimation

Waterrequireperperson : N.A.litersperday

TotalSewageWaterCapacity : 200KLD(asperclient200KLDisproducedperday)

PlantOperatingHrs : 22–24HRs

PlantFlowRate : 9.0m3/hr

Treatment : AnaerobicDigestion[AD]+Polishing+Ozonation

GreenSTP/AD+ModelNo. : AD+/STP-200

www.chemtronicsindia.com Page 6 of 26

WaterQuality–RawSewage&Treated/Recycled

Parameters RawSewageWaterQuality

TreatedWaterQualityForReuse

Color Brownish/Black Clear

Odor Characteristic Unobjectionable

pH 6.5–8.5 6.5–8.0

TSS 100–150ppm 1–5ppm

BOD(3days28⁰C) 300–500ppm 10-30ppm

COD 500–700ppm 100-250ppm

Oil&Grease 20–25ppm 5-10ppm

TreatmentTechnology

Concept-GreenSTPAD+

Green STPAD+ combines state of the artHighRateAnaerobicReactor (HRAR) technologywith aselection of adequate tertiary treatment methods of filtration & disinfection. This full-blowndecentralizedwastewatertreatmentandreusesystemsisalignedwiththeprojectspecificconditionsand requirements. We provide our clients custom and tailored wastewater solutions withoutstandingeconomicandecologicperformanceswhilemakingmaximalbenefitoutofon-sitereuseof products out ofwastewater treatment. Our STPs are engineered to complywith the respectiveregulationsandnorms.

AD+[AnaerobicDigestion+]isawastewatertreatment,particularlysuitedtoorganicmaterial&iscommonlyusedforeffluent,sewage&greywatertreatment.Anaerobicwastewatertreatmentisabiologicaltreatmentwithouttheuseofairorelementaloxygen.Manygroupsofanaerobicbacteriawork together inabsenceofoxygentodegradecomplexorganicpollutants intomethane/biogasandcarbondioxide.Inanaerobicdigestionthemicro-organismsresponsiblefortheconversionoftheorganicmatterortheotherconstituentsinthewastewatertogases&celltissuesaremaintainedin-suspensionwithin the liquid. Anaerobic digestion is a simple process that can greatly reduce theorganicmatterwithoutusinganyotherresource&anyformofenergy.

www.chemtronicsindia.com Page 7 of 26

CoreTreatment-HighRateAnaerobicReactorTechnology

HighRateAnaerobicReactors(HRAR)refers tobioreactorswhichcanretainactivebiomass in thereactorindependentlyoftheincomingwastewater(HydraulicResidenceTimeHRT).Slowgrowinganaerobescanbemaintainedinthereactorsathighconcentrations,enablinghighreactionrateperunit reactorvolumeandhighresistanceoforganicorhydraulic shock loads.HRARcanbeused totreat wastewater from various sources and strengths like waste water from domestic sources,hospitalsandindustrieslikedistilleriesorfood-processing.TheHRARweusearecascadedinseriestomulti-stepanaerobicsystems,enablingseparationoftheanaerobic treatment steps (Hydrolysis/Acidogenesis/Acetogenesis/Methanogenesis) withoutdifficult process controlling. With respect to sustainability and cost- effectiveness, anaerobictreatmenthas the coreadvantageof avoiding the lossof energy fordestructionoforganicmatter,whileenergyisreclaimedfromtheorganicwasteconstituentsintheformofmethaneinbiogas.SalientFeatures:

* OverallOrganic&Inorganiccontentreduction(BOD,COD&TSS)withcolor&odor.

* TreatedSewageWaterQuality -MostsuitedforIrrigation&Landscape.

* EnergyEfficiency -Highest–50–90%lessconsumption

* Sustainability -SelfSustained[Autark]

* ReusableOutput -Highest–morethan99%

* Operation&Maintenance -Least–Operatornotrequired

* SludgeManagement -Least–OnceinaYear

* Consumables -Minimum

* LifeSpan -VeryHigh–100Years[CoreTechnology]

* FootPrint -Minimum70–80%less[BeingUnderground]

* Nutrients -Rich

* Process&Technology/R&D -GREENSTPAD+fromSwitzerland

www.chemtronicsindia.com Page 8 of 26

Advantages–HRAR[AD]:

* LowProcessControl

* LowProcessEnergy

* NoChemicals

* LowSludgeProduction

* MLSSandSVImonitoringnotrequired

* EnergyGenerationintheformofBiogas

* MinimumMechanical&ElectricalParts

* UnderGroundStructure(Canbeaboveground)

* HighShockLoadResistance[Organic&Hydraulic]

* HighTreatmentPerformanceInTermsOfCOD,BOD&TSS

* Self-Sustained

* ReclaimedWatermorethan99.0%

* Innovativestillnaturaltreatmentprocess

* Energyefficient.60–90%lesserpower

* Extremelystabletohydraulicshockloads

* Hightreatmentperformance

* Lowoperatingcost

* Lowspacerequired–beingsubsoil

* Nofoulodour

* Longlife–atleast50years

www.chemtronicsindia.com Page 9 of 26

ProcessDescription

PrimaryTreatment

Screening: - This is the first unit of the Green STP AD+. Sewage water from sewage collectionchamberiscollectedintoanADtankthroughabarscreenbygravity.Barscreenisprovidedtotrapfloatingmaterialslikeleaf,flowers,cottons,plastic,halfeatenfood,papers,etc.Oil&GreaseChamber: - Sewagewater from the kitchenwhich contains free oil, if not removedcreates scum accumulation and affects the functioning ofmicrobes. To avoid this, oil & grease, achamberisprovidedafterthebarscreenwherefreefloatingmaterialoilisarrestedpriortoentryintheADTank.Accumulatedoilwillberemovedperiodicallyanddisposedofproperly.

SecondaryTreatment

BiologicalTreatment:-

SewagefromOil&GreasechamberwillpassthroughtheADTank.TheADTankisacascadeofthreemajor treatments steps i.e. Settler,HighRateAnaerobicReactor [HRAR]/AnaerobicBaffleReactor[ABR]andupflowAnaerobicFilterwhichisconstructedbelowgroundlevel.Thesethreedifferentphases are built together in a single AD Tank with interconnecting compartments. The AD Tankperformsthecoretreatmentofthesewagewateroxidization&decompositionoforganicpollutantwith the help of anaerobicmicroorganism to provide higher surface area formicro – organisms,floating random media is provided, on which micro- organisms growth takes place. Generallyactivation of AD tank with full sewage load can take 40 to 50 days and come to its optimumefficiency.

1. Settler

The first compartment ofADTank is a settler. The settler has two treatment processes. First is asedimentationinwhichtheliquidpartisseparatedfromthesolidmatterandsecondisstabilization,whichsettlesoutmostofthesolidsinthewastewater.

2. HighRateAnaerobicReactor/AnaerobicBaffleReactor(HRAR/ABR)

In this treatment phase, biological and natural chemical processes are used to digest and removemostoftheorganicmatter.Inthishighrateanaerobicreactor,withoutoxygenmechanicalmixingisapplied.Treatmentisachievedbyanaerobicdigestionbynaturallyselectedanaerobicmicrobial.Thisgivesgoodretentiontimetowastewateranddevelopmentofathicksludgeblanketinthebottomofcompartment.

www.chemtronicsindia.com Page 10 of 26

Fig.1,AnaerobicDigester[AD]Tank–CivilOnSiteConstruction

3. UpflowAnaerobicFilter

After the HRAR/ABR Treatment sewage water is transferred into up flow Anaerobic Filtercompartment inorder to improve further treatmentefficiency, a filtermediaallowingwidespreadcontactwiththewastewaterstreamisusedwhichisveryefficientinretaininganddigestingtheleftoverpollutants.Theprocessworkswithfixedplasticbiomedia.Thewastewaterpassingoutoftheanaerobicfiltershas90%oftheoriginalpollutionloadremoval.

PolishingTertiaryTreatment

Secondary (biological) treated water from AD Tank will be collected in a equalization tank. Thistreatedwaterisozonatedforpathogendisinfection.Ozonationalsoreducesfoulodor&tintofcolor,if present in treatedwater. PostOzonationwater is filtered by “ChargedActivatedMedia Filter[CAMF]” through a filter feed pump to trap tiny suspended particles from water. Ozonation oftreatedsewagewaterreducetinyorganicandinorganicimpuritiesfromwater.FrombackwashcumTreatedWaterTankwater isused forbackwashingof filters. From this tankwaterwillbefurthercollectedinmaintreatedwatertank.AsperMPCB,OzonationinSTPtertiarytreatmentismandatory.

Equalization

HRAR

BarScreen

UFAF

Settler

www.chemtronicsindia.com Page 11 of 26

Fig.2,TertiaryTreatment:ChargedActivatedPressureFiltration+OnlineOzonation

www.chemtronicsindia.com Page 12 of 26

ProcessFlowDiagram

Fig.3,ProcessFlowDiagramof“GreenSTPAD+”

www.chemtronicsindia.com Page 13 of 26

TechnicalSpecification

Therearetwooptionsforanaerobictankconstruction:

Option1–CivilTankConstructionUnderGround

Option2–CivilTankConstructionAboveGround

Inoption1,theconstructionofthesewagecollectioncumtreatmenttank&treatedwatertanksareto be constructed on site below ground by your civil contractor & we will give the dimensionaldrawings.Inoption2theconstructionofthesewagecollectioncumtreatmenttank&treatedwatertanksaretobeconstructedaboveground.Thebio-media&pipegridwillbeinstalledbyourteam,afterthetankisconstructedalongwiththeconstructionoftopslab.Also,thetertiarytreatmentplantwillbesupplied&installedbyourteam.

Inanyoftheoptedoption,oncethetanksareready,theywillbeinoculatedforanaerobicbacteriaatthesite.

www.chemtronicsindia.com Page 14 of 26

Option1–CivilConstruction–BelowGround

FootPrint–ADTank

Fig.4,ADTank,OxidationTank&FinalTreatedWaterTankcanbelocatedbelowlandscape

Fig.5,ADTank,OxidationTank&FinalTreatedWaterTankcanbelocatedbelowcarpark.

www.chemtronicsindia.com Page 15 of 26

ActualSitePicture–600KLD-2008

GREENSTPAD+BelowCarParking

www.chemtronicsindia.com Page 16 of 26

Fig.6,ADTank,OxidationTank,FinalTreatedWaterTank&PlantRoom.

ADTank :UnderGround/AboveGround :500m2[Area]X3.0m[Depth]

OzoneOxidationTank :UnderGround/AboveGround :10m2[Area]X3.0m[Depth]

TreatedWaterBufferTank :UnderGround/AboveGround :10m2[Area]X3.0m[Depth]

FinalTreatedWaterCumB/WTank :AboveGround[Aboveplant] :5m2[Area]X2.5m[Height]

PlantRoom :AboveGround :10m2[Area]X4.0m[Height]

TotalAreaRequired :UnderGround&AboveGround :510m2

www.chemtronicsindia.com Page 17 of 26

FootPrint–Equipment

ADTank : AboveorBelowGround : 480-500m2x3.0m[Ht/depth]

PlantRoom : AboveGround : 8–10m2x4.0m[Height]

PowerRating

ABR+AF : 0.0Kw

TertiaryTreatment : 0.75Kwx24hrs =18.0Kwhr[Units]

Ozonation : 1.2Kwx24hrs =28.8Kwhr[Units]

FinaltransferPump : 0.55Kwx24hrs =13.2Kwhr[Units]

PlantRoom[Lights&Fans] : 0.1Kwx1hr =0.1Kwhr[Units]

TotalPowerRating : 2.6Kw[1Phase] =60.1Kwhr[Units]

ReclaimEfficiency

TreatedWaterQuantity : 200KLD : 97–99%Recovery

BiogasProduction : ____m3/day : Electricityof10kw/day*

*at50%efficiency.

Lifespan

ADTank–CoreTreatment : 50Years

TertiaryTreatment : 25Years

OzonationPlant : 20Years

www.chemtronicsindia.com Page 18 of 26

Operation&Maintenance

InADtankwastewaterflowsnaturallybygravity.Tertiarytreatment&disinfectionprocesscanbeautomaticanddoesnotrequireanyoperator.Onlyaparttimenon-technicaloperatorisrequiredforgeneral supervision & log keeping. Sludge management is also minimal & does not demand forfrequentsludgehandling.

Maintenance&ReplacementFrequency

SludgeMonitoring : Oncein6Months

Sludgeinspection : Oncein6Months

SludgeMaintenance : Settler : OnceinaYear

ABR/AF : Oncein3-4Years

Consumables

Chemicals

NoConsumablechemicalsarerequired.

ManPower

Non-technicaloperatorisrequiredforparttime. : 1hr/day

Electricity

CoreSewagetreatmentplant :0units/day :0.0Kw/m3

TertiaryFiltration :18units/day :0.09Kw/m3

Ozonation :28.8units/day :0.14Kw/m3

FinalTransferPump :13.2units/day :0.07Kw/m3

Misc/Plantroomlighting :0.1units/day :0.0005Kw/m3

Total :60.1units/day :0.3Kw/m3[Rs.3.0perm3]*

*:ConsideringelectricityrateRs10.0perunit

www.chemtronicsindia.com Page 19 of 26

Spares

ABR&AF : BiogrowthMedia/PipeGrid : 50Years

TertiaryTreatment : FilteringMedia : 25Years

OzoneGenerator : OzoneCell : 2Years

OxygenGenerator : MolecularSeives : 2Years

AnnualMaintenanceContract

Annualmaintenancecontractisavailableposthandoverduringwarrantyperiod&postwarranty,forrestofplantlife.

OperationCharges : Rs.60,000/=peryear

ComprehensiveMaintenanceCharges : Rs.60,000/=peryear

Total : Rs.120,000/=peryear [Rs1.65perm3]

www.chemtronicsindia.com Page 20 of 26

CapitalCost

CivilTankConstruction [UnderGround] : Rs._____________[ClienttoEstimate]

CivilTankConstruction [AboveGround] : Rs._____________[ClienttoEstimate]

PlantRoomConstruction : Rs._____________[ClienttoEstimate]

GREENSTPAD : Rs.13.0Lakh±2.0%

TertiaryEquipment : Rs.16.0Lakh±2.0%

OzoneAdvanceTertiaryTreatment : Rs.4.0Lakh±2.0%

Installation&Commissioning+Inoculation : Rs.2.0Lakh±2.0%

Installation&Commissioning–TertiaryStage : Rs.1.0Lakh±2.0%

Installation&Commissioning–OzoneSystem : Rs.0.5Lakh±2.0%

TOTAL Part1 CivilCost : Rs.ClienttoEstimate

Part2 Design+Equipment+Installation : Rs.36.5–37.0Lakh.

Packing+Forwarding+Freight : Rs.1.0Lakh.

Goods&ServiceTax[GST] : Rs.6.75Lakh.

Note:Unloading&safestorageofmaterial/equipmentisinclientscope.

OperationalCost

Consumables&Spares CostperMonthCostPerYear

Electricity [60.1units/day] Rs.0.18Lakh Rs.2.16Lakh

Operator Rs.0.05Lakh Rs.0.60Lakh

Chemicals/Misc. Rs.0.01Lakh Rs.0.12Lakh

Spares&Labor Rs.0.05Lakh Rs.0.60Lakh

TOTAL Rs.0.29Lakh Rs.3.48Lakh

www.chemtronicsindia.com Page 21 of 26

Taxes&OtherCharges

AllTaxes,duties&otherincidentalchargesareextraasapplicableaslistedbelow

GSTonConstructionmaterial [email protected]%

GSTonEquipmentSupply [email protected]%

GSTondesign,I&C,inoculation[Labour] [email protected]%

TimeDuration

ConstructionofADTank[BelowGround] 4–6months[ClientScope]

ConstructionofADTank[AboveGround] 3–5months[ClientScope]

ConstructionofthePlantRoom 1–1.5month[simultaneously]

SupplyofTertiaryStageEquipment 1.5–1.8months[Simultaneously]

Installation&CommissioninginADTank 1.0months[Simultaneously]

Installation&Commissioningofequipment 2weeks

Inoculation 1.0weekpostsewagefeed

Startup 2–3months,postinoculation

www.chemtronicsindia.com Page 22 of 26

Savings/ReturnonInvestment

Savings/ReturnonInvestment[ROI]iscalculatedbasedonconventionalaerobicsewagetreatmentplant,of200KLDandbelowlistedassumptions.

AboveGroundconstruction 50.0-70m2 SavinginFSI

EnergyEfficient 79%less LEEDPoints/HighROI

Design Indo-Swiss-Innovation LEEDPoints

Sludge/WaterRecovery 2–3%Sludge+99%water LEEDPoints/HighROI

Technology Self-Sustain&EnvironmentalFriendly

Operation 1hr/day[OnlyMonitoring]

LifeSpan 50Years HighROI

Operator 95%less HighROI

Chemical 95%less HighROI

Repairs&Spares 90%less HighROI

Assumptions

Forcomparison,wehaveassumedstandarddataofAerobicSewageTreatmentPlantof200KLD.

Electricity Rawsewagetransfer 1.5Kw

Blower 3.0Kw

Aerator 15.0Kw

FilterfeedPump 1.5Kw

FinaltransferPump 1.5Kw

Ozonation 2.8Kw

PlantRoom[L&F] 0.5Kw

Total 25.8Kw

Operationtime 24hrs

www.chemtronicsindia.com Page 23 of 26

TotalElectricalConsumption 25.8Kwx24hrs 619.2Kwhr[Units]

ElectricityCostperday [@Rs10/-perunit] Rs.6,193/-

ElectricityCostperyear Rs.22,60,000/-

Chemicals Chlorine [WithoutOzonation] 20ppm

[WithOzonation] 5ppm

Alum 5ppm

ChlorineConsumptionperday 20ppmx200m3 40ltrs

Costofchlorineperday @20/-perltr 800/-

AlumConsumptionperday 5ppmx200m3 1.0Kg

CostOfAlumperday @50/- 50/-

ChemicalConsumptionperyear -Chlorine+Alum+Urea+DAP 3,10,250/-

Operator 24x7

CostofOperationagencyperyear @20,000/-permonth 2,40,000/-

Repair&Spareperyear Routine 1,00,000/-

TotalOperationalCostPerYear 29.1Lakh

Operationalcostperm3ofwater 39.87

FinalComparisonwith“GREENSTPAD+”

Conventional GREENSTP

TotalOperationalCostPerYear Rs.29.1Lakh Rs.3.48Lakh

Operationalcostperm3ofwater Rs.39.87 Rs.4.77

www.chemtronicsindia.com Page 24 of 26

References

YakshashriBeverage

Lotus I T Park

OPInfra

CairnIndiaLtd–Factory-Bhogat–Jamnagar,Gujarat 12CMD

EssarProjects–Residential–PapuaNewGuinea 50CMD

VasconEngineers–LaborCamp–Andheri 45CMD

AkashDeveloper–Resi–GTP BombayCentral 25CMD

CraftsmanAutomation–Factory-Prithampur[MadhyaPradesh] 15CMD

RhythmResort–Resort–Lonavala 60CMD

ManipalHospital–Hospital–Banglore 600CMD

YakshashriBeverage–Factory–Karjat- 3CMD

LotusITPark–CommercialBuilding–Parel 50CMD

GrandFortCity–Residential–Agra 60CMD

DreamMall-SunriseHospital–Bhandup- 50CMD

www.chemtronicsindia.com Page 25 of 26

CollaborationCertificate

www.chemtronicsindia.com Page 26 of 26

PleaseclickonbelowlinkstoknowaboutthemoreInformationon

Details-GreenSTPAD+

Presentation–FeaturesofGreenSTPAD+

Presentation–GreenSTPAD+

Catalogue–GreenSTPAD+

CollaborationSystem

SitePhotos

SiteVideo1-YakshshriBeverages,Karjat–5CMD

SiteVideo2–LotusMumbai-

SiteVideo3–EssarProject–PapuaNewGuinea(PNG)–40CMD

SiteVideo4–RhythmResort-Lonavala

Clientlist

CompanyProfile–Chemtronics’

ContactUs:

ChemtronicsTechnologies(India)Pvt.Ltd.

#28,SatyamIndustrialEstate,SubhashRoad,Jogeshwari(East),Mumbai-400060.INDIA

URL:www.chemtronicsindia.com;Mail:[email protected];Office:+91–22–28259933

ContactPerson:

Mr.SunilShah–Director(Technical)–India–[+91-9321234527]

Mr.NanchozZimmermann(Principle“GREENSTPAD+”Designer)–Switzerland,[email protected]