ZincOx Resources plc

“Where there’s Muck there’s Brass”

Corporate OverviewMay 2012

Page 2: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Disclaimer

This document is for informational purposes only and must not be used or relied upon for the purposes of making any

investment decision or engaging in any investment activity. No reliance may be placed for any purpose whatsoever

on the information contained in this Presentation, nor on assumptions made as to its completeness. No

representation or warranty, express or implied, is given by ZincOx Resources plc or any of its advisers, directors,

officers, employees or agents, as to the accuracy, fairness or completeness of the information or opinions contained

in this Presentation and no liability is accepted for any such information or opinions (which should not be relied upon)

or for any loss howsoever arising, directly or indirectly, from any use of this document or its contents or information

expressed in the Presentation. The information contained in this Presentation is subject to amendment, revision and

updating in any way without any notice or liability to any party.

Certain statements in this document relate to the future, including forward looking statements including but not limited

to those with respect to the financial position and strategy of the Company, the price of zinc, the estimation of mineral

resources and reserves, the realisation of mineral reserve estimates, the timing and amount of estimated future

production, costs of production, capital expenditures, costs and timing of development of new deposits, success of

exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government

regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and

limitations on insurance coverage and the timing and possible outcome of pending litigation. These forward looking

statements involve known and unknown risks, uncertainties, assumptions and other important factors that could

cause the actual results, performance or achievements to be materially different from future results, performance or

achievements expressed or implied by such statements. Such risks, uncertainties, assumptions and other important

factors include, among other things, general economic conditions, exchange rates, interest rates, the regulatory

environment, structural changes in the industries in which the Company operates, competitive pressures, selling

price and market demand. The forward looking statements in this document reflect views held only as of the date of

this document and the Company expressly disclaims any intention or obligation to update or revise any forward

looking statements, whether as a result of new information, future events or otherwise, except in accordance with

applicable securities laws.

Page 3: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Business Overview

Zinc rich steel industry waste (EAFD)

Free

ZincOx

Recycling

Plant

Zinc bearing product

Sold to

Zinc Smelters(90% Revenue)

Iron bearing product

Sold to

Steel Mills(10% Revenue)

First Plant in S. Korea

Production ramping up

Game Changing Technology

Global Roll-outs planned

Page 4: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Corporate Overview

History

95% of zinc comes from sulphide ore deposits

ZincOx set up (1998) to develop non-sulphide zinc mines

Each one different – bespoke solution

Exceptional technical team, >128 years of zinc experience

Technology driven but not technology provider

Development and application of “Game Changing Technology”

Modify existing technology, not “black box”

Objective: To become the largest and most sustainable zinc recycler

Status

HQ in Surrey (7 - strategy, finance, etc)

Technical support in Belgium (12 - technical and development)

Regional offices: USA (5), Thailand (2), Korea (5578)

AiM quoted

89.4 mil. shares @ 63p, market capitalisation £60 mil.

Page 5: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Feed - Electric Arc Furnace Dust (EAFD)

1/3 of world’s steel produced by recycling scrap in Electric Arc Furnaces (EAF)

Scrap contains steel that is increasingly galvanised (zinc coated)

During iron melting zinc is driven off into the EAFD as an oxide

EAFD contains: zinc: 18-24% (average mine: 5-6% zinc)

iron: 26-30%

cadmium, lead: <2% (harmful elements = Hazardous Waste)

Currently landfill or subsidised recycling

ZincOx has “game changing” process that needs no subsidy

Page 6: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Technology- Rotary Hearth Furnace (RHF)

2/3 of steel produced from iron ore in Blast / BO Furnaces (BBOF)

BBOF generate waste dust: iron (50%) low in zinc (<3%) BF can not

recycle: fine or zinc bearing material

Rotary Hearth Furnace (RHF) removes zinc + metallises iron

10 plants built over the past 10 yrs for treatment of BBOF

EAFD

EAFD, low iron (<30%), high zinc (>20%), Salts (7%) – most value in zinc

RHF + EAFD

Technology modified to improve: zinc recovery, product quality, energy use

Extensive R&D including test work, piloting and computer simulation

Compared to existing EAFD recycling technology: Iron recovery

Greater zinc revenue

Lower energy

Not subsidy dependent

(an environmental improvement that costs less)

Page 7: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

RHF – Feed & Products

HZO

Zinc Concentrate58% zinc

+ lead + halidesDried briquettes

EAFD (83%)

coal (14%)

binder (3%)

ZHBI

Iron Product50% iron 50% slag

RHF

27 meters

1,300oC

NO WASTE

gas

solid

Zinc

Smelter

Electric

Arc

Furnace

Page 8: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

81

South Korean Recycling Project

100 km

Scrap Recycling Plants

( EAFD generation)

To date EAFD has been landfilled

ZincOx Supply Agreement

10 year contracts with all steel recyclers

400,000 tpa EAFD @ 23.1% zinc

EAFD paid for above zinc price threshold

Transport paid by mills at low zinc prices

Strong Support

Korea Iron and Steel Association

Zinc Industry

Government

Foreign Investment Zone Status

Years 1-5, tax free (Years 6-7, 11% tax)

Tax free import of capital goods

Site Lease

Government purchase site, US$ 20 million

50 year renewable lease, 5 years rent free

Environmentally permitted

KRP

92,000 tpa zinc in conc

100,000 tpa Fe in ZHBI

Korea Zinc

smelter

600,000t zinc in conc

Scrap 8,000,000t

49,000,000t iron ore

Page 9: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

KRP 1 and 2

Page 10: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

KRP - Development Plan

TOTAL

Capacity

EAFD tonnes per annum 400,000

Zinc grade Concentration 23%

Zinc concentrate tonnes per annum 162,000

Zinc contained tonnes per annum 92,000

Iron Product (ZHBI) tonnes per annum 190,000

Capital cost US$ million 210

Financing

Equity US$ million

Offtake US$ million

Bank US$ million

Start Up

EBITDA Zinc = US$2250/t US$ million pa

TOTAL Phase 1 Phase 2

Capacity

EAFD tonnes per annum 400,000 200,000 200,000

Zinc grade Concentration 23% 26% 22%

Zinc concentrate tonnes per annum 162,000 83,000 79,000

Zinc contained tonnes per annum 92,000 49,000 43,000

Iron Product (ZHBI) tonnes per annum 190,000 79,000 111,000

Capital cost US$ million 210 110 100

Financing

Equity US$ million

Offtake US$ million

Bank US$ million

Start Up

EBITDA Zinc = US$2250/t US$ million pa

TOTAL Phase 1 Phase 2

Capacity

EAFD tonnes per annum 400,000 200,000 200,000

Zinc grade Concentration 23% 26% 22%

Zinc concentrate tonnes per annum 162,000 83,000 79,000

Zinc contained tonnes per annum 92,000 49,000 43,000

Iron Product (ZHBI) tonnes per annum 190,000 79,000 111,000

Capital cost US$ million 210 110 100

Financing

Equity US$ million 60

Offtake US$ million 50

Bank US$ million 0

110

Start Up Q1 2012

EBITDA Zinc = US$2250/t US$ million pa 31

TOTAL Phase 1 Phase 2

Capacity

EAFD tonnes per annum 400,000 200,000 200,000

Zinc grade Concentration 23% 26% 22%

Zinc concentrate tonnes per annum 162,000 83,000 79,000

Zinc contained tonnes per annum 92,000 49,000 43,000

Iron Product (ZHBI) tonnes per annum 190,000 79,000 111,000

Capital cost US$ million 210 110 100

Financing

Equity US$ million 60

Offtake US$ million 50

Bank US$ million 0

110

Start Up Q1 2012 H2 2013

EBITDA Zinc = US$2250/t US$ million pa 53 31 22

TOTAL Phase 1 Phase 2

Capacity

EAFD tonnes per annum 400,000 200,000 200,000

Zinc grade Concentration 23% 26% 22%

Zinc concentrate tonnes per annum 162,000 83,000 79,000

Zinc contained tonnes per annum 92,000 49,000 43,000

Iron Product (ZHBI) tonnes per annum 190,000 79,000 111,000

Capital cost US$ million 210 110 100

Financing

Equity US$ million 60 60 na

Offtake US$ million 40 50 na

Bank US$ million 110 0 na

210 110 na

tentative

Start Up Q1 2012 H2 2013

EBITDA Zinc = US$2250/t US$ million pa 53 31 22

Page 11: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

KRP1 Plant Layout

View 1

View 2

Page 12: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

KRP Construction

12 months construction

Completed on schedule and budget

>500,000 man hours

No lost time accidents

Page 13: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Korean Recycling Plant January 2012

EAFD silos

Mega-silo

Briquettingtower

Coalpulverising

Office

Gas handling

Hotbriquetting

tower

RHF

Workshop

ZHBIstorage

Page 14: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

First EAFD delivery (30 Jan 2012)

Page 15: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

First HZO and DRI (27 April 2012)

Direct Reduced Iron

(DRI)

Zinc Oxide

Concentrate

(HZO)

Page 16: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Growth Potential

200k

200k

400k

Scrap recycling centres

Priority Targets

200k

Page 17: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Short term (2012) objectives

• KRP1

Full capacity

Product sales

Achieving target zinc recovery and iron metallisation

• KRP2

Financing

Development commences

• Plant 2

Environmental permitting

EAFD contracts

• Plant 3

Environmental permitting

Page 18: ZincOx Resources plc Corporate Overvie · ZincOx Resources plc ... Corporate Overview May 2012. ... to those with respect to the financial position and strategy of the Company,

Summary

• Focused on Korean Recycling Plant

• 400,000 tpa EAFD 10 year supply agreed (23.1% zinc)

• Phase 1

• to produce 76,000tpa zinc oxide concentrate

Ramping up from May 2012

• Full year EBITDA US$31 million pa

• Phase 1+2

• to produce 152,000 tonnes of zinc oxide concentrate Q4 2013

• EBITDA US$53 million per annum

• Excellent Additional Growth Potential

• Plans to “roll out” in Turkey, Thailand and USA

Using today’s technology to make yesterday’s waste into tomorrow’s resource