Zornitsa Zaharieva , BE-CO-DA on behalf of the CCS team CO3 Meeting 5 December 2013. Controls Configuration Service (CCS) - Renovation Aspects I mportant for the ACCOR Project & the Equipment Groups. Contents. Introduction to CCS - PowerPoint PPT Presentation
Citation preview
Controls Configuration Service (CCS) -Renovation Aspects Important for the
ACCOR Project & the Equipment Groups
Zornitsa Zaharieva, BE-CO-DAon behalf of the CCS team
CO3 Meeting5 December 2013
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 22
Contents
• Introduction to CCS
• Migration of the configuration data for the renovated Controls
Devices
• CCS support for the ACCOR baseline
• CCS support for renovation changes in LSA in 2014
• Conclusion
Z.Zaharieva 22.04.2013 Controls Configuration Service - LS1 Plans EDMS doc: 1281984 2
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 3
Controls Configuration Service
• Provides the configuration management facilities for the Controls System components for all accelerators
• A collection of processes, tools (editors), APIs and a common repository (DB) for configuration data
• Presents an integrated, trusted, coherent and a centralized view of the Controls System, which is used as a configuration source by all of its components (e.g. CMW, Front-Ends, Timing, Diamon, Laser, etc.)
• Integrated, cross-domain configuration data for various controls devices frameworks – FESA, Hardware, Virtual, GM, SL
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 4
Controls Devices Configurations Migration• ACCOR Controls Devices Renovation
• GM FESA• FESA2 FESA3• GM Hardware (FGCs, Vacuum, etc.)• GM Virtual
• In order to speed up the migrations of the configuration data and not to lose existing configurations a dedicated process has been put in place
• Input (migration maps) required in order to perform the migrations
• Without the migration maps it is not possible to perform the migration
• Only the equipment expert (class responsible) can provide the map (the key)
Class Properties Migration Map
Device Migration Map
Device Properties Migration Map
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 5
Controls Devices Configuration Migration Process• Challenges:
• There are a lot of manual interventions and coding that the CCS team needs to perform for each class migration
• It is not possible to handle all requests simultaneously due to limited resources• Solution: to plan the migrations and to space them in time
• The first time a given class & devices from it need to be migrated – 4 weeks notice period• Subsequent migrations of devices – 2 weeks notice period
Devices migration map
Device Properties migration map
working sets,
knobs, metaproperties
instance level properties /
fields
equip relations,cable signals,
module interrupts,sub-addresses, etc.
Migrate all
configurations from original device D@FEC
to new device D-NEW
Rename original device from D to
D-OLD@FEC-dummy
Rename new device from D-NEW to D
LSAControls Configuration
Reference settings
FECs Generations
Class Properties migration map
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 6
Support for the Configuration Migration Process
• A dedicated editor to collect the input – Migration Maps Editor• User-friendly features - notifications, bulk loading capabilities, etc. Objective: Automate as much as possible the migration process
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 7
Gathered Experience in 2013
• 3 Successful Pilot Dry-Runs – Linac2, AD, Booster• The CCS team collected a lot of input for the required work and for the
optimization of the process
• Essential to work in close collaboration with the class responsible in order to perform the migrations
• The speed of the migration process varies depending on the complexity of the class being migrated• The most difficult migration case so far – GM POW-V class
• Special ‘Thank you!’ to Daniel Calcoen
! It is not possible to completely automate the migration process
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 8
Controls Devices Migration 2013 Results• Reports with the migrated devices status and statistics are available in the Controls
Configuration Data Browser (https://cern.ch/service-co-config )
• Total number of migrated devices – 2742• PTIM-V to LTIM (GM -> FESA2/3) - 1303• POW-V to PowM1553 (GM -> FESA3) – 1078 devices• POW to FGC_61 (GM -> HARDWARE) – 104 devices• VGAUG to PVPUMP (GM -> HARDWARE) – 96 devices• …..
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 9
Controls Devices Configuration Migrations Plans for 2014• Migration of Timing Classes from Jean-Claude Bau, Xavier Piroux• Continue with the migration of PTIM-V and LTIM from Ioan Kozsar• Migration of the CO Generic Classes from Steen Jensen• Migration of Pow classes from Daniel Calcoen (PowRs422, etc.)• Migration of QPS classes from Herve Milcent (wipe out everything and insert)• …………
! If you are planning to migrate configuration data from classes and devices – contact the [email protected] as soon as possible in order to look into the details
Machine Migration Submit by Ready by Needed by
PSB 4 DIGIO -> CGDIO 29 Nov2013 13 Dec 2013 01 Feb 2014*
CPS 75 GFAS -> CGAFG 29 Nov 2013 13 Dec 2013 Feb 2014*
6 DIGIO -> CGDIO 29 Nov 2013 13 Dec 2013 Feb 2014*
13 DIGCTL -> CGDIO 29 Nov 2013 13 Dec 2013 Feb 2014*
3 PTIMD -> CGTDEL 29 Nov 2013 13 Dec 2013 Feb 2014*
LEI 4 AIOX -> CGAO 29 Nov 2013 13 Dec 2013 Dec 2014
3 GFAS -> CGAFG 13 Dec 2013 17 Jan 2014 March 2014
12 DIGCTL -> CGDIO 13 Dec 2013 17 Jan 2014 March 2014
2 PTIMD -> CGTDEL 13 Dec 2013 17 Jan 2014 March 2014
AD 6 DIGIO -> CGDIO 17 Jan 2013 31 Jan 2013 March 2014
6 DIGCTL -> CGDIO 17 Jan 2013 31 Jan 2013 March 2014
2 PTIMD -> CGTDEL 17 Jan 2013 31 Jan 2013 March 2014
CTF 13 PTIMD -> CGTDEL As requested As requested March 2014Example: C
O Generic Classes schedule from Steen
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 1010
CCS - ACCOR Baseline end of 2013
• Continue with the support for the ACCOR FEC renovations• Refactoring of the Controls Configuration Hardware area
• Upgrades and improvements of the db model• New Hardware Configuration Editor (migrating from obsolete technology)• Support for new driver’s configurations functionalities and other new features• User announcements and tutorials will be sent• Release – Dec. 2013
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 11
CCS - ACCOR baseline end of 2013
• Integration of the FESA3 Configuration model into the Controls Configuration Service• Providing integration (coherency) with the rest of the systems using the Controls
Configuration (e.g. Timing, FEC Configurations, RBAC, etc.)• Support for the FESA releases v.3.1 – 01.07.2013, v.3.1.2 – Dec. 2013
• Reengineering of the Controls Devices -Virtual Devices framework• Extensions for Diamon configurations• Release – Dec. 2013
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 1212
CCS Data Propagation to LSA in 2013
• The CCS provides a level of abstraction/isolation between LSA and the class-properties device model• Example: LSA uses the FGC aliases and not the device names, etc.
• A subset of the class-properties and devices data from CCS is propagated to LSA• Controls Configuration uses ~ 5 100 000 parameters• LSA uses ~192 000 parameters
• Usually the properties and devices for LSA are propagated manually
• Working Sets and Metaproperties are entered in the Controls Configuration and propagated to LSA
FECs Generations
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 13
CCS Renovation Changes Affecting LSA in 2014
• Increase the level of abstraction and restrict further the data set that LSA will be able to see• Improve the robustness of the model and avoid problems in
LSA due to configuration changes that should not affect it
• Transfer the working sets and metaproperties to LSA as they are seen as extension of the settings model (for non-GM devices)
• Introduce a flag for all devices and properties in the Controls Configuration (FESA, Hardware, Virtual, GM, SL) to designate which ones should be published to LSA• Based on the flag the propagation of data will happen instantaneously
(smooth process)
• There will be no need to use the manual data propagation tool
• When the flag is introduced all devices and properties currently in LSA will be set with it
• Equipment Experts/Operators will need to take care only of subsequent changes
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 14
Conclusion
• Together with the ACCOR team we have established processes in order to perform and to optimize the device migrations • Proven to be working successfully with the Pilot Dry Runs
• Working together with the equipment expert is essential for the successful and on-time migration
• Plan the migrations and take into account the notice periods • The Controls Devices configuration data migration requires quite a lot of resources and
planning from the CCS team• Contact the [email protected] - tailored support
• The CCS is supporting the agreed milestones in the ACCOR baseline
• Improvements to the Configuration model and tools in 2013 and 2014 introduced gradually
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 15
Questions
Thank you for your attention!
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 16
Controls Configuration Service Overview
16
Controls Configuration DB
XML config files,Binaries, etc.
PL/SQL APIsDrivers Gen, Timing, FESA, etc.Pro*C scriptsFECs configs, GM, etc.
Java APIsBeam Intelocks ConfigSMP ConfigDirectory ServiceLogbooks publishing
Browsing Tools 220 reports covering all areas of the CCS
> 300 users from 4 departments
Set of 16 Data Editors >250 editing forms
- Strict authorization 250 users
LASER DB(Alarms)
LSA DB
Layout DBRBACCMWDiamonFixed Displays...
Z. Zaharieva Controls Configuration Service – Renovation aspects important for ACCOR 1717
Controls Device Classes & Properties Models(FESA, GM, Hardware, Virtual, SL frameworks)
Fixed Displays Configuration
Computers Configurations ,
Hardware modules ( FECs, PLCs,
PVSS servers, etc.)
Common ConsoleManager
Configuration
Role-Based Access
Configuration Diagnostics &Monitoring
Configuration
Safe Machine Parameters
Config
AlarmsConfiguration
QPSConfig
Video Observation System Config
Beam Interlock System Config
Accelerators Timing System
Config
Drivers Config
CMW Config
WICConfig
PICConfig
OasisConfig
Power Converters
Config
Working Sets & Metaproperties
Config
Z.Zaharieva 22.04.2013 Controls Configuration Service - LS1 Plans EDMS doc: 1281984
Controls Configuration Logical Domains