Busbar Protection
Protection & Contrle / Application
Rev. A JM, September 2004
5/26/2018 11-Busbar Protection Busbar Protection Rf
2/63
08/0205/02/032 2
Without Busbar Protection
F2F1
There are fewer faults on busbars than on other parts of the
power system.
No risk of dislocation of system due to accidental operation of
busbar protection.
Argues
5/26/2018 11-Busbar Protection Busbar Protection Rf
3/63
08/0205/02/033 3
Without Busbar Protection
F2F1
Slow fault clearance.
Busbar faults at F1 and F2 are cleared by remote time
delayed protection on circuits feeding the faults:
Time Delayed Overcurrent or
Time Delayed Distance Protection
Drawbacks
5/26/2018 11-Busbar Protection Busbar Protection Rf
4/6308/0205/02/034 4
With Busbar Protection
BUSBARZONE
F1
Fast clearance by breakers at the busbars
5/26/2018 11-Busbar Protection Busbar Protection Rf
5/6308/0205/02/035 5
With Busbar Protection
BUSBARZONE
F2F1
Where busbars are sectionalised,
Protection can limit the amount of systemdisruption for a busbar fault
5/26/2018 11-Busbar Protection Busbar Protection Rf
6/6308/0205/02/036 6
21 21
87BB
87BB
1/2
With Busbar Protection
SS1
SS2
SS3
5/26/2018 11-Busbar Protection Busbar Protection Rf
7/6308/0205/02/037 7
21 21
87BB
87BB
2/2
With Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
8/6308/0205/02/038 8
21 21 21
21 21
1/2
With NoBusbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
9/6308/0205/02/039 9
21 21
2/2
21
21 21
With NoBusbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
10/6308/0205/02/0310 10
21 21 21
21 21
21 21
87BB
87BB
With Busbar protection
With NoBusbar protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
11/6308/0205/02/0311 11
Busbar Faults Are Usually Permanent
Causes of Busbar Faults :
Falling debris
Insulation failures
Circuit breaker failures
Current transformer failures Isolators switchs operated on load or outside their ratings
Safety earths left connected
Therefore :
Circuit breakers should be tripped and locked out by busbar
protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
12/6308/0205/02/0312 12
Busbar Protection must be :
RELIABLE
Failure to trip could cause widespread damage to the substation
STABLE
False tripping can cause widespread interruption of supplies to
customers / possible power system instability
DISCRIMINATING
Should trip the minimum number of breakers to clear the fault
FAST
To limit damage and possible power system instability
5/26/2018 11-Busbar Protection Busbar Protection Rf
13/6308/0205/02/0313 13
Methods of Providing Busbar Protection
Frame to Earth (Leakage) Protection
Blocking Scheme Protection
Differential Protection : High Impedance
Low Impedance
Insulation
>I
>I >I >I >I>I
5/26/2018 11-Busbar Protection Busbar Protection Rf
14/63
08/0205/02/0314 1405/02/0314
Frame Leakage Protection
Protection & Contrle / Application
Rev. A JM, September 2004
5/26/2018 11-Busbar Protection Busbar Protection Rf
15/63
08/0205/02/0315 15
Insulation
>I
Frame Leakage Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
16/63
08/0205/02/0316 16
>I
Frame Leakage Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
17/63
08/0205/02/0317 17
>I
Frame Leakage Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
18/63
08/0205/02/0318 18
>I
Frame Leakage Busbar Protection
>I
5/26/2018 11-Busbar Protection Busbar Protection Rf
19/63
08/0205/02/0319 19
Can detect only earth faults
Switchgear must be insulated from earth (by standing onconcrete plinth)
Only one single earth conductor allowed on switchgear
All cable glands must be insulated
Switchgear sections must be insulated
Frame Leakage Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
20/63
08/0205/02/0320 20
>I
>I
Frame Leakage Busbar Protection
Neutral Check
False Operationbecause inducedloop
No operationprevents from
false trip
5/26/2018 11-Busbar Protection Busbar Protection Rf
21/63
08/0205/02/0321 21
>I
>I
Frame Leakage Busbar Protection
Neutral Check
5/26/2018 11-Busbar Protection Busbar Protection Rf
22/63
08/0205/02/0322 22
>I
>I
Neutral Check
Frame Leakage Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
23/63
08/0205/02/0323 2305/02/0323
Blocking Scheme Protection
Protection & Contrle / Application
Rev. A JM, September 2004
5/26/2018 11-Busbar Protection Busbar Protection Rf
24/63
08/0205/02/0324 24
>I >I >I >I>I
Blocking Scheme Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
25/63
08/0205/02/0325 25
>I >I >I >I>I
Blocking Scheme Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
26/63
08/0205/02/0326 26
>I >I >I >I>I
Blocking Scheme Busbar Protection
5/26/2018 11-Busbar Protection Busbar Protection Rf
27/63
08/0205/02/0327 2705/02/0327
High Impedance Protection
Protection & Contrle / Application
Rev. A JM, September 2004
5/26/2018 11-Busbar Protection Busbar Protection Rf
28/63
08/0205/02/0328 2808/0205/02/0328
Single Bus Substation
Single Bus Substation
5/26/2018 11-Busbar Protection Busbar Protection Rf
29/63
08/0205/02/0329 29
P1
P2
S1
S2
P1
P2
S1
S2
P1
P2
S1
S2
Single Bus Substation
5/26/2018 11-Busbar Protection Busbar Protection Rf
30/63
08/0205/02/0330 30
Single Bus Substation
5/26/2018 11-Busbar Protection Busbar Protection Rf
31/63
08/0205/02/0331 31
Single Bus Substation
5/26/2018 11-Busbar Protection Busbar Protection Rf
32/63
08/0205/02/0332 32
5/26/2018 11-Busbar Protection Busbar Protection Rf
33/63
08/0205/02/0333 3308/0205/02/0333
Double Bus Substation
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
34/63
08/0205/02/0334 34
yCurrent switching
Bus A
Bus B
ab
Current
P1
P2
S1
S2
P1
P2
S1
S2
P1
P2
S1
S2
P1
P2
S1
S2
P1
P2
S1
S2
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
35/63
08/0205/02/0335 35
yCurrent switching
Bus A
Bus B
ab
Current
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
36/63
08/0205/02/0336 36
yCurrent switching
Bus A
Bus B
ab
Current
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
37/63
08/0205/02/0337 37
Current switching
Bus A
Bus B
ab
Current
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
38/63
08/0205/02/0338 38
Current switching
Bus A
Bus B
ab
Current
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
39/63
08/0205/02/0339 39
Current switching
Bus A
Bus B
ab
Current
Isolator Auxiliary Switches
5/26/2018 11-Busbar Protection Busbar Protection Rf
40/63
08/0205/02/03
40 40
Bus A
Current
Bus B
ab
Tripping switching
Tripping ab
5/26/2018 11-Busbar Protection Busbar Protection Rf
41/63
08/0205/02/03
41 41
Main CT must be identical
Current switching via auxilliary relay is not acceptable.
Requirement of number of position contact (Disconnectorswitch) is high
Interposing CT are not acceptable
Isolator Auxiliary SwitchesC t it hi
5/26/2018 11-Busbar Protection Busbar Protection Rf
42/63
08/0205/02/03
42 42
Current switching
Bus A
Bus B
abCurrent
Isolator Auxiliary SwitchesC t it hi
5/26/2018 11-Busbar Protection Busbar Protection Rf
43/63
08/0205/02/0343 43
Current switching
Bus A
Bus B
abCurrent
Bus A
Bus B
abCurrent
Isolator Auxiliary SwitchesO L d T f
5/26/2018 11-Busbar Protection Busbar Protection Rf
44/63
08/0205/02/0344 44
Bus A
Bus B
a
bCurrent
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
45/63
08/0205/02/0345 45
Bus A
Bus B
abCurrent
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
46/63
08/0205/02/0346 46
Bus A
Bus B
abCurrent
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
47/63
08/0205/02/0347 47
Bus A
Bus B
abCurrent
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
48/63
08/0205/02/0348 48
Bus A
Bus B
ab
Current
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
49/63
08/0205/02/0349 49
Bus A
Bus B
abCurrent
On Load Transfer
Isolator Auxiliary SwitchesOn Load Transfer
5/26/2018 11-Busbar Protection Busbar Protection Rf
50/63
08/0205/02/0350 50
Bus A
Bus B
abCurrent
On Load Transfer
Isolator Auxiliary SwitchesCheck Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
51/63
08/0205/02/0351 51
Bus A
Bus B
TripBusA
TripBusB
Zone A
Zone B
Check Zone
Isolator Auxiliary SwitchesCheck Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
52/63
08/0205/02/0352 52
Bus A
Bus B
TripBusA
TripBusB
Zone A
Zone B
Check Zone
Current
switching
failure
False
Tripping
Isolator Auxiliary SwitchesCheck Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
53/63
08/0205/02/0353 53
Bus A
Bus B
TripBusA
TripBusB
Check
Zone
Zone A
Zone B
Check Zone
Isolator Auxiliary SwitchesCheck Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
54/63
08/0205/02/0354 54
Bus A
Bus B
TripBusA
TripBusB
Zone A
Zone B
Check Zone
Isolator Auxiliary SwitchesCheck Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
55/63
08/0205/02/0355 55
Bus A
Bus B
TripBusA
TripBusB
Check
Zone
5/26/2018 11-Busbar Protection Busbar Protection Rf
56/63
08/0205/02/0356 5608/0205/02/0356
One Breaker and a HalfSubstation
5/26/2018 11-Busbar Protection Busbar Protection Rf
57/63
08/0205/02/0357 57
Bus A Bus
B
P1
P2
S1
S2
P1
S1
P2
S2
P1P2
S1S2
5/26/2018 11-Busbar Protection Busbar Protection Rf
58/63
08/0205/02/0358 58
Bus A Bus
B
5/26/2018 11-Busbar Protection Busbar Protection Rf
59/63
08/0205/02/0359 59
Bus A Bus
B
5/26/2018 11-Busbar Protection Busbar Protection Rf
60/63
08/0205/02/0360 60
Bus A Bus
B
5/26/2018 11-Busbar Protection Busbar Protection Rf
61/63
08/0205/02/0361 61
Bus A Bus
B
5/26/2018 11-Busbar Protection Busbar Protection Rf
62/63
08/0205/02/0362 62
Bus A Bus
B
5/26/2018 11-Busbar Protection Busbar Protection Rf
63/63
08/0205/02/0363 63
Bus A Bus
B
P1
S1
P2
S2
P1
S1
P2
S2
P1
S1
P2
S2
P1
S1
P2
S2