7/26/2019 13.05.2016, Check Girder Momen Strength Due to Crane C1, Span 15 m
1/1
Steel Material =
Fy = 240.00 MPa H.iwf = 1,500.00 mm Mu = 2,013.91 kN.m
Steel Profile Used = B.iwf = 500.00 mm Mn = 3,077.96 kN.m
E (Elastic Modulus) = 200,000.00 MPa Yes tw = 1 2. 00 m m Vu = 461.19 kN
Ix (Moment Inertia) = 11,972,940,565 mm4 0.75 x h tf = 1 6. 00 m m Vn = 2,256.67 kN
Steel Making = 1,101.00 mm r = 5.00 mm .max x FD = 18.07 mm
Web Classification = 0.90 r min = 5.00 mm Limit = 15.00 mm
Flange Classification = 0.97 Check r = OK!
2,507.41 k N
2,256.67 kN
AISC Moment Provision = H.iwf = 2,500.00 mm Mn = 3,583.77 kN.m
L Span = 15.00 m B.iwf = 500.00 mm
Unbrace Length Factor = 0.13 Dead Load = 1.25 tw = 1 9. 00 m m
Unbrace Length (Lb) = 1.88 m Live Load = 0.5 tf = 4 2. 00 m m X1 = 3.69 m
Lp = 3,952.57 mm Live Load Crane = 1.5 r = 8.00 mm
Lr = 13,796.67 mm r min = 8.00 mm
Lb Condition = Lb Lp Check r = OK!Design Method =
Cb = 1.00
Mn = 3,419.96 kN.m
= 0.90
P1 Point Load Position from RA
CHECK GIRDER STRENGTH DUE TO CRANE C1, Span = 15 m
BJ 37
Not Compact Web
Not Compact Flange
F4
Multiplier Load Factor (LF)
v =
Web Shear Coefficient (Cv) =
Vn =Allowable Moment Capacity (AISC 2010)
IWF 1500x 500 x 12 x 16
Built Up
LRFD
Vn =
Custom Profile Dimension 2
Moment Strength Capacity
Based on SNI Baja 2002
Summary Report
StiffenerReq =h/tw > 2.46 x (Es/Fy), Required
Transverse Stiffeners
Use Stiffener=
OK!
OK!
Allowable Shear Capacity (AISC 2010)
StiffenerSpacing (a) =
Custom Profile Dimension 1
NOT OK!!
65.4%
20.4%
120.5%
Created by: Made Eka Prayuda Pande
Email: [email protected]
WA:081804022644
= .
Mn = 3,077.96 kN.m
Moment Cap. Ratio (Mn/Mp) = 78%
Width of Load Area = 0.75 m
FP x Load
1. Occupancy Load = 3.00 kN/m2 1.50
2. Others Load (Area Load) = 0.00 kN/m2 0.00
3. Others Load (Line Load) = 0.00 kN/m 0.00
FP x Load
Include Self Weight = Yes
1. Self Weight = 2.64 kN/m 3.30
2. Concrete Slab = 0.00 kN/m2 0.00
Conc.Thickness = 0.00 mm
3. Others Load (Area Load) = 0.50 kN/m2 0.63
4. Others Load (Line Load) = 0.20 kN/m 0.25
Total Distrb.Load (Q1) = 5.14 kN/m
Load Type = Pa x LF
Pa.1 = 68.96 kN 86.20Pa.2 = 68.96 kN 86.20
Pa.3 = kN 0.00
Distributed Load
Point Load 1
Dead Load
Live Load =
Dead Load =
P1 P2 P3 P4 P5 P6 P7 P8
L Span
X1 X5X2 X3 X4 X6 X7 X8
=
Pa.4 = kN 0.00 RA = 461.19 kN RB = 335.21 kN
Pa.5 = kN 0.00
Pa.6 = kN 0.00
Pa.7 = kN 0.00
Pa.8 = kN 0.00 M1 = 1,665.19 kN.m 1 = 13.46 mm
M2 = 2,013.91 kN.m 2 = 18.07 mm
Load Type = Pb x LF M3 = 1,448.78 kN.m 3 = 14.82 mm
Pb.1 = 182.29 kN 273.44 M4 = 0.00 kN.m 4 = 0.00 mm
Pb.2 = 182.29 kN 273.44 M5 = 0.00 kN.m 5 = 0.00 mm
Pb.3 = kN 0.00 M6 = 0.00 kN.m 6 = 0.00 mm
Pb.4 = kN 0.00 M7 = 0.00 kN.m 7 = 0.00 mm
Pb.5 = kN 0.00 M8 = 0.00 kN.m 8 = 0.00 mm
Pb.6 = kN 0.00 mi dd = 1 1. 60 mm
Pb.7 = kN 0.00 M.Max = 2,013.91 kN.m max = 18.07 m m
Pb.8 = kN 0.00
P1 = (Pa.1 + Pb.1) x LF = 359.64 kN X.P1 = 3.69 m
P2 = (Pa.2 + Pb.2) x LF = 359.64 kN X.P2 = 8.69 m V.RA = 4 61.19 kN
P3 = (Pa.3 + Pb.3) x LF = 0.00 kN X.P3 = 10.52 m V1 = 442.24 kN
P4 = (Pa.4 + Pb.4) x LF = 0.00 kN X.P4 = 15.22 m V2 = 56.89 kN
P5 = (Pa.5 + Pb.5) x LF = 0.00 kN X.P5 = 16.22 m V3 = -312.20 kN
P6 = (Pa.6 + Pb.6) x LF = 0.00 kN X.P6 = 17.22 m V4 = 0.00 kN
= = = =
Out of Span
PositionLoad Position from RA:
Internal Moment Force in P5 =
Max Moment =
Deflectionin P5 =
Max Deflection=
Deflectionin middle span =
Internal Moment Force in P3 =
Deflectionin P1 =
Point Load 2
Internal Moment Force in P8 =
Deflectionin P2 =
Deflectionin P3 =
Deflectionin P4 =
Deflectionin P6 =
Deflectionin P7 =
Deflectionin P8 =
Internal Moment Force in P4 =
Internal Moment Force in P6 =
Internal Moment Force in P7 =
Major Moment Force Major Deflection
Internal Moment Force in P1 =
Internal Moment Force in P2 =
Live Load Crane
Point Load 1 + 2 =
Internal Shear Force in P2 =
Major Shear Force
Shear Force in RA =
Internal Shear Force in P1 =
Inside of Span
Inside of Span
Inside of Span
Out of Span
Out of Span Internal Shear Force in P3
Internal Shear Force in P4
P7 = (Pa.7 + Pb.7) x LF = 0.00 kN X.P7 = 18.22 m V5 = 0.00 kNP8 = (Pa.8 + Pb.8) x LF = 0.00 kN X.P8 = 19.22 m V6 = 0.00 kN
V7 = 0.00 kN
V8 = 0.00 kN
L span = 15.00 m V.RB1 = -335.21 kN
X = 1,000.00
Limit = L span / X = 15.00 mm V.Max = 461.19 kN
M ul ti pl ie r Fa ctor fo r Sh ea r De fl ec ti on (FP D) = 1 .0 0
X1 = 3.69 m
X2 = 5.00 m
X3 = 1.84 m
X4 = 4.70 m
X5 = 1.00 m
X6 = 1.00 m
X7 = 1.00 m
X8 = 1.00 m
Deflection Limit
Load Position Arrangement
Out of SpanOut of Span
Max Shear Major Force =
Internal Shear Force in P5Internal Shear Force in P6
Internal Shear Force in P7
Internal Shear Force in P8
Shear Force in RB =