1"of"3"
As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"
Argus- By Dead Puppet Society Touring Technical Specification B V1 Music Playback Option "
Touring"Company"
4"Cast"Members"
1x"SM"
"Equipment"with"Touring"Company"
Set$ 1x"4m"Circle"Truss""(in"4"arcs)"
" 12x"plywood"set"cladding"
" 12x"steel"arms"w/scaff"clamp"
" 6x"cladding"joins"
" 2x"1000mm"roller"legs"
" 2x"3000mm"steel"roller"legs"
" 4x"short"cross"brace"pipe"
" "
" 3x"2500mm"48"OD"Steel"pipe"
" 3x"2000mm"48"OD"Steel"Pipe"
" 2x"3200mm"48"OD"Steel"Pipe"
" 2x"3900mm"48"OD"Steel"Pipe"
" 2x"Cross"brace"length"
" 6x"Fixed"(90"Degree)"scaff"clamps""27x"Swivel"scaff"clamps"
$
Costume$and$Props$$ 2x"Small"props"road"case$
$ ""
Lighting$$ "3x"LED"par""(Venue"to"supply"if"available)"
$ 4x"Festoon"lengths""5x"BC"pendant"bulb"fittings"
"
2"of"3"
As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"
" "
Sound" 1x"Macbook"Pro"with"QLab"playback"system"
"
Performance$
Running"time"of"45"minutes,"no"interval"
"
Pre6rig$and$set$up$ Lighting$4"Lighting"to"be"rigged,"coloured"and"patched"prior"to"companies"arrival"as"per"venue"issued"lighting"plan"4"Floor"Electrics"to"be"prepped"and"circuits"to"be"run4"however"will"be"placed"following"the"set"build"4"Lighting"to"be"focussed"during"company"bump"in"4Show"file"is"in"both"ION"format"and"MA"format4"Please"advise"on"venue"console"
" Staging)
) 4"Scaff"pipe"and"scaff"clamps"for"wheel"structure"may"be"provided"by"the"venue4"TBC"in"liaison"with"the"venue"
" *Risk"Assessments"and"Safe"Work"Method"Statements"(SWMS)"Available"prior"to"bump"in*"
$
Bump$In$ $ $ 4"2x"Lighting"technicians"for"5"hours"
$ 41x"Staging"for"4"hours"
4"1x"Sound"technician"for"3"hours"(Or"minimum"call)"
(Expecting"that"the"venue"has"pre4rigged"lighting,"and"PA"is"currently"installed"in"standard"position)"
" " " " "
Performance$ 6$1x$Sound$Operator$6$1x$Lighting$Operator"
"
Bump$Out$ 4"1x"Staging"for"3"hours"(Or"minimum"call)"
4"1x"Lighting"for"3"hours"(Or"minimum"call)"
41x"Sound"for"3"hours"(Or"minimum"call)"
"
$$
3"of"3"
As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"
Dimensions$ $ $ Black"Box"set"Up"Proscenium"Set"Up""Minimum"5m"usable"stage"width"Stage"Depth"min"6m"
" " " " " Floor"to"Grid"Height"Minimum"4m""General$Storage$ $ Storage"space"is"required"in"the"theatre"for"any"excess"
touring"equipment"not"used."243"cubic"metres"if"possible."$$$Lighting$ $ $ $ Venue"specific"plans"and"paperwork"to"be"provided"closer"
to"date."Generic"plan,"patch"sheets"and"focus"notes"to"come."""Audio$and$Talkback$ $
Venue$to$Supply:$
$1x"mixing"console"with"facility"for"stereo"input"from"computer"
FOH"audio"set"up"(+"subs,"if"possible)""
2x"condenser"mics"on"short"stands"DS"of"wheel4"Performers"vocal"
1x"Choir"mic,"hung"in"centre"of"circle4"Performers"vocal"
3x"Talkback"headsets"(2x"control"position,"1x"stage"level)"
"
Dressing$Rooms$ 1x"dressing"room"for"cast"members"1x"production"dressing"room""
Wardrobe/Laundry$ Access"to"washing"machine"and"dryer"+"ironing/steaming"facilities"1"Clothes"rack"in"performer"dressing"room"
ARGUSBy Dead Puppet SocietySET DRAWING V11:25 @ A1
Drawn By Whitney EglingtonAs at 5 July 2013
Side View- Opposite Prompt
Front View
Top View
Notes:- Drawings do not depict plywood cladding- bare truss only
- Dimensions are subject to change
- All pipe is 48 OD- Steel
- Build drawing only- Venue specific plans to be issued prior to bump in
3900
3600
4000
ARGUSBy Dead Puppet Society Standard Production Schedule B
(Music Playback Option)
1 of 1
Whitney Eglington0419585511
Time Activity Required
0800 Load into venue SM, Venue CrewSet Position, venue induction etc
0830 Begin Set construction SMStaging x 1
1230 Sound Set Up 1x SoundProps bump in SM, CastLX Prac Rig 2x LX
1330 LX Focus Commence SM, 2x LX
1530 LX Plot/ Fixups SM , 2x LX
1730 DINNER All
Crew Summary: 1x Staging (4hrs), 2x LX (5hrs), 1x SND (4hrs)
Please note this is a sample schedule- actual schedule to be issued prior to bump in subject to venue specific needs.
CL
1 2 3 41234 55
CL 1 2 3 41234 55
9
The following table lists MIX mode colors sorted by DMX % level. A source temperatureof 3200 degrees K. is presumed.
Mix Mode Color Table - Sorted by DMX % Level
front string back string front string back string
Color Chan 1 Chan 2 Chan 1 Chan 2
Number Color Name DMX % DMX % DMX (dec) DMX (dec)
--- CLEAR 49% 45% 125 115
--- CUSTOMER 2 49% 100% 125 255
--- CUSTOMER 1 100% 45% 255 115
L116 MED BLU GRN 0% 63% 0 161
L139 PRIMARY GREEN 0% 95% 0 242
G905 DARK BLUE 4% 0% 10 0
R83 MEDIUM BLUE 4% 4% 10 10
R80 PRIMARY BLUE 4% 9% 10 23
L132 MEDIUM BLUE 4% 13% 10 33
R69 BRILLIANT BLUE 4% 27% 10 69
G740 OFF BLUE 4% 31% 10 79
L124 DARK GREEN 4% 85% 10 217
R90 DRK YELL GRN 4% 90% 10 230
L181 CONGO BLUE 9% 0% 23 0
R383 SAPPHIRE BLUE 9% 4% 23 10
G835 AZTEC BLUE 9% 13% 23 33
G810 MOON BLUE 9% 18% 23 46
L118 LIGHT BLUE 9% 27% 23 69
G690 BLUEGRASS 9% 54% 23 138
G915 TWILIGHT 13% 4% 33 10
G760 AQUA BLUE 13% 31% 33 79
G725 PRINCESS BLUE 13% 40% 33 102
G685 PISTACHIO 13% 63% 33 161
G650 GRASS GREEN 13% 85% 33 217
G945 ROYAL PURPLE 18% 0% 46 0
G847 CITY BLUE 18% 18% 46 46
G815 MOODY BLUE 18% 22% 46 56
R65 DAYLIGHT BLUE 18% 27% 46 69
G710 BLUE GREEN 18% 36% 46 92
G680 KELLY GREEN 18% 63% 46 161
G660 MED GREEN 18% 81% 46 207
R358 ROSE INDIGO 22% 0% 56 0
L180 DARK LAVENDER 22% 4% 56 10
G950 PURPLE 22% 9% 56 23
R64 LIGHT STEEL BLUE 22% 22% 56 56
R57 LAVENDER 27% 13% 69 33
G940 LIGHT PURPLE 27% 18% 69 46
L201 FULL CT BLUE 27% 27% 69 69
L117 STEEL BLUE 27% 36% 69 92
R86 PEA GREEN 27% 85% 69 217
10
G960 MEDIUM LAVENDER 31% 18% 79 46
G790 ELECTRIC BLUE 31% 36% 79 92
G995 ORCHID 36% 4% 92 10
G990 DARK LAVENDER 36% 13% 92 33
R52 LIGHT LAVENDER 36% 22% 92 56
R54 SPECIAL LAVENDER 36% 31% 92 79
G540 PALE GREEN 36% 67% 92 171
R48 ROSE PURPLE 40% 9% 102 23
L203 1/4 CT BLUE 40% 40% 102 102
L101 YELLOW 40% 95% 102 242
R344 FOLIES PINK 45% 9% 115 23
R10 MEDIUM YELLOW 49% 90% 125 230
G450 SAFFRON 54% 85% 138 217
R312 CANARY 54% 90% 138 230
L104 DEEP AMBER 54% 95% 138 242
G325 BASTARD AMBER 58% 58% 148 148
R09 PALE AMBER GOLD 58% 72% 148 184
R14 MEDIUM STRAW 58% 90% 148 230
G155 LIGHT PINK 63% 54% 161 138
G330 SEPIA 63% 63% 161 161
L204 FULL CT ORANGE 63% 85% 161 217
R15 DEEP STRAW 63% 90% 161 230
G160 CHORUS PINK 67% 54% 171 138
G343 HONEY 67% 81% 171 207
L179 CHROME ORANGE 67% 90% 171 230
L110 MIDDLE ROSE 72% 58% 184 148
L105 ORANGE 72% 95% 184 242
R36 MEDIUM PINK 76% 63% 194 161
R318 MAYAN SUN 76% 81% 194 207
G335 CORAL 76% 95% 194 242
G130 ROSE 81% 54% 207 138
L111 DARK PINK 81% 63% 207 161
R23 ORANGE 81% 90% 207 230
G315 AUTUMN GLORY 81% 95% 207 242
R44 MIDDLE ROSE 85% 54% 217 138
R32 MEDIUM SALMON PINK 85% 81% 217 207
R22 DEEP AMBER 85% 95% 217 242
G110 DARK ROSE 90% 49% 230 125
G120 BRIGHT PINK 90% 58% 230 148
G180 CHERRY 90% 76% 230 194
R19 FIRE 90% 95% 230 242
L128 BRIGHT PINK 95% 54% 242 138
R39 EXOTIC SANGRIA 95% 58% 242 148
R46 MAGENTA 95% 76% 242 194
R26 LIGHT RED 95% 95% 242 242
FOH 1
LX 1
LX 2
LX 3
SET POSITIONED APPROX 1m-2m US of Setting LineSightlines for set will determine its position in each venue. This will in turn solidify LX Bar positions.
Position from setting line- US 0.0m - 1.5m
Position from setting line- US 2.0m - 3.0m
Position from setting line- US 4.0m - 5.0m
Position from setting line- DS 2.5m - 4.0m
SETTING LINE
BLIN
DER
N/C
16
DSC
1DSC
2
DSC
3
Ring
8
DSC
Let
terb
ox200/R132
12
Bridge
201/R
132
13Bridge
201/R132
14
Ring
B
5
Ring
A
4
Curtain Call
202/R
119
18Curt
ain Call
202/R119
19
31
BOTTLE LED RGB STRIP
FLOOR LX
43
HAZER
22 24 25
On fly pully to be rigged above DSC of wheel
Venue to provideif available
FROSTED BULB
30
Spac
e fly
tigh
t
200/R132
15
23 26 2721
Extreme Approx sightline 45º Extreme Approx sightline 45º
FESTOONTo be hung above set between LX positions on stage
ARGUSBy Dead Puppet Society
PURP
OSE
COLOUR
CHANNELPACIFIC23º - 50º
1200FRESNEL
FESTOON STRINGPLUG POSITION
BAYONET
IRIS
VEN
UE NOTES
- All Fresnels to be rigged with Barndoors. - All profiles have 4 workable shutters.- All Lamps to be rigged with full colour and accessories.- All gel is LEE unless otherwise stated.- All measurements of lighting positions from setting line take into account an approx LX bar height of 6m from stage floor.- All hanging bayonets are clear white bulbs- can be mix fancy/reg size.- Gobos in twin spins are standard medium breaks ups.
PRODUCTION TEAMdirector DAVID MORTON
lighting designer JASON GLENWRIGHTtouring Stage manager/realiser SAMUEL MAHER
NATIONAL TOURING
STANDARD LIGHTING PLAN
1:50 @ A3 DRAWN BY J.G. © JASON GLENWRIGHT
06/05/2015- VER 1.07.5" CXI
SCROLLERROSCO
TWIN SPINCustom Gobo
Chan 8
CXI COLOUR CHEAT SHEET
PROFILE30º - 40º
TOU
RIN
G
Items positioned USC of 'wheel' set structure
BOTTLE LED FLY