Transcript
Page 1: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 57 )

Sborník 46. Konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

NESTABILIT A

A 2/2

RNDr., Mgr. Ivan Poul, Ph.D.1, 2

1Projekce iGEO s.r.o. a

2FINE s.r.o.

Human caused slope instabilities restoration works and a country road III/42117 putting into

part 2/2

Heavy rains in September 2014 have caused origin of shallow landslides affecting a country road

(3rd

class.) between a Pavlov.

investigation and the slope stability evaluation (03/2018). We completed 3 phases (09/2017-

04/2018) of geological and geotechnical investigations focussed on CPT tests and direct shear soil

test. New geological model and newly generated geotechnical model helped to understand natural

processes of slope instability process of origin along the country road. Evaluated global slope

stability is satisfactory with a factor of safety higher than 1.3. The main problems are wrong

excavation works taken under the slopes. This works has worsen local slope stabilities. A

restoration works design was our job for the South Moravia Authority.

:

1.

Page 2: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 58 )

Sborník 46. konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

(obr. 1) ce PDPS

(Poul a kol., 2018).

2. GEOLOGICKÝ MODEL

-

(obr. 2)

sesuvy jsou

-

aly.

3. GEOTECHNICKÝ MODEL

m

Page 3: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 59 )

Sborník 46. Konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

Tabulka1:

4. GEOTECHNICKÝ POSUDEK A PROJEKCE SANACE SV

1:1 apod.

– s

situace s -

jednom

v

FS=1,3 pro dlouhodobou situaci v

Jednotka

F6 CI/CL S2 SP F6/F8 R5

Konzistence/ulehlost IC/ID 2,5 0,3-0,5 1,5-2,5 -

O kN.m-3

17,5 17,5 18,5 18,5

M Edef MPa 10 27 50 100

0,34 0,31 0,31 0,21

E cef kPa 10 10 25 17*

E í efo 29 33 33 47*

Page 4: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 60 )

Sborník 46. konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

Obr. 2

j

Page 5: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 61 )

Sborník 46. Konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

d

Page 6: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

( 62 )

Sborník 46. konference Zakládání staveb Brno 2018. ČGtS ČSSI Praha, 2018

5.

jednom pruhu s omezenou

sti.

-

s -

-

17892-

-

po

- Vzhledem k

s

-

FS = 1,4 (obr. 3).

-

-

pou

,

6.

III/42117 -

Proj ;

E-mail adresa: [email protected]

Page 7: 6$1$&( ý/29 .(0 =3 #62%(1é&+ 69$+29é&+ NESTABILIT A =35 ... · Konzistence/ulehlost I C/I D 2,5 0,3-0,5 1,5-2,5 - OEMHPRYi WtKD ]HPLQ\ J kN.m-3 17,5 17,5 18,5 18,5 MRGXO S HWYiUQRVWL

Česká geotechnická

společnost ČSSI

Sb

orn

ík p

řísp

ěv

/ P

roce

ed

ing

s

ZAKLÁDÁNÍ STAVEB

46

. ko

nfe

ren

ce s

e za

hra

nič

ní ú

čast

í4

6th

Co

nfe

ren

ce w

ith

inte

rnat

ion

al p

arti

cip

atio

n

FOUNDATION ENGINEERING

19. – 20. 11. 2018

BRNO 2018


Recommended