AHLTA / EHR Way Forward:PART 1 – AHLTA and AHLTA Service
Pack 1PART 2 – EHR Way Forward
Presented by:
CAPT Robert Marshall, MD MPH MISMChief Medical Informatics Officer, BUMED M6
Robert L. Flores
AHLTA Program Manager, NAVMISSA
17-19 February 2011 Leading NAVMED through PortfolioManagement.
Learning Objectives
• AHLTA – Making it work better for patient care– Describe MAPS and COMPASS programs– Discuss IT applications to help– Discuss workflow analysis and AHLTA– Discuss AHLTA training and trainers– Describe the AHLTA Triumvirate– Discuss Secure Messaging, iMedConsent and
AHLTA
2
Learning Objectives (cont)
• AHLTA Service Pack 1• Understand Service Pack 1 milestones
• Beta test plans• Release management• Clinical Impact Analysis
• Service Pack 1 Fixes and Updates• Release contents• Fixes and Changes
• Release Tracking and Progress Reporting
317-19 February 2011 Leading NAVMED through PortfolioManagement.
Learning Objectives (cont)
• Deployment Plans• EUD Installation and Imaging • Reporting Process
• Troubleshooting• Reporting processes• Information gathering and Lessons Learned
• Communications and Coordination• Cross Discipline information sharing• Clinical User inclusion
• Training and User Awareness
417-19 February 2011 Leading NAVMED through PortfolioManagement.
Learning Objectives (cont)
• EHR Way Forward• Planning – Past, Present and Future
• EHRWF Tiger Teams review• Interagency (DoD/VA) planning – Before decision• Interagency (DoD/VA) planning – Post decision
• Products• Original Analysis of Alternatives• Directed AoA• Working Teams/Executive Team recommendations• Expected Interagency EHR
• Training and User Awareness
517-19 February 2011 Leading NAVMED through PortfolioManagement.
AHLTA – Present State
• Version 3.3 deployed to all Navy sites; all Army/Air Force sites by 12/31/2010
• Over 200 new and updated features – many not utilized; two turned off (aCPG and APV)
• No major upgrades after SP1 released• Possible for major Medcin upgrade (SOO)
6
MAPS and COMPASS
• What they are• The forms that support these• Workflow analysis and Business Process
Reengineering – why they are vital• WLAN – why it is critical to success• What does the Navy have?• What does the Navy need?• Dragon Naturally Speaking and AsUType• Tablets – PC, Android and iPad
7
Secure Messaging and iMedConsent
• Secure messaging - part of PCMH (Medical Home)– Web service – no Network or AHLTA interface– Copy and paste to document care
• iMedConsent - a library of consent forms– Both for procedures and for advanced directives– Also has research consent forms for IRB’s– Web service – no Network or AHLTA interface– Is the VA’s consent library (integrated)– Favorites, print and scan
8
AHLTA Training & Triumvirate
• Sustainment training contract– Sustainment trainers/consultants– Navy AHLTA web site– Regional Trainers from TMA
• Triumvirate– Consists of AHLTA trainer, Coder and Clinical
Champion– Need Command support to help clinics use AHLTA
better– Is a business/clinical process support asset
9
AHLTA Training & Triumvirate
• Sustainment training contract– Sustainment trainers/consultants– Navy AHLTA web site– Regional Trainers from TMA
• Triumvirate– Consists of AHLTA trainer, Coder and Clinical
Champion– Need Command support to help clinics use AHLTA
better– Is a business/clinical process support asset
10
11
AHLTA SERVICE PACK 1
17-19 February 2011 Leading NAVMED through PortfolioManagement.
AHLTA Service Pack 1
• Service Pack 1 Milestones
– Beta test plans
– Clinical Impact Analysis
– Release management
12
13
Beta Phases * 60 days Mon 1/17/11 Fri 4/8/11
Phase 1: Beta Tester 15 days Mon 1/17/11 Fri 2/4/11
Phase 2: Small Group of Providers 15 days Mon 2/7/11 Fri 2/25/11
Provide SP1 Briefing to New Users 15 days Mon 2/7/11 Fri 2/25/11
SP1A 16 days Fri 2/4/11 Fri 2/25/11
Phase 3: Full Clinic 15 days Mon 2/28/11 Fri 3/18/11
Provide SP1 Briefing to New Users 15 days
Full Site deployment 15 days Mon 3/21/11 Fri 4/8/11
Provide SP1 Briefing to New Users 15 days Mon 3/21/11 Fri 4/8/11
AHLTA Service Pack 1
*All Dates and Milestones are subject to change
Milestones
AHLTA Service Pack 1
• BETA Testing
– Plan includes testing by a representative site from each service
• Groton NH• Goodfellow AFB• Brooks Army Medical Center
14
AHLTA Service Pack 1
• BETA Test Plan– Users at the BETA sites using the software in live
encounters• DHIMS will collect usage info from BETA teams
– Testing on Windows 7 (32 bit) based EUDs for the first time in addition to Windows XP
• Windows 7 STIG creation• DHIMS will certify SP1 for both platforms• Windows Vista will not be supported
15
AHLTA Service Pack 1
• Clinical Impact Analysis– Plan includes analysis to be conducted on
implications of SP1 changes
• Clinical
• Business and Data Quality
16
AHLTA Service Pack 1
• Clinical Impact Analysis– TBD
17
AHLTA Service Pack 1
• Clinical Impact Analysis– TBD
– HIGHLIGHTS from the release notes will go here
18
AHLTA Service Pack 1
• Clinical Impact Analysis– TBD
– HIGHLIGHTS from the release notes will go here
19
AHLTA Service Pack 1
• Data Quality Impact Analysis– TBD
– HIGHLIGHTS from the release notes will go here
20
AHLTA Service Pack 1
Data Quality Impact Analysis– TBD
– HIGHLIGHTS from the release notes will go here
21
AHLTA Service Pack 1• Release Management
– Plan will include multiple facets
• Training Requirements– DHIMS has contracted to create training instruments
• Information on the Release to be communicated – IT specific deployment plans and instructions– Information resulting from functional impact analysis
efforts– Lessons learned from the BETA period
22
AHLTA Service Pack 1
Release Management– IT Organizations will need to develop plans prior to the release
• Magnitude of the SP1 code changes– Hundreds of fixes and thousands of code changes– Many modules have been completely re-written– Most massive update since 3.3 release
• Deployment plans should include creating new Gold Image from scratch (i.e., complete fresh installation of OS , etc)
» Re-imaging of EUDs is the deployment method sites should plan for» Re-imaging, while labor intensive and upsetting to the users, will pay
dividends in minimizing long term support issues» Start preparing users for the process well in advance
• Backing up users desktops, documents, etc.• Document printer settings, etc• Involve Clinical and Business/Data Quality managers in the process
23
AHLTA Service Pack 1
• Service Pack 1 Fixes and Updates
• Release contents and timetable• Beta Phases
• Fixes and Changes• Changes to Infrastructure• SP1 A plans
24
AHLTA Service Pack 1
Release Contents
Pieces to be included in SP1– Windows 7/XP Compatibility– CDR Stabilization – SQL Optimization (Integration
effort)– Remove unused AHLTA components– Oracle 10.2.0.5 (CDR)– Reflections 14.1
25
AHLTA Service Pack 1Deployment
CDR Update 814o Delivery CM (11/17)o DT&E Testing (11/22 – 11/29)o Fielding (12/18)
3.6 Mid-Tier Update o Delivery CM (12/3)o DT&E Testing (12/8 – 1/7)o Fielding
Groton (1/15) Goodfellow (1/15) AMEDD site (1/15)
3.6 Web Service Update o Delivery CM (12/3)o DT&E Testing (12/8 – 1/7)o Fielding
Groton (1/15) Goodfellow (1/15) BAMC(1/15) 26
AHLTA Service Pack 1Deployment
ICD Update 469 o Delivery CM (12/3)o DT&E Testing (12/8 – 1/7)o Fielding
Groton (1/15) Goodfellow (1/15) AMEDD site (1/15)
SP1 Cliento Delivery CM (12/3)o DT&E Testing (12/15 – 1/15)
Codes (CPT 6.0)o Delivery CM (1/21)o DT&E Testing (1/24 – 1/28)
27
AHLTA Service Pack 1
BETA Phases
Phase 1: Beta Tester (1/17 – 2/4)
Phase 2: Provider (2/7 – 2/25)cannot start until CPT dates• Small group: includes codes and SP1A
SP1A (will happen between Phase 2 and 3)code fix of any bugs found in beta testing)
Phase 3: Full Clinic (2/28 – 3/18)
Phase 4: Full site deployment (3/21 – 4/8)28
AHLTA Service Pack 1
• Troubleshooting
– Deployment processes• Procedures during Rollout• Reporting
– Information gathering and Lessons Learned• Communication plans• Sharing of lessons learned
29
AHLTA Service Pack 1
General Escalation Plan
– Successful completion of milestones will be reported and tracked
• Written communications primary means
– MHS Help tickets to be used to report problems during testing or deployment
• The word “BETA” must appear in the ticket title
30
AHLTA Service Pack 1
Mitigation Roll Back / Deployment
• Sites need to have a Roll Back plan– Beta testing, DT&E approval and a staggered
implementation does not guarantee a problem won’t appear
– Sites should minimize risk where possible» E.g., Monitor results of testing and BETA progress,
internal testing, staggered rollouts
Hope for the best but
plan for the worst!
31
AHLTA Service Pack 1
Communications
– Beta Period• Scheduled conferences will be held weekly and as
needed• Results of the Beta will be collated and
communicated to the sites• Sites should follow the progress of the Beta and
other information as they become available• “…if you’re not getting it, ASK for it!”
32
AHLTA Service Pack 1
Coordination
• Communications and Coordination at the local level
• Training and User Awareness
33
AHLTA Service Pack 1
Coordination
Cross Discipline information sharing
• Clinical User inclusion
• Business Office/Coding inclusion
• Use the Triumvirate process to get all stakeholders on board
34
AHLTA Service Pack 1
Coordination
• IT Managers should involve clinic managers, coders, and trainers when planning the deployment
• Users need to be aware of what is coming and when
– How to report issues
– Who to go to for help
– MHS Trouble Ticket processes
• Disseminate Lessons Learned
• Disseminate Impact Analysis
• AHLTA Clinical Champions can help coordinate these efforts 35
AHLTA Service Pack 1
Training
• DHIMS has contracted to create training materials
– Briefings and CBTs are expected
• Site Deployment Plans should include training plans
– Use ‘Triumvirate’– Involve Clinic managers and Coding/Data Quality– Involve MTF leadership
36
37
EHR WAY FORWARD
17-19 February 2011 Leading NAVMED through PortfolioManagement.
EHR Way Forward
• Past Planning– JCIDS-driven AoA– Down selected to four options– >90 clinical and non-clinical Tiger Teams– Full engagement by all three Services
• Pre-Decisional Interagency (DoD/VA) Planning – Driven by senior TMA leadership– Limited or no Service involvement initially– Multiple DoD/VA working groups
38
EHR Way Forward (cont)
• Post-Decisional Interagency Planning– Decision made in January for future direction– Decision was…..– Based on decision, planning did this….– Future product expected to be….– Timeline for implementation….– Long term planning….
39
Original/Interagency AoA
• DoD AoA process• Choices made• Alignment with Interagency decision• Why things changed?• Interagency AoA work• Working groups
– Mission Requirements and Performance Outcomes– Data Interoperability– Infrastructure and Enterprise Architecture– Systems Capabilities– Presentation Layer– Business Process
40
What is next?
• Outcomes of Interagency working groups – slides• Future end state• Timeline – separate slides• Data model – separate slides• Enterprise Service Bus/Data Access Layer –
separate slides• Mid-tier – separate slides• Presentation layer – separate slides• Interoperability – separate slides• Nationwide Health Information Network - slides
41
42
Click to edit Master title styleUse this two column slide for long lists of
bullets
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
17-19 February 2011 Leading NAVMED through PortfolioManagement.
Summary
43
• Font is Arial – 26 pt at this level– Second level – 25.5 pt
• Third level – 24 pt– Fourth level - 22.5 pt
» Fifth level – 21 pt
17-19 February 2011 Leading NAVMED through PortfolioManagement.
Contact Information
• CAPT Robert C. Marshall, MD, MPH, MISM• [email protected]• 253-225-1690
• Robert L. Flores• [email protected]• 210-808-0789
4417-19 February 2011 Leading NAVMED through PortfolioManagement.
Questions
4517-19 February 2011 Leading NAVMED through PortfolioManagement.
Once your Navy Days 11 presentation draft is complete, please follow the naming convention and version control instructions below:
1. File name begins with Navy Days 11 plus the name of your session then the date of submission in
a mm_dd_yyyy format then the word Draft, e.g., ND11_Fixing the World Via Powerpoint_11_15_2010_Draft.
2. Each time the draft is revised, a version number is added, e.g., ND11_Fixing the World Via
Powerpoint_11_15_2010_Draft_V1; ND11_Fixing the World Via Powerpoint_11_15_2010_Draft_V2, etc.
3. When the final version of the presentation has been approved, replace the word Draft with Final.
4. With any changes made to the Final, begin the versioning process at 1 again, e.g., ND11_Fixing
the World Via Powerpoint_11_15_2010_Final; ND11_Fixing the World Via Powerpoint_11_15_2010_Final_V1.
5. Save the file in MS Powerpoint 97-2003 and 2007 to accommodate the reviewers' operating
systems.
4617-19 February 2011 Leading NAVMED through PortfolioManagement.