Allomax Update
Subsea / ROVSubsea / ROV
Asset Evaluation
Recruitment Changes
www.allomax.com www.sysmax.com
Staff
Recruitment
ROV Operations
Asset EvaluationRecruitment
Agency Services
Well Engineering
Operations
SubseaPersonnel
Evaluation
Risk Management
Competence Assurance
ALLOMAX ASSOCIATES
Well Engineering Well Engineering
Subsea / ROV Operations
Management Consulting
Personnel Provision• We provide highly experienced personnel globally
– Drilling– Completions– Subsea– Management Consulting
• Support Network for Consultants• Support Network for Consultants– Social Network– Allomax Answers (knowledge network)– Online Job Notice Board
• Internationally experienced
Why Allomax?•Provide ‘quality over quantity’
• Innovative, fast & efficient
•Focussed market awareness
•Originality, objectivity, enthusiasm & trust
•Premium service delivering ‘value for money’
• PEOPLE TECHNOLOGY• PEOPLE
• Skills base
• Track record
• Experience in the industry
TECHNOLOGY
• Social Networking site
• Knowledge Bank
• Job Notice Board
• CANDIDATE QUALIFICATION
• CV Screening
• Casmax competency profiling
• Interviews
Allomax Answers
• Post questions to peers
• Find answers to • Find answers to challenges
• Get expert advice from the network
Search Consulting Opportunities
• Search our latest vacancies
• Get paid for posting opportunities
Network with Colleagues
• Find past and present colleagues
• Stay in touch
Social Networking & Allomax Answers
•Find past & present colleagues
•Search our Consulting opportunities
•Post questions to peers
•Find answers to challenges
•Get paid for posting opportunities
•Stay in touch with colleagues
•Get expert advice from the network
Our Client base
Our Client base
SYSMAX
Track Record Over 250 projects Indicative Examples
• ERD vs Subsea vs MMFP� Harding (BP), Claymore (Talisman), Tilapia (Ranger Congo), Zhoa Dong
(Apache China), Espoire (Ranger Cote d’Ivoire)
• Conceptual Field Design Optimisation� Jasmine (ConocoPhillips), Shiehallion & Foinavon (BP)
• Well design / planning optimisation� Tartan, Auk, Burghley, Gyda, South Angsi (Malaysia) (Talisman)� Tartan, Auk, Burghley, Gyda, South Angsi (Malaysia) (Talisman)� Erskine workover (Total)� Nini (Dong – Denmark)
• Potential major incident (confidential)� Shut in production for riser replacement or not?� Commence relief well or not?� Deepwater Xmas tree deployment (Total Dalian Angola)
• Risk Based Well cost estimation – custom build Tullow Oil, • >100 field acquisitions
Asset Evaluation Team• Peter McAteer – BSc C.Eng C.Dir FIMMM MIoD – Project Management
� 25 year experienced specialist in conceptual field design and asset evaluationsupervising multi-disciplinary teams unlocking reserves for many oilcompanies.
• Tom Mackay – BSc Geol. SPE - Subsurface
� Ex Managing Director and Senior VP of Stratic Energy Corporation -Increased market cap. of company over period 2002-2007 from approx. $10million to approx. $220 million.Increased market cap. of company over period 2002-2007 from approx. $10million to approx. $220 million.
• Paul Barron – Bsc C.Eng MIMM Eur. Ing - Facilities Engineering� Paul has over 30 years experience, specialising in new field developments
and project management internationally.• Jon Ford – Bsc Geol & Geophys - Geoscience
� 30 years of subsurface evaluation and interpretation experienceinternationally.
• Steven Turner – Financial
� Led and executed investments / divestments in over 30 energy assets andlicences totalling more than $1.1bn. Raised over $2.1bn in new debt includingproject debt, tax based structures and public market bonds.
Sysmax Risk Management
• Reduce waste (non productive time / cost / incidents)
• Communicate risk and likely costs to managementmanagement
• Evaluate options and choose the best
• Integrate wells, facilities and reservoir risk to achieve optimal development
Risk Management Toolbox
Risk Management
Risked Well Cost Estimation
Risk Based Option Analysis
Optimise asset performance
www.sysmax.com
Casmax
• Competence Assurance System� Develop people to meet objectives
Track Record > 1200 Personnel
Wells, Subsea & Facilities Engineering available
How Is Casmax Used?
• By the individual?�To drive own career
• By the Asset?�To provide assurance / succession planning
• By Discipline• By Discipline�Right people / right place / right time�Succession planning
• By Company�Demonstrates commitment to people�Link to career ladder / grades
A Simple Process
Database Architecture
Set-up
Range StatementAmendment or Creation
Set up Job Profiles
CandidateSelf AssessmentPersonal Profile
Training / Development /
PromotionSupervisorAssessment
Self Assessment
DevelopmentAction Setting
Initiation
Cyclic
Customise
Personal ProfileAmendment
Benefits
• Corporate improvement
• Assess, Assure, Develop & Deploy people better
�Focus training and development�Focus training and development
�Demonstrate the experience / skills / knowledge required
�Help retain and motivate people
�Increase efficiency and HS&E
ALLOMAX SUBSEA
Allomax Subsea
• Personnel Provision
• ROV Vehicle Supply
– Operations Management
– Specialist Tooling– Specialist Tooling
Allomax Subsea
• Personnel Provision– Operations Management
– Able to call on 60 years ROV industry knowledge
– Single point senior project manager
– Senior PM supported by qualified ROV project Engineers– Senior PM supported by qualified ROV project Engineers
– Experienced ROV offshore staff
• ROV Vehicle Supply– Specific ROV systems for Drill support
– Large rental tooling pool
– Specific drill support tooling
– Tooling designed for our ROV systems
Allomax Subsea• ROV System’s
– TSV 1 125 HP dual manip ROV
– Capable of 300KG payload
– Konsberg MS900 digital sonar
– Fibre optic multiplexing
– TMS 200 Mt tether– TMS 200 Mt tether
– Triton 12 100 HP dual manip ROV
– Capable of 200KG payload
– Konsberg MS1000 digital sonar
– Fibre optic multiplexing c/w survey expansion mux
– TMS 500Mt neutrally buoyant tether
Thank you!!
Allomax - Integrity with Efficiency…Allomax - Integrity with Efficiency…
Recommended