BAB VPERENCANAAN GEOMETRIK JALAN
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 57
BAB VPERENCANAAN GEOMETRIK JALAN
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 58
BAB VPERENCANAAN GEOMETRIK JALAN
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 59
BAB VPERENCANAAN GEOMETRIK JALAN
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 60
BAB VPERENCANAAN GEOMETRIK JALAN
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 61
BAB VPERENCANAAN GEOMETRIK JALAN
BAB V
PERHITUNGAN VOLUME
5.1 Perhitungan Volume Perkerasan untuk Umur Rencana 5 Tahun
5.1.1 Perhitungan Volume Aspal Beton (Surface Course)
Gambar 5.1 Sket Penampang Surface Course
- Lebar perkerasan = 15
- m
- Tebal perkerasan surface course = 0,1 m
Panjang jalan = 7780 m
- Lapisan perkerasan surface course yang digunakan:
Panjang jalan X Lebar perkerasan = 7780 m x 15 m
= 116700 m2
- Luas penampang perkerasan base course
= (15m+15,2m)
2x 0,1m=11,40 m2
- Volume perkerasan base course
= 11,40 m2 x 7780 m
= 88692 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 62
15,2 m0,1 m
15 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.1.2 Perhitungan Volume Batu Pecah (Base Course)
Gambar 5.2 Sket Penampang Base Course
- Lebar perkerasan base course = 15,2 m
- Tebal perkerasan base course = 0,2 m
- Panjang jalan = 7780 m
- Panjang perkerasan base course
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680 m
- Luas penampang perkerasan base course
= (15,2m+15,6m)
2x 0,2m=3,080 m2
- Volume perkerasan base course
= 3,080 m2 x 7680 m
= 23654,4 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 63
15,2 m
15,6 m
0,2 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.1.3 Perhitungan Volume Sirtu (Sub Base Course)
Gambar 5.3 Sket Penampang Sub Base Course
- Lebar perkerasan sub base course = 15,6 m
- Tebal perkerasan sub base course = 0,3 m
- Panjang jalan = 7780 m
- Panjang perkerasan sub base course
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680 m
- Luas penampa perkerasan sub base course
= (15,6m+16,2m)
2x 0,3m=4,77 m2
- Volume perkerasan sub base course
= 4,77 m2 x 7680 m
= 36633,60 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 64
15,6 m
16,2m
0,3 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.2 Perhitungan Volume Bahu Jalan untuk Umur Rencana 5 Tahun
Gambar 5.4 Sket Penampang Bahu Jalan
- Lebar bahu jalan = 2 x 3 m = 6 m
- Tebal bahu jalan = 0,6 m
- Panjang jalan = 7780 m
- Panjang bahu jalan
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680 m
- Luas penampang bahu jalan
= 6 m x 0,6 m = 3,6 m2
- Volume perkerasan bahu jalan
= 3,6 m2 x 7680 m
= 27648 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 65
3 m 3 m
0,6 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.3 Perhitungan Volume Perkerasan untuk Umur Rencana 10 Tahun
5.3.1 Perhitungan Volume Aspal Beton (Surface Course)
Gambar 5.1 Sket Penampang Surface Course
- Lebar perkerasan = 15 m
- Tebal perkerasan surface course = 0,15 m
Panjang jalan = 7780 m
- Lapisan perkerasan surface course yang digunakan:
Panjang jalan X Lebar perkerasan = 7780 m x 15 m
= 116700 m2
- Luas penampang perkerasan base course
= (15m+15,3m)
2x 0,15m=2,27 m2
- Volume perkerasan base course
= 2,27 m2 x 7780 m
= 17660,6 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 66
7,5 m
15,3 m
7,5 m
0,15 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.3.2 Perhitungan Volume Batu Pecah (Base Course)
Gambar 5.2 Sket Penampang Base Course
- Lebar perkerasan base course = 15,3 m
- Tebal perkerasan base course = 0,2 m
- Panjang jalan = 7780 m
- Panjang perkerasan base course
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680 m
- Luas penampang perkerasan base course
= (15,3m+15,7m)
2x 0,2m=3,1 m2
- Volume perkerasan base course
= 3,1 m2 x 7680 m
= 23808 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 67
15,3 m
15,7 m
0,2 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.3.3 Perhitungan Volume Sirtu (Sub Base Course)
Gambar 5.3 Sket Penampang Sub Base Course
- Lebar perkerasan sub base course = 15,7 m
- Tebal perkerasan sub base course = 0,25 m
- Panjang jalan = 7780 m
- Panjang perkerasan sub base course
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680 m
- Luas penampa perkerasan sub base course
= (15,7m+16,2m)
2x 0,25m=3,99 m2
- Volume perkerasan sub base course
= 3,99 m2 x 7680 m
= 30643,2 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 68
15,7 m
16,2 m
0,25 m
BAB VPERENCANAAN GEOMETRIK JALAN
5.4 Perhitungan Volume Bahu Jalan untuk Umur Rencana 10 Tahun
Gambar 5.4 Sket Penampang Bahu Jalan
- Lebar bahu jalan = 2 x 3 m = 6 m
- Tebal bahu jalan = 0,6 m
- Panjang jalan = 7780 m
- Panjang bahu jalan
= panjang jalan – panjang jembatan
= 7780 m – 100 m
= 7680m
- Luas penampang bahu jalan
= 6 m x 0,6 m = 3,6 m2
- Volume perkerasan bahu jalan
= 3,6 m2 x 7680 m
= 27648 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 69
3 m 3 m
0,6 m
BAB VPERENCANAAN GEOMETRIK JALAN
V.3 Perhitungan Volume Galian dan Timbunan
V.3.1 Perhitungan Volume Timbunan
V.3.1.1 Timbunan 1
Gambar 5.5 Sket Timbunan 1
Luas Penampang
- Sta 2+900
Luas penampang : 0 m2
- Sta 3+000
20,5 m
3 m
26,5 m
Luas penampang : (26,5m+20,5m)
2x 3m=¿70,5 m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 70
Sta 0 000
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 3+070
20,5 m
5 m
30,5 m
Luaspenampang : (30,5m+20,5m)
2x 5m = 127,5 m2
- Sta 3+100
20,5 m
6,9 m
34,3 m
Luas penampang : (34,3m+20,5m)
2x 6,9m=¿189,06 m2
Volume
- Sta 2+900 s/d Sta 3+000 = (0+70,5)
2x 100m=¿3.525 m3
- Sta 3+000 s/d Sta 3+070 = (70,5+127,5)
2x 70m = 6.930 m2
- Sta 3+070 s/d Sta 3+100 = (127,5+189,06)
2x 30m = 4.748,4 m3
Total Volume Timbunan 1 = 15.203 m 3
V.3.1.2 Timbunan 2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 71
BAB VPERENCANAAN GEOMETRIK JALAN
Gambar 5.6 Sket Timbunan 2
LuasPenampang
- Sta 3+300
20,5 m
7,9 m
36,3 m
Luas penampang : (36,3m+20,5m)
2x 7,9m=¿224,36 m2
- Sta 3+400
20,5 m
5 m
30 m
LuasPenampang : (30m+20,5m)
2x 5m = 126,25 m2
- Sta 3+410
Luas penampang : 0 m2
Volume
- Sta 3+300 s/d Sta 3+400 = (224,36+126,25)
2x 100m=¿17.530,5 m3
- Sta 3+400 s/d Sta 3+410 = (126,25+0)
2x 10m=¿631,25 m3
Total Volume Timbunan 2 = 1 8 . 161,75 m 3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 72
BAB VPERENCANAAN GEOMETRIK JALAN
` V.3.1.3 Timbunan 3
Gambar 5.7 Sket Timbunan 3
- Sta 3+800
Luas penampang : 0 m2
- Sta 3+830
20,5 m
0,5 m
21,5 m
Luaspenampang :(21,5m+20,5m)
2x 0,5m = 10,5 m2
- Sta 3+900
20,5 m
1m
22,5 m
Luas penampang : (22,5m+20,5m)
2x 1m=¿21,5 m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 73
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 4+000
20,5 m
1,5 m
23,5 m
Luas penampang : (23,5m+20,5m)
2x 1,5m=¿33 m2
- Sta 4+100
20,5 m
2,1 m
24,7 m
Luas penampang : (24,7m+20,5m)
2x2,1m=¿47,46 m2
- Sta 4+200
20,5 m
1,1 m
22,7 m
Luas penampang : (22,7m+20,5m)
2x1,1m=¿23,76 m2
- Sta 4+300
Luas penampang =0 m2
Volume
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 74
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 3+800 s/d Sta 3+830 = (0+10,5)
2x 30m=¿157,5 m3
- Sta 3+830 s/d Sta 3+900 = (10,5+21,5)
2x 70m = 1.120 m3
- Sta 3+900 s/d Sta 4+000 = (21,5+33)
2x 100m=¿2.725 m3
- Sta 4+000 s/d Sta 4+100 = (33+47,46)
2x100m=¿4.023 m3
- Sta 4+100 s/d Sta 4+200 = (47,46+23,76)
2x 100m=¿3.561 m3
- Sta 4+200 s/d Sta 4+300 = (23,76+0)
2x100m=¿1.188 m3
Total Volume Timbunan 3 = 12.774,5 m 3
V.3.1.4 Timbunan 4
Gambar 5.8 Sket Timbunan 4
Luas Penampang
- Sta 5+550
Luas penampang = 0 m2
- Sta 5+600 20,5 m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 75
BAB VPERENCANAAN GEOMETRIK JALAN
0,4 m
21,3 m
Luas penampang = (21,3m+20,5m)
2x 0,4m=¿ 8,36m2
- Sta 5+700 20,5 m
1,1 m
22,7 m
Luas penampang = (22,7m+20,5m)
2x1,1m=¿ 23,76m2
- Sta 5+730 20,5 m
1,4 m
23,3 m
Luaspenampang =(23,3m+20,5m)
2x 1,4m = 30,66 m2
- Sta 5+800
Luas penampang = 0 m2
Volume
- Sta 5+550 s/d Sta 5+600 = (0+8,36)
2x50m=¿209 m3
- Sta 5+600 s/d Sta 5+700 = (8,36+23,76)
2x100m=¿1.606 m3
- Sta 5+700 s/d Sta 5+730 = (23,76+30,66)
2x30m = 816,3 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 76
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 5+730 s/d Sta 5+800 = (30,66+0)
2x70m=¿1.073,1 m3
Total Volume Timbunan 4 = 3.704,4 m 3
V.3.1.5 Timbunan 5
Gambar 5.9 Sket Timbunan 5
Luas Penampang
- Sta 7+450
Luas penampang = 0 m2
- Sta 7+500 20,5 m
1 m
22,5 m
Luas penampang = (22,5m+20,5m)
2x 1m=¿ 21,5m2
- Sta 7+600 20,5 m
3m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 77
BAB VPERENCANAAN GEOMETRIK JALAN
26,5 m
Luas penampang = (26,5m+20,5m)
2x 3m=¿ 70,5m2
- Sta 7+615
20,5 m
3,3m
27,1 m
Luaspenampang = (27,1m+20,5m)
2x 3,3m = 78,54 m2
- Sta 7+700
Luas penampang = 0m2
Volume
- Sta 7+450 s/d Sta 7+500 = (0+21,5)
2x 50m=¿537,5 m3
- Sta 7+500 s/d Sta 7+600 = (21,5+70,5)
2x 100m=¿4.600 m3
- Sta 7+600 s/d Sta 7+615 = (70,5+78,54 )
2x15m = 1.117,8 m3
- Sta 7+615 s/d Sta7+700 = (78,54+0)
2x85m=¿3.337,95 m3
Total Volume Timbunan 5 = 9.593,25 m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 78
BAB VPERENCANAAN GEOMETRIK JALAN
V.3.2 Perhitungan Volume Galian
V.3.2.1 Galian 1
Gambar 5.10 Sket Galian 1
Luas Penampang
- Sta 2+335
Luas penampang = 0 m2
- Sta 2+400 25,5 m
1 m
23,5 m
Luas penampang = (25,5m+23,5m)
2x 1m=¿24,5m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 79
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 2+500 27,5 m
2 m
23,5 m
Luas penampang = (27,5m+23,5m)
2x 2m=¿51 m2
- Sta 2+600 27,5 m
2 m
23,5 m
Luas penampang = (27,5m+23,5m)
2x 2m=¿51m2
- Sta 2+700
30,5 m
3,5 m
23,5 m
Luas penampang =(30,5m+23,5m)
2x 3,5m = 94,5 m2
Volume
- Sta 2+335 s/d Sta 2+400 = (0+24,5)
2x 65m=¿796,25 m3
- Sta 2+400 s/d Sta 2+500 = (24,5+51)
2x100m=¿3.775 m3
- Sta 2+500 s/d Sta 2+600 = (51+51)2
x100m=¿5.100 m3
- Sta 2+600 s/d Sta 2+700 = (51+94,5)
2x 100m=¿7.275 m3
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 80
BAB VPERENCANAAN GEOMETRIK JALAN
Total Volume Galian 1= 16.946,25 m 3
V.3.2.2 Galian 2
Gambar 5.11 Sket Galian 2
- Sta 2+700
30,5 m
3,5 m
23,5 m
Luas penampang =(30,5+23,5)
2x 3,5m = 94,5 m2
- Sta 2+715
30,9 m
3,7 m
23,5m
Luaspenampang = (30,9+23,5)
2x 3,7m = 100,64 m2
- Sta 2+800
Luas penampang = 0 m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 81
BAB VPERENCANAAN GEOMETRIK JALAN
Volume
- Sta 2+700 s/d Sta 2+715 = (94,5+100,64)
2x15m=¿1.463,55 m3
- Sta 2+715 s/d Sta 2+800 = (100,64+0)
2x85m = 4.277,2 m3
Total Volume Galian 2= 5.740,75 m 3
V.3.2.3 Galian 3
Gambar 5.12 Sket Galian 3
Luas Penampang
- Sta 5+900
Luas penampang =0m2
- Sta 6+000
26,1 m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 82
BAB VPERENCANAAN GEOMETRIK JALAN
1,3 m
23,5 m
Luas penampang = (26,1m+23,5m)
2x 1,3m=¿ 32,24m2
- Sta 6+050
27,3 m
1,9 m
23,5 m
Luaspenampang = (27,3m+23,5m)
2x 1,9m = 48,26 m2
- Sta 6+100
26,5 m
1,5 m
23,5 m
Luas penampang = (26,5m+23,5m)
2x 1,5m=¿ 37,5m2
- Sta 6+200
25,1 m
0,8 m
23,5 m
Luas penampang = (25,1m+23,5m)
2x 0,8m=¿ 19,44m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 83
BAB VPERENCANAAN GEOMETRIK JALAN
- Sta 6+300
Luas penampang = 0m2
Volume
- Sta 5+900 s/d Sta 6+000 = (0+32,24)
2x100m=¿1.612m3
- Sta 6+000 s/d Sta 6+050 = (32,24+48,26)
2x 50m=¿2.037,5m3
- Sta 6+050 s/d Sta 6+100 =(48,26+37,5)
2x50m = 2.144 m3
- Sta 6+100 s/d Sta 6+200 = (37,5+19,44 )
2x100m=¿2.847 m3
- Sta 6+200 s/d Sta 6+300 = (19,44+0)
2x100m=¿972 m3
Total Volume Galian 3= 9.612,5 m 3
V.3.2.4 Galian 4
Gambar 5.13 Sket Galian 4
Luas Penampang
- Sta 6+900
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 84
BAB VPERENCANAAN GEOMETRIK JALAN
Luas penampang =0m2
- Sta 7+000
24,9 m
0,7 m
23,5 m
Luas penampang = (24,9m+23,5m)
2x 0,7m=¿ 16,94m2
- Sta 7+100
26,5 m
1,5 m
23,5 m
Luas penampang = (26,5m+23,5m)
2x 1,5m=¿ 37,5m2
- Sta 7+150
27,3 m
1,9 m
23,5 m
Luaspenampang = (27,3m+23,5m)
2x 1,9m = 48,26 m2
- Sta 7+200
25,9 m
1,2 m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 85
BAB VPERENCANAAN GEOMETRIK JALAN
23,5 m
Luas penampang = (25,9m+23,5m)
2x 1,2m=¿ 29,64m2
- Sta 7+300
Luas penampang = 0m2
Volume
- Sta 6+900 s/d Sta 7+000 = (0+16,94 )
2x100m=¿847m3
- Sta 7+000 s/d Sta 7+100 = (16,94+37,5)
2x100m=¿2.722 m3
- Sta 7+100 s/d Sta 7+150 = (37,5+48,26)
2x50m = 2.144 m3
- Sta 7+150 s/d Sta 7+200 = (48,26+29,64)
2x 50m=¿1.947,5 m3
- Sta 7+200 s/d Sta 7+300 = (29,64+0)
2x100m=¿1.482 m3
Total Volume Galian 4 = 8.295,5 m
Tabel 5.1 Hasil perhitungan volume galian dan timbunan
StaLuas Volume
Galian (m2) Timbunan (m2) Galian (m3) Timbunan (m3)0+000 - -
- -0+100 - -
- -0+200 - -
- -0+300 - -
- -0+400 - -
- -
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 86
BAB VPERENCANAAN GEOMETRIK JALAN
0+500 - -- -
0+600 - -- -
0+700 - -- -
0+800 - -- -
0+900 - -- -
1+000 - -- -
1+100 - -- -
1+200 - -- -
1+300 - -- -
1+400 - -- -
1+500 - -- -
1+600 - -- -
1+700 - -- -
1+800 - -- -
1+900 - -- -
2+000 - -- -
2+100 - -- -
2+200 - -- -
2+300 - -769,25 -
2+400 24,5 -3775 -
2+500 51 -5100 -
2+600 51 -7275 -
2+700 94,5 -5740,75 -
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 87
BAB VPERENCANAAN GEOMETRIK JALAN
2+800 - -- -
2+900 - -- 3525
3+000 - 70,5- 11678,4
3+100 - 189,06- -
3+200 - -- -
3+300 - 224,36- 17530,5
3+400 - 126,25- 631,25
3+500 - --
3+600 - --
3+700 - --
3+800 - -- 1277,5
3+900 - 21,5- 2725
4+000 - 33- 4023
4+100 - 47,46- 3561
4+200 - 23,76- 1188
4+300 - -- -
4+400 - -- -
4+500 - -- -
4+600 -- -
4+700 - -- -
4+800 - -- -
4+900 - -- -
5+000 - -- -
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 88
BAB VPERENCANAAN GEOMETRIK JALAN
5+100 - -- -
5+200 - -- -
5+300 - -- -
5+400 - -- -
5+500 - -- 209
5+600 - 8,36- 1606
5+700 - 23,76- 1889,4
5+800 - -- -
5+900 - -1612 -
6+000 32,24 -4181,5 -
6+100 37,5 -2847 -
6+200 19,44 -972 -
6+300 - -- -
6+400 - -- -
6+500 - -- -
6+600 - -- -
6+700 - -- -
6+800 - -- -
6+900 - -847 -
7+000 16,94 -2722 -
7+100 37,5 -4091,5 -
7+200 29,64 -1482 -
7+300 - -- -
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 89
BAB VPERENCANAAN GEOMETRIK JALAN
7+400 - -- 537,5
7+500 - 21,5- 4600
7+600 - 70,5- 4455,75
7+700 - -- -
7+800 - -- -
∑ Total Volume Galian : 40.595m3
∑ Total Volume Timbunan : 59.437,3m3
V.4 Perhitungan Volume Galian Drainase
Gambar 5.14 Sket Penampang Galian Drainase
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 90
BAB VPERENCANAAN GEOMETRIK JALAN
- Panjang jalan = 7800 m
- Panjang galian drainase
= panjang jalan – panjang jembatan
= 7800 m – 200 m
= 7600 m
- Luas penampang 2 jalur drainase
= 2 x ((0,5+1,5)2 ) x0,5=¿ 1 m2
- Volume perkerasan drainase
= 1 m2 x 7600 m
= 7600 m3
V.5 Luas Tanah Dasar
- Panjang jalan = 7800 m
- Panjang tanah dasar
= panjang jalan – panjang jembatan
= 7800 m – 200 m
= 7600 m
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 91
BAB VPERENCANAAN GEOMETRIK JALAN
- Lebar penampang jalan
=median + lebar perkerasan + bahu jalan
= 1,5 + (2 x 2 x 3,5) + (2 x 2,5)
= 20,5 m
- Luas tanah dasar
= panjang tanah dasar x lebar penampang jalan
= 7600 x 20,5
= 155.800 m2
PERANCANGAN STRUKTUR PERENCANAAN JALAN KELAS II A PADA DAERAH DATAR 92