Abbey R
d
Copyright nearmap 2015
Project AssetsRegional Stormwater System
¯ 0 50 100 Feet
BALDWIN CREEK STABILIZATION NEAR ABBEY ROADNorth Royalton, Ohio
SUMMARYThis project includes over 400 linear feet of channel realignment and floodplain reconnection west of Abbey Road to create a stable meander pattern and alleviate severe bank erosion. A private driveway crossing will be evaluated for replacement because it is in poor condition and contributes to stream instability.
Project DetailsAsset Numbers:BD00287BD00291BD00292BD00293Contract Type:GED/Bid/BuildConstruction Cost:$440,000
Anticipated Construction NTP:3rd QTR 2020Watershed Team Leader:Donna [email protected]
ROCKY RIVERWATERSHED•BALDWIN CREEKSUBWATERSHED