Public Notice#6758 11/15/19
Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
FIGURE
Alamo Manhattan Bank Stabilization - Portland, Oregon United States
Geological Survey (USGS) Lake Oswego, Oregon 7.5 quadrangle,
2017
(viewer.nationalmap.gov/basic)
Bank Stabilization Work area
#6758 11/15/19
Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, OR 97070
FIGURE
Blocks 41, 42, 44, & 45
Bank Stabilization Work area
31
32
32
32
0
5
10
15
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig4A ExistCond.dwg, 7/2/2020 1:05:37
PM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 3 of 15
Encl 1
AutoCAD SHX Text
200
BASE ALIGNMENT PROFILE: STA 0+00 TO STA 3+50 Horiz. Scale: 1"=20'
Vert. Scale: 1"=10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0+00 1+00 2+00 3+00 3+50
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW
PROPOSED GREENWAY TRAIL ELEVATIONEXISTING
ORDINARY HIGH WATER (OHW)
TYPE 4 (TYP.)
TYPE 3 (TYP.)
TYPE 2 (TYP.)
TYPE 1 (TYP.)
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
ORDINARY LOW WATER (OHW ELEV 5.90')
SOUTH WATER FRONT TOP OF BANK (2002, PORTLAND GIS)
PROPOSED FENCE
LEGEND
SOUTH WATERFRONT TOP OF BANK 2002 (PORTLAND GIS)
BANK STABILIZATION TO MATCH EXISTING GROUND EXISTING SLOPES 2H:1V
OR FLATTER
PROPERTY BOUNDARY
CITY OF PORTLAND DATUM)
POST-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
PRE-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
WORK LIMIT FOR BANK STABILIZATION)
EXISTING WOOD PIER TO BE REMOVED
TRANSITION GRADING TO ADJACENT GREEN WAY AS SHOWN
LARGE WOOD TYPE 4 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 3 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 2 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 1 (TYP.) SEE FIGURE 5E
M AT
C H
LI N
E - B
AS E
AL IG
N M
EN T
ST A
3+ 50
SE E
FI G
U R
E 5B
NOTES: 1. SEE FIGURE 5C AND 5D FOR BANK STABILIZATION PLAN
2. SEE FIGURE 5F FOR PILE REMOVAL DETAIL
3. SEE FIGURE 7F FOR BANK STABILIZATION DETAILS
4. SEE FIGURES 7A-7C FOR BANK SECTIONS.
Site Plan
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Horiz. Scale: 1"=60' Vert. Scale: 1"=30'
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5A Siteplan.dwg, 7/8/2020 3:44:27 PM,
AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 4 of 15
Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
120
BASE ALIGNMENT PROFILE: STA 3+50 TO STA 7+00 Horiz. Scale: 1"=20'
Vert. Scale: 1"=10'
-10
0
10
20
30
40
-10
0
10
20
30
40
3+50 4+00 5+00 6+00 7+00
OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW
OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW OLW
ORDINARY HIGH WATER (OHW)
GROUND
TYPE 2 (TYP.)TYPE 1 (TYP.)
TYPE 4 (TYP.)
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
ORDINARY LOW WATER (OHW ELEV 5.90')
SOUTH WATER FRONT TOP OF BANK (2002, PORTLAND GIS)
PROPOSED FENCE
LEGEND
6+89
WILLAMETTE RIVER
PS D
BANK STABILIZATION TO MATCH EXISTING GROUND EXISTING SLOPES 2H:1V
OR FLATTER
REMOVE WOOD PILE (TYP)
TIE INTO EXISTING GROUND
PROPERTY BOUNDARY
POST-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
FUTURE GREENWAY TRAIL (BY OTHERS)
"BASE" ALIGNMENT SOUTH WATERFRONT TOP OF BANK 2002 (PORTLAND
GIS)
EXISTING CONCRETE PIER TO REMAIN
FUTURE BUILDING (BY OTHERS)
ORDINARY LOW WATER (6.12' ELEVATION CITY OF PORTLAND DATUM)
PRE-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
LARGE WOOD TYPE 2 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 1 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 3 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 4 (TYP.) SEE FIGURE 5E
M AT
C H
LI N
E - B
AS E
AL IG
N M
EN T
ST A
3+ 50
SE E
FI G
U R
E 5A
Site Plan
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Horiz. Scale: 1"=60' Vert. Scale: 1"=30'
NOTES: 1. SEE FIGURE 5C AND 5D FOR BANK STABILIZATION PLAN
2. SEE FIGURE 5E FOR LARGE WOOD PLACEMENT DETAILS
3. SEE FIGURE 5F FOR PILE REMOVAL DETAIL
4. SEE FIGURE 7F FOR BANK STABILIZATION DETAILS
5. SEE FIGURES 7A-7C FOR BANK SECTIONS.
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5B Siteplan.dwg, 7/8/2020 3:49:35 PM,
AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 5 of 15
Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
Work Limit For Bank Stabilization
South Waterfront Top of Bank 2002 (Portland GIS)
Alcove Area Where Bank is 4:1 or Flatter be Preserved and Rip Rap
Will Be Overlain With Clean Rock and Sediment
Proposed Retaining Wall and Fence
Pre-Project Ordinary High Water (18.22' Elevation City of Portland
Datum)
Post-Project Ordinary High Water (18.22' Elevation City of Portland
Datum)
Property Boundary
Sediment Fence
PROPOSED CONTOUR (5')
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
M AT
C H
L IN
E SE
E FI
G U
R E
5D
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5C Bank Stabilization.dwg, 7/9/2020
8:18:42 AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page
6 of 15 Encl 1
AutoCAD SHX Text
OLW
OLW
Rip rap
Rip rap
(Typical)
Alcove Area Where Bank is 4:1 or Flatter be Preserved and Rip Rap
Will Be Overlain With Clean Rock and Sediment
Work Limit For Bank Stabilization
South Waterfront Top of Bank 2002 (Portland GIS)
Post-Project Ordinary High Water (18.22' Elevation City of Portland
Datum)
Pre-Project Ordinary High Water (18.22' Elevation City of Portland
Datum)
Work Limit For Bank Stabilization
Future Greenway Trail
PROPOSED CONTOUR (5')
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
M AT
C H
L IN
E SE
E FI
G U
R E
5C
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5D Bank Stabilization.dwg, 7/9/2020
8:19:16 AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page
7 of 15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
BURIED LOG
CONST. NOTE
ATTACHED?
LENGTH) BURIED
1 1 18-24 24 YES 66% 3.0 DOWN
2 1 18-24 24 YES 60% 3.5 UP
3 1 18-24 24 YES 80% 1.0 DOWN
4 1 18-24 24 YES 73% 5.5 DOWN
5 1 18-24 24 YES 78% 3.0 DOWN
6 1 18-24 24 YES 85% 3.0 DOWN
TYPE 3 CONSTRUCTION SEQUENCING: PLACE KEY LOG AT ANGLE AND
ELEVATION SPECIFIED ON FIGURE 5F, WITH TILT ANGLE AND BURIAL AS
SPECIFIED.
PLACE SECOND LOG AT AN 18 DEGREE ANGLE WITH THE KEY LOG SUCH THAT
THE TWO ROOTWADS BARELY OVERLAP (6 FEET ON CENTER). TILT ANGLE AND
BURIAL SHALL BE AS SPECIFIED.
PLACE THIRD LOG SUCH THAT ROOTWADS 2 & 3 OVERLAP BY 1' AND FORM
A 150 DEGREE ANGLE AT THEIR FACES. TILT ANGLE AND BURIAL SHALL BE
AS SPECIFIED. PLACE FOURTH LOG SUCH THAT THE ROOTWAD FACE OVERLAPS
WITH THE ROOTWAD OF LOG 2 AND THE STEM RESTS ON LOG 2. LOG 4 SHALL
BE PERPENDICULAR TO THE SLOPE AND INSTALLED AT THE TILT ANGLE AND
BURIAL AS SPECIFIED. PLACE FIFTH LOG SPACED 4 FT DOWNSTREAM OF LOG
4, SIMILARLY ORIENTED WITH THE BANK. LOG 5 RESTS ON LOG 2 AND IS
APPROXIMATELY 6.5 FT FROM ROOTWAD COLLAR OF LOG 2. TILT ANGLE AND
BURIAL SHALL BE AS SPECIFIED. PLACE SIXTH LOG SPACED 9.5 FT
DOWNSTREAM OF LOG 5, ALSO ROUGHLY PERPENDICULAR TO THE BANK. THE
STEM OF LOG 6 (8.5 FT FROM ROOTWAD COLLAR) SHALL REST ON LOG 2,
APPROXIMATELY 18.5 FT FROM THE ROOTWAD COLLAR OF LOG 2. TILT ANGLE
AND BURIAL SHALL BE AS SPECIFIED.
1
2
3
4
5
6
QUANTITY (EA) DBH (IN) LENGTH (FT) ROOTWAD
ATTACHED?
LENGTH) BURIED
1 1 18-24 24 YES 60% 2.0 DOWN
2 1 18-24 24 YES 55% 2.0 DOWN
3 1 18-24 24 YES 50% 0-2.0 DOWN
TYPE 2 CONSTRUCTION SEQUENCING: PLACE KEY LOG AT ANGLE AND
ELEVATION SPECIFIED ON SHEET C3.2, WITH TILT ANGLE AND BURIAL AS
SPECIFIED.
PLACE SECOND LOG SPACED SUCH THAT ITS ROOTWAD BARELY OVERLAPS WITH
KEY LOG ROOTWAD (APPROXIMATELY 6 FT DOWNSTREAM ON CENTER). PLACE AT
AN ELEVATION SUCH THAT CROWN OF ROOT COLLAR IS AT OR SLIGHTLY ABOVE
ELEVATION OF KEY LOG ROOT COLLAR CROWN.
PLACE THIRD LOG AT A 40 DEGREE ANGLE WITH THE KEY LOG, POINTING
UPSTREAM. TILT ANGLE OF THE THIRD LOG SHOULD BE FLAT OR SLIGHTLY
DOWN-ANGLE.
1
2
3
TYPE 3 LARGE WOOD STRUCTURE3 NOT TO SCALE
TYPE 2 LARGE WOOD STRUCTURE2 NOT TO SCALE TYPE 1 LARGE WOOD
STRUCTURE1 NOT TO SCALE
TYPE 1 CONSTRUCTION SEQUENCING: PLACE LOG AT ANGLE AND ELEVATION
SPECIFIED ON SHEET C3.2. LOGS SHALL BE INSTALLED FLAT OR AT A TILT
ANGLE UP TO 2 DEGREES. LOGS PLACED AT TOE OF BANK-LEVEL MAY BE
INSTALLED SUCH THAT UP TO 6 FT OF STEM IS EXPOSED. LOGS ABOVE THE
TOE OF BANK BUT BELOW 10 FT MAY HAVE EXPOSED STEM UP TO 2 FT. LOGS
INSTALLED ABOVE THE 10 FT ELEVATION SHOULD HAVE EXPOSED STEM
0.5-1FT MAXIMUM, DECREASING AS ELEVATION INCREASES.
1
QUANTITY (EA) DBH (IN) LENGTH
(FT) ROOTWAD
LENGTH) BURIED
1 1 18-24 24 YES 55% 0-2 DOWN
1 1
3
2
3
4
5
2
1
6
KEY LOG LOCATION GIVEN ON FIGURE 5F AT CROWN OF ROOTWAD
COLLAR
KEY LOG LOCATION GIVEN ON FIGURE 5F AT CROWN OF ROOTWAD
COLLAR
FLOWFLOW
KEY LOG LOCATION GIVEN ON FIGURE 5F AT CROWN OF
ROOTWAD COLLAR
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Sections Provided by OTAK, Inc.
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5E LWD Dets.dwg, 7/7/2020 8:57:57 AM,
AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 8 of 15
Encl 1
KEY LOG LOCATION AND ORIENTATION STRUCTURE
TYPE
CONST. NOTE
ATTACHED? MIN. PERCENT OF
LOG BURIED STEM TILT
1 1 18-24 24 YES 55% 2.0 DOWN
2 1 18-24 30 NO 20% 5.0 DOWN
3 1 18-24 24 YES 50% 7.0 DOWN
4 1 18-24 24 YES 50% 5.0 DOWN
5 1 18-24 24 YES 65% 2.0 DOWN
TYPE 4 CONSTRUCTION SEQUENCING: PLACE KEY LOG AT ANGLE AND
ELEVATION SPECIFIED ON THIS SHEET, WITH TILT ANGLE AND BURIAL AS
SPECIFIED. PLACE SECOND LOG AT A 20 DEGREE ANGLE WITH THE BANK FACE
(40 DEGREES WITH RESPECT TO LOG 1 ROOTWAD), WITH THE UPSTREAM END
RESTING ON THE ROOT COLLAR OF LOG 1. TILT ANGLE AND BURIAL SHALL BE
AS SPECIFIED. PLACE THIRD LOG SUCH THAT THE ROOT COLLAR OF THE LOG
RESTS ON LOG 2, 7 FT FROM THE UPSTREAM END. TILT ANGLE AND BURIAL
SHALL BE AS SPECIFIED. PLACE FOURTH LOG SUCH THAT THE ROOT COLLAR
OF THE LOG RESTS ON LOG 2, 12 FT FROM THE UPSTREAM END. TILT ANGLE
AND BURIAL SHALL BE AS SPECIFIED. PLACE FIFTH LOG SUCH THAT THE
ROOT COLLAR OF THE LOG RESTS ON LOG 2, JUST UPSTREAM OF THE BURIAL
POINT (18 FEET FROM UPSTREAM END). TILT ANGLE AND BURIAL SHALL BE
AS SPECIFIED.
FILL GAP BETWEEN BOTTOM OF LOG 2 AND SLOPE WITH CLASS 700 RIP RAP
AND ROUNDED RIVER ROCK (APPROX. 2 CY, 1.5 FT DEEP). FILL VOIDS UP
TO LOG CROWNS WITH SOIL AND PLANT PER LANDSCAPING PLAN.
1
2
3
4
5
6
LARGE WOOD MATERIAL SCHEDULE
TOTAL 100
ROOTWAD COLLAR FLOW
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Sections Provided by OTAK, Inc.
USE THE FOLLOWING STEPS TO MINIMIZE CREOSOTE RELEASE, SEDIMENT
DISTURBANCE, AND TOTAL SUSPENDED SOLIDS:
1. INSTALL A FLOATING SURFACE BOOM TO CAPTURE FLOATING SURFACE
DEBRIS. 2. KEEP ALL EQUIPMENT (E.G., BUCKET, STEEL CABLE, VIBRATORY
HAMMER) OUT OF THE WATER, GRIP PILES ABOVE THE
WATERLINE, AND COMPLETE ALL WORK DURING LOW WATER AND LOW CURRENT
CONDITIONS. 3. DISLODGE THE PILING WITH A VIBRATORY HAMMER,
WHENEVER FEASIBLE--NEVER INTENTIONALLY BREAK A PILE BY
TWISTING OR BENDING. 4. SLOWLY LIFT THE PILE FROM THE SEDIMENT AND
THROUGH THE WATER COLUMN. 5. PLACE THE PILE IN A CONTAINMENT BASIN
ON A BARGE DECK, PIER, OR SHORELINE WITHOUT ATTEMPTING TO CLEAN
OR
REMOVE ANY ADHERING SEDIMENT (A CONTAINMENT BASIN FOR THE REMOVED
PILES AND ANY ADHERING SEDIMENT MAY BE CONSTRUCTED OF DURABLE
PLASTIC SHEETING WITH SIDEWALLS SUPPORTED BY HAY BALES OR ANOTHER
SUPPORT STRUCTURE TO CONTAIN ALL SEDIMENT, AND RETURN FLOW MAY BE
DIRECTED BACK TO THE WATERWAY).
6. FILL THE HOLES LEFT BY EACH PILING WITH CLEAN, NATIVE SEDIMENTS.
7. DISPOSE OF ALL REMOVED PILES, FLOATING SURFACE DEBRIS, ANY
SEDIMENT SPILLED ON WORK SURFACES, AND ALL
CONTAINMENT SUPPLIES AT A PERMITTED UPLAND DISPOSAL SITE.
IF PILE CAN NOT BE REMOVED BY PULLING FOLLOW DETAIL 1. INSTALL
STEEL CASING BELOW MUDLINE, MIN 3FT or REFUSAL 2. ROTATE CASING TO
SNAP PILE OFF BELOW MUDLINE 3. TRANSPORT PILE IN CASING TO DISPOSAL
AREA 4. DISPOSE PILE IN ACCORDANCE TO ALL STATE AND FEDERAL
REGULATIONS 5. BACKFILL HOLE WITH CLEAN SAND OR MATERIALS AS SHOWN
ON PLANS 6. IF PILE IS NOT FULLY REMOVED MARK REMNANT ON SHEETS
C2.0 AND C2.1 AND PROVIDE TO ENGINEER OF RECORD
PILE REMOVAL DETAIL1 NOT TO SCALE
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig5F LWD-Det-PierRemove-Det.dwg,
7/7/2020 8:58:40 AM, AutoCAD PDF (High Quality
Print).pc3NWP-2019-494-1 Page 9 of 15 Encl 1
EXISTING CONTOUR
PROPOSED CONTOUR
ORDINARY LOW WATER (OHW ELEV 5.90')
SOUTH WATER FRONT TOP OF BANK (2002, PORTLAND GIS)
PROPOSED FENCE
PROPERTY BOUNDARY / TAX LOT
REMOVED WOOD PILE (TYP)
BANK STABILIZATION TO MATCH EXISTING GROUND EXISTING SLOPES 2H:1V
OR FLATTER
FUTURE BUILDING (BY OTHERS)
PROPERTY BOUNDARY
TRANSITION GRADING TO ADJACENT GREEN WAY AS SHOWN
LARGE WOOD TYPE 4 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 3 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 2 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 1 (TYP.) SEE FIGURE 5E
21
ORDINARY LOW WATER (6.12' ELEVATION
CITY OF PORTLAND DATUM)
POST-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
PRE-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
M AT
C H
LI N
E - B
AS E
AL IG
N M
EN T
ST A
3+ 50
SE E
FI G
U R
E 7B
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
NOTE: BANK SECTIONS ARE SHOWN ON FIGURES 7C-7E
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig7A GradingPlan.dwg, 7/9/2020 7:46:06
AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 10 of
15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
ORDINARY LOW WATER (OHW ELEV 5.90')
SOUTH WATER FRONT TOP OF BANK (2002, PORTLAND GIS)
PROPOSED FENCE
PROPERTY BOUNDARY / TAX LOT
"BASE" ALIGNMENT
FUTURE BUILDING (BY OTHERS)
LIMIT OF PROPOSED BANK REGRADING SEE TYPICAL SECTION SEET
C3.0
TYPE 1 (TYP.) LARGE WOOD TYPE 2 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 1 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 4 (TYP.) SEE FIGURE 5E
LARGE WOOD TYPE 3 (TYP.) SEE FIGURE 5E
WORK LIMIT FOR BANK STABILIZATION
POST-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
SOUTH WATERFRONT TOP OF BANK 2002 (PORTLAND GIS)
ORDINARY LOW WATER (6.12' ELEVATION CITY OF PORTLAND DATUM)
PRE-PROJECT ORDINARY HIGH WATER (18.22' ELEVATION CITY OF PORTLAND
DATUM)
19
7
5+ 50
5+ 50
BANK STABILIZATION TO MATCH EXISTING GROUND EXISTING SLOPES 2H:1V
OR FLATTER
M AT
C H
LI N
E - B
AS E
AL IG
N M
EN T
ST A
3+ 50
SE E
FI G
U R
E 7A
Grading Plan (South) and Cross Section Locations
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig7B GradingPlan.dwg, 7/9/2020 7:53:36
AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 11 of
15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
EDGE OF TRAIL
EDGE OF TRAIL
BASE ALIGNMENT SECTION: STA 0+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 0+50.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 1+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 1+50.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
LIMIT OF PROPOSED BANK GRADING LIMIT OF PROPOSED
BANK GRADING
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
ACTUAL 4.2:1
ACTUAL 4.4:1
ACTUAL 3.1:1
ACTUAL 4.0:1
ACTUAL 2.3:1
ACTUAL 3.3:1
ACTUAL 3.6:1
ACTUAL 2.2:1
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR
FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
BANK STABILIZATION
SLOPES 2H:1V OR FLATTER
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig7C-7E Xsects.dwg, 7/9/2020 8:54:51
AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 12 of
15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
60
BASE ALIGNMENT SECTION: STA 2+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 2+50.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 3+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 3+50.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
ACTUAL 2.2:1
ACTUAL 3.2:1
ACTUAL 2.3:1
ACTUAL 3.0:1
ACTUAL 2.9:1
ACTUAL 3.0:1
ACTUAL 2.3:1
ACTUAL 3.4:1
BANK STABILIZATION
SLOPES 2H:1V OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND,
EXISTING SLOPES 2H:1V OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
WORK LIMIT
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig7C-7E Xsects.dwg, 7/9/2020 8:55:13
AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 13 of
15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
60
BASE ALIGNMENT SECTION: STA 4+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 4+50.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
0 20 400-20-40-60-80
BASE ALIGNMENT SECTION: STA 5+00.00 Horiz. Scale: 1" = 10' Vert.
Scale: 1" =10'
-10
0
10
20
30
40
-10
0
10
20
30
40
PROPOSED GROUND
EXISTING GROUND
BANK GRADING
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
MAX 2:1
MAX 3:1
ACTUAL 3.2:1
ACTUAL 3.1:1
ACTUAL 2.1:1
ACTUAL 3.5:1
ACTUAL 3.2:1
ACTUAL 2.2:1
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
BANK STABILIZATION TO MATCH EXISTING GROUND, EXISTING SLOPES 2H:1V
OR FLATTER
WORK LIMIT WORK LIMIT
Alamo Manhattan Bank Stabilization Project - Portland, Oregon
Pacific Habitat Services,Inc. 9450 SW Commerce Circle, Suite 180
Wilsonville, Oregon 97070 Phone: (503) 570-0800 Fax (503)
570-0855
FIGURE
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
Horiz. Scale: 1"=30' Vert. Scale: 1"=30'
C:\Users\Lisa\Desktop\WorkFromHome\6758 Alamo
Manhattan\AutoCAD\Plot Dwg\Fig7C-7E Xsects.dwg, 7/9/2020 8:55:35
AM, AutoCAD PDF (High Quality Print).pc3NWP-2019-494-1 Page 14 of
15 Encl 1
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
60
BANK STABILIZATION TYPICAL SECTION: BASE ALIGNMENT STA. 0+80 to
1+15, 3+70 to 4+00 NOT TO SCALE
MAX 2:1
FUTURE GREENWAY
STABILIZED SOIL WITH NATIVE VEGETATION (SEE L SHEETS FOR
PLANTING)
LIMIIT OF BANK STABILIZATION AT ELEV. 0
EXISTING GROUND
PROPOSED GROUND
EXISTING SLOPE
1'
3'
SEPARATION GEOTEXTILE
EXISTING SLOPES 2H:1V OR FLATTER
LIMIT OF PROPOSED BANK RE-GRADING
CLASS 700 RIPRAP WITH LARGE WOOD STRUCTURES. SEE FIGURES 5C AND
5D.
BANK STABILIZATION TYPICAL SECTION: BASE ALIGNMENT STA. 1+15 to
3+70 NOT TO SCALE
STABILIZED SOIL WITH NATIVE VEGETATION (SEE L SHEETS FOR
PLANTING)
LIMIT OF PROPOSED BANK RE-GRADING
EXISTING GROUND
PROPOSED GROUND
EXISTING SLOPE
FUTURE GREENWAY
1'-6" FILTER BLANKET
OHW ELEV. 18.22 FT
CLASS 700 RIPRAP WITH LARGE WOOD STRUCTURES. SEE FIGURES 5C AND
5D.
6" to 2" RIVER ROCK
SEPARATION GEOTEXTILE
EXISTING SLOPES 2H:1V OR FLATTER
LIMIT OF PROPOSED BANK RE-GRADING
LIMIIT OF BANK STABILIZATION AT ELEV. 0
STABILIZED SOIL WITH NATIVE VEGETATION (SEE L SHEETS FOR
PLANTING)
EXISTING GROUND
PROPOSED GROUND
BANK STABILIZATION TYPICAL SECTION: BASE ALIGNMENT STA. 0+00 to
0+80, 4+00 to 4+20 NOT TO SCALE
FUTURE GREENWAY
2.5" to 0" WELL GRADED ROUNDED ROCK AT ALCOVE AREAS
1'-6" FILTER BLANKET
CLASS 700 RIPRAP
CLASS 700 RIPRAP WITH LARGE WOOD STRUCTURES. SEE FIGURES 5C AND
5D.
SEPARATION GEOTEXTILE
MAX 3:1
MATCH EXISTING GROUND EXISTING SLOPES 4H:V1 OR FLATTER
OHW ELEV. 18.22LIMIT OF PROPOSED BANK RE-GRADING
MAX 2:1
1.5'
3'
6" TO 2" RIVER ROCK
BANK STABILIZATION TYPICAL SECTION: BASE ALIGNMENT STA. 4+20 to
5+30 NOT TO SCALE
FUTURE GREENWAY
2.5" to 0" WELL GRADED ROUNDED ROCK AT ALCOVE AREAS
ALCOVE AREA: BANK STABILIZATION TO
MATCH EXISTING GROUND EXISTING SLOPES 4H:V1 OR FLATTER
LIMIT OF PROPOSED BANK RE-GRADING
MAX 3:1
MAX 2:1
EXISTING GROUND
PROPOSED GROUND
STABILIZED SOIL WITH NATIVE VEGETATION (SEE L SHEETS FOR
PLANTING)
1'-6" FILTER BLANKET
CLASS 700 RIPRAP
CLASS 700 RIPRAP WITH LARGE WOOD STRUCTURES. SEE FIGURE 5C AND
5D.
SEPARATION GEOTEXTILE1.5'
1 2
Phone: (503) 570-0800 Fax (503) 570-0855
FIGURE