Page 1: Banks Rd SR 54 - fayettecountyga.gov · sr 54 georgia department of transportation sr 54 fayetteville rd 2303 juan velasquez 9/11/2019 sr 54 bridge 1 jacking detour plan. road traffic

Project Number

Owner

Prime Contractor

Project Name

DatePhone

GA DEPARTMENT OF TRANSPORTATION

US 41; SR 3; US 411 STPOO-0002-00(626)

(770)422-7520Subject

CWM Job NumberSheet Number

Prepared By

C. W. MATTHEWS 1

CJD 10/13/16

12109

RAMP “B” & “F” CLOSURE & DETOUR

Circle 75

Cobb County

E4150/E4160/X2403

2224

3/1/2017Juan Velasquez678-233-0744

Circle 75 Temporary Closure

BRIDGE 1LOCATION

SR 54 CLOSED TOTRAFFIC 10/25 9:00PM

THRU 10/28 5:00AM

SR 54

SR 54

SR 54

SR 54

SR 54

SR 54

SR 54

SR 54

SR 54 CLOSED TOTRAFFIC 10/25 9:00PM

THRU 10/28 5:00AM

SR 85

Banks Rd

Corinth Rd

ROADCLOSED

ROADCLOSED

SR 54

GEORGIA DEPARTMENT OF TRANSPORTATION

SR 54 FAYETTEVILLE RD

2303

9/11/2019Juan Velasquez

SR 54­ Bridge 1 Jacking Detour Plan

Recommended