• Benin City CNG Project
• On 7th March’ 2007 NIPCO plc made its presentation to the Inter-ministerial
Team of FGN at Abuja on the CNG Program and on 21st March’2007 FGN
accorded its approval for the proposed project at Benin City.
• NIPCO introduced CNG in the Benin City, Edo State, on a pilot scale, to
demonstrate to the Public, the Government & other stakeholders, the
followings:
• Its seriousness towards the CNG business in Nigeria.
• Its Project implementation capabilities.
• The benefits of CNG over conventional fuels.
• Popularize CNG as a new vehicular fuel in Nigeria.
• Benin City CNG Project
• NIPCO formed a Joint Venture Company, GREEN GAS LIMITED, with the
Nigerian Gas Company Limited (NGC) to implement the CNG project.
• Important targeted parameters of the Benin City CNG project are:
• Target for CNG Vehicle Conversion :
50,000 CNG Vehicles in 3 to 4 yrs
• CNG Stations:
8 to 10 Nos. in first 2 yrs
• Steel Pipelines to be laid:
Around 50kms in first 2 yrs
• CNG Conversion workshops:
2 Nos. in first 2 yrs
CNG Station
Laid Steel Pipeline Route
CNG STATION LOCATIONS IN BENIN CITY
UNIVERSITY OF BENIN
Auchi Road
Agbor Road
New Lagos Road
MM Way Road
Siliku Road
Textile Mill Road
Sapele Road
Ring Road
Ramat Park
7 Up Plant
Coca Cola Plant
NIPCO’s City Gate Station
CNG Workshop
Guinness Plant
Benin Airport
CNG Stations Commissioned:
•Eiyaen, Near Coca Cola Plant, Auchi Road
•Agbor Road, Near Guinness Plant
•2nd East Circular Road, Off. Akpakpava Road
•Sapele Road, Opp. Exclusive Stores
CNG Stations Under Construction :
•Benin-Lagos Road, Near 7-Up Plant
•Textile Mill Road
•5 Junction
•MM Way Road
CNG Kit Fitment Workshop:
•Aduwawa, Auchi Road
5 Junction