Transcript
Page 1: Bruce Highway (Cooroy to Curra) corridor map/media/projects/b/bruce... · 2009. 6. 8. · monkland the palms traveston chatsworth lagoon pocket tuchekoi tandur mo th ar u ni mt corella

SOUTHSIDE

Kin Kin Rd

Gympie-Brooloo Rd

Traveston Rd

Gympie -Brooloo Rd

TravestonCrossing Rd

Tin Can Bay Rd

GympieConnection Rd

Gympie -Woolooga Rd

WideBay Hwy

Kin Kin Rd

Boreen Rd

KenilworthSkyring Creek Rd

PomonaConnection Rd

Cooroy Beli Creek Rd

Cooroy Noosa Rd

Six Mile Ck

Amamoor Ck

Woondum Ck

Six Mile Ck

Four Mile Ck

Calico Ck

Calico Ck

Pie Ck

Eel Ck

Deep Ck

Mary River

Curra Ck

MaryRiver

BLACK MOUNTAIN

Coles Creek Rd

Tandur Rd

Woondum Rd

Noosa Rd

LagoonPocket Rd

Old Maryborough Rd

Fritz Rd

Rammutt Rd

Old Maryborough Rd

Purcell Rd

MeadowsLane

Six Mile Creek

Middle Creek

Coles Creek

Skyring Creek

CURRA

COOROY

COORAN

POMONA

GYMPIE

KYBONG

FEDERAL

MONKLAND

THE PALMS

TRAVESTON

CHATSWORTH

LAGOONPOCKET

TUCHEKOI

TANDUR

MOTHAR MOUNTAIN

MT CORELLA

MT COOROORA

¯Cooroy to Curra Highway Corridor

0 1 2 3 4

Kilometres

Traveston Crossing Dam Stage 1 FSL (RL 71m)

Traveston Crossing Dam Stage 2 FSL (RL 79.5m)

Aerodrome

Cooroy Curra Highway Corridor

Major Roads

Mary River

Rivers / Creeks

Railway

Bruce Highway

275kV Overhead Power Lines

Brisbane

Caboolture

Caloundra

Rainbow Beach

Noosa HeadsCooroy

Gympie

Curra

Maryborough

The Queensland and Australian governments initiated the Bruce Highway (Cooroy to Curra) Strategic Planning Study to investigate how best to improve safety, reduce delays and improve freight efficiency during the next 30 years whilst minimising impacts on existing communities and the environment.

To meet the strategic needs of the highway for the next 30 years and beyond, it was necessary to plan for the new highway corridor to be of rural motorway standard which caters for safe and high speed travel. To improve safety, the highway will be a limited access road which caters for an initial four-lane divided highway, providing two lanes in each direction with a wide central median. Provision has been made for a future six-lane case.

The existing highway will remain as a local arterial road and maintain connectivity and provide access to most of the local roads and properties that currently have direct access to the existing highway. The connections of existing network and local roads will be maintained by under/overpasses where feasible.

Community feedback since the March 2007 displays resulted in the following changes to Proposed Corridor.

1) Provision for the Woondum interchange to have all movements and thus cater for motorists seeking to head north, or coming from the north on the new corridor. These ramps have been included to and from Penny Road.

2) Shift the corridor further east in the general vicinity of the Curra State Forest to reduce the impact on freehold properties by utilising more state owned land.

South facing ramps only at Woondum Interchange to provide priority and safety for the major movements

• northboundfromthenewcorridorinto Gympie

• southboundoutofGympieontothe new corridor

All movements interchange at Gympie Connection Road

All movements interchange combining the existing Bruce Highway

and Harvey Siding Road

Existing Bruce

Highway

2 Lanes

Prop

osedH

ighway

4 Lanes

Connection RoadExisting Cooroy

Existing

Cudgerie

Drive Existing ArchUnderpass

Existing

Traveston Road

ExistingTravestonCrossing

Road

Prop

osed

2 La

neSe

rvic

e R

oad

Prop

osed

Hig

hway

4 La

ne

Exi

stin

g B

ruce

Hig

hway

2 La

ne

Exi

stin

g B

ruce

Hig

hway

2 La

ne

Proposed H

ighway

4 LaneExisting GympieConnection Road

Proposed

Highw

ay

4 Lane

Exis

ting

Bru

ceH

ighw

ay2

Lane

Existing Harvey

Siding R

oad

Proposed Highway

4 Lane

Ashford Road

Proposed Access

All movements interchange at Traveston Road

All movements interchange at Cooroy Connection Road/Cudgerie Drive

including connection of existing highway

North facing ramps only at Penny Rd

2 lane

Exi

stin

g Fl

ood

Rd

Pro

pose

d H

ighw

ay

2 la

ne

Existin

g

Penny Rd

2 lane

Existing Noosa Rd

2 lane

Existing Hall Rd(Connects to existing Bruce Hwy)

Existing Noosa R

d

Bruce Highway (Cooroy to Curra) Corridor

Alignment subject to Traveston Crossing Dam decision.

Recommended