BRUCE HIGHWAY—PINE RIVER TO CALOUNDRA ROAD INTERCHANGE UPGRADE

*An estimate will be provided once the proposal has been developed further.

PROPOSAL

NEXT STEPS

NEED

RESPONSIBLE AGENCY

DEPARTMENT OF TRANSPORT AND MAIN ROADS

PROPOSAL STAGE OF DEVELOPMENT

STRATEGIC BUSINESS CASE COMPLETE

PLANNED STAGE END DATE

NOT APPLICABLE

ESTIMATED COST OF DELIVERY

TO BE DETERMINED*

The proposal is investigating flood, safety and capacity improvements spanning the 60 kilometre section of the Bruce Highway from Pine River to the Caloundra Road Interchange.

A number of options are being considered including:

» non-asset (e.g. improved signage and variable messaging)

» improvements to existing assets (e.g. flood immunity, safety and operational improvements)

» new asset (e.g. new road corridor).

The existing section of the Bruce Highway from Pine River to the Caloundra Road Interchange lacks capacity to accommodate current peak demand, resulting in significant congestion and potential increases in motor vehicle incidents. This section of the Bruce Highway is also prone to flooding.

Commence Preliminary Business Case Building Queensland to assist with Preliminary Business Case

Building Queensland | Infrastructure Pipeline Report | December 2016

For the period 4 June–3 December 2016

Recommended