2019 RHCCC PresentationBy: Joshua Nelson, City of Industry City Engineer
2019 RHCCC Presentation
Industry Business Center
Industry Business Center
2019 RHCCC Presentation
Industry Business Center
Industry Business Center
2019 RHCCC Presentation
Industry Business Center
Industry Business Center
2019 RHCCC Presentation
Industry Business Center
Industry Business Center
2019 RHCCC Presentation
Industry Business Center
Pomona (60) Freeway On
and Off Ramps
2019 RHCCC Presentation
Industry Business Center
57/60
• $256 Million Project
• $35 Million Contributed by the City of Industry
• Phase II B completed in Fall of 2018
• The project is relieving one of the worst bottlenecks in the West Coast
$37.5 Billion
Eases congestion for the estimated $37.5 billion worth of
goods that move through the corridor from the Ports.
5,148 Jobs
Generated approximately 5,148 jobs.
725,000 Hours
Phases I and II will save truckers and commuters 725,000 hours per year.
5,050 tons
Reduced congestion from Phase I and II will save
5,050 tons of CO2 emissions per year.
2019 RHCCC Presentation
2019 RHCCC Presentation
Industry Business Center
Lemon Ave
On/Off Ramp
2019 RHCCC Presentation
Industry Business Center
Lemon Ave
On/Off Ramp
Fairway Drive Grade Separation
• Four-lane roadway underpass• Four-track railroad bridge• Construction 35% Complete• Recently completed 10-week
work on Fairway Dr./ Walnut Dr. N intersection
• Anticipated completion: Spring 2022
2019 RHCCC Presentation
Fairway Drive Grade Separation
• Four-lane roadway underpass• Four-track railroad bridge• Construction 35% Complete• Recently completed 10-week
work on Fairway Dr./ Walnut Dr. N intersection
• Anticipated completion: Spring 2022
2019 RHCCC Presentation
Fullerton Road Grade Separation
• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on
September 19 (next week)• Anticipated Completion Early
2022
2019 RHCCC Presentation
Fullerton Road Grade Separation
• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on
September 19 (next week)• Anticipated Completion Early
2022
2019 RHCCC Presentation
Fullerton Road Grade Separation
• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on
September 19 (next week)• Anticipated Completion Early
2022
2019 RHCCC Presentation
Turnbull Canyon Road Grade Separation
• Separates Roadway from UPRR tracks
• Grading is from Salt Lake Ave. to Clark Ave.
• Currently at 65% design phase
2019 RHCCC Presentation
Capital Improvement Projects
Arenth Avenue Reconstruction, Anaheim-Puente Road to Phillips Drive Business Parkway Reconstruction San Jose Avenue Reconstruction Walnut Drive South, Storm Drain Improvements and Street Widening City Wide Sign Replacement City Wide Street Light Purchase Don Julian Road and Sixth Avenue Traffic Signal Valley Boulevard from Old Valley Boulevard to Azusa Avenue ADA Transition plan Nelson Avenue and Sunset Avenue Traffic Signal and Intersection Improvements Azusa Avenue Bridge Painting
2019 RHCCC Presentation
Expo Center and Industry Hills
Trail Lighting, Trail Grading and Exercise Equipment
Grand Arena Parking Lot Improvements & Pavilion Parking Expansion
Grand Arena Painting
Avalon Room and Patio Café
2019 RHCCC Presentation
El Encanto Convalescent Hospital
Completed Projects: Roof Repair Parking Lot Lighting Vault Repair
Future Projects: Carpet Moulding and Wall Coverings Licensure Change for Sub-Acute Dialysis Center
2019 RHCCC Presentation
Annual Slurry Seal Annual Pavement Rehab Albatross Rd Almahurst Street Canada Court Capitol Avenue Castleton Street Chestnut Street El Encanto Road Faure Avenue Garcia Lane Hatcher Avenue Keystone Street Parriott Place Radecki Court Stoner Creek Road Walnut Hall Road
Old Ranch Road Green Drive Currier Road Mayo Avenue Crossroads
Parkway South Canal Place
Benton Court Castleton Street Hanover Road Kaplan Avenue Loukelton Street Nelson Avenue Newquist Place Salt Lake Avenue Hurley Street John Reed Court Evergreen Place Long Lane Willow Avenue Orange Avenue California Avenue
2019 RHCCC Presentation