feasibility and review of housing plan for LADY FRERE 800LADY FRERE 800
Feasibility and Review of Housing Plan
LADY FRERE 800LADY FRERE 800
April 2014
by
prepared for
CNdV africa (Pty) Ltdenvironmental planning, urban design, landscape architecture
17 New Church Street Cape Town 8000Tel: 021 424-5022 Fax: 021 424-6837
Kantey & TemplerPO Box 15087Beacon Bay, 5205Tel: 041 373-0738
IQ Vision110 Sarel Cillier Street, Strand, 7140Tel: 021 853-3902
EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS 31-33 Phillip Frame Road ChiselhurstTel: 043 711- 9735
EMALAHLENI LOCAL MUNICIPALITYPrivate Bag X1161, Lady Frere , 5410
Tel: 047 878-0020Fax: 047 878-0303
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 5
CONTENTS
2.1 INTRODUCTION
2.1.2 Purpose of the Report
2.1.2 Background of this Report
2.1.3 Terms of Reference
2.1.4 Background to Settlement
2.2 Status of Housing Project and Waiting List
2.3 Land Identification and Ownership
2.4 Engineering
2.5 Environment
2.6 Geo-tech
2.7 Distribution of Social Facilities
2.8 Current Spatial Development Framework
2.9 Future Plans of Other Sector Departments
2.10 Summary and Recommendations
LIST OF FIGURES
Figure 2.1 .1 Locality Plan
Figure 2.1.2 Aerial Photograph
Figure 2.1.3 Visual Survey
Figure 2.2.1 Statistical Background
Figure 2.3.1 Cadastral Layout
Figure 2.4.1 Engineering
Figure 2.5 .1 Environment
Figure 2.6.1 Geo-tech
Figure 2.7.1 Distribution of Social Facilities
Figure 2.8.1 Current Spatial Development Framework
LIST OF ANNEXURESAnnexure 1 OwnershipAnnexure 2 Title DeedAnnexure 3 Surveyor General diagram
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 6
CONTENTS
GLOSSARY
Informal Site: A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief.
Formal Site: A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered.
In-Situ upgrade project: Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit.
Greenfields project: New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development.
Infill Project: New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement.
Rectification projects: Repair or rebuilding of defective existing houses built through one or other government housing program.
Erven: The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan.
Plots: The plural of ‘plot’ meaning unregistered pieces of land informally laid out.
Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered.
ACRONYMS
BLMC Basic Land Management ClassECBCP Eastern Cape Biodiversity Conservation PlanECDHS Eastern Cape Department of Human SettlementEIA Environmental Impact AssessmentGP General PlanHSP Human Settlement PlanLM Local Municipality MHSP Municipal Human Settlement PlanSA South AfricaSANBI South African National Biodiversity InstituteSDF Spatial Development Framework
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 8
INTRODUCTION 2.1
2.1.1 PURPOSE OF THE REPORT
The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Lady Frere 800 as a Human Settlement Project and to recommend whether it should be approved or not.
2.1.2 BACKGROUND TO THIS REPORT
This report is one of three Human Settlement Project feasibility reports for Emalahleni Municipality. It is designed so that it can be part of a single document that includes the other two projects.
2.1.3 TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240)
The project terms of reference for the feasibility report are summarised as follows:
Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to:
1. Determination of housing demand and potential beneficiary status
2. Land identification and ownership3. Availability of bulk services and confirmation of capacity4. Environmental conditions;5. Geo-technical conditions6. Alignment with Municipal Spatial Planning7. Visual survey (area visits)8. Future development plans of other sector departments 9. Provision of recommendation and proposals to ECDHS
2.1.4 BACKGROUND TO SETTLEMENT
• Registered Owner: Title Deed is requested
• Property Description: Erf 763 and Erf 1290, Lady Frere
• Title Deed Number: Awaiting Title Deed
• Servitudes: None (See Annexure 3)
• Site Size: 48 Ha
• The Lady Frere 800 project is located in Lady Frere under the jurisdiction of Emalahleni Municipality.
• Lady Frere is the main administration seat of Emalahleni municipality and comprises a population of 4024 people of which 98.3 % are black Africans, according to Census 2011.
• The study area, where the award of subsidiesis proposed, is located west of Lady Frere town across Ecacadu River, see Figure 2.1.2
• The study area comprises two portions and is divided by a gravel road leading to Lady Frere’s rural villages.
• It abuts the northern boundary of the R396 regional route to Queenstown near the entrance to Lady Frere.
• There is a sports facility and rural village immediately to the south.
• A large new Eskom sub-station has been constructed north of the site.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 9
Locality Plan Figure 2.1.1
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 10
Aerial Photograph Figure 2.1.2
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 11
Visual Survey Figure 2.1.3
a. Lady Frere welcome sign post b. Ecumakala River is a barrier between the site and Lady Frere town. c. Road cutting through site towards Lady Frere villages.
d. Sub – station north of the site. e. A view of the eastern portion of the site from the south east boundary f. A view of the western portion of the site from the north west corner boundary
g. The only bridge connecting the site to Lady Frere CBD. h. A water coarse flowing south east of the site. i. A view down Indwe Street in the Lady Frere CBD
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 12
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 13
STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2
• 800 subsidies have been proposed for Lady Frere.
• The proposed housing project’s delivery strategy and housing instrument is a project linked subsidy into existing greenfield sites.
• A beneficiary waiting list has been requested from the municipality and is still awaited for this project.
LADY FRERE 800
Population (Emalahleni SDF 2011) Not Specified
Population (2011 Census) Not Specified
No. Households (at 4/hh) Not Specified
Proposed Subsidies (EC DHS) 800
Waiting List (Emalahleni LM) Awaiting
Figure 2.2.1 Statistical Background
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 14
LAND IDENTIFICATION AND OWNERSHIP 2.3
• The land on which the site is located Erf 763 and Erf 1290 Lady Frere and is indicated on Surveyor Diagram No. 5354/2002 and S.G. No/5142/2002, respectively.
• Erf 763 comprises 523 erven including 3 public places and the Street. It was registered with the Surveyor – General Office on 03/08/2000, see Annexure 3 (S.G Diagram).
• Erf 1290 comprises 255 erven including 2 public places. It was registered on 24/02/2003.
• The existing number of erven total 773 and are less than the number of proposed beneficiaries (800) for the site.
• The project may have to be reduced to match the number of units on the existing cadastral units.
• There is however enough land to accommodate 800 beneficiaries, depending on the number of people on the verified waiting list.
• No servitudes are reflected on the S.G Diagram, see Annexure 3.
• The status of the subdivision approval requires confirmation as to whether it has lapsed due to not being acted upon. If this is the case, it should be a simple matter to reinstate, as there does not appear to be any intervening factors that would require its review.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 15
Cadastral Layout Figure 2.3.1
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 16
ENGINEERING (Kantey and Templer) 2.4
BULK SERVICES Existing Services
....
INTERNAL SERVICES Existing Services
....
GEOTECHNICAL CONDITIONS....
EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING
Await K&T
TOP STRUCTURE....
TRAFFIC IMPACT ASSESSMENT...
ROADS AND ACCESSIBILITY...
THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 17
Engineering (Kantey and Templer) Figure 2.4.1
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 18
• The Human Settlements Project is a greenfield site west of the Ecacadu River.
• It comprises two registered General Plans.
• The site is on relatively flat land.
• The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence.
• The site falls within CBA 3: Other Natural Areas as per SANBI data (2007) and therefore is subject to BLMC 3 guidelines according to the ECBCP. This must be ground truthed by a Professional Botanist prior to undertaking the Human Settlement Project, see Fig. 2.5.1.
• BLMC 3 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlement are permitted with conditions.
• However, it can be seen on Fig. 2.5.1 that CBA 3 is shown as extending over most of the urban areas of Lady Frere. It does not take into account that the site comprises two registered General Plans. This is clearly incorrect and the mapping of CBA 3 in this vicinity has not been ground-truthed and amended.
• The Ecacadu River flowing east of the site, however, does not impact the proposed Human Settlement Project.
• Housing development needs to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). In which, a basic assessment would be required for:
– The expansion of:
(i) jetties by more than 50 square metres;
(ii) slipways by more than 50 square metres; or
(iii) buildings by more than 50 square metres
(iv) infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line.
ENVIRONMENT 2.5
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 19
Environment Figure 2.5.1
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 20
GEO-TECH 2.6
• In terms of the geotechnical information available the following is extracted from a report by Outeniqua Geotechnical Services cc, 2013 .
• Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is suitable for further development of these areas.
• Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs.
• The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements.
• On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications.
• Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems.
• In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. (Outeniqua Geotechnical Services cc, 2013 )
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 21
Geo-tech Figure 2.6.1
The Site
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 22
DISTRIBUTION OF SOCIAL FACILITIES 2.7
• The site is approximately 500m – 800m from Lady Frere town and cut off by the Ecacadu River. The only linkage to town and existing social facilities is the bridge on the R396, see Figure 2.1.3(g).
• Lady Frere has a primary school and a combined school located in town.
• The threshold for the provision of schools in small towns is a population of 7000 people and must be within a 5km distance from learners. (CSIR, 2012)
• Both schools are within 2km distance from the proposed human settlement project sites and fall within the required population threshold.
• There is a sports facility immediately across the R396 to the south.
• Glen Grey Hospital is situated within Lady Frere town.
• The police station that will service the area is also in Lady Frere town approximately 1.2km from the site.
• No new facilities will need to be provided for the proposed Human Settlements Project.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 23
Distribution of Social Facilities Figure 2.7.1
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 24
CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8
• The site is situated within the urban edge.
• The Emalahleni SDF envisages a potential local business or mixed use node directly opposite the site across the R396 which will benefit its development and vice versa.
• The Proposed Human Settlement Project is in line with the SDF.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 25
Current Spatial Development Framework Figure 2.8.1
The Site
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 26
FUTURE PLANS OF OTHER SECTOR DEPARTMENTS2.9
• The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the Draft IDP 2014/2015.
• There are no projects envisaged in the IDP that will impact the proposed Human Settlement Project in the financial years 2013/2014 and 2014/2015, however it should be noted that the project is a greenfield project.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 27
SUMMARY AND RECOMMENDATIONS 2.10
2.10.1 SUMMARY
• The site was inspected on 9/01/2014 and the conclusions below ground-truthed.
• There are adequate engineering services. (K&T to confirm)
• In Terms of ECBCP BLMCs that apply to CBA 3, settlements are not recommended. It is recommended that the site be assessed by a Botanist to verify and ground-truth the extent of the CBA in the site prior to the commencement of the Human Settlement Project.
• A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing.
• The site is located on Erf 763 and Erf 1290 Lady Frere as indicated on Surveyor Diagram No. 5354/2002 and S.G. No/5142/2002, respectively.
• The existing number of erven, 773, and are less than the number of proposed beneficiaries (800) for the site.
• The project comprises 800 subsidy units onto existing greenfield.
• Awaiting beneficiary list from the municipality.
• There are no new social facilities required to support the proposed human settlements project.
• The Human Settlement Project is in line with the SDF.
• Awaiting Council Resolution from the municipality.
2.10.2 RECOMMENDATIONS
• The project is feasible pending a technical assessment by a Botanist to ground truth the extent of CBA on the site.
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 28
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 29
ANNEXURE 1: OWNERSHIP PRINTOUT
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 31
ANNEXURE 2: TITLE DEED
LADY FRERE 800 FEASIBILITY STUDYCNdV africa (Pty) Ltd 21 April 2023
page 33
ANNEXURE 3: SURVEYOR GENERAL DIAGRAM