MnDOT - ACEC/MN Annual Conference
Creating Multimodal Connections
FacilitatorPatrick Watz, AECOM
March 5, 2013
Page 2
Central Corridor – The Common Link
• 18 new stations• 11 miles long
• 9.8 miles of new double track• 47 new Light Rail Vehicles• 40,940 average weekday
ridership in 2030
• 18 new stations• 11 miles long• 9.8 miles of new double track• 47 new Light Rail Vehicles• 40,940 average weekday
ridership in 2030
Page 3
Preliminary Engineering (PE)
Environmental Documentation
Final Design -Heavy Construction Begins
Full Funding Grant Agreement
Continue Heavy Construction
Start Operation2014
Central Corridor Timeline
2009
2007
2011
2010
2011 - 2013
Page 4
Regional Transitway System
Page 5
Connecting Transit Modes
Page 6
Today’s Presentations
The Interchange Project:Innovation in Multimodal Planning & DesignGeorge Fantauzza, Project Architect, The Interchange
Union Depot Renovation & Restoration: A Multimodal Transportation HubGreg Brown, URS Corporation Kevin Dalager, MortensonMichael Bjornberg, HGA