ABOUT NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM & EXHIBITION As Indonesia is embracing into the Golden Age of Gas, many are gearing up to anticipate Indonesia’s position as the next “destination” for sustainable NGV and related infrastructure development and growth.
With countless CNG/LNG for public & heavy duty vehicles and CNG/LNG & LCNG Infrastructure development projects mushrooming and planned across Indonesia, 2013 brings lots of promises. The government, state-owned enterprises led by PT Pertamina and private stakeholders are ready to make Indonesia road transport ready utilizing CNG/LNG.
Striving to be one of the most developed NGV markets in South East Asia, Indonesia’s NGV Program is set to fly. With PT Pertamina already leading the way to complete the construction of 33 natural gas stations by middle 2013 – to support the initial 14 000 NGVs anticipated to be on the road next year – , the concrete commitment to support the government’s efforts to promote environmentally friendly and fuel-efficient natural gas vehicles can bring much benefits.
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
Silver Sponsors:
Conference Sponsors:
®
safeS.p.A. Gas Technology
Gold Sponsor:
Exhibitors: Hosted by:
Official Magazines: Media Partners: Literature Drop:
Endorsed and Supported By:
Organized by:
Gold & Lanyard Sponsor:
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
AGENDA
•SITE TOUR – PT PERTAMINA DAAN MOGOT STATION• 0900 – 1200 Wednesday 30th January 2013
Delegates will have a unique opportunity to see �rst-hand a newly built NGV infrastructure. The expected development of new NGV projects in Indonesia is expected to continue and grow exponentially in 2013, fuelling the growth of this dynamic industry.
SITE TOUR DETAILS:SPBG COCO Daan MogotJl. Daan Mogot Raya No. 2 (Lokasi SPBG berada di belakang SPBU 31)
•HANDS-ON CNG CONVERSION WORKSHOP• 0900 – 1200 Wednesday 30th January 2013
You too will now have the opportunity to see first-hand how C. Melchers converts a petrol vehicle to operate on CNG. This half day workshop will give participants the opportunity to take part in the conversion of a Toyota Camry using the well-known Italian conversion system and Type 4 composite cylinder.
The focus of this workshop is to demonstrate the installation method of a sequential conversion system, the electronics involved, safety matters, and the most suitable way to convert an Asian vehicle. This is the first event of its kind to be held as part of the CNG-NGV Forum Series.
Facilitated by:C MELCHERS GMBH
Hosted by:
Literature Drop:
safeS.p.A. Gas Technology
Hosted by: Sponsored by:
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
•CONFERENCE DAY ONE •Thursday, 31st January 2013
0815 Registration and Welcoming of VIPs and Delegates
0900 Organizer’s Welcome Remark
0905 Host Remark by APCNGI Danny Praditya President CNG ASSOCIATION OF INDONESIA (APCNGI)
0910 Co-Host Remark by ANGVA Lee Giok Seng Executive Director ASIA PACIFIC NATURAL GAS VEHICLES ASSOCIATION (ANGVA)
0930 OPENING KEYNOTE ADDRESS NATURAL GAS AS THE ALTERNATIVE FUEL OF CHOICE FOR PUBLIC TRANSPORTATION AND A CLEANER JAKARTA
Joko “Jokowi” Widodo (Invited) Governor DKI JAKARTA
0945 KEYNOTE II DRIVING INDONESIA’S NATURAL GAS VEHICLE MARKET FORWARD IN 2013: CHALLENGES AND OPPORTUNITIES
Directorate General Oil & Gas (Invited) MINISTRY OF ENERGY AND MINERAL RESOURCES
1015 KEYNOTE III BPH MIGAS’S ROLE TOWARDS INDONESIA’S NATURAL GAS FUEL PROGRAM
Dr. Qoyum Tjandranegara Commissioner of Gas Infrastructure BPH MIGAS (Oil and Gas Downstream Regulatory)
1045 Networking Coffee Break
1115 KEYNOTE IV INFRASTRUCTURE DEVELOPMENT AND EXPANSION TO SUPPORT INDONESIA’S NGV INITIATIVES Linda Sunarti CNG Manager PT PERTAMINA
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
1145 EFFECTIVE LIGHTWEIGHT CYLINDER SOLUTIONS FOR LIGHT DUTY VEHICLES AND HEAVY DUTY VEHICLES
Frank Häberli Vice President LINCOLN COMPOSITES
1215 Networking Lunch
1345 ANGVA ROUNTABLE PANEL: BUILDING A SUSTAINABLE NGV INFRASTRUCTURE Facilitated by Lee Giok Seng, Executive Director, ANGVA
Panellists include: • Fazal Ali Khan • Rolando V. Oliquino, Jr CNG Development Manager Project Development Manager EMIRATES GAS LLC PHILIPPINES NATIONAL OIL COMPANY - EXPLORATION CORPORATION
• Robbi Sukardi • Mariarosa Baroni Secretary General President and CEO CNG ASSOCIATION OF INDONESIA NGV ITALIA (APCNGI)
Director PT RAJA RAFA SAMUDRA
1430 FAST TRACKING NGV INFRASTRUCTURE EXPANSION WITH EFFECTIVE AND TAILORED REFUELLING SOLUTIONS
Jonas Giuliani Asia Pacific Markets Development Manager SAFE S.p.A.
1500 Networking Coffee Break
1530 THE 1 MILLION NGVs DREAM FOR INDONESIA: SUSTAINABLE STRATEGIES TO MAKE IT HAPPEN
Member APCNGI (EAST JAVA CHAPTER)
1600 CNG FLEET CONVERSION CASE STUDY- EUROPEAN ENGINEERING, IN ASIAN CONDITIONS
Gilbert von der Aue Head of Department – General Engineering Dept C MELCHERS GMBH & CO., SINGAPORE
1630 LPG/CNG INJECTORS
Luigi Stevani President RAIL SPA, ITALY
1700 End of Conference Day One
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
•CONFERENCE DAY TWO• Friday, 1 February 2013
0900 Recap and Summary
0915 UPDATED STATUS AND FUTURE PLANS OF NGVPPT IN PHILIPPINES – CHALLENGES AND OPPORTUNITIES
Rolando V. Oliquino, Jr Project Development Manager PHILIPPINES NATIONAL OIL COMPANY - EXPLORATION CORPORATION
0945 USING A COST EFFICIENT TRASNSPORTATION SYSTEM FOR MOTHER- DAUGHTER STATIONS IN MALAYSIA •Abd Aziz Miskon •Haris Bin Mohd Harowi Managing Director / CEO Manager – Energy Supply Chain MISC INTEGRATED LOGISTICS (MILS) MISC INTEGRATED LOGISTICS (MILS)
1015 Networking Coffee Break
1045 WORLDWIDE CNG REFUELLING EXPERIENCE – COMPARISON OF DIFFERENT CNG REFUELLING INTERFACE
Roman Vitomirac Sales Alternative Fuels CNG WEH GAS TECHNOLOGY
1115 CNG CYLINDERS, CNG STORAGE AND TRANSPORT APPLICATIONS
Martin Litvik Managing Director VÍTKOVICE GENERAL TRADING
1145 Networking Lunch and Break for Friday Prayers
1345 IMPACT OF HEAVY DUTY NATURAL GAS VEHICLES ON AIR QUALITY IN BANGKOK
Dr. Pipon Boonchanta Associate Professor KAESETSART UNIVERSITY
1415 UTILIZING NATURAL GAS ENGINE FOR HEAVY DUTY VEHICLES IN INDONESIA
Qin Weiwei Regional General Manager (Asia Pacific) SHANGHAI DIESEL ENGINE COMPANY LTD
1430 RE-POWERING OF HEAVY DUTY VEHICLES FOR THE MINING INDUSTRIES
Alexandre Hintz Director PT POWER SERVICE INDONESIA
1500 Closing Remarks and End of Conference Day 2
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
Jakarta, Indonesia / 31Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
For more information, please contact:stephanie.chan@al leventsgroup.comTelephone : +65-6506 0963 Fax : +65-6749 7293 Website : www.cngngv.com/indo2013
16 17 18 19 20 21
8 9 10 11
22 23
262730 29
33 34 37 - 38
12
25
2413 14
35
15
4
36
28
5 6 7
YOUNGDO SINOMATIAN EN
MATESUABADI
C. MELCHERS
HEXAGONCOMPOSITES
AEB S.p.A.
VITKOVICE CYLINDERS a.s
CAVAGNA GROUP
RAILWEH / Thyssen Krupp
GALILEO TENARIS
A1 A2 A3 A4 A5 A6
A A8 A9 A10 A11 A12
B2 B3 B4 B5
B7 B8 B9
B10
XEBECSHANGHAI
CONFERENCE
B1 B6
WUXI BANNER VESSEL
RESERVED SAFE S.p.A.
STANDARD BOOTH
Consists of:
Wall Panels; 1 x Reception Table; 2 x Chairs; 1 x Powerpoint; 1 x Spotlight; 1 x Waste Basket; Carpet Underlay; Fascia Sticker with Booth No.
3m x 3m
PREMIUM BOOTH
Consists of:
Wall Panels; 1 x Reception Table; 2 x Chairs; 1 x Powerpoint; 1 x Spotlight; 1 x Waste Basket; Carpet Underlay; Fascia Sticker with Booth No.
4m x 3m
Includes 2 Conference Passes
09 SQM BOOTH USD 6,50012 SQM BOOTH USD 8,000
EXHIBITION PRICE
B11EMERSON PROCESS
MANAGEMENT
ENDRESS + HAUSER
A13PT. JAVA ENERGY SEMESTA
A7
CHONGQINGYIFENG
A12
ANGI
A7
CHONGQINGYIFENG
A12
ANGI
Delegate 1 Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Delegate 2 Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Approving Manager Mr ( ) Mrs ( ) Ms ( ) Dr ( ) Other ( )
First Name: Last Name:
Job Title: Department:
Telephone ( ) Fax ( )
Email:
Company:
Address:
Email: [email protected]
Phone: +65 6506 0965
Fax: +65 6749 7293
Post: All Events Group Pte Ltd 52 Foch Road, #02-02 Singapore 209274
By Cheque: Made payable to All Events Group Pte Ltd and mailed with your registration form to All Events Group Pte Ltd (postal address above)
By Telegraphic Transfer: to All Events Group Pte Ltd, United Overseas BankAccount Number: 421-300-086-6Branch Code: 7375-494
By Credit Card: Please debit my credit card for:
USD
Card No:
Expiry Date: (mm/yy)
Name on Card:
CVV/Security Code:
Signature:
Visa Mastercard
Payment Policy: Payment is due in full at the time of registration. Full payment is mandatory for event attendance. Cancellations & Substitutions: Substitutions will be accepted at any time prior to the event. AEG will not provide refunds for cancellations. For cancellations received in writing more than seven (7) days prior to the conference, you will receive a full credit to be used at another AEG event for up to one year from the date of issuance. For cancellations received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the event that AEG cancels an event, a full credit will be credited to the delegate for use at another AEG event. This credit is valid for one (1) year from the date of issuance. We reserve the right to change the venue and date of the event if required. AEG is not responsible for any loss or damage as a result of a substitution, alteration or cancellation / postponement of an event. AEG will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this event impracticable or impossible. For purpose of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergencies. Program Change Policy: Please note that speakers and topics were confirmed at the time of publishing; however circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, AEG reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible.
EASY PAYMENT METHODS
4 WAYS TO REGISTER
CNG & LNG Vehicles and CNG/LNG & LCNG Infrastructure Development
Jakarta, Indonesia / 31 Jan - 1 Feb 2013
NATURAL GAS VEHICLES & INFRASTRUCTURE INDONESIA FORUM AND EXHIBITION
TEL: +65 6506 0965 FAX: +65 6729 7293 EMAIL: [email protected]
2 DAYS CONFERENCE USD 700
ANGVA Members USD 500
Hands-On Conversion Workshop USD 50
REGISTRATION:
SITE TOUR (REGISTRATION FULL) USD 50