Energizing Life, Empowering People
PT Sumberdaya Sewatama
TMT 2 Building, Floor 1 & 2Jl. Cilandak KKO No. 1 Jakarta 12560
T +62 21 2997 6712 (Hunting) F +62 21 2997 [email protected]
toll free 0800 1821 301
Balikpapan - Jayapura - Makassar - Medan - Palembang - Pekanbaru - Surabaya
A Member of ABM Group
COMPANY PROFILE
1.3 million new connections annually to achieve 90%
electrification ratio by 2020 require new approach
to electrification2
68.0% electrification ratio up to April 2011,1 with
uneven distribution across the archipelago
1 The Ministry of Energy and Mineral Resources of the Republic of Indonesia www.esdm.go.id/news-archives/electricity/46-electricity/4549-electrification-ratio-of-quarter-i-2011-reached-67-99-.html?tmpl=component&print=1&page 2 Worldbank. http://siteresources.worldbank.org/INTINDONESIA/Resources/Publication/280016-1106130305439/Electricity-for-All-Options-for-Increasing-Access-in-Indonesia.pdf. Seminar on Electricity for All: Options for IncreasingAccess in Indonesia. Oct 25, 2005.3 PT. Perusahaan Listrik Negara (Persero). “Rencana Usaha Penyediaan Tenaga Listrik 2010-2019.” Jakarta: PT. PLN (Persero) 2010.
In 2006, the government launched a Fast Track Plan,
inviting Independent Power Producers (IPP) to participate3
20 GW in additional power, including 4 GW of
geothermal power from IPP, for the grid by 20143
Bridging Needs for Power Solutions
Indonesia is a vast country of 245 million people inhabiting 17,508 islands. The uneven spread of the
populace across massive oceanic and mountainous expanses creates substantial challenges to provide
equitable access to electricity.
As Indonesia’s leading power solutions provider, PT. Sumberdaya Sewatama (“Sewatama”) looks forward
to energizing life and empowering people across Indonesia.
We look forward to energizing life
and empowering people across Indonesia
1 2
MARKET FACTS
Vision
To be the Leading Power Solutions Provider and
the preferred choice in the industry.
Sewatama at A Glance
Sewatama has been delivering power across ocean expanses
and mountainous terrains to even the remotest regions in
Indonesia since 1992.
Today, we have more than 1,300 people in 7 offices and 5
depot stations from Sumatra to Papua, providing a portfolio of
services that enables us to deliver total power solutions with
our current installed base of over 1 GW – more than enough
to power the island of Bali!
Our recently added subsidiaries, PT. Nagata Bisma Shakti
(Nagata) and PT. Pradipa Aryasatya (Pradipa), have taken us
to the forefront of developing renewable and thermal power
solutions.
Sewatama is a subsidiary of PT. ABM Investama Tbk. (ABM
Group), which is a sub-holding of PT. Tiara Marga Trakindo (TMT
Group).
The integrated energy business under ABM Group allows us
access to end-to-end capabilities that ensures effective scale of
operation.
As Sewatama, we energize life and empower people.
Mission
To maintain profitable growth and maximize value for
shareholders.
To provide the most relevant and highest quality power
solutions and associated services to both Utility (PLN) and Non-
Utility customers in Indonesia in the short to medium term, and
beyond Indonesia for the medium to long term.
To continue creating worthwhile and challenging job
opportunities for as many Indonesians as possible, while
providing continuous development opportunities and a better
quality of life for
our employees.
To continue applying safe and environment-friendly technology
that delivers added value to the community.
Delivering power solutions across ocean
expanses and along mountainous terrains
to even the remotest regions in Indonesia
3 4
ABOUT US
Wind
Thermal energy sources:
Fuel Oils
Gas
Coal
ACHIEVING OUR VISION
Grown beyond temporary power
through relentless pursuit of relevant
and innovative power solutions for life
Power Solutions for Life
Sewatama has taken a leadership position in delivering temporary power to people since 1992.
Through a series of key milestones, we have grown from strength to strength beyond temporary
power provision through relentless pursuit of relevant and innovative power solutions.
Such innovations allow us to provide total power solutions for life.
Renewable energy sources:
Solar
GeothermalHydro
OceanBiomass
5 6
Started as a rental division under PT. Trakindo Utama Energy Division.
Launched as PT. Sumberdaya Sewatama (Sewatama), a rental provider for Caterpillar diesel generator sets used mostly in mining and construction.
Added pumps into its equipment offering to meet the growing needs of the mining and construction industries.
Launched bi-fuel generator sets to produce high quality electricity, and mobile generator sets for rapid delivery of power.
Moved beyond rental with the launch of load bank equipment to support Sewatama’s first line of electricity capacity testing services.
Repositioned as “Power Solutions Provider” with a new logo and tagline.
1991 20011992 2003 2006
the power rental business the power rental businessESTABLISHING LEADING
Recognized for its commitment to SHE, and ranked as a Top 10 Company practicing SMK3.
Launched Business Development as a catalyst toward becoming an IPP with renewable and thermal energy solutions.
Established end-to-end power solutions with a comprehensive scale of operations through consolidation into PT. ABM Investama Tbk. (ABM Group).
Expanded its portfolio products and services through 3 business units: Temporary Power, Pillar, Operation & Maintenance.
Established IPP subsidiaries through 20% share acquisition of PT Metaepsi Pejebe Power Generation.
Launched PT. Nagata Bisma Shakti and PT. Pradipa Aryasatya for the provision of renewable and thermal energy solutions.
Established power optimization services.
2007 20102008 20112009
as the national power solutions provider TAKING OFF
MILESTONES
Our collective experiences have led
to deep understanding of the terrains
and the industry that we work in
In the span of 20 years, we have worked with both utility and non-utility customers in various locations
across the archipelago. Our collective experiences have led to deep understanding of the terrains and
the industry that we work in, to provide customized power solutions for all, everywhere.
Throughout our years in operation, we have had the privilege of serving a wide range
of customers from utility, mining, oil, gas, building, to property, etc.
Power Solutions for All Our Customers
78
• Head Office
• Area / Branch Office
• Depot
2010 acquisition year of a Gas Fired Power Plant in Gn. Megang, Muara Enim, South Sumatera. marking IPP/CPP development 24 hour toll-free
service running from Jakarta Headquarter
2 x 1,000 kVA power barge installed offshore
Over 60 fleet of pumps including pontoons and pipelines – some are in Kalimantan
Over1 GW installed capacity - more than what is needed to power the entire Bali
First diesel generator set rental in Bitung by PT. PLN (Persero) in
1995
Palembang
Pekanbaru
Medan
MakassarJakarta
Balikpapan
Batulicin
Surabaya
Jayapura
Over 80 Operation & Maintenance projects including ones at the border of Papua
Only 20 days required to install 40 MW in South Kalimantan
More than 800 unit generator sets including those in Ambon
IMPACT
PRODUCT AND SERVICES
Sewatama’s links with its holdings, the ABM and TMT Groups, enables access to a wide network
of experience and expertise in integrated energy resources and heavy machinery services.
Our product and services are tightly integrated into three business units: Temporary Power, Pillar,
and Operations & Maintenance. Within these business units, highly experienced people provide
total power solutions through consultation in research, design, installation, operation and
maintenance, even up to financing.
Our Business Development acts as a catalyst towards becoming an IPP through research and
development.
Temporary Power Business Unit provides reliable solutions with various power generator sets customized to specific site requirements. Our solutions include on-site research, installation, connection, monitoring, and project management support for utility and non-utility industries.
Pillar Business Unit has been providing high quality power solutions in water management since 2001, and has extended its service to power optimizing services for various types of plant and commercial facilities.
Operation & Maintenance Business Unit operates and maintains power generators, pumps, and gas turbine, as well as various types of power plants to raise productivity, while introducing high quality, safety, health, and environmental standards.
Business Development takes us beyond diesel power rental by focusing on research and development that will find relevant power innovations using thermal and renewable power solutions.
Total Power Solutions 01 02 03Temporary Power
Pillar Operation & Maintenance
BusinessDevelopment
Providing total power solutions through
consultation in design, installation, operation
and maintenance, even up to financing
9 10
1
Temporary Power Pillar
Temporary Power Business Unit provides superior equipment
and services that allow customers to keep their operations
efficient, productive and reliable. Our services include three
types of solutions:
Urgent power solutions rapidly respond to emergency
situations with mobile, and easy-to-install technology.
Temporary power solutions customized to project requirements
that are determined from on-site research.
Planned power solutions providing superior power equipment
and services to ensure that business operations are efficient
and productive.
We operate over 1,000 power generator sets and pumps.
Pillar Business Unit provides high quality services in water
management including water transfer in difficult terrains,
as well as power optimization.
Since 2001, we have built strong track records in mining,
petrochemical, marine, construction and property industries.
Our operators are expert in analyzing, designing and installing
relevant solutions, and are highly competent in professionally
handling Original Equipment Manufacturer (OEM) adapted to
extreme ground conditions.
Our range of services includes consultation, design, installation
to operation and maintenance, as well as financing and
investment. Our power optimization service is done through
loadbank equipment rental and capacity testing, as well as
auditing of commercial facilities, such as parks, hotels, and
retail centers.
Pillar Business Unit oversees projects in Sumatra and
Kalimantan, and is expanding into the rest of Indonesia
as our customers go further into remote areas.
11 12
Containerized generator sets offer fast and mobile solutions
Quality dewatering services using various types of pump sets
Our fuel solutions include relevant uses of diesel, coal, and gas
Reliable capacity test result through 24-hour loadbank test
BUSINESS UNIT BUSINESS UNIT
BUSINESS UNIT
Operation & Maintenance Business Development
Operation and Maintenance Business Unit provides customized
solutions for power asset management, including operation
and maintenance of power generation sets and pumps.
We also provide consultation for improving equipment
productivity at various power plants.
We have over 1,000 skilled people trained for optimal handling
of basic diesel engines and electric generators toward
achieving high quality, safety, health, and environmental
operational standards. Our robust technical expertise and
experience are garnered through nationwide projects.
Our partnerships with OEM and its dealers allow us to be
responsive to ensure operational efficiencies for our customers
even in the remotest areas.
Our Operation & Maintenance Business Unit serves the rest of
Sewatama’s Business Units.
Optimal handling of generator sets and pumps
Optimal use of thermal energy such as coal resources
Absolute focus on quality, safety, health and environment
Hydro resources, among other renewable energy sources that are innovative and relevant
Business Development Unit acts as Sewatama’s arm, which
invests continuously into research and development programs
that will enhance our power solutions by leveraging more
advanced, relevant, and environmentally friendly technology.
Since 2011, Sewatama launched two subsidiaries:
Sewatama’s initiatives are achieved through guidance on
strategy and investment from our holding company, the ABM
Group.
PT. Pradipa Aryasatya (“Pradipa”) is Sewatama’s
subsidiary that focuses on power solutions through
optimal use of thermal energy such as coal, gas and
fuel oil resources.
PT. Nagata Bisma Shakti (“Nagata”) is established
with focus on renewable energy solutions from hydro,
biomass, wind, geothermal, ocean and solar energy
resources that are innovative and relevant.
13 14
BEYOND TEMPORARY POWER
Sewatama’s Quality, Safety, Health and Environment (QSHE) culture is driven by our understanding
and action as a process-driven organization to deliver operational excellence.
Our enterprise-wide risk management process ensures that QSHE is an integral part of each step of
our operations, whether large or small, in every location; from rugged terrain to the boardroom.
Our commitment to safety and quality is well recognized nationally and internationally through
OHSAS 18001:2007, SMK3, and Quality Management System ISO 9001:2008 Certification.
At Sewatama, QSHE lies in each of our everyday step.
Quality is Our Way of Life
Our enterprise-wide risk management
process ensures that QSHE is an integral
part of each step of our operations
Through Sewatama Improvement Program, we constantly
raise our quality performance bar by embedding the QSHE
principles into all of our systems and everyday activities,
in our never-ending quest for excellence.
Sewatama Improvement Program>
15 16
QUALITY, SAFETY, HEALTH AND ENVIRONMENT
As a power solutions leader, we strive to be a good corporate citizen for our employees and their families, as
well as for our shareholders, customers, suppliers, and the community, including our environment, while strictly
complying to government regulations.
Among our efforts to ensure good relations with communities, Sewatama Disaster Response immediately
stepped in to provide aid and temporary power when earthquakes hit Padang and Yogyakarta, when flood hit
Situgintung as well as when Mount Merapi erupted. Beyond emergency relief, our Sewatama Volunteer Team,
together with Yayasan IBEKA, actively engages a community in Banten with a sustainable social business
model, to rehabilitate a Micro Hydro Power Plant through our Kasepuhan Ciptagelar Initiative.
Most of all, we strictly adhere to the highest ethical and integrity standards, and continuously endeavor to
achieve optimum positive impact on profit, people and the planet we all live on.
Our Commitment to Profit, People and the Planet
We strictly adhere to the highest ethical and
integrity standards, and endeavor to achieve
optimum positive impact
17 18
Courtesy of Freddy Hartanto
CORPORATE CITIZENSHIP