COMPANY PROFILEPT WASKITA KARYA (PERSERO) TBK
COMPANIES OVERVIEW
CORPORATE MANAGEMENT STRUCTURE
BUSINESS LINE
6
WASKITA GROUP CORPORATE STRUCTURE
59,99%
PT Waskita Beton Precast Tbk
99,99%
PT Waskita Karya Realty
80,56%
PT Waskita Toll Road
20,00%
PT Prima Multi Terminal
90,00%
PT Cimanggis Cibitung Tollways
PT Cinere Serpong Jaya
25,00%
PT Citra Waspphutowa
94,70%
PT Waskita Sangir Energi
PT Waskita Karya Infrastruktur
99,99%
PT Waskita WadoEnergi
99,99%
77,69%99,99%
PT Pejagan Pemalang Tol Road
99,99%
PT Semesta Marga Raya
PT Trans-Jawa Paspro Jalan-Tol
22,31%
39,50%
60,00%
PT PemalangBatang
Tol Road
PT Trans Jabar Tol
99,99%
PT Waskita Bumi Wira
99,90%98,18%
PT Waskita Sriwijaya Tol
60,00%
PT Tol TelukBalikpapan
75,00%
PT Waskita Bali
Mandara
55,00%
PT CibitungTanjung PriokPort Tollways
99,70%
PT Kresna Kusuma
Dyandra Marga
PT Waskita ModernRealti
60,00%
30.00%
PT Jasa MargaKualanamu Toll
35,00%
PT Jasamarga Semarang Batang
40,00% 30.00%
PT HutamaMarga Waskita
PT Citra KaryaJabar Tol
15,00%
PT Waskita FimPerkasa Realti
60,00%
PT Hotel KaryaIndonesia
25,00%
PT PP SinergiBanjaratma
20,00%
Pemerintah
66,04%
PT Waskita Karya (Persero) Tbk
Masyarakat
33,96%
OPERATING AREAS & EXPERTISE
Cimanggis - Cibitung Toll Road
EPC PORTFOLIO
Owner PT PLN (Persero)Project Location Papua, IndonesiaProject Value Rp. 231.397.521.640,- (Excl.VAT)Contract Value (Incld.Addendum) Rp. 487.420.463.423,- (Excl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 24 November 2008 – 30 December 2015Actual Duration (Incld.Addendum) 24 November 2008 – 23 December 2015
Scope Of Works
1. Design, Drawing and Documentation2. Civil Works Weir & River Intake De-sedimentation Basin &
HeadraceCulvert Tunnel Inlet Portal Tunnel Construction Valve House Portal
Penstock Civil Works Powerhouse and Tailrace Access Road & Bridge 20 KV Local Supply Line Reservoir Clearance
3. Plant, Equipment and Mandatory Spare parts
8
PROJECT EXPERIENCE
Genyem Hydro Power Project 2x10 MW
Owner PT Waskita Sangir EnergyProject Location Sangir, Sumatra Barat, IndonesiaProject Value Rp. 166.766.903,- (Excl.VAT)Contract Value (Incld.Addendum) Rp. 265.826.618.105,- (Excl.VAT)
Contract Scheme Lump Sum Fixed PriceDuration as Contract 29 November 2013 – 22 February 2015Actual Duration(Incld.Addendum) 29 November 2013 – 18 November 2016
Scope Of Works
1. DED2. Main Works Coffering & Dewatering Intake, Main Dam, Transition Tunnel Sandtrap Waterway Syphon Head Pond & Emergency
Inspection Road & Side Ditch Civil Work / Saddle
Supportfor Penstock Powerhouse & Tailrace Metal Work Generating Equipments
9
PROJECT EXPERIENCE
EPC Construction of Sangir Mini Hydro Power Plant 2 x 5 MW
Owner PT. Bayu Daya Perkasa
Project Location Banten, Indonesia
Project Value Rp 91.286.967.000,- (Excl.VAT)
Contract Value (Incld.Addendum) Rp. 126.251.021.000,- (Excl.VAT)
Contract Scheme Lump Sum Fixed Price
Duration as Contract 20 June 2014 – 13 September 2015
Actual Duration(Incld.Addendum)
20 June 2014 – 25 January 2017
Scope Of Works
1. General Work2. Access Road3. Diversion Weir & IntakeStructure4. Waterway5. Waterway & Related Structure
6. Head Pond7. Penstock8. PowerHouse9. Hydromechanical10. Miscellaneous Works
10
PROJECT EXPERIENCE
Lebak Tundun Mini Hydro Power Plant 2 X 4 MW
Owner PT PLN (Persero)
Project Location Kalimantan Timur, Indonesia
Project Value Rp. 151.578.435.800,- (Excl.VAT)
Contract Value (Incld.Addendum)
Rp. 280.448.151.569,– (Excl.VAT)
Contract Scheme Lump Sum Fixed Price
Duration as Contract 15 December 2010 – 14 October 2012
Actual Duration(Incld.Addendum)
15 December 2010 – 20 September 2020
Scope Of Works
1. Land Preparation2. Design3. Building Construction (Turbine & Boiler House)4. Colling tower System5. Mechanical, Electrical & Process6. Coal Handling Facility (Conveyor System)7. Commissioning & COD
11
PROJECT EXPERIENCE
EPC Construction of Malinau Coal Fired Power Plant 2x3 MW
Owner PT. Sinoma Engineering Indonesia
Location Citeureup, West Java, IndonesiaProject Value Rp 192.053.400.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 235.004.737.327,- (Incl.VAT)
Contract Scheme Unit PriceDuration as Contract 1 January 2014 – 31 December 2014Actual Duration(Incld.Addendum) 1 January 2014 – 12 December 2018
Scope Of Works
1. Cement Silo2. Civil Works at Cement Grinding3. Civil Works at Cement Mill Feed4. Civil & Finishing Works at CoalStorage
12
PROJECT EXPERIENCE
Cement Silo P14 Plant Capacity 10000 tpd at Citeureup
Owner CBMI - DDK JO
Location Palembang, South Sumatra, IndonesiaProject Value Rp 101.864.283.077,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 101.864.283.077,- (Incl.VAT)
Contract Scheme Lump Sum Fixed PriceDuration as Contract 16 August 2015 – 17 August 2016Actual Duration(Incld.Addendum)
16 August 2015 – 16 February 2017
Scope Of Works
CIVIL WORK1. Main Substation Building2. Cement Silo3. Cement Component Dosing4. Clinker Silo 2 &35. Coal Storage
6. Water Treatment Building7. Raw Material Dosing8. Sandy Clay –Trench9. Limestone Storage10. Cement Grinding Building
13
PROJECT EXPERIENCE
Baturaja Cement Project (Plant II)
Owner PT. Semen Padang
Location Dumai, RiauProject Value Rp 52.662.500.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 52.662.500.000,- (Excl.VAT)
Contract Scheme Lump Sum Fixed PriceDuration as Contract 6 July 2009 – 1 May 2010Actual Duration(Incld.Addendum) 6 July 2009 – 1 May 2010
Scope Of Works
1. Cement Silo2. Packer Building3. Unloading Faculity4. Office & OthersFacility
14
PROJECT EXPERIENCE
Silo and Packing Plant Dumai
Owner PT. Semen PadangLocation Padang, Sumatra, IndonesiaProject Value Rp 169.290.000.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 180.167.022.566,- (Incl.VAT)
Contract Scheme Unit PriceDuration as Contract 17 October 2014 – 5 July 2015Actual Duration(Incld.Addendum)
17 October 2014 – 9 August 2016
Scope Of Works
1. Cyclone Preheater Upper Structure2. Kiln Feed Structure3. Raw Mill Foundation4. CF Silo Structure5. Kiln Foundation
15
PROJECT EXPERIENCE
CC-1 Package : Civil Construction for Foundation and Upper Structure Building Indarung Project
Owner PT. Semen Padang
Location Padang, Sumatra, IndonesiaProject Value Rp 140.880.597.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 156.764.192.211,- (Excl.VAT)
Contract Scheme Unit PriceDuration as Contract 7 August 2015 – 3 May 2016Actual Duration(Incld.Addendum) 7 August 2015 – 27 February2017
Scope Of Works
1. Silo Clinker Teluk Bayur2. Unloading Clinker3. Raw Coal Handling4. CCR Building5. SubstationCCR6. Transport Tunnel
16
PROJECT EXPERIENCE
CC-8 Package : Civil Works Construction of Indarung VI Project
Owner PT Dahana (Persero)Location Subang, West Java, IndonesiaProject Value Rp 108.900.000.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 108.900.000.000,- (Excl.VAT)
Contract Scheme Lump Sum Fixed PriceDuration as Contract 22 October 2015 – 18 July 2016Actual Duration(Incld.Addendum) 22 October 2015 – 28 April 2017
Scope Of Works
Phase I :1. Engineering & Site Preparation2. Civil & Steel Structure Worksfor
Utility Building3. Utility Procurement (ME)
Phase II :1. Engineering & Site Preparation2. Civil & Steel Structure Works UtilityBuilding
and Main Process3. Pek. Procurement, Instalation dan
Commissioning Utility Work (MEWork)4. Process Equipment Installation
17
PROJECT EXPERIENCE
Engineering, Utility, Building, Civil Works Facilities and Prototipe Nitrogliserin Project
Owner Ministry of Energy and Mineral Resources
Project Location Balikpapan & Tarakan, East Borneo, Indonesia
Project Value Rp. 152.780.000.000,- (Incl.VAT)
Contract Scheme Lump Sum Fixed Price
Duration as Contract May 2020 – December 2020
Scope Of Works
1. Design2. Main Equipment Instalation3. Pipeline for LPG Distribution
18
ON GOING PROJECT
LPG Facility and Pipeline Distribution at Tarakan and Balikpapan
MailingAddress: Head Office Waskita BuildingJl, MT, Haryono Kav, No.10 Cawang, Jakarta 13340Ph: (+6221) 8508510/20 E-mail: [email protected] website:www.waskita.co.id
Disclaimer:This material Rev by Rady is for information only, and we are not soliciting any action based upon it, This report is not to be construed as an offer to sell or the solicitation of an offer to buy anysecurity in any jurisdiction where such an offer or solicitation would be illegal, The information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurateor complete, and it should not be relied upon as such, Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice, It is intended forthe use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PTWaskita Karya (Persero) Tbk.