Topics

• Program Level Status

– Program Management

– Spacecraft

– Mission Planning

– Science Instruments and Calibration

– OCC

– Data Processing

– CXCDS

– CDO

– Education and Outreach

• Mission Metrics

• Chandra Grant Awards

Page 3: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 3

• Program Management

– Successfully passed the 5 year milestone on July 23, 2004!

– CXC remained within budget for FY04 and expect FY05 costs to track to POP04 plan. HRC, ACIS & HETG PI subcontracts moved under SAO, 1 Oct 04.

– Staffing: Martin Elvis resigned as Lead for Science Data System Planning, Jonathon McDowell appointed new Lead with Mike Wise (MIT) as Deputy.

– Tom Aldcroft certified as 3rd Chandra Flight Director (replaces Rob Cameron).

– Facilities: Draper Labs moving ahead with new Hill building attachment. ~1500 sf floor space to be lost to 7th floor including the conference room and 5 offices. ACIS room to be sacrificed to allow for new conference room to be built. ACIS Equipment has been relocated to the TST room.

Program Level Status 6/30/04 – 1/25/05

Page 4: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 4

Page 5: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 5

Page 6: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 6

Present 7th Floor Layout

ACIS

Page 7: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 7

Proposed7th Floor Modifications

Page 8: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 8

• Spacecraft– Continues to operate extremely well overall

– OBC patch for SCS 101 and SCS 31. Modify 101 to contain all CPE patches; modify 31 to call 101 during eclipse ops, 8/23. Improved eclipse safemode transition.

– Helium Channel replacement patch, 9/1, for use of HRC anti-coincidence shield data in place of EPHIN as radiation detector. 6 cases of EPHIN rail voltage anomaly due to high temperatures however no indication of performance degradation; plan to budget ~6 rail voltage drops per year.

– Conducted ACA dark current calibration 9/9 and 12/24 – shows expected trend in warm pixel increase

– Nominal ’04 summer and ’05 winter eclipse seasons, nominal Lunar Eclipse, 11/12

– Radiation events during ’04 eclipse season resulted in contingency commanding and 3 Normal Sun Mode (NSM) recoveries.

– Uneventful Leonids passage 11/19

– Anomalies: Propulsion line cooling, EPHIN rail voltage, unexpected NSM transition

Program Level Status 6/30/04 – 1/25/05

Page 9: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 9

• Mission Planning

– Thermal heating and constraints starting to impact mission planning

– 10 SCS 107 runs due to high radiation events (includes major event last week)

– 7 load interrupt TOOs:

Date Target Request

07/05/04 AXP 1048-5937 1 day

08/14/04 GRB 040812 3 days

08/31/04 XRF 040825 3 days

09/13/04 GRB 040912 3 days

10/06/04 GRB 041006 3 days

10/06/04 SGR 1806-20 3 days

12/13/04 BL 0520+675 1 day

Program Level Status 6/30/04 – 1/25/05

Page 10: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 10

• Science Instruments and Calibration

– Operating extremely well overall

– ACIS bakeout decision postponed in Sept due to safety concern over use of abort heaters, and simulation questions over contaminant volatility

– HRC anticoincidence shield rates show acceptable correlation with high energy EPHIN channel. Antico rates exceeded proposed threshold for prior radiation safing event during mission, i.e., a safe EPHIN alternative

– 2004 Calibration Review held 10/25-10/26

• OCC

– Linux Migration initial config. 10/4, test started 12/1, to ops 3-4/05

– DSN unexpected commanding, 9/11

Date Version Change

07/23/04 OFLS 11.0 Linux port12/06/04 ONLS 3.10.6 Linux port; test fixes12/06/04 OFLS 11.3 Linux port

Program Level Status 6/30/04 – 1/25/05

Page 11: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 11

• Data Processing

– Automatic processing is current; data delivery time averaged <4 days

– Planning underway for Re-processing #3

• CXCDS

Date Version Change

07/07/04 CIAO 3.1 Tools, data model, infrastructure11/29/04 CXCDS 7.4 Automated V&V, MTA DB, AGASC 1.612/14/04 CXCDS 7.5 Cycle 7 support12/15/03 CIAO 3.2 Tool updates (e.g., mkacisrmf), bug fixes

– CalDB 2.28 released 8/11, 2.29 on 11/29, and 3.0 on 12/15

Program Level Status 6/30/04 – 1/25/05

Page 12: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 12

• GO and Fellows Program, CDO

– Cycle 6 stage 2 cost review held 10/20, results sent to observers 11/1

– Cycle 6 EPO review held 10/20, results announced 11/16

– Cycle 7 CfP released on schedule 12/15

– Cycle 8 Fellows review held 1/19

– Other: Galaxies workshop 7/7, Fellows Symposium 10/13

• Education and Public Outreach

– 14 Chandra press releases and 7 additional image releases made

Program Level Status 6/30/04 – 1/25/05

Page 13: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 13

Mission MetricsMUPS Fuel Usage

Page 14: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 14

Mission Metrics (con’t)

Page 15: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 15

Mission Metrics (con’t) Scheduled Observing Efficiency

Scheduled Observations

Month Seconds in month (ks)

Scheduled Observing Time (ks)

Scheduled Observing Efficiency

Jan-04 2678.4 1700.3 0.63

Feb-04 2505.6 1807.6 0.72

Mar-04 2678.4 1727.7 0.65

Apr-04 2592.0 1767.3 0.68

May-04 2678.4 1896.3 0.71

Jun-04 2592.0 1769.7 0.68

Jul-04 2678.4 1687.7 0.63

Aug-04 2678.4 1718.9 0.64

Sep-04 2592.0 1640.8 0.63

Oct-04 2678.4 1827.3 0.68

Nov-04 2592.0 1439.6 0.56

Dec-04 2678.4 1796.1 0.67

Page 16: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 16

Mission Metrics (con’t)Observing Efficiency

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.80

Jan-04 Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

Sch

edu

led

Eff

icie

ncy

Page 17: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 17

Data Delivery EffectivenessAs of middle of following month As of 1/13/05

Month Number of Obs

Days to Data Delivery Number Deliv

Number Outstanding

Number Deliv

Number Outstanding

Min Avg Max

Jan-04 65 0 3 19 65 0 65 0

Feb-04 59 0 4 13 59 0 59 0

Mar-04 53 1 6 39 53 0 53 0

Apr-04 36 1 5 18 36 0 36 0

May-04 50 0 5 23 50 0 50 0

Jun-04 66 1 5 27 66 0 66 0

Jul-04 52 1 4 10 52 0 52 0

Aug-04 53 1 3 13 53 0 53 0

Sep-04 50 0 3 12 50 0 50 0

Oct-04 44 0 4 22 44 0 44 0

Nov-04 36 1 5 12 36 0 36 0

Dec-04 73 0 2 7 73 0 73 0

Page 18: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 18

Chandra Grant Awards

As of middle of following monthAs of 1/12/05

Month of Data Delivery

No. Grants (1)

No. Grants Awarded

No. Outstand

ing

Avg days to award (2) *

No. Grants

Awarded

No. Outstand

ing

Outstanding AwardsProposal no, Comments

Grants to Non-Federal Institutions

Jan-04 54 35 19 40 54 0

Feb-04 14 12 2 35 14 0

Mar-04 23 15 8 15 22 1 5700535 – PI changed institution, req cancelled. Reissued in Sep. 04.

Apr-04 11 5 6 18 11 0

May-04 4 3 1 10 4 0

Jun-04 15 7 8 16 15 0

Jul-04 13 3 10 19 13 0

Aug-04 12 0 12 n/a 12 0

Sep-04 10 4 6 38 9 1 5300202

Oct-04 10 2 8 22 9 1 5200622

Nov-04 4 0 4 n/a 4 0

Dec-04 31 22 9 25 22 9 6200274, 6200742, 6400243, 6400892, 6500974, 6610143, 6700116, 6700990 (A&B)

* Grant awards delayed due to SAO conversion to new Institute-wide financial software system.

Page 19: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 19

Chandra Grant Awards

As of middle of following monthAs of 1/12/05

Month of Data Delivery

No. Grants (1)

No. Grants Awarded

No. Outstan

ding

Avg days to award

(2) *

No. Grants Award

ed

No. Outstan

ding

Outstanding AwardsProposal no, Comments

Grants to Federal Institutions

Jan-04 6 1 5 21 6 0

Feb-04 3 2 1 24 3 0

Mar-04 1 1 0 7 1 0

Apr-04 1 0 1 n/a 1 0

May-04 1 1 0 7 1 0

Jun-04 2 0 2 n/a 2 0

Jul-04 0 0 0 n/a 0 0

Aug-04 3 0 3 n/a 3 0

Sep-04 1 0 1 n/a 1 0

Oct-04 0 0 0 n/a 0 0

Nov-04 0 0 0 n/a 0 0

Dec-04 0 0 0 n/a 0 0

(1)Number of grants eligible for award, for which data were delivered to the observer in the month(2)Average days from data delivery to grant award to observer.

Page 20: CXC Manager’s Status Report

25 January 2005 CXC Status Report/CUC Page 20

Grant Award Efficiency

CXC GO Data Distribution (# Of Days from Data Distribution to Award )July 1, 2004 through October 31, 2004

0255075

100125

7/1

7/16

7/31

8/15

8/30

9/14

9/29

10/14

10/29

# o

f D

ays

SAO Days to Award SAO Outstanding Awards MSFC Outstanding Awards