DECISION TREE Project Risk Management: A combined Analytic Hierarchy Process and Decision Tree Approach
Dr.Prasanta Kumar Dey
CONTENT
What is the decision tree? The example of decision tree The advantage of decision tree The application of decision tree
WHAT IS THE DECISION TREE?
Decision tree is a decision support tool that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility.
Decision tree is commonly used in operations research, specifically in decision analysis, to help identify a strategy most likely to reach a goal.
Another use of decision trees is as a descriptive means for calculating conditional probabilities.
THE EXAMPLE OF DECISION TREE
THE ADVANTAGE OF DECISION TREE Are simple to understand and interpret. Have value even with little hard data. Use a white box model. Can be combined with other decision techniques.
Project Risk Management: A combined Analytic Hierarchy Process and Decision
Tree Approach
Dr.Prasanta Kumar Dey
CONVENTIONAL PROJECT MANAGEMENT MODEL
PROPOSED PROJECT MODEL
RISK MANAGEMENT PROCESS
Risk identification Risk analysis Risk response
RISK MANAGEMENT FLOW
METHODOLOGY Identifying the work packages for risk analysis. Identifying the factors that affect the time, cost, and
quality achievement of a specific work package. Analysis the effect and determining severity of
failure Driving various alternatives responses for mitigating
the effect of risk factors. Estimating cost for each alternative Determining the probability and severity of failure of
a specific work package Forming a decision tree. Deriving expected monetary value or the cost of risk
response in this case. Selecting the best option statistical analysis.
IDENTIFICATION OF WORK PACKAGES
Riving crossing Pipeline laying Stations construction Telecommunication and SCADA system
WORK BREAKDOWN STRUCTURE
AHP MODEL FOR DETERMINING RISKING OF PROJECT
IDENTIFICATION OF RISK FACTORS
Technical Risk scope change technology selections implementation methodology selection Equipment risk materials risk Engineering and design change
Acts of God normal natural calamities abnormal natural calamities
Financial, Economical and Political Risk inflation risk fund risk changes of local law changes in government policy improper estimation
Organization Risk capability risk of owner’s project group contractors failure vendor’s failure consultant’s failure
Statutory Clearance Risk environmental clearance land acquisition clearance from chief controller of explosives other clearance from government authorities
LIKELIHOOD OF RISK IN A PROJECT
PROBABILITY AND SEVERITY OF RISK FACTORS
DECISION ALTERNATIVES
do nothing carrying out detailed survey using superior technology engaging an expert project team taking all responses
THE COST DATA FOR EACH PACKAGE AGAINST VARIOUS RESPONSES
DECISION TREE FOR PIPELINE LAYING WORK PACKAGE
DECISION TREE FOR RIVER CROSSING WORK PACKAGE
DECISION TREE FOR STATION CONSTRUCTION WORK PACKAGE
DECISION TREE FOR TELECOMMUNICATION AND CATHODIC PROTECTION WORK PACKAGE
THE EMV FOR “ PIPELINE LAYING PROJECT”
THE EMV FOR” PIPELINE LAYING ACROSS RIVER”
THE EMV FOR ” STATION CONSTRUCTION”
THE EMV FOR “TELECOMMUNTION AND SCADA SYSTEM
THE DECISION EMERGE
RISK RESPONSES
To avoid To reduce To transfer To absorb
CONCLUSION
Risk management using a combined AHP and DTA provides an effective means for managing a complex project efficiently.
Risk management makes an effect to quantify risk by modeling its probability and severity in line with the perceptions of experienced project executives subjectivity.