Dedicated Freight Corridor
The transportation of freight or goods through high speed railway linesdedicated for quick supply of goods across country and ports for export
Illustration
VJTI-MTech(Proj.Mgmt)/ Fall 2014
3
Freight Transportation ModeFreight Transportation Mode
AIRWAYS WATERWAYS
ROAD PIPIELINE
RAILWAYS
VJTI-MTech(Proj.Mgmt)/ Fall 2014
4
Contd…
Sources:RITES(2009)
Freight Traffic in Billion (2007-08)
VJTI-MTech(Proj.Mgmt)/ Fall 2014
5
INDIAN RAILWAYS• Indian railways benefit from freight transportation• In 1970’s, 70% freight transport on railways
30% on roadways• Current scenario, 30%- railways
70%- roadways
VJTI-MTech(Proj.Mgmt)/ Fall 2014
6
RAILWAYS v/s ROADS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1950-51 1960-61 1970-71 1980-81 1990-91 2000-01 2007-08
RoadRail
Source: RITES (2009)
VJTI-MTech(Proj.Mgmt)/ Fall 2014
7
CONTD..
VJTI-MTech(Proj.Mgmt)/ Fall 2014
8
WHY DFC IS REQUIREDTo cope with increased freight traffic:
• To carry the same on existing network OR• Creation of a new passenger corridor OR• To go for separate freight corridor.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
9
CONTD…
• First option of upgrading not convincing due to
-average freight speed is very low
-Heavy traffic density routes-Technical constraints-to overcome these constraints the cost incurred is very high
• Second option not feasible.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
10
SALIENT FEATURES & DESIGN CONSIDERATIONSVJTI-MTech(Proj.Mgmt)/ Fall 2014
11
CONTD..VJTI-MTech(Proj.Mgmt)
/ Fall 2014
12
BENEFITS OF DEDICATED FREIGHTCORRIDOR• Contribution to economic development by freight
transportation
• Segregated electrified line for freight, parallel to theexisting railway line, allows the passenger trains to movefaster in the existing lines
• For industry, reduced unit cost of transportation as DFCprovides rail infrastructure to carry higher throughput pertrain
• Guaranteed, faster transit at an economic tariff
VJTI-MTech(Proj.Mgmt)/ Fall 2014
13
CONTD..
• Accelerate nation-wide economic development aswell as improve the environment
• Less energy consumed as compared to truck modeand avoided gas emissions
• Increase in employment opportunities of the region
• Improve and expand the market for agriculturalproduce, forestry and fisheries of the regions
VJTI-MTech(Proj.Mgmt)/ Fall 2014
14
WHAT IS INDUSTRIAL CORRIDOR?
• Development of the Industries along the transportCorridor to facilitate the movement of Goods fromthese industries.
• It is the iintegration between the industries and theinfrastructure
VJTI-MTech(Proj.Mgmt)/ Fall 2014
15
Selection Criteria for Investment Region:
To ensure at least one such node in each of the DMICState to spread the economic benefits;
• Benefit from the proximity to Metropolitan Areas asDelhi, Mumbai;
• Potential for Developing Greenfield Ports (or)Augmentation Possibilities;
• Easy Availability of such huge land parcels andestablished industrial base.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
16
Selection Criteria for Industrial Area:
• To take advantage of inherent strengths of specificlocations (mineral resources, rich agriculture base,availability of skilled human resource base, potentialfor setting up specific group of industries, IT/ITESetc);
• Selection of suitable locations to ensure anopportunity to transform under-developed regionsalong the Corridor to Developing/ Well Developedregions.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
17
INDUSTRIAL CORRIDORS IN INDIA
• Delhi - Mumbai
• Amritsar - Kolkata
• Mumbai - Bengaluru
• Chennai - Bengaluru
VJTI-MTech(Proj.Mgmt)/ Fall 2014
18
ESTIMATED TOTAL COST OF PROJECT
Source: JICA report
VJTI-MTech(Proj.Mgmt)/ Fall 2014
19
DELHI MUMBAI INDUSTRIAL CORRIDOR
States covered
1. Uttar Pradesh
2. Haryana
3. Rajasthan
4. Gujarat
5. Maharashtra
VJTI-MTech(Proj.Mgmt)/ Fall 2014
20
SHORTLISTED INVESTMENT REGION IN PHASE1SHORTLISTED IR
Dadri-Noida-Ghaziabad (U.P. ) General Manufacturing ;
Manesar-Bawal in Haryana Auto Component/ Automobile
Khushkhera-Bhiwadi-Neemrana inRajasthan
General Manufacturing/ Automobile/ AutoComponent
Pitampura-Dhar-Mhow in MadhyaPradesh
General Manufacturing
Bharuch-Dahej in Gujarat Petroleum, Chemical and Petro-Chemical
Igatpuri-Nashik-Sinnar in Maharashtra General Manufacturing
VJTI-MTech(Proj.Mgmt)/ Fall 2014
21
SHORTLISTED INVESTMENT AREA IN PHASE 1
Meerut-Muzaffarnagar in Uttar Pradesh Engineering/ Manufacturing
Faridabad-Palwal in Haryana Engineering & Manufacturing
Jaipur-Dausa in Rajasthan Marble/Leather/Textile
Nimach-Nayagaon in Madhya Pradesh Engineering/ Agro-Processing
Vadodara-Ankleshwar in Gujarat General Manufacturing
Dighi/Alewadi in Maharashtra. Greenfield Port
VJTI-MTech(Proj.Mgmt)/ Fall 2014
22
PROJECT COST AND FINANCING OF THEWESTERN CORRIDOR
VJTI-MTech(Proj.Mgmt)/ Fall 2014
23
DMIC in Maharashtra
• Node No.17:Dhule-Nardhana InvestmentRegion• Node No.18:Igatpuri-Nashik-SinnarInvestment Region• Node No.19:Pune-Khed Industrial Area• Node No.20:Industrial Area with GreenfieldPort at Dighi
VJTI-MTech(Proj.Mgmt)/ Fall 2014
24
Length of corridor: 930 km approx.
GENERALFEATURES
ofDMIC (inVadodara-Rewari)
Junction stations:10, crossing station:10
Major & Important bridges:207
Road over bridges:8
Alignment passed through: Gujarat,Haryana, Rajasthan
District involved:17, Villages covered: 451
Maximum Speed: 100 km/hr
VJTI-MTech(Proj.Mgmt)/ Fall 2014
25
Status of the Project: Land Acquisition - Being acquiredunder Railway Amendment Act (RAA) 2008 - (units inhectares)
Land to beacquired
Land Acquired
Eastern DFC 4807 3635 (75%)
Western DFC 5860 5039 (85%)
Total 10667 8673 (81%)
VJTI-MTech(Proj.Mgmt)/ Fall 2014
26
REHABILITATION ANDRESETTLEMENT POLICY (RRP)
Objective of RRP :Avoid or minimize land acquisition; where
displacement is unavoidable, prepare time boundRRP for PAPs.Special care for weaker sections/vulnerable groups To provide better standard of living Facilitate harmonious relationship between the
requiring body and affected families through mutualcooperation.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
27
COMPENSATION POLICYApplication
Definition of AffectedPersons Entitlement
Land on the ProjectRight of Way
Loss Of PrivateAgricultural,Homestead &Commercial Land
Legal Title holders andAffected Parties withtraditional land rights
1.Compensation atreplacement cost2.Resettlement andRehabilitation
Registered tenants,contract cultivators &leaseholders
Compensation for standingcrops at market rate
Un-registered tenants,contract cultivators,leaseholders,sharecroppers
Compensation for standingcrops at market rate
VJTI-MTech(Proj.Mgmt)/ Fall 2014
28
CONTD..
Structure on the ProjectRight of WayLoss of PrivateStructures(Residential/Commercial)
Title Holder/Owner Compensation Atreplacement rateResettlement &Rehabilitation Assistance
Tenants/Lease HoldersResettlement &Rehabilitation Assistance
Standing Trees, Crops onProject Right of Way
Loss of Trees & Crops
Owners & beneficiaries ofland
Compensation at marketvalue
VJTI-MTech(Proj.Mgmt)/ Fall 2014
29
Structures on the ProjectROWLoss ofResidential/Commercial Structures byNon Title Holders
Owners of structuresidentified as on date ofnotification
Compensation at replacementcostResettlement & RehabilitationAssistance
Households living onRight of wayLoss of Livelihood
Title Holders/ Non-Titleholders/share-croppers,agricultural labourersand employees
Rehabilitation Assistance
Households affected byROWAdditional support tovulnerable group
Households affectedRehabilitation Assistance
CONTD..…VJTI-MTech(Proj.Mgmt)
/ Fall 2014
30
Affected ScheduledTribes
Households affected byROW
Rehabilitation Assistance
Structures & otherresources (eg land,water, access to socialservices etc) on ROWLoss of CommunityInfrastructure/Common PropertyResources
Affected communitiesand groups
Reconstruction ofcommunity structure andcommon property resources
Land & assetstemporarily impactedduring construction
Owners of land & assets Compensation for temporaryimpact during constructionlike disruption of normaltraffic, damage to adjacentparcel of land/ assets due tomovement of heavymachinery and plant site.
CONTD.. VJTI-MTech(Proj.Mgmt)/ Fall 2014
31
HINTERLAND DEVELOPMENT• NODE-18: IGATPURI-NASHIK-SINNAR INVESTMENT REGION
• Close by the Mumbai-Kalyan-Igatpuri-Manmad-Jalgaon trunk road.
• Industrial sectors in Nashik - Engineering, Automobile, Aluminium, Raisins,and Steel Furniture.
•ADVANTAGES:Proximity to urban center of Nashik.Served by NH-3 and NH-50.
• Widening and Strengthening of NH-3 to four lane dual carriageway beingimplemented whereas NH-50 has two-lane carriageway configuration.
• Construction of Nashik-Mumbai Expressway is under implementation.
• Wine Park in Nashik district at Vinchur
• Urban Infrastructure improvement under JNNURM Scheme
VJTI-MTech(Proj.Mgmt)/ Fall 2014
32
• Export-oriented Industrial Units/ SEZ: has the potential forEngineering, Automobile, Aluminium, Raisins, and Steel FurnitureSectors.
• Augmentation of Existing Industrial Estates: augmentation of twoindustrial areas in Nashik district (Nashik and Sinnar) are considered forimplementation under DMIC.
• Integrated Agro/Food Processing Zone: an Integrated Agro/FoodProcessing Zone with horticulture market will be developed as part of theNashik-Sinnar Investment Region.
• Knowledge Hub/Skill Development Centre: To support theengineering, automobile, wine production/ agro-processing sectors, aKnowledge Hub/skill up gradation centre is proposed to be developed withintegrated infrastructure facilities.
BUSINESS CASE
VJTI-MTech(Proj.Mgmt)/ Fall 2014
33
Contd..• Integrated Logistics Hub
• Integrated Township
• Development of Nashik Airport
• Feeder Road Links
• Feeder Rail Links
VJTI-MTech(Proj.Mgmt)/ Fall 2014
34
LogisticsVJTI-MTech(Proj.Mgmt)
/ Fall 2014
35
NEED FOR LOGISTICS IN INDIA
•Highly Competitive and Low Cost
•Low Utilization and High Transit Times
•Overloading of Vehicles
•Poor Infrastructure
•Barriers to Free Movement
•Very Unsafe
VJTI-MTech(Proj.Mgmt)/ Fall 2014
36
Freight Cost
• Canada - US$ 0.02
• Japan – US$ 0.037
• France - US$ 0.055
• India – US$ 0.07
high rates of economicgrowth and trade growth
weaknesses in qualityand geographicalcoverage of the logisticsservices and facilities
VJTI-MTech(Proj.Mgmt)/ Fall 2014
37
BENEFITS
• Reduced transit time and processing time
• Optimal use of all modes of transport thusreducing overall cost
• Easy access to value added logistics services
• Improved service levels, professionalism
• Reduction in inventory and damages.
VJTI-MTech(Proj.Mgmt)/ Fall 2014
38