DIVISION OF SMALL BUSINESS OPPORTUNITY
TOGETHER, WE BUILD.
Denver Arts & Venues
Denver Arts & Venues’ mission is to amplify Denver’s quality of life and economic vitality through premier public venues, arts and entertainment opportunities.
Denver Arts & Venues
DIVISION OF SMALL BUSINESS OPPORTUNITY Denver Arts & Venues
2018 - 2020• Colorado Convention
Center Expansion
2018 - 2028• The Next Stage – DPAC
Redevelopment
Project Name: Colorado Convention Center Expansion (Design & Construction)
Disciplines Needed: General Contractor, Demolition, Concrete (structural & flatwork), Steel, Masons, Construction Management, Fire Alarm, Date/Low-Voltage, Electrical & Security Trucking, Traffic Control, Rough & Finish Carpentry, Vertical Conveyance, Millwork, Audio/Visual, Kitchen Equipment, Mechanical & Fire Protection, Plumbing, Drywall, Roofing, Glazing & Curtainwall, Paint, Carpet, Tile, Signage, Architectural/Engineering Professional Services and Commissioning
Estimated Construction Cost: TBD
Denver Arts & Venues - CCC
Denver Arts & Venues – CCCRooftop Ballroom & Terrace Improvements
Denver Arts & Venues – CCCRooftop Ballroom & Terrace Improvements
Project Name: The Next Stage (Venue Finishes) – DPAC Redevelopment (Design & Construction)Disciplines Needed: General Contractor, Framing, Mechanical & Fire Protection, Electrical, Plumbing, Drywall, Paint, Carpet, Tile, Acoustics, Millwork, Audio / Visual, Specialty Finishes, Signage.Estimated Construction Cost: TBD
Denver Arts & Venues – The Next Stage
Denver Arts & Venues – The Next Stage
Denver Arts & Venues – The Next StageSculpture Park Improvements
Denver Arts & Venues – The Next StageGalleria Improvements
DIVISION OF SMALL BUSINESS OPPORTUNITY
TOGETHER, WE BUILD.DIVISION OF SMALL BUSINESS OPPORTUNITY
DIVISION OF SMALL BUSINESS OPPORTUNITY
TOGETHER, WE BUILD.
Public Works
The Capital Projects Management program provides efficient, timely and cost effective capital project delivery while maintaining the highest level of service for the citizens of Denver. This includes annual capital projects, special one-time projects, and projects related to Bond initiatives.
Department of Public Works
Department of Public Works
Estimated Advertisement Dates Dec 2016 : 6 Projects
2017: 29 ProjectsSee handout for a complete
list of projects, dates anddisciplines needed.
2016 Qtr 4
2017 Qtr1
2017 Qtr2
2017 Qtr3
2017 Qtr4
Facilities 2
Transportation 2 4 3 1 1
Wastewater 3 7 3 3 1
Transportation and Mobility 1 2 1 1
Total 6 15 7 5 2
Department of Public Works
Work for Denver website: www.Work4Denver.com
Select “Upcoming Projects” Project list is
updated monthly
Department of Public Works –Wastewater Project Highlights
Project Name Description Disciplines NeededEst. Ad
DateGeneral Storm – Mt. Harvard
An program to complete multiple small projects to address flooding and other storm water management issues City-wide.
General Contractor, Concrete Flatwork, Asphalt, Traffic Control, Landscape and Irrigation, Erosion Control, Excavation/Shoring, Utility Coordination , Trucking, Storm Sewer System.
Qtr 4/2016
33rd St. Outfall Blake to Arapahoe (31st and 36th Street Outfall)
A major outfall project with the goal is to provide 5-year conveyance for the Lower Platte Valley basin.
General Contractor, Concrete Flatwork, Asphalt, Traffic Control, Landscaping and Irrigation , Erosion Control, Excavation/Shoring , Utility Coordination , Trucking, Storm Sewer System .
Qtr 4/2016
2017 Citywide ADA Ramp & Concrete Repair, Phase 2
Citywide construction of ADA Ramps including concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley.
General Contractor, Concrete Flatwork, Asphalt, Traffic Control, Landscape and Irrigation, Trucking.
Qtr 4/2016
Department of Public Works –Transportation Projects Highlights
Project Name Description Disciplines NeededEst. Ad Date
19th & 20th Two-Way Conversion
Convert 19th & 20th Avenues to two-way operations through the North Capitol Hill/Uptown area, from approximately Broadway to Park Avenue. Simultaneous conversions of Logan and Grant Streets north of 18th Avenue are also included.
General Contractor, Concrete Flatwork, Asphalt, Traffic Signal/Lighting, Traffic Control, Pavement Striping & Signage , Landscaping and Irrigation, Wastewater Pipe, Erosion Control, Utility Coordination, Trucking.
Qtr 4/2016
Mississippi Bridge Rehabilitation
Routine Deck, Superstructure, and Substructure repairs.
General Contractor, Concrete Flatwork, Asphalt, Traffic Signal/Lighting, Traffic Control, Pavement Striping & Signage , Erosion Control, Trucking, Bridge Rehab
Qtr 1/2017
Park Avenue Rehabilitation
Rehabilitation of the Park Avenue Viaduct waffle slab. Work includes expansion joint replacement and deck repairs.
General Contractor, Bridge Rehab, Traffic Control, Pavement Striping & Signage , Erosion Control, Trucking.
Qtr 2/2017
Department of Public Works –Facilities Projects Highlights
Project Name Description Disciplines NeededEst. Ad Date
Hadley Branch Renovations - Phase 2
Renovate the 1st floor of the Library and make the basement accessible for future program use.
General Contractor, Structure, Exterior, Interiors, Equipment, Vertical Systems, Mechanical, Electrical, Demolition.
Qtr 1/2017
Ellie Caulkins Facade Lighting
Rehab of existing pin dot lighting and installation of new LED systems for the lighting of exterior features of the historical facade.
General Contractor, Electrical, Masonry.
Qtr 1/2017
Department of Public Works –Current RFPs
Iowa Underpass (Design)Anticipated RFP – Qtr 1 2017
Project Description: Improve pedestrian and bike signals, and construct ADA-compliant ramps at Iowa/Santa Fe.
Anticipated Disciplines (Construction): General Contractor, Concrete Flatwork, Traffic Signal/Lighting, Traffic Control, Landscaping and Irrigation, Erosion Control, Utility Coordination, Trucking, Bridge Rehab, Excavation/Shoring.
Department of Public Works –Current RFPs
39th Avenue Channel / Park Hill Golf Course Detention (Design/ Build)
Anticipated RFP – Qtr 2 2017 Project Description: Design and construction of an open channel along 39th Avenue
and a collection/conveyance system from the Holly Pond Area to Parkhill Golf Course. Anticipated Disciplines (Construction): General Contractor, Engineering Consultant,
Concrete Flatwork, Asphalt, Traffic Control, Erosion Control, Excavation/Shoring, Utility Coordination, Trucking, Storm Sewer System.
Department of Public Works –Current RFPs
Platte to Park Hill Program ManagementAnticipated RFP - December 2016
Project Description: Program management services including oversight of City Park Golf Course Parks and Drainage Improvements Design/Build Project and 39th Avenue/Park Hill Parks and Drainage Improvements Design/Build Project.
Anticipated Disciplines: Program management services
DIVISION OF SMALL BUSINESS OPPORTUNITY
TOGETHER, WE BUILD.DIVISION OF SMALL BUSINESS OPPORTUNITY
Public Works