Transcript
Page 1:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 2:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 3:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 4:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 5:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 6:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 7:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 8:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 9:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 10:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 11:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking
Page 12:  · driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed by attaching an accelerometer to the pile head and striking