(Paris, France, 23 to 24 January 2013)
Agenda Item 8: Review the PBN TF ToR and action plans. Organizational maters and future
work programme.
EUR PBN WORK PROGRAMME
(Presented by the Secretariat)
SUMMARY
This paper provides updates to the EUR PBN work programme proposed in
view of the latest developments.
.
1. Introduction
1.1 The ICAO EUR PBN task force was established by the EANPG to foster the implementation of the ICAO Assembly Resolutions regarding PBN (36/23 and 37/11). The Terms of
Reference of the task force is provided in Attachment A for reference.
1.2 The 12th Air Navigation Conference of ICAO was held in November 2012 in Montreal, Canada. The outcomes of the Conference will result in the revision of the
Global Air Navigation Plan to be endorsed by the ICAO Assembly in October 2013. The
revised plan is based on the Aviation Systems Block Upgrades (ASBU) concept (ref
http://www.icao.int/Meetings/anconf12/Pages/default.aspx).
1.3 PBN plays one of the central roles in the revised plan and is one of the key enablers of the current and future airspace concepts, enhancing safety, sustainability and reducing impact of
aviation on environment.
1.4 The outcomes of the Conference require reinforced efforts to further advance the PBN implementation. The role of the EUR PBN TF is hard to underestimate in ensuring regional
coordination, developing necessary guidance material and facilitating the exchange of knowledge and
experience in the EUR Region.
1.5 In view of the above, the EUR PBN TF ToR and work programme need adaptation. The revision of the ToR is a subject of a separate working paper.
http://www.icao.int/Meetings/anconf12/Pages/default.aspx
-2- PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
2. Discussion
2.1 The work programme was endorsed by the EANPG (Conclusion 53/20 refers) as part of the endorsed EUR PBN performance frameworks (Attachments B –D refer).
2.2 The attachments describe the EUR PBN regional action plans and performance frameworks per following regional projects:
a) Optimized en-route trajectories;
b) Optimized terminal trajectories; and
c) Safe and optimized approaches.
2.3 The performance frameworks describe the performance benefits to be achieved as well as examples of performance targets and metrics. These performance targets and metrics were
provided for States for implementation at national level on a voluntary basis.
2.4 The action plans identify actions to be undertaken by States, regional international organisations in order to progress the PBN implementation in the EUR Region.
2.5 The EANPG have also urged States (Conclusion 53/34 refers) to use the ICAO Fuel Saving Estimate Tool (IFSET) in order to assess the fuel/CO2 emission reductions benefits and report
to ICAO using the template provided in Attachment E. This reporting would enable ICAO to assess
and demonstrate the region-wide accumulated benefits of the PBN implementation.
2.6 In view of the above, some changes were made to Attachments B to D to reflect on the latest developments.
3. Action by the meeting
3.1 The PBN TF is invited to:
a) Comment and agree on the changes to the action plans per Attachment B to D;
b) Agree that the action plans and performance metrics should be linked to the revised ToR;
c) Comment and agree with the changes proposed to the EUR PBN status matrix as provided in Attachment F; and
c) Urge States and service providers to use the IFSET and the reporting template (Attachment E refers) to provide information to ICAO on the assessed benefits of any
new PBN related implementation.
A - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT A
COG PBN TASK FORCE TERMS OF REFERENCE
(COG CONCLUSION 41/2 REFERS)
The COG PBN Task Force shall:
1) Develop a EUR Regional PBN implementation plan with objectives and timelines in accordance
with the ICAO PBN goals and milestones. This PBN implementation plan must be based on the following
strategic objectives and guiding principles:
Strategic objectives:
a) Requirements for navigation systems should be linked with operational requirements
b) Multiple avionics equipage and/or ground-based systems should be avoided;
c) Avoid the need for multiple airworthiness and operational approvals;
d) Amend the contents of the EUR ANP and EUR Supplementary procedures in respect of the PBN planning and implementation.
Guiding principles:
a) That changes are warranted on safety, capacity, efficiency basis
b) Continued application of conventional air navigation procedures during the transition period, to guarantee the operations by users that are not RNAV- and/or RNP-equipped;
c) The needs of all stakeholders should be considered in development of the ICAO EUR PBN Implementation Plan;
d) That planning should be kept at a strategic level avoiding unnecessary details impacting legitimate business needs of individual stakeholders.
e) The ICAO EUR PBN implementation plan should address at least the short term (2008-2012) and medium term (2013-2016); and
f) The ICAO EUR PBN implementation plan shall be completed by EANPG/51.
2) Carry out specific studies, develop guidance material and facilitate training to assist States with
RNAV/RNP implementation in the en-route, terminal, and approach flight phases, taking into account the
performance based navigation (PBN) concept, according to the ICAO Strategic Objectives and Global Plan
Initiatives (GPI) on this matter (GPI 5, 7, 10, 11, 12, 20, 21);
3) Identify other issues/action items arising from the work of ICAO or for consideration by ICAO in
order to facilitate regional and global harmonization of existing applications as well as future implementation
of Performance Based Navigation operations;
4) Review the States’ PBN implementation documentation to ensure regional harmonization and for
possible inclusion in ICAO-developed model documentation;
5) Address other regional PBN implementation issues as needed; and
6) The Task Force should report to the EANPG COG, in coordination with the other COG Contributory
Bodies on APV issues.
B - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT B
PERFORMANCE FRAMEWORK FORM
Performance Improvement Area
OPTIMISED TERMINAL TRAJECTORIES (PBN related)
Performance Benefits
Safety Safety level maintained or improved
Environment Reduced emissions through shorter flights and use of optimum trajectories
Capacity Increased capacity through better utilization airspace resources
Cost effectiveness
Fuel cost reduction through availability of more optimized trajectories
Performance targets
a) 100% PBN based SID/STARS by 2016 b) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation c) 90% international aerodromes airports to offer CDOs by 2016 (TBD) c)d) 90% international aerodromess to offer CCOs by 2016
Performance Measurement
Metrics Number of PBN based SIDs/STARs implemented vs total number of SIDs/STARs
(To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)
Percentage of fuel consumption and CO2 emissions reduction achieved by implementing PBN, CCO and CDO
(Measured at the national level using ICAO IFSET or similar tools - optional)
Number of aircraft using PBN based SID/STAR vs total number of aircraft using SID/STARs
(potentially to be implemented at the national level)
Percentage of international aerodromes offering CDOs
(States reporting through the ICAO EUR ANP mechanism)Percentage of fuel consumption and CO2 emissions
reduction achieved by implementing PBN and CDO
(TBD, to be measured on the regional and national levels depending on the availability of the ICAO tools)
Percentage of CDOs implemented vs total number of STARs
(To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)
Percentage of international aerodromes offering CCOs
(States reporting through the ICAO EUR ANP mechanism)
EUR Strategic action plan
ICAO ATM
Operational
Concept Component
(Doc 9854)
TASK DESCRIPTION TIME
RESPONDIBILITY
STATUS
a) Develop the EUR PBN Harmonisation Strategy
2008-
2009
EUR PBN TF
Completed
Conclusion
EANPG50/14
Conclusion
COG44/8
b) Develop the EUR regional PBN implementation plan
2008-
2009
EUR PBN TF
Completed
Conclusion
EANPG50/14
Conclusion
COG44/8
Formatted: Font: Not Italic
B - 2 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
c) Review, amend and approve the ICAO EUR SUPPS (Doc 7030) to reflect the equivalence
of BRNAV vs RNAV5 and PRNAV vs
RNAV1.
2008-
2009
EUR PBN TF
EANPG
ICAO
Completed
d) Develop the States national PBN implementation plans that inter alia should
also envisage the establishment of the
national PBN collaborative implementation
teams to progress PBN, identify training
needs and address safety issues. 2008-
2012
States In progress
17 States
reported
completion.
26 States covered
through LSSIP
Eurocontrol
10 reported work
in progress
5 – no
information
e) Develop the EUR PBN related performance measurement plan.
2010-
2012
EUR PBN TF
CompletedIn
progress
f) Establish a regional collaborative decision making process with regards to the PBN
based SIDs/STARs implementation
2008-
2009
EUR PBN TF
EANPG RDGE
RNDSG
EANPG
Completed
Airspace
Organization and
Management
(AOM), Demand
Capacity
Balancing (DCB),
Traffic
Synchronization
(TS) and Conflict
Management
(CM)
g) Review or develop and publish the appropriate regional/national regulations for
aircraft and operational approvals (RNAV 1
related)
2008-
2012
PBN TF (EUR ACs)
EASA
States
In progress
h) Provide inputs to the EC PBN IR development process to ensure a coordinated
and harmonised implementation of PBN in
the EUR
2011-
2013
EUR PBN TF In progress
i) Provide regional inputs into the global work within the ICAO PBN SG to develop an
advanced RNP specification to meet future
(post 2015) EUR requirements.
2012-
2014
EUR PBN TF
Eurocontrol
Completed
Start in 2012
j) Develop regional guidance material to assist in implementation of advanced –RNP
2013-
2015
EUR PBN TF
a)k) Review, amend and approve the ICAO EUR SUPPS (Doc 7030) to cater for new PBN
implementations include the regional
requirements for the future (post 2015) RNP
implementations.
2014-
152018
EUR PBN TF
EASA
States
TBD
b)l) Develop and publish the appropriate regional/national regulations for aircraft and
operational approval for advanced-RNP
(future RNP implementations related)
20132008
-2016
EUR PBN TF
EASA
States
In progress
k)m) Implement PBN based SIDs/STARs
2008-
2016 States
In progress
Target- 100%
PBN based
SID/STARs by
2016
n) Implement CDO and CCOs whenever possible
2013-
2016
Target
90% international
airports offering
CDO/CCOs by
2016
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 5 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 5 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
B - 3 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
o) Monitor the progress of PBN, CDO and CCO implementation
2013-
2016
EUR PBN TF
States
Through the PBN
status reports
Supporting
activities
Regional workshops and seminars – 1 per year raising awareness and share knowledge and experience on
PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in 2013)
Development of the ICAO ATM improvement tool (IFSET is ready)
Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the Russian Federation; 1
in 2013 – Central Asia States)
C - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT C
PERFORMANCE FRAMEWORK FORM
Performance Improvement Area
SAFER AND OPTIMISED APPROACHES (PBN and CDOs related)
Performance Benefits
Safety Improvements in safety at aerodromes by replacing NPAs with RNP approaches APV or LNAVs
Environment Reduction in CO2 emission and noise
Cost effectiveness
Fuel cost reduction through availability of more optimized trajectories
Performance targets
d)e) 100% RNP APV/LNAVsapproaches at all approaches at all instrument runway ends by 2016 e)f) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation f) 90% airports to offer CDOs by 2016 (TBD)
Note: Acknowledging the benefits to be generated from CCOs implementation, work is ongoing on defining/revising
performance framework forms for CCOs
Performance Measurement
Metrics examples Percentage of APVs and/or LNAVsRNP approaches implemented vs total number of approaches
(To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)
Percentage of runways offering CDOs
(To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)
Number of aircraft using APV/LNAVs and CDOs vs total number of approaches
(potentially to be implemented at the national level)
Percentage of fuel consumption and CO2 emissions reduction achieved by implementing RNP approaches
APV/LNAVs and CDOs
(TBD, to be mMeasured on the regional and at the national levels depending on the availability of the
ICAO tools ICAO IFSET or similar tools - optional)
EUR Strategic action plan ICAO ATM
Operational Concept
Component (Doc 9854)
TASK DESCRIPTION TIME RESPONSIBILITY STATUS
a) Develop the EUR PBN Harmonisation Strategy
2008-
2009
EUR PBN TF
Completed
Conclusion
EANPG50/14
Conclusion
COG44/8
b) Develop the EUR regional PBN implementation plan
2008-
2009
EUR PBN TF
Completed
Conclusion
EANPG50/14
Conclusion
COG44/8
Formatted: Left, Indent: Left: 0.25"
C - 2 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
c) Develop the States national PBN implementation plans that inter alia should
also envisage the establishment of the
national PBN collaborative implementation
teams to progress PBN, identify training
needs and address safety issues 2008-
2012
States In progress
17 States
reported
completion.
26 States
covered
through LSSIP
Eurocontrol
10 reported
work in
progress
5 – no
information
d) Develop the EUR PBN related performance measurement plan
2010-
2012
EUR PBN TF
Completed
In progress
e) Establish a regional collaborative decision making and coordinating process with regards
to the PBN approaches implementation
2008-
2009
EUR PBN TF
EANPG
Completed
Airspace Organization
and Management
(AOM), Demand
Capacity Balancing
(DCB), Traffic
Synchronization (TS)
and Conflict
Management (CM)
f) Review or develop and publish appropriate regional/national regulations for aircraft and
operational approvals
2008-
2012
EUR PBN TF(EUR
ACs)
EASA
States
Completed
In progress
g) Implement RNP approaches APVs/LNAVs and CDOs
2016
States In progress
340 RNP based
vs 1550 total
number of
approaches.
771 planned by
2016
l)h) Monitor implementation progress and measure performance in accordance with the
EUR regional and States national PBN
implementation plans
2008-
2016
EUR PBN TF
In progress
Through
CNS4B table
i) Develop a regional EUR RNP APCH implementation guidance material
2011-
2012
EUR PBN TF completed
Supporting activities Regional workshops and seminars 1 per year raising awareness and share knowledge and experience on
PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in 2013)
Development of the ICAO ATM improvement tool (IFSET is ready and made available to States)
Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the Russian Federation; 1
in 2013 – Central Asia States)
Formatted: French (France)
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
D - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT D
PERFORMANCE FRAMEWORK FORM
Performance Improvement Area
OPTIMISED EN-ROUTE TRAJECTORIES (PBN related)
Performance Benefits
Safety Safety level maintained or improved
Environment Reduced emissions through shorter flights and use of optimum routes/trajectories
Capacity Increased capacity through better utilization airspace resources
Cost effectiveness
Fuel cost reduction through availability of more optimized routes/trajectories; and
Ability of aircraft to conduct flights more closely to preferred trajectories
Performance targets a) 100% PBN routes by 2016 b) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation
Performance Measurement
Metrics Percentage of PBN routes implemented vs total number of routes
(To be measured on the regional level based on States reporting through the ICAO EUR ANP
mechanism)
Percentage of fuel consumption and CO2 emissions reduction achieved by implementing PBN
(TBD, to be mMeasured on the regional and at the national levels depending on the
availability of the ICAO tools using IFSET or similar tools - optional)
EUR Strategic action plan
ATM
Operational
Concept
Components
(Doc 9854)
TASKS TIME
RESPONSIBILITY
STATUS
EUR PBN TF
Completed
Conclusion
EANPG50/1
4
Conclusion
COG44/8
Airspace
Organization and
Management
(AOM), Demand
Capacity
Balancing
(DCB), Traffic
Synchronization
(TS) and Conflict
Management
(CM)
c)a) Develop the EUR PBN Harmonisation Strategy
2008-2009
d)b) Develop the EUR regional PBN implementation plan
2008-2009
EUR PBN TF
Completed
Conclusion
EANPG50/1
4
Conclusion
COG48/8
e)c) Review, amend and approve the ICAO EUR SUPPS (Doc
7030) to reflect the
equivalence of BRNAV vs
RNAV5 and PRNAV vs
RNAV1.
2008-2009
EUR PBN TF
EANPG
ICAO
Completed
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
D - 2 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
f)d) Develop the States national PBN implementation plans
that inter alia should also
envisage the establishment of
the national PBN
collaborative implementation
teams to progress PBN,
identify training needs and
address safety issues.
2008-2012
States In progress
17 States
reported
completion.
26 States
covered
through
LSSIP
Eurocontrol
10 reported
work in
progress
5 – no
information
g)e) Develop the EUR PBN related performance measurement
plan.
2010-2012
EUR PBN TF
In
progressco
mpleted
h)f) Establish a regional collaborative decision making
process with regards to the
PBN implementation
2008-2009
EUR PBN TF
EANPG RDGE
RNDSG
EANPG
Completed
i)g) Review or develop and publish the appropriate
regional/national regulations
for aircraft and operational
approvals (RNAV 5 and
RNAV 1 related)
2008-2012
EUR PBN TF(EUR
ACs)
EASA
States
In progress
Completed
j)h) Provide inputs to the EC PBN IR development process to
ensure a coordinated and
harmonised implementation of
PBN in the EUR
2011-2013
EUR PBN TF In progress
k)i) Provide regional inputs into the global work within the
ICAO PBN SG to meet future
(post 2015) EUR
requirements.
2011-2012
EUR PBN TF
Eurocontrol
EANPG
Start in
2012Compl
eted
l)j) Review, amend and approve the ICAO EUR SUPPS (Doc
7030) to cater for advanced
RNP and other future
implementations include the
regional requirements for the
future (post 2015) RNP
implementations.
2012-2014
EUR PBN TF
Start in
20122013-
2015
m)k) Develop and publish the appropriate regional/national
regulations for aircraft and
operational approval for
advance RNP and other future
implementation (future RNP
implementations related)
2014-2018
EUR PBN TF
EASA
States
TBD
l) Develop a reguinal guidance document to assist with
advance RNP implementation
2013-2015
EUR PBN TF
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: French (France)
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
D - 3 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
n)m) Monitor implementation progress and measure
performance in accordance
with the EUR PBN
implementation plan and State
implementation plan
2008-2016
EUR PBN TF
States
In progress
Through
PBN status
reports
o)n) Implement PBN based routes 2008-2016 States In progress
Implement PBN routes in the
eastern part of the EUR
2013-2016 Kazakhstan,
Kyrgyzstan, Russian
Federation,
Tajikistan,
Turkmenistan,
Uzbekistan
Implement
PBN routes
in the
eastern part
of the EUR
Supporting
activities
Regional workshops and seminars1 per year raising awareness and share knowledge and
experience on PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in
2013)
Development of the ICAO ATM improvement tool (IFSET is ready and made available)
Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the
Russian Federation; 1 in 2013 – Central Asia States)
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"
E - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT E
REGION STATE ATM IMPROVEMENT SAVING
FUEL(KG)
SAVING
CO2(KG)
TOOL
EUR XXX A)PBN BASED ROUTE B)PBN BASED SID/STAR
C)PBN APPROACH
IFSET
F - 1 PBN TF/8 - WP/03
PBNTF8 WP03_EUR PBN Work Programme.docx
ATTACHMENT F
STATES AVAILABILITY
OF THE NATIONAL
PBN PLAN
YES/NO/PLANNED BY
PERCENTAGE OF
PBN ROUTES VS
CONVENTIONAL
ACTUAL/PLANNED
2016
PERCENTAGE OF
RNP
APPROACHES VS
CONVENTIONAL
(INTERNATIONAL
AERODROMES)
ACTUAL/PLANNED
2016
PERCENTAGE OF
PBN SID/STARS VS
CONVENTIONAL
ACTUAL/PLANNED
2016
PERCENTAGE OF
INTERNATIONAL
AERODROMES
OFFER CDO
ACTUAL/PLANNED
2016
PERCENTAGE OF
INTERNATIONAL
AERODROMES OFFER
CCO
ACTUAL/PLANNED 2016