Engineering (Track & Civil) Instruction Underbridge Transoms - Installation ETI-09-04
Version A.0 Date of last revision: 09 Nov 09 Page 3 of 4
This document is uncontrolled when printed. See ARTC Intranet for latest version.
Figure 1
Engineering (Track & Civil) Instruction Underbridge Transoms - Installation ETI-09-04
Version A.0 Date of last revision: 09 Nov 09 Page 4 of 4
This document is uncontrolled when printed. See ARTC Intranet for latest version.
Figure 2
Engineering Standard–NSWBridges and Structures BDS 20Configuration Standard - Bridge Ends
Issue 1 © Australian Rail Track CorporationRevision 2 This document is uncontrolled when printedMarch 2005 Page 11 of 11
Appendix 3 - Ballast Retention Walls
PLANN.T.S.
NOTE:BALLAST CAN BE EXCAVATED AND SUPPORTEDWITH STAR PICKETS AND TWO LAYERS 20mmPLYWOODWHILE CONSTRUCTION OF FLEXBEAMGUARD RAIL TAKES PLACEFLEXBEAM MUST NOT ENCROACH ON STRUCTUREGAUGE.
Engineering Standard–NSWBridges and Structures BDS 20Configuration Standard - Bridge Ends
Issue 1 © Australian Rail Track CorporationRevision 2 This document is uncontrolled when printedMarch 2005 Page 9 of 11
Appendix 1 - Subgrade Construction behind Abutments
Rail Infrastructure Corporation Sheep Creek Arch and Eleven Other Corrugated Steel StructuresSite Inspection, Condition Assessment and Review of Remedial Works
J:\83509\0004REPORTIJC ISSUE.DOC
Page D1 ArupIssue 17 June 2004
TYPICAL DETAIL FOR REPAIR OF ACCESSIBLE PIPE CULVERTS - EXTRACT FROM AS/NZS 2041