The intent
The intent of an ISO 14001 environmental management system (EMS) is to develop a systematic management approach to the environmental concerns of the organization. The expected outcome of this approach is continual improvement in environmental management.
What is EHS
Environment: - Conserving Air, Water, Soil, Plants, Animals, Wildlife, Our
Community (causing no damage)Health: - Physical, Mental & Social well being of a person.
Preserving Human Health both Chronic and Acute (preventing illness)Safety: - Protection from unacceptable level of harm.
Preserving Human and Community Safety/ Well Being (preventing injury)
•What is EHSMS ISO 14001 (EMS – Environment Management System) • Published by International Organization for Standardization
• First publication in 1996
• First revision in 2004
OHSAS 18001 Occupational Health & Safety Assessment Series)• Published by British Standard Institute
• First publication in 1999
• First revision in 2007
What is EHSMS System for identification and elimination /
minimization of Environmental impacts / OHS Risks that arise from our
Activities -- Products -- Services
What is EHSMSISO 14001:2004
Environmental Management System (EMS)
OHSAS 18001:2007Occupational Health & Safety
Management System(OHSMS)
EHSMSEnvironmental, Health & Safety Management System
How it worksPOLICY
Gap analysis, management commitment, define program
PLANNINGASPECTS-IMPACTS-REGULATRY ISSUE-MGT PROG
IMPLEMENTATIONResponsibility- staff, physical & capabilities
MEASUREMENT & EVALUATIONOps Control-Documentation-Performance Indices
Review and ImprovementManagement Review- Problem Resolution
ENVIRONMENTAL OPPORTUNITY
Policy DevelopmentTop management shall define the organization’s environmental
policy and ensure that it:
is appropriate to the nature, scale and environmental impacts of its activities, products or services;includes a commitment to continual improvement and prevention of pollution;includes a commitment to comply with relevant environmental legislation and regulations, and with other requirements to which the organization subscribes;provides the framework for setting and reviewing environmental objectives and targets; is documented, implemented and maintained and communicated to all employees; is available to the public.”
IPM&SL EHS Policy IL&FS Property Management & Services Ltd. is committed to
promote pollution free environment; and maintain healthy surrounding and safe working conditions by constantly guiding all the services rendered to the Clients within a consciously recognized and adopted set of standards.
We are committed to comply with applicable legislation and other requirements related to identified EHS aspects / hazards.
We shall strive to improve the environmental, health and safety performance continually and emphasize prevention of adverse impacts in all areas of operations by ensuring active involvement of employees, service partners and clients.
Date:15.11.2007 Ram Walase Version: 1.2 Chief Operating Officer
Key Points of Policy
1. Promote pollution free environment; 2. Maintain healthy surrounding 3. Safe working conditions 4. Comply with applicable legislation and other requirements5. Improve the Environmental, Health and Safety
performance 6. Prevention of adverse impacts 7. Active involvement of employees, Service Partner’s and
clients.8. Continual improvement
Planning-Aspects/Impacts
The organization shall establish and maintain procedures to identify the environmental aspects of its activities, product, or services that it can control and over which it can be expected to have an influence, in order to determine those which have or can have significant impacts on the environment. The organization shall ensure that the aspects related to these significant impacts are considered in setting its environmental objectives.
ISO 14001 4.3.1 Environmental Aspects
Planning-Aspects/ImpactsEnvironmental aspects are those elements of an organization’s activities, products, services or physical resources which may have potentially beneficial or harmful effects on the environment. These may include discharges and emissions, raw materials and energy use, waste recycling, noise, dust, and visual pollution.
An environmental impact is the change that takes place from the occurrence of any given aspect. The relationship between the two is causal: an impact is the pollution that would result if an environmental aspect were not properly managed or controlled.
Planning-Aspects/Impacts
OHS Hazard Source Situation or act with a potential to cause harm in terms of
injury, ill health or combination of these.
OHS RiskCombination of likelihood and severity of a specified hazardous
event occurring.ILL Health
Identifiable, adverse physical or mental condition arising from and / or made worse by a work activity and/or work related situation.
Planning-Aspects/Impacts
Environmental AspectsEffluent (wash water) generationSolid waste / garbage generationEmpty containers with residual materialsDust generationLeakage of Chemicals / oil / fuelSpillage of chemicals / oil / fuel
OHS HazardsExposure to dustInhalation of vapors of chemicalsContact of chemicals with Skin etcExposure to noiseWorking at heightSlippery floorManual handling of garbage / wastes / chemicals
Planning-Aspects/ImpactsAspects can be identified in four easy steps:
1. Activities are first reviewed in process increments small enough to be examined for impacts, but large enough to get the job done in a reasonable time.
2. All environmental aspects of the procedures or process are identified.
3. All potential and actual environmental impacts from these aspects: positive impacts, negative impacts and potential impacts, are identified and associated with an aspect.
4. The aspects are judged for their significance. A measurement system is developed to separate those aspects which are Significant (and thus will require “Targets and Objectives” and “Operational Control” under the ISO 14001 Standard) and those that are not. Since a Registrar auditor must review the procedures for this step, it is suggested that it be written down and quantified.
Planning- EAIE MATRIXEAIE : Environmental Aspect Impact Evaluation Matrix To identify impact of our Operations / Activities on
Environment & Plan control measures on Significant Aspects EAIE is done.
Sl.No
Operation
Activity Related Envt.Aspect
EnvironmentalImpact
Legal Requirement
Client Requi rement
ImpactNeighborhood
PotentialFor resource saving
Critically impact environment
Significant Envt. Aspect
Mgmt. Prog.OCP
1 House keeping
Disposal of empty container
Residual material
Soil/ water contamination
N N Y N N Y OCP 4
Planning-EAIE MATRIXPreparation of Matrices is first step of starting implementation of EHS.Every site (responsible person) has to prepare Matrices of Operations at the site.Significant Aspect / Hazard to be identified & control measures to be planned & executed.All the personnel working at site should be aware of Significant aspect / hazard also criteria for significance.One copy of Matrices to be kept with DMR as Master copy & one at site as control copy.Matrices to be reviewed & updated at least once in a year or earlier in case of any major change in scope of work.
PLANNING- HIRA MATRIXHIRA : Hazard Identification & Risk Assessment Matrix
To identify Hazards associated with our operations/ activities and to plan control measures on the Significant Hazard HIRA is done.
Operation Activity OHS Hazard
OHS Risk Probability of occurrence( P )
Severity of Risk/ Harm ( S )
Hazard rating( P* S)
Significant Hazard Y/N
Controlmeasure
Housekeeping
Dispensing of Chemical
Contact with skin/ eyes
Skin inflammation
3 2 6 Y OCP 1
PLANNING- HIRA MATRIXSignificance Determination of OHS Hazards / Risks
RATING
PROBABILITY (P) SEVERITY OF RISK / HARM (S)
1Unlikely Safety-No injury and / or
Health Problem- No illness
2
Hazard likely to arise once in a year
Safety- Minor injury e.g. minor cuts and bruises, eye irritation from dust and / or Health Problem- that be recovered on the same day e.g. nuisnace and irritation (headache etc), illness leading to temporary discomfort
3
Hazard likely to arise once in a month
Safety -Lost time injury e.g. burns, lacerations, serious sprains, minor fracture etc and / or Health Problem - Lost time illness without permanent disability e.g. dermatitis, asthma, wotk related upper limb disorders, temporary deafness
4
Hazard likely to arise once in a week or more frequently
Safety- Amputation, major fractures, multiple injuries, poisoning, permanent disability and / or Health Problem - irrecoverable health problem e.g. Cancer, permanent neurological disorder, silicosis, irrecoverable damages of kidney or other vital organs.
Note : If the product P*S, i.e. Hazard Rating is equal to or more than 6, the Hazard is considered ‘Significant’. However, in case of Fatal risk, the hazard is to be termed as Significant even if the hazard rating is = 4.
EHS Legal Register
The legal register defines the obligations of organization against various Acts and Rules that are applicable to the environmental aspects / OHS hazards of the activities and services that are offered by organization to the clients.
EHS requirement, if any specified by the Clients, document specifying client’s EHS requirement to be maintained at the concerned site.
The EHS requirement is reviewed and updated at least once in a year by taking inputs on the amendments in existing laws.
Updated EHS legal register is issued to all sites, the Site In-charge has to screen the EHS legal register to identify the requirement applicable to their site depending services in scope of IPM&SL.
EHS Legal Register
Some of the legal obligations applicable to our scope of work: Environment protection act The Noise pollution rules,2000 Petroleum Act, 1934 & Petroleum rule, 1976 Central motor vehicle rule The hazardous waste (Management & Handling) rule Contract labour (Regulation & Abolition) act Workmen compensation act Batteries (Management & Handling) rules, 2001
PLANNING- Objectives and Targets
“The organization shall establish and maintain documented environmental objectives and targets, at each relevant function and level within the organization.
When establishing and reviewing its objectives, an organization shall consider the legal and other requirements, its significant environmental aspects, its technological options and its financial, operational and business requirements, and the views of interested parties.
The objectives and targets shall be consistent with the environmental policy, including the commitment to prevention of pollution.”
PLANNING- IPM&SL Objective and Target
Sl.no.
EHS Objectives UOM Target
1 Control incident of injury to personnel Nos Zero
2 Control incident of major leaks/spills of chemicals/ fuel/ Oils
Nos Zero
3 Prevent Fire Hazards due to IPM&SL Activities
Nos Zero
4 Control Noise Exposure to personnel due to IPM&SL Activity
Db(A) Max. 85
5 Improve PPEs usage by the personnel PPE usage compliance
Min. 80%
6 Make provision for secondary containment for chemicals, fuel and oil
------- 100% compliance
7 Make provision of disposal of spent lubricating oil to Govt Authorised vendor
------- Dec 2008
PLANNING- IPM&SL Objective and Target
Sl.no.
EHS Objectives UOM Target
8 Reduction in consumption of housekeeping chemicals
% Min. 2% per year
9 Reduction in consumption of electrical energy
% Min. 2% per year
10 Reduction in consumption of refrigerant gases
% Min. 2% per year
11 Impart EHS training to IPMSL personnel Man-hours per person per half
year
Min. 8 hrs
Operation Control Procedures
OCP’s are prepared for controlling impacts of our activities on Environment & Health, also to provide guideline for safe working.We have prepared 19 OCP for FMS operations & 17 OCP for PMS operations.All the personnel at site should be aware of OCP related to their work.
List of Ops Control ProcedursOCP No.01: Handling of Fuels, Chemicals & LubricantsOCP No.02: Employee TrainingOCP No.03: Communication of Chemical HazardsOCP No.04: Management of Wastes (Handling, Storage & Disposal)OCP No.05: Maintenance of Hygiene In Food Preparation & ServiceOCP No.06: Selection and Control of Contracted ServicesOCP No.07: EHS Communication With ClientsOCP No.08: Hot Work Guidelines & Work Permit SystemOCP no. 09: Work at Height GuidelinesOCP No.10: Electrical Safety GuidelinesOCP No.11: Accident Investigation & ReportingOCP No.12: Conservation Of Hearing AbilityOCP No.13: Handling & Use Of Cylinders (LPG, Oxygen, Acetylene etc.)OCP No.14: Management Of PesticidesOCP No.15: Maintenance Program For Major EquipmentOCP No.16: Statutory Inspection Program For Equipment (Lifts, Pressure Equipment, Fire
Protection System, etc.)OCP No. 17: Water Conservation & Waste Water Management
OCP No. 18: Site specific STP / WTP OperationsOCP No. 19 : Control of Fatal Risk
OCP 1: Handling of Chemicals, fuels, Oils
Purpose: To define procedure for safe handling of fuels, chemicals and
lubricants.
Scope: The procedure shall be used while handling chemicals.
Records:
Incoming material inspection record
EHS incidence record
MSDS of all chemicals/ fuels used at site.
OCP 2: Employee TrainingPurpose :To define procedure to ensure that:
EHS related training requirements for employees at different levels / functions is identified.Conduct of training is planned and impartedPost- training evaluation is carried out and records of training and evaluation are maintained.
Scope : The procedure is applicable for EHS related training to all IPMSL existing / new joiners deployed at sites.
Records:• EHS Training Plan / Schedule (F/03)• Training attendance & effectiveness evaluation Record (F/04)
OCP 3: Communication of Chemical Hazards
Purpose:
To provide information to the site personnel of the hazards associated with different chemicals handled by them & action to be taken for preventing their exposure / in case of exposure.
Scope:
The potential hazards of handling the chemicals / fuels / Lubricants etc shall be communicated to the site personnel.
Records:
Chemical Hazard Information Dossier.
Training Attendance Record for Personnel.
OCP 4: Management of Waste
Purpose:To ensure that different types of waste generated by the sites are handled, stored & suitably disposed off suitably to control / minimize EHS related hazards.
Scope:This procedure is applicable for handling, storage & disposal of wastes generated from our Facility Management Sites.
Records:Waste Generation record.Disposal record for hazardous waste.EHS incidence record.
OCP 5: Maintenance of Hygiene in food preparation & service
Purpose:
To ensure the food material is stored, prepared & served in hygiene manner.
Scope:
This procedure shall be applicable wherever we providing such services.
Records:
OCP 6: Selction and control of contracted service
Purpose: To define procedure to ensure that
Contracted Service providers for the sites are communicated on the EHS requirements of the site and, EHS requirements of IPMSL are met by contractors working at the sites.
Scope: The procedure applies to all those contracted services received by the sites that have potential to cause significant EHS Hazards.
Records:Contracts / Agreement with VendorsTraining attendance records
OCP 7: EHS Comunication with ClientsPurpose:
To define procedure to ensure that;Clients are kept updated on the EHS related legal requirements applicable to themExpectations of IPMSL from clients to efficiently implement EHS system is communicatedEHS related complaints received from clients are addressed suitably.
ScopeThe procedure applies to EHS Communication with clients related to the activities within the scope of IPMSL.
Records:Compliance Evaluation Report (F/08)EHS Incident Record (F/02)Information / Circular to clients
OCP 8: Hot work guidelines and work permit system
Purpose :To define procedure to ensure that all Hot Work on site are carried out in a safe manner.
Scope: The procedure shall be applicable to all activities collectively termed as ‘Hot work’ including
Electric Arc WeldingGas Welding / Cutting (Oxy-Acetylene)Use of Blow torch (Kerosene) for Heating / Annealing / Quenching /General metal working .
Records: Hot Work Permit – F/09
EHS Incidence Record
OCP 9: Work at Height
Purpose:To define the procedure to be followed when working at height and to ensure implementation of the same.
Scope:The procedure shall be followed while working at height, the potential drop being 3 mtrs & above (such as terraces, scaffolding, roofs, façade, etc.), where there is a risk of injury due to personnel / material falling from a height.
Records:Work At Height Permit F/10 EHS Incidence Record – for recording incidents of accidental falls of
personnel / material leading to damage to property / injury or loss of life. (Format: F/02)
OCP 10:Electrical Safety Guidelines
Purpose: To define the guidelines to be followed for working on electrical equipment safely and ensure implementation of the same.
Scope: The procedure shall be applicable to all electrical repair, maintenance and new installation work which is to be carried out at the client’s premises either by IPM&SL personnel or by any other person contracted or deputed by the IPM&SL.
Records:Checklist – Monitoring Electrical Work
EHS Incident Record
OCP 11: Accident Investigation and reporting
Purpose:
To define procedure for investigation of accidents in order to analyze root cause / Assess the extent of damage to life & property / Prevent reoccurrence by taking adequate actions and Reporting and circulation to the management and sites.
Scope:
This requirements is applicable to all accidents involving IPM&SL employees, temporary agency employees, on-site vendors, contractor employees and /or visitors with a potential to cause personal injury and /or visitors with a potential to cause personal injury and /or property damage.
Records:Accident Investigation Report. (Format: 12)Monthly Accident/Incident (near miss) Statistics Report. (Format: F/13)
OCP 12: Conservation of Hearing ability
Purpose:To identify high noise areas, control of noise generation from such areas and also control of exposure to personnel working in high noise areas.
Scope:The procedure applies to exposure of noise to employees and contract workers working on our behalf at all the facility management sites of IPMSL.
Records:Noise Survey Reports (Format: F/14)Surprise Inspection Record For Usage Of PPEs. (Format: F/16)
OCP 13: Handling and Use of Cylinder
Purpose:To define guidelines to be followed for safe handling, storage and use of Gas Cylinders and ensure implementation of the same
Scope: The procedure shall be applicable for handling, storage and use of LPG, Nitrogen, Oxygen, Acetylene or any other flammable or pressurised gas cylinders.
Records:Records of Training programs (F/04)Inspection Record of Cylinders (F/17)EHS Incident Record (F/02)
OCP 14:Management of Pesticides
Purpose:
To ensure the activity is carried out in safe, healthy and environmentally acceptable manner.
Scope:
This procedure shall be used wherever we providing such services.
Records:Government authorization letter.Activity report.MSDS of chemicals
OCP 15: Maintenance program for major equipments
Purpose:To define maintenance systems for equipment that are critical from EHS point of view and to ensure compliance to the same.
Scope:This procedure shall apply to all major / critical equipment including (but not restricted to) Lifts, Chillers, AHUs, DG Sets, Sewage / Water treatment plants etc.
Records:
OCP 16: Statutory Inspection Program for Equipments
Purpose: To define inspection / testing requirements of various equipment (along with their frequency) as required by Indian legislations and ensure compliance to the same.
Scope: This procedure shall apply to all important equipment such as Lifts, Pressure vessels, Fire protection system etc. for which regular Statutory Inspection and Licensing (a) is mandatory vide Government policy and (b) falls within the scope of IPMSL services at site.
Records:
OCP 17: Water conservation & Waste Water management
Purpose: To ensure water wastage is prevented for activities within the scope of IPM&SL.
• Waste water generated at the site doesn’t lead to water/ soil pollution
Scope: The procedure is applicable for all those activities, within the scope of IPM&SL, where water is consumed foe carrying out the activity..
Records:Record of inspection for leakage of water.Record of inspection for leakage of effluent.
OCP 18: Site Specific STP/WTP Operations
OCP 19: Control of Fatal Risk
Purpose:To define controls for OHS hazards related to FMS services having severity rating of 4 and probability rating of 1 to prevent their recurrence
Responsibility:The FM is overall responsible to ensure implementation of the procedure
Records:EHS Incidence reportConfined Space entry permit
Documents and formats
Formats provides necessary check points / precautions for controlling impacts.Formats are helpful for maintaining records, that necessary precaution has been taken to avoid impact on Environment and Health.Formats should be filled by responsible person.We have F/01 to F/21 for daily / activity based use formats F/51 to F/59 are for Quarterly reports, also known as Monitoring & Measurement Formats
Activity Based Formats
F/01: Incoming material inspection recordF/02: EHS Incident RecordsF/03: Training CalenderF/04: Training attendance and effectiveness evaluation recordF/05: Pest Control RecordF/06: Waste Generation RecordF/07: Daily Pantry/Cafeteria checklistF/08: Compliance evaluation recordF/09: Hot work permitF/10: Work at Height permit
Activity Based Formats
F/11: Monitoring electrical workF/12: Accident Investigation reportF/13: Monthly Health and Safety StatisticsF/14: Noise Survey reportF/15: Record of consultation or communication with employeeF/16: Monthly Surprise inspection record of uses of PPEsF/17: Cylinder Inspection ChecklistF/18: Preventive maintenance plan for critical machineriesF/19: Schedule of Statutory inspection and tastingsF/20: Record of inspection of leakage of water, sewage/effulent etc.F/21:Confined Space entry permit
F/01: Incoming material inspection record
Format Filling guideline: Date : Date of receipt of material Supplier name : Name of the supplier of the material Material : Name of material received e.g. R1 Mode of Transport :write down by taxi, truck or by hand. Remark : If leaky container, write down action taken ( i.e. sent back/
shifted to another container ) Signature : sig. of person inspecting material is most important if any
problem arises with material later on.
F/02: EHS Incidence record
Fill the content only if any incident occurs . Signature is important in this form. Any Health related incident also to be mentioned in the same
format Incident observed to be recorded. Root cause analysis of Incident is to be done to find out the
Reson for occurrence. Corrective measure taken to avoid the recurrence is to be
mentioned.
F/03: Training Calender
Training calender is to be prepared for a year with tentative time frame for the same.
Topics to be covered during training is given in EHS Manual
While deciding duration of training, Objective related to Training must be taken in consideration
Trainer can be Internal / External, IPMSL employee or Vendor Supervisor.
F/04: Training attendance
Training title : In short title of training . e.g. Job Related OCP Contents (in brief): e.g. No.10 OCP, Electrical Safety Guidelines Signature : Participant’s Sig. provides evidence that he had attended the training. Method of evaluation : Tick the method applied for evaluation
e.g. On the job training, Interview Rating : Give rating from 1 – 4 , if rating is below 2 mention
recommended action e.g. retraining required Date & evaluators signature : Important for evidence
F/05: Pest Control Record
Frequency : e.g. Monthly, Quarterly, Planned Date/Month: Planned date as per the frequency. Carried out : Agency name who has done the Pest control
treatment and date of execution. Check : certificate – Government authorized vendor
PPE : Mask, Hand gloves available or not Protective clothing : Obligatory requirement, protective clothing should be used during operation.
Signatures: Person carrying out the activity and person verifying it should sign the record.
F/06: Waste generation record
Format is for entry of waste generated within a month.
Daily generated & disposed waste quantity is to be entered in a format, so that cumulative quantity can be calculated in a single form for the whole month.
Type of waste generated at site with quantity is to be entered in the format.
Types of waste is listed at the end of the format.
F/07: Daily Pantry Checklist
This checklist is applicable only for the sites where pantry / cafeteria operation under scope.
Grooming of staff, Food preparation area, Serving area to be checked daily.
If status of any check point is not satisfactory ,mention in remarks column.
Signature of supervisor is important to know who has carried out the check.
F/08: Compliance evaluation record
Applicable Act/Rule : Act/rule applicable to the site (Refer EHS legal register )
Obligations under act : Refer EHS legal register for obligation , put applicable to the site only. Current compliance : Status of compliance against
the obligation. Compliance Details: certificate/Permission taken from
authorized body for complying the rule, Date of issue of the certificate and renewal date is to be entered.
Remark : If any non – compliance, mention in remarks column.
F/09: Hot Work Permit
Location & description of work : Important for reference Validity of permit is to be mentioned and if extends to more
than a day all checks to be carried out every day. Precautionary checks : should be carried out by responsible
person ,without overlooking any point. Mark the status of check i.e. Y or N in the column.
Fire sentry : Important for safety ,should be available all the time during work.
All required PPEs should be used all the time during work All required equipments for Fire safety should be available
during the work. After completion of job permit should be signed & closed by authorized person only e.g. Site In-Charge, FM Supervisor
F/10: Work at Height Permit
Work which is carried out above three meters height is termed as work at height.
Location and description of work is important for reference. Validity of Permit is to mentioned & if it extends more than a
day all checks to be carried out every day. Responsible person should carry out checks & mark status as ‘Y’
or ‘N’ Preparation checks to be carried out before starting the work
and monitoring checks to be carried out during the work. PPE s ,sign boards , safety net ,first – aid box are the prime
important things during work at height.
F/11: Monitoring Electrical Work
Description of work: Detail description of work to be carried out with equipment name and specifications.
All the checks to be carried out and status to be marked/ticked in the next column.
LOTO is prime important before starting any electrical work. Earthling should be provided to portable equipment. Safety signage , first – aid kit , PPE are prime important. Agency: If work is being carried out by external agency, name of
the Agency is to be mentioned. All the checks should be carried out by responsible person,
should sign the permit.
F/12: Accident Investigation Report
This form is to be filled only if any accident occurs. Details of Accident: Date, time (24hr clock), location, type of
work during the which the Accident was occurred is to be mentioned.
Description: Detailed description of Accident is to be mentioned for proper investigation of Accident.
Details of witness: Important for investigating the root cause of Accident.
Details of injured person: Person’s details who is injured in the Accident is important with details of injury.
Root cause and corrective action of the Accident to be analyzed Signatures: Person filling the report or FM is to signed the
report.
F/13: Monthly Health and Safety Statistics
This report shows clear picture of EHS statistics in the month. Accident , incident with who is affected is to be recorded in this
report. Causes of accident are important for planning necessary action
for recurrence. If no Incident/Accident occurred in the month, mention NIL in
column in Statistics Section. In case of Nil Incident causes of incident column need not be
filled. If Incident is occurred in the month enter no. and cause of that
incident also respective incident report should be filled. Signature of the person entering and checking the statistics is
important
F/14: Noise survey report
Noise survey should be carried out at least twice in a year. Noise level checks should be carried out at all high noise area. If noise level is above 90 db(A) necessary precaution should be
taken for reducing the exposure to high noise. Warning signs should be posted at entry points of high noise
areas as well as mobile high noise generating equipment like vacuum cleaners.
Sound level meter should be available with RO and survey will be carried by Internal Auditor/ DMR.
F/15:Record of Communication
Any communication or consultation with persons at site related to EHS is to be mentioned on the format.
Date, Name of person and nature of communication to be noted.
Details of communication/consultation is to be mentioned e.g. Suggestion regarding handling of chemical while diluting the chemicals.
Remarks: Enter the action taken on the communication. E.g. Handling of chemicals procedure modified.
F/16: Monthly Surprise Inspection record
Activity inspected : Any activity in high noise area PPEs expected to be used : PPEs to be used during performing
the activity, Can be one or more .(Refer F/59,PPE Usage Matrix) Deficiencies : No of persons : no. of person not using PPE PPE found not being used : No. of PPE not used by the inspected
person out of the PPE he supposed to be used. % Compliance : Calculate % of compliance of PPE. Compliance
should be more than 80% as our EHS objective is uses of ppe (more than 80%)
Within a month more than one surprise checks can be done.
F/17: Cylinder Inspection Checklist
Applicable if Cylinders are stored at site and in our scope.
Storage area is to be checked once in a month. All checks to be carried out by responsible person. Mark the status of checks in the next column in the
check points as Yes, No or not Applicable. Signature of person carrying out checks and Site In-
Charge’s signature is important.
F/18: Preventive Maintenance Plan
Machinery name : Name of machinery under inspection Task to be performed : Maintenance to be performed on the machinery. Maintenance frequency : Frequency of maintenance to be done e.g. monthly quarterly etc. Maintenance to be done by : Name of agency carrying out
maintenance Maintenance activity planned/ Conducted : Month of Activity
planned and status of Activity conducted is to be mentioned.
F/19: Schedule of Statutory Inspection
The machinery requiring statutory inspection, e.g. lifts, transformers etc.
Machinery name : Name of machinery which inspection is to be carried out. First identify equipment requiring statutory inspection.
Inspection to be performed : Mention inspection to be performed on the machinery e.g calibration , load testing.
Frequency : Frequency of inspection e.g. six monthly,annualy. Agency carrying out inspection. Schedule : Tick the month in which inspection is schedule and
carried out. Plan period & month of inspection are important to mention in
this schedule.
F/20: Record of Inspection of Leakage
Date : Inspection date & date of completion are important as to indicate leak is arrested within what period.
Observation & action taken should be mentioned to indicate proper action has been taken to arrest leak.
Date of review and Signature of reviewing person is important to indicate the activity is completed.
F/21: Confined Spae entry
Confined space : A space sufficiently surrounded by confining surface that may trap hazardous gases , vapours or dust where oxygen deficiency exits.
A confined space with physical configuration such that entry/exit is restricted to point that emergency assistance or self egress by a person in distress will be difficult.
Description of job: is important for precaution to be taken during the job.
Check points in the permit are important & should be carried out by responsible person only.
All the precautions should be followed without any failure, as lack of any safety precaution can cause incident/accident.
Signatures are important to know who has checked & who has permitted to work.
Monitoring Formats
F/51: Quarterly performance review against objectives and targetsF/52: Quarterly review report on communication from interested parties including complaintsF/53: Attendance of EHS MRMF/54: Quarterly Minutes of EHS MRMF/55: Monitoring and measurement matrix against legal and other requirementsF/56: MP Closer reportF/57: Corrective Action report F/58: PPE usage matrixF/59: EHS Objective and Targets
The Benefits
Better conformance to environmental regulations, Greater marketability, Better use of resources, Higher quality goods and services, Increased levels of safety, Improved image and Increased profits.