Transcript

LEGEND

Ongoing Projects

ADP Projects

Existing AirTrain Facilities

Existing AirTrain Tracks

Future AirTrain Facilities

Future AirTrain Tracks

Ground Access Development Projects – AirTrain

� AirTrain Track ExtensionThe AirTrain would be extended to Lot DD and a new AirTrain station constructed that would provide direct access to the RCC lobby area and Long Term Parking Garages in Lot DD.

� Airport Hotel AirTrain StationAn AirTrain station will be constructed adjacent to the Airport hotel. A pedestrian platform will be located on the third floor of the hotel and will provide hotel guests with direct pedestrian access to the new AirTrain station.

• AirTrain Station ExpansionStation platforms throughout the system would be retrofitted to accommodate four-car trains on the Blue Line. Additional vehicles and increased frequency of service would serve increasing passenger demand.

• AirTrain Maintenance Yard ExpansionThe tracks near the AirTrain Maintenance Building would be extended to provide storage/staging for an expanded AirTrain vehicle fleet.

Lot DD Station

Rental Car Center Station

West Field Road Station

Air Train Maintenance & Storage Facility

Terminal 3 Station Terminal 2 Station

Terminal 1 StationInternational

Terminal G Station

International Terminal A Station

Garage G/BART Station

Garage A Station

Recommended