Page 1: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

HFT PIXEL Mechanical Progress

Strasbourg

June-2009

Wieman

1

Page 2: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

Topics

• Thin support beam• ladder fabrication• Air cooling analysis• Air vibration tests• Full scale cooling

tests• Spatial mapping

2

Page 3: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

3

Development of sector beam and ladder fabrication

• Eric Anderssen and Tom Johnson have been working on fabrication methods for:– Sector Beam– and Ladders

• Produced sample beams, 244 m thick, 7 ply, 21 gm

• expected ladder mass 7.5 gm

ladders

sector beam

Page 4: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

4

prototype design being built

Page 5: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

5

PIXEL mass breakdown

Page 6: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

Sector structures

6

Page 7: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

ladder fabrication and tooling

7

Page 8: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

ladder fabrication and tooling

8

Page 9: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

ladder fabrication and tooling

9finalizing mechanical designs and developing rapid production methods

Page 10: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

ladder fabrication and tooling

10

ladder withsilicon heaterchips(50 m thick)

Page 11: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

wire bonding 50 m silicon to flex PC

11

vacuum chuck tosecure flex and siliconflat against solid surfaceto remove bounce

Any bounce then no bond

Good Newsafter a couple of minor modifications to the vacuum chuck wire bonding works well

Page 12: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

12

ladder to sector bond fixture

ladder to out2 bond fixture.SLDASM

(designed to allow ladder replacement)

Page 13: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

ladder to sector tooling fixtures (4 stations)

13

Page 14: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

Air cooling of silicon detectors – Computational Fluid Dynamics (CFD) analysis

air flow path – flows along both inside and outside surface of the sector

• Silicon power: 100 mW/cm2 (~ power of sunlight)

• 240 W total Si + drivers

14

Page 15: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

Air cooling – CFD analysis• air flow velocity 9-10 m/s• maximum temperature rise

above ambient: 12 deg C• sector beam surface –

important component to cooling

• dynamic pressure force 1.7 times gravity

stream lines with velocity

silicon surface temperature

velocity contours

15

430 mm ID

Page 16: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

16

vibration modes – preliminary – better composite numbers available

229 Hz

316 Hz

224 Hz

473 Hz

348 Hz

Page 17: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

17

vibration modes with reinforced end cap

• The message– Lots of complicated modes close in

frequency– End cap raises frequencies a bit

259 Hz

397 Hz

276 Hz

441 Hz

497 Hz

Page 18: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

18

air velocity probetwo positions shown

capacitance vibration probetwo positions shown

carbon fiber sector beam

wind tunnel setup to test vibration and displacement

adjustablewall for airturn around

air in

air out

C:\Documents and Settings\Howard Wieman\My Documents\aps project\mechanical\PXL phase 1 sept 2008\sector ph1 wind tunnel.SLDASM

Page 19: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

19

wind tunnel, rapid prototype parts from model air flow control

parts built with3D printer

parts built with SLA, stereolithography apparatus

Page 20: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

20

wind tunnel

Page 21: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

21

capacitive probe vibration measurements

air velocity 2.7 m/s

position signal, 25 m/volt

air velocity 9.5 m/s

position signal, 25 m/volt

log FFT, peak at 135 Hz

Page 22: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

22

Ladder vibration induced by cooling air

30m

12

20m

12

system resolution limitall errors

desired vibration target

required air velocity18 mph

0 2 4 6 8 10 120

2

4

6

8

10

measured vibration with negative pressure modemeasured vibration with positive pressure mode

Ladder Vibration

air velocity (m/s)

vibr

atio

n R

MS

(m

icro

ns)

5.77

8.66

8

Page 23: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

Full sized cooling tests

Thermal camera window not shown

> 300 CFPM air flow for verification of cooling capability

Cooling tests will begin as soon as prototype sectors completed

9 inch diameter tube mocks upMSC

23dust collector for air supply

Page 24: HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1

24

development of spatial map procedureBob ConnorsSpiros MargetisYifei Zhang

touch probe 2-3 m (xyz) andvisual 2-3 m (xy) 50 m (z)

active volume: huge

10 gm touchprobe force(could deflect beam)

MEMOSTAR3, 30 m pitch

We need better fiducialson the main pad side that the coordinate machine can find automatically.

The pads will be buried and not visible