Safari • Number 53 on the Arab News/Al Eqtisadiah Top 100
Saudi Companies List• 8th fastest Growing Company in Saudi Arabia• 9th biggest Employer in The Kingdom
(Source Arab News/Al Eqtisadiah Top 100 Saudi Companies List/Supplement, December 5th 2005)
Diversified Companies in the following Sectors:• Security• Construction• Electronics• Motors• Hospital Management
• Food• Travel• Trading • Investment• Operation & Maintenance
A Saudi leader in Operations & Maintenance and Hospital Management
Organization ChartCEO
VP Government Contracts
Auditing
LegalAdvisory
Committee
CFOFinance
Accounting
Auditing
Financial Analysis :Budget/Forecast
Banking/ Finance
G.M.Motors
G.M.Travel
G.M.Security
G.M.Electronics
Deputy VPPlanning &
Bus Development
Property Control
Deputy VP Health Care
Deputy VPOperations
Support Services
HR
MIS
Logistics
Finance, Projects
VP Domestic Investment
Operation & Maintenance
Present O&M contracts - total value of more than 2.5 billion SAR
120 government contracts carried out
Serviced, maintained and operated over 200 million square meters of facilities in:•Commercial•Institutional•Government •Municipal Areas
Classified as a Grade One Contractor by The Ministry of Municipal Areas & Housing for most areas of O&M
Our Experience in O&M
Power Generation & Transmission Desalination Plants
Janitorial Services
Heating & Ventilating Air Condition
Systems
Water & Sewage Treatment Plants
Sports & Recreational Facilities
Electronics & Communication
Systems
Pest Control Services
Fire Alarm & Security Control Systems Fire & Rescue Services
Food Supply & Catering
Landscaping & Irrigation Services
Roads & Grounds Maintenance Fabric Roof Systems
Airport Vehicles & Equipment
Checked Baggage & Conveying Systems Commercial & Military
Applications
Building & Electro-Mechanical
Flight Information Display
Airfield Lighting System
Current O&M and Construction projects
• King Abdul Aziz International Airport, Jeddah - 864m SAR• King Fahd International Airport, Dammam - 420m SAR• Kingdom Tower, Riyadh – 71m SAR• Kingdom Schools, Riyadh – 37m SAR• Riyadh Airbase – 37m SAR• Air Defense Forces, Taif Region – 22m SAR• Air Navigation System all over The Kingdom – 369M SAR• King Abdul Aziz Naval Base, Jubail – 246m SAR• Hail Water Project – 46m SAR• Saudi Naval Forces, Jeddah – 66m SAR• Saudi Land Forces, Hafr Al Batin and Al Kharj – 127m SAR• Saudi Air Defense Forces, Taif – 9m SAR
King Abdul Aziz Airport, Jeddah
Operated and maintained by Safari since 1992
Current Contract period 2001 – 2006 - extended
Contract Value SAR 864,077,513 Manpower involved: 2146
• Logistical Support• Airport Terminal including Civil &
Mechanical Installations, Structural, Electronic, Electrical
• Technical Consultations• Catering & Housekeeping• Landscaping Services
The Air Navigation System in The KingdomContract period 2005 – 200836 monthsContract Value SAR 379,000,000Manpower involved 765
•Operation and Maintenance of Navaids Systems Kingdom wide to the International required Standards (ICAO).
Saudi Arabia’s 491 Air Navaids located in:Jeddah 104 Abha 74Riyadh 105 Tabuk 39Dammam 92 Taif 23Madina 54
The Air Navigation System in The Kingdom cont.
•Program Management and Technical Support Personnel for O&M of The Kingdom’s Air Navigation System including Radars, Landing systems, Transmitters, Air Traffic Control Towers etc.
•O&M of all Navaids buildings.
•Logistics Supplies Services.
Kingdom TowerContract period 2003-2009
72 monthsContract valueSAR 71,031,168Manpower involved 206
• CCTV, Security Camera and Access Control System, Satellite TV System for 95 Channels
Kingdom Tower cont.
• Chilled Water supply and Air Conditioning System for 186,000 Sq.m. area (all Electromechanical)
• 24 Hours Janitorial and Cleaning Services including Cleaning of Glass Panels of 300 meter High Tower, 76,000 Sq.m. Car Parking Area
• Telephone and Security Intercom System, Fire Detection, Fire Alarm and Sprinkler System (Electromechanical)
Kingdom SchoolsContract period1999 – 2005 –
extended for an unlimited period
Contract value SAR 37,300,000Manpower involved 108
• BMS Control and Network System (Electromechanical)
• Sewage Treatment Plant, Swimming Pool (Electromechanical)
• Fountains, Fire Fighting System (Electromechanical)
• Sport Facilities, Central Facility, Mosque and Auditorium
• Janitorial Services and Pest Control
King Abdul Aziz Naval Base, Jubail
Contract Period 2005-200844 monthsContract Value SAR 246,575,000Manpower involved 650
•Demolition of 5 piers including electromechanical surfaces and reconstruction
•Treatment of piles
•Dredging work
•Materials, Manpower, Management Workshops and as-built drawings
King Abdul Aziz Naval Base, Jubail cont.
Case Study The Project consists essentially of:
•Complete demolition and reconstruction of the wharves and piers structures, including deck slab, transverse beams, fascia panel, pile caps, hotel stations and utility tunnels.
•Removal of ship lift platform, refurbishment and reinstatement on completion of civil works.
•Load testing of piles.
•Injection of cracks in the piles.
•Re-skinning/local repair of all the piles followed by the re-instatement of the concrete surface using GFRP as a permanent formwork.
•Removal, supply and re-installation of all mechanical and electrical equipment and services
King Abdul Aziz Naval Base, Jubail cont. •Lay asphalt wearing course to deck areas of wharves and piers
•Dredging works in the vicinity of the wharves and piers to remove excess silting and debris from demolition works
•Re-skinning to transfer pit base slab, re-construction of retaining wall adjacent to dry dock area and re-skinning to selected areas of remaining retaining wall.
•Demolition and re-construction of dry dock foundation (3 No.)
•Re-construction to areas of concrete pavement in dry dock area
•Re-construction of re-skinning/local repair of the service trenches SRF area, including replacement of trench covers.
King Abdul Aziz Naval Base, Jubail cont.
The construction project is divided into 4 phases:
•Phase 1: Piers No 1&2 and Wharves D,E, F,G, H and J
•Phase 2: Wharves A,B,C Ammo pier and floating pier
•Phase 3: Pier No. 5 and Wharves L & M
•Phase 4: Piers No. 3&4, Wharf K, Synchro Lift, Dry Dock and SRF Service Trenches and Transfer pit
Hail Water ProjectContract period 2005 – 2008 36 monthsContract value SAR 45,825,210Manpower involved 65
• Reimbursable Units 100,000 cubic meters/day• Laboratory Water Analysis 13 Deep Wells depth 304 meters• Pump Stations covering 150 cubic meters/hour• Diesel Power Plant 8.6 megawatts
Hospital ManagementOur highly focused approach
continuously introduce state of the art developments into the process
Experience in areas such as:• Hospital Management• Medical Recruitment• Medical Personnel• Bio-Medical Equipment• Full Spectrum of O&M• Consulting Services • Medical Gas• Laundry Services in compliance
with international standards for medical care
Current Medical Projects• King Fahd Hospital, Hofuf – 188m SAR• Iman, Hotat Ban Tamim and Huraymilah General Hospitals – 282m SAR• King Fahd Medical City, Riyadh – 185m SAR
King Fahd Hospital, HofufContract period: 2004-2007 36 monthsContract Value: SAR 187,998,018 Manpower involved: 1468• Partial Medical Operation• Full Non-Medical O&M• Complete Bio-Medical Maintenance
Security
Sole Agent for:
• Rapiscan Security Systems• ICOM Communications• Robson Conveyors• Newfield Controls• Frontier Pitts• TeleRadio
Distribution Agreements with Companies such as:
• Global Security Systems• Allen’s• Metorex• Detec• Frontier Pitts
Safari Gulf provides Security Consultancy and Equipment to Government and Private Sector Clients.
Bomb Detection and Disposal Equipment
Vehicle Search Mirrors
Under Vehicle Surveillance Systems
Bomb Detection and Disposal Equipment
Explosive Ordinance Disposal
X-ray Screening ProductsPersonnel
Hand-Held Metal Detectors
Walk-ThroughMetal Detectors
Hands-Off Screening Systems
X-ray Screening ProductsBaggage Handling Systems
Airport Screening
X-ray Screening ProductsSpecialized Vehicles
X-ray Screening ProductsSpecialized Vehicles• Fire Trucks
Ground Support EquipmentSpecialized Vehicles
Ground Mobile Radios
Trunking Networks
UHF-VHF Systems
Safari Facts & Figures
0102030405060708090
2001 2002 2003 2004 2005
Net Income (Million Saudi Riyals)
0100200300400500600700800900
1000
2002 2003 2004 2005
Total Assets(Million Saudi Riyals)
0
2000
4000
6000
8000
10000
2002 2003 2004 2005
Manpower
1166mTotal Revenue (Million Saudi Riyals) 1200
1000
800
600
4002001 200520032002 2004
547m 530m549m
816m
Our Offices16 Park StreetLondon W1Y 3WDU.K.Tel: 44-207-499 5545
777 Leesburge PikeSuite 14 LSFalls Church, VA 22043U.S.A.Tel:1-703-448 6614
Sheikh Zayed RoadBur DubaiDubaiU.A.E.Tel: 971-4-321 2293
Al-Gawazat StreetAbu DhabiU.A.E.Tel: 971-2-642 8810
37 Al-Batal Ahmad AbdelazizAlmohandeseenCairo EgyptTel: 20-2-303 6893, 303 8213
P.O. Box 7710 11472 Riyadh Tel:01-231 5577 Fax:01-230 0010
P.O. Box 15005 21444 Jeddah Tel: 02-685 7300 685 7342 Fax:02-685 7339
P.O. Box 4499 31491 Dammam Tel: 03-883 2225 Fax;03-883 2224
www.safari.com.sa [email protected]