Investment Opportunities in Public
Works and Highways
Secretary MARK A. VILLAR
Imperial Hotel, Tokyo, Japan February 28, 2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
$3.5B
P 175.4 B (1.8%)
FY 2011
$16.9B
P 847.2 B (5.3%)
FY 2017
PHILIPPINES INFRASTRUCTURE BUDGET (Billions and % of GDP)
TARGET INFRASTRUCTURE SPENDING 7% of GDP
1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
SOURCE: www.build.org.ph
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Traffic Decongestion Program (Construct / widen national roads and bridges; Construct by-passes/diversion roads;
Construct flyovers; interchanges and underpasses)
Integrated and Seamless Transport System (Construct/improve logistics infrastructure network in Northern Mindanao, Davao,
SOCSARGEN and CARAGA (MLIN); Construct/improve roads leading to growth corridors in
Western Mindanao; Study and implement Inter-island linkage projects through long-span
bridges; Connect gaps along national roads; Construct/replace bridges; Initiate studies on
tunneling technology)
Public-Private Partnership Program (Augment and complement Locally-Funded and Foreign-Assisted projects; Construct High-
Standard Highway Network based on Masterplan and Technical Studies.)
Convergence and Rural Road Development Program (Construct/upgrade local access roads to designated tourism destinations, RORO ports /
seaports and airports; Construct Farm to Market Roads (FMRs); Construct/improve roads
leading to industrial trade corridors.)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Livable, Sustainable and Resilient Communities
Integrated Water Resources Management Program (Construct/rehabilitate flood mitigation structures along major river basins and
principal rivers; Construct water impounding projects to optimize water resources;
Construct water supply/septage & sewerage/rain collectors; Upgrade/improve
drainage capacity)
Disaster Risk Reduction and Climate Change Adaptation Program (Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to
highly vulnerable areas; Improve national roads vulnerable to flooding, landslide
and slope failure; Build evacuation centers; Upgrade quality standards based on
Design Guidelines, Criteria & Standards (DGCS) 2015)
Infrastructure Support for Marginalized Sectors (Construct support facilities for marginalized sectors (senior citizens, physically
challenged persons, women sector, etc.)
Create Environment-Friendly Communities (Build more bike lanes and pedestrian infrastructure.)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
$1.8B
P90.7B
FY 2011
$8.6B
P428.4B
FY 2017
DPWH FY 2017 INFRASTRUCTURE PROGRAM (Amount in Billion)
P107.8 B ($2.2B) Traffic Decongestion Program
P18.8 B ($0.4B) Convergence and Rural Road Development
Program (TRIP, ROLL-IT)
P95.9 B ($1.9B) Integrated and Seamless Transport System
(Includes P31.1 B for Mindanao Logistics Infrastructure Network, MLIN)
P104.4 B ($2.1B) Livable, Sustainable and Resilient
Communities
1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Traffic Decongestion Program
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
6.90 km – 4 lane elevated expressway from
the end point of NAIA Expressway Phase I to
PAGCOR Entertainment City.
It will provide access to NAIA Terminals 1, 2
and 3 as well as an interface with the Skyway
and Cavitex.
Will reduce travel time between Skyway and
Terminal 1 from 24 minutes to 8 minutes.
Will benefit 80,000 travelers per day.
Project Cost: P20.45 B ($409.11 M)
Schedule: 2014-2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Widening/Concreting of 3.24 kilometers
section of Radial Road 10 (R-10) into 6 lanes
road including lateral and cross drainage.
2,107 Informal Settler Families (ISFs)
were relocated and 427 ISFs availed financial
assistance.
Will reduce travel time between Manila and
Navotas City from 1hour to 30 minutes.
Project Cost: P378.18 M ($7.56 M)
Schedule: 2006-2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
5.65 km -6 lanes elevated expressway connecting
McArthur Highway and C-3.
It will utilize the existing PNR railroad tracks that cut
across Valenzuela City & Malabon City.
Will decongest Metro Manila by providing access to
NLEX without passing through EDSA or the
Balintawak Toll Plaza and improve movement of
cargo between NLEX and Radial Road 10.
Project Cost: P9.00 B ($ 180.05 M)
Schedule: 2014-2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
8 km- four lane expressway from C3 Road in
Caloocan City to PUP, Sta. Mesa, Manila and
will connect to common alignment of Skyway
Stage 3.
Will reduce travel time between SLEX and
NLEX from 1.5 - 2 hours to 15 - 20 minutes.
Will reduce travel time between Clark and
Calamba from 3 hours to 1 hour and 40
minutes.
Will benefit 35,000 travelers per day.
Project Cost: P23.30 B ($466.12 M)
Schedule: 2018-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
14.8km - 6lane expressway that will connect
Balintawak, Quezon City to Buendia, Makati
Will decongest EDSA and other major roads
in Metro Manila (e.g., Quezon Ave., Araneta
Ave., Nagtahan, Quirino Ave) by as much as
55,000 vehicles daily.
Will reduce travel time from Buendia to
Balintawak from 2 hours to 15 to 20 minutes
Project Cost: P37.43 B ($748.79M)
Schedule: 2015-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Construction/widening of two (2) bridges,
rehabilitation/concreting of existing 7.46 kms
road with provision of additional two lanes,
including construction of 2-meter wide
planting strips and 3 meter bike lane.
Will reduce travel time from Taytay via C-5 to
Bicutan from 1 hour to 30 minutes via Laguna
Lake Highway.
Project Cost: P1.068 B ($21.36 M)
Schedule: 2013-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
34 kms - 6-lanes expressway from Skyway FTI,
Paranaque City to Batasan, Quezon City.
Its alignment will connect to Skyway Stage 1
at FTI, towards C5/Diego Silang, going
towards Laguna de Bay, intersecting Ortigas
extension at Tikling intersection in Antipolo
City midway, crossing Marcos Highway and
terminating in Batasan Complex.
Project Cost: P31.32 B ($626.56 M)
Schedule: 2016-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
50 expressway that will connect Bataan with
Metro Manila and providing direct access to
the provinces of Bulacan and Pampanga.
City Flood Control in the coastal waters of
Navotas City.
Coastal Sea Barrier through the northern
part of Manila Bay covering the coastal areas
of Bulacan, Pampanga and Bataan.
Project Cost: P399.66 B ($7,995.28 M)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
88.85-km expressway from Tarlac City to
Rosario, La Union.
Will reduce travel time between Tarlac City
and Rosario, La Union from 3.5 hours to 1
hour.
Will benefit 20,000 travelers per day.
Project Cost: P24.42 B ($488.53 M)
Schedule: 2010-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
30 km –four lane expressway from Tarlac City
to Cabanatuan City, Nueva Ecija.
Will reduce travel time between Tarlac City
and Cabanatuan City from 70 minutes to 20
minutes.
Will benefit 11,200 motorists per day.
Decongest traffic by about 48% passing thru
Daang Maharlika
Project Cost: P14.94 B ($298.88 M)
Schedule: 2016-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
44.2 km – four lane expressway with 8
interchanges and 12,207 lm bridges
(inclusive of 4,618 lm viaduct)
Will connect CAVITEX in Kawit, Cavite
and SLEX-Mamplasan interchange in
Biñan, Laguna.
Will reduce travel time between CAVITEX
and SLEX from 1.5 hours to 45 minutes
Project Cost: P35.68 B ($713.79 M)
Schedule: 2017-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
56.87 km – 4 lane expressway extension from
Sto. Tomas, Batangas to Tayabas / Lucena,
Quezon
Will facilitate faster and safer travel to Laguna,
Batangas, Quezon and Bicol Region.
Will reduce travel time from Sto. Tomas,
Batangas to Lucena, Quezon from 4 hrs to 1
hour.
Will benefit 17,000 travelers per day
Project Cost: P13.10 B ($262.07 M)
Schedule: 2017-2021
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
180 kilometer expressway that will start
about two (2) kilometers from the end of
the proposed TR-4 project and will end
before the start of the proposed
Camarines Sur Expressway.
To provide a direct and fast route
between both provinces, the trade of
goods will also prosper not only between
Quezon and Bicol but also in the
Northern part of Luzon because travel
time for trucks will be reduced.
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Four (4) lane divided underpass along Senator
Gil Puyat Avenue passing through the Makati
Avenue and Paseo de Roxas intersections.
Underpass/Covered tunnel-570m; approaches
and At-grade Transition-310m (Length = 880 m)
It will relieve traffic congestion along EDSA,
Kalayaan Ave and Osmena Highway in Makati
City and nearby C-5 Road, Pres Quirino Ave and
Roxas Boulevard.
Project Cost: P1.01 B ($20.21 M)
Schedule: 2015-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Four (4) lane 2nd level flyover along Gov.
Forbes St. from Alcantara St. crossing Fajardo
St., Loyola St., Espana Blvd., and Laong Laan
St. and down ramp at mid-point of Maria Clara
St. and Aragon St. in the City of Manila.
It also involves the construction of a 433 lm
down ramp along Dimasalang St. and road
improvement along Espana Blvd. (1,600 m)
The project will benefit from the reduction of
intersection delays using at-grade controlled C-
2/R-7 intersection.
Project Cost: P2.30B ($46.01 M)
Schedule: 2018-2019
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
EDSA/North Ave.-West Ave. Interchange
North Ave.-Mindanao Ave. Interchange
C-5/Greenmeadows / Acropolis / Calle
Industria Interchange
EDSA/Roosevelt-Congressional Avenue
Interchange
Project Cost: P4.02 B ($80.42 M)
Schedule: 2017-2019
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Sta. Monica-Lawton Bridge:
614 m - 4 lane bridge across Pasig River
connecting Lawton Ave. in Makati City and
Sta. Monica St. in Pasig City.
Lawton Ave.-Global City Viaduct:
337 m – 4 lane viaduct structure traversing
Lawton Avenue onwards to the entrance of
Bonifacio Global City in Makati City.
Will decongest traffic from EDSA and C-5
particularly along the section of Guadalupe
Bridge and Bagong Ilog Bridge respectively.
Project Cost: P1.95 B ($39.01 M)
Schedule: 2017-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Bridges crossing Pasig River (6)
•North and South Habor Bridge
•Binondo-Intramuros Bridge
•2nd Ayala Bridge (Carlos Palanca-San Marcelino)
•Beata-F.Y. Manalo Bridge (Pandacan-Sta. Ana)
•F. Blumentritt-Antipolo Bridge
•Estrella-Pantaleon Bridge
Bridges crossing Marikina River (4)
•Kabayani-Katipunan Bridge
•Reposo-Guatemala Bridge
•J.P. Rizal-Yale Bridge
•G. Gabriel St.-Mercury Ave. Bridge
Bridges crossing Manggahan Floodway (2)
•East Bank-West Bank Bridge 1
•East Bank-West Bank Bridge 2
Project Cost: P18.98 B ($379.70 M)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Construction of a 4-lane 3rd Level Flyover at
the intersection of EDSA and Taft Ave.
It starts between F.B. Harrison and Roxas
Blvd. and ends from near approach of Tramo
left turning flyover on EDSA. 1,696 m
(Northbound), 1,046 m (Southbound).
Travel time will be reduced by half to cross the
intersection.
Project Cost: P2.70 B ($54.01 M)
DPWH has put the project on hold to give way
to the construction of NAIA Expressway Phase
II.
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
1,844 m - 4 lane viaduct along C-5/Katipunan
Avenue, Quezon City
Travel time in Katipunan and CP Garcia will
be reduced by 80%.
Will mitigate vehicle congestion in the C-
5/Katipunan areas since the viaduct will cater
all the thru traffic skipping the choke points
along the Ateneo and Miriam schools, and the
intersection of CP Garcia Avenue, as well as
UP Town Center.
Project Cost: P2.96 B ($59.22 M)
Schedule: 2017-2019
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
9.96-km bypass road including 4 bridges, drainage
facilities, and slope stabilization works.
Traverses the municipalities of Balagtas, Guiguinto,
Plaridel, Bustos and San Rafael in Bulacan and
connects NLEX in Balagtas, Bulacan with Maharlika
Highway in San Rafael, Bulacan.
Will reduce average travel time between Burol,
Balagtas and Maasim, San Rafael in Bulacan from 69
minutes to 24 minutes.
Will benefit 15,132 motorists per day.
Project Cost: P3.34 B ($66.82 M)
Schedule: 2014-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
South Section (Road) and Center Section (Tunnel)
JICA PH-P261- P 14.23 B
Road: 28.8 km
Tunnel: 2.28 km
Improvement of existing two connector (local)
roads: 10.20 km
North Section (Road) - P5.58 B
Road: 15.78 km
Will reduce travel time from 1 hour and 44 minutes
via Pan-Philippine Highway and Diversion Road to 49
minutes via Davao By –pass road.
Project Cost: P19.81 B ($396.30)
Schedule: 2018-2022
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Integrated and Seamless Transport System (Inter-Island Linkage Projects)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Construction of a bridge across Panguil Bay
connecting the City of Tangub in Misamis
Occidental and Municipality of Tubod in
Lanao del Norte.
Center span (main bridge): 320 meters
Approach viaduct: 2,040 meters
Approach roads: Tubod-856 meters; Tangub
City -260 meters
Project Cost: P4.86 B ($97.22 M)
Schedule: 2017-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Construction of 23 km long bridges linking the
Visayas islands of Panay, Guimaras and Negros.
Estimated Project Cost: P21.67B ($433.51 M)
Project Duration: Six Years
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Construct/improve logistics infrastructure
network in Northern Mindanao, Davao,
SOCSARGEN and CARAGA (Length-2,074 km)
Aims to enhance the agribusiness
competitiveness in Mindanao by developing an
intermodal logistics system that will address
the constraints caused by high cost of transport
and inadequate logistics infrastructure, among
others.
Project Cost: P80.41 B ($1.61 B)
Schedule: 2015-2018
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program)
Name of Project Php’B $’M
Pasig-Marikina River Improvement and Dam Construction
198.44 3,969.83
Meycauayan River Improvement 14.04 280.87
Malabon-Tullahan River Improvement 21.64 432.91
South Parañaque-Las Piñas River Improvement
17.34 346.89
East Mangahan Floodway (Cainta & Taytay River Improvement)
25.90 518.13
West Laguna Lakeshore Land Raising 25.19 503.93
Land Raising for Small Cities around Laguna Lakeshore
7.16 143.24
Improvement of the Inflow Rivers to Laguna Lake
0.64 12.80
Manila Core Area Drainage Improvement 27.26 545.34
West Mangahan Area Drainage Improvement
5.52 110.43
Valenzuela-Obando-Meycauayan (VOM) Improvement
8.61 172.24
Total Estimated Requirement: P351.7 B $7,036.6M
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Channel improvement works consisting of revetments,
parapet walls, riverbank excavation, dredging works,
dike embankment, drainage improvement, sluice
structures, bridge foundation protection at remaining
sections of Pasig River and priority critical sections of
Lower Marikina River.
Will decrease flood inundation by 18%.
Will reduce flood damages by P14.3 billion.
Will reduce affected population by 0.2 million.
Project Cost: P7.55 B ($151.04 M)
Schedule: 2014-2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Modernization of Drainage Areas.
Minimizing Solid Waste in Waterways.
Participatory Housing and Resettlement .
Project management, support, and coordination.
Project Development Objective is to reduce flood
risks in flood-prone areas of Metro Manila that
are served by targeted pumping stations.
Approximately 2 million beneficiaries.
Project Cost: P23.47 B ($469.52 M)
Schedule: 2018 - 2023
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Cagayan River:
Revetment structures for the most eroded river banks
located at Brgy. Alibago and Cataggaman, Tuguegarao City
to address serious bank erosion resulting to loss of valuable
lands in the targeted areas of Tuguegarao City and parts of
Cagayan Province.
Tagoloan River:
Construction of river dikes and partial excavation of river
channel together with drainage channel improvement.
Imus River:
Construction of two (2) off-site retarding basins along Imus
River and Bacoor River located in Brgy. Buhay na Tubig and
Brgy. Anabu.
Project Cost: P6.18 B ($123.63 M)
Schedule: 2016-2019
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Earth dike: 11,928 meters (left and right bank);
Concrete Flood Wall: 3,259 meters (left and right bank)
including 1,449 meters reinforced concrete/masonry slope
protection;
Gates and Drainage Outlets: 3 steel slide gates; 19 flap gates;
3 reinforced concrete box culverts; 18 reinforced pipe culverts;
and 1 reinforced concrete headwall;
Retarding basins: preserved 97 hectares of natural retarding
basin; developed 13 hectares of natural retarding basin;
New Road and Raising of Existing Road for Evacuation:
2,756 m;
Improved Kagayan Bridge
Project Cost: P8.55 B ($171.04 M)
Schedule: 2018-2022
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Excavating and dredging of 30.30 km. – Third River
and Eastern Branch
Improving the flow of 23.0 km – Caduang Tete River
and Sapang Maragul River
Repair of Eight (8) sluice gates
Will lessen the area affected by flooding from 4,150
hectares (ha) to 23,780 ha;
Will reduce flood depth from 1.4-2.9 m to 0.6-1.4 m;
Will shorten flood duration from 66 days to 17 days.
Project Cost: P4.22 B ($84.42 M)
Schedule: 2017-2020
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Livable, Sustainable and Resilient
Communities
(Disaster Risk Reduction and Climate Change
Adaptation Program)
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
The rehabilitation of super structure of Quezon
Bridge, along Quezon Boulevard Extension has
major scope of work underneath the steel bridge
which involved sand blasting, replacement of fire
damaged structural components and painting of
structural steel members, installation of carbon
fiber.
The scope on the bridge proper are asphalt
overlay, application of epoxy on deck slab, repair
of steel railings & lamp post and repair & painting
of pylons including parapet walls/center island.
Project Cost: P 77.83 M ($1.56 M)
Schedule: March 2016-February 2017
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Replacement of outer bridges amd
replacement of substructure
including foundation of inner bridge
of Guadalupe Bridge.
Replacement of Lambingan Bridge
with vertical geometry improvement
of both sides approach road.
Project Cost: P4.29 B ($85.82 M)
Schedule: 2019-2022
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
Target Infrastructure Spending: 7% of GDP
Improve expenditure performance• Organize Infrastructure Monitoring and Advisory Group (IMAG).
• Create a multi-media citizens feedback mechanism including 24/7 Secretary’s hotline.
• Expedite ROW resolution based on new ROW Law.
• Streamline procurement process based on New Procurement Manual.
• Institutionalize 24/7 operations.
• Update and expand coverage of masterplans on road network system and flood & drainage system.
• Initiate studies on tunneling technology.
• Fast-track project implementation thru new construction methodology such as one-day curing of
concrete pavement.
• Augment infrastructure spending thru Public-Private Partnership (PPP) projects.
DPWH will continue and pursue investments in:• Traffic decongestion programs/projects (expressways, diversion roads, by-passes, flyovers,
interchanges and underpasses).
• Logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA.
• Access roads leading to growth corridors in Western Mindanao.
• Inter-Island Linkage projects through long-span bridges.
• Access roads leading tourism destinations, RORO ports/seaports and airports.
• Roads leading to industrial trade corridors.
• Disaster risk reduction and climate change adaptation & mitigation programs/projects.
• Infrastructure support for marginalized sector.
• Bike lanes and pedestrian infrastructure.
Institutionalization of reforms on anti-corruption program.
Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved
THANK YOU ! ! !