Transcript

The glass of this live fish “waterpool” required cleaningonce a month. After 6 months with ENEFLOW PowerCells, the glass and the water remain crystal clear, andthe fish are healthier and living longer.

ENEFLOW5000’s (3 pairs)installed on thiscooling waterpipe haveprevented anyscalingproblems.

Mineral scale problems have been eliminated with theinstallation of

on this 20 inch diameter cooling water pipe.10 pairs of ENEFLOW 5000 Power

Cells

The muddy waste water carried by this pipe meantpressure cleaning 2 or 3 times per year. The system hasbeen cleaned since installing PowerCells.

only once in 2 years

Copyright © 2002 by ENECON®Corporation EF-003_ENEFLOW_Grows_with_the_Flow_in_Japan.pdf

JAPAN’S TOEI GIKOCONTINUES TO GROW

WITH THE FLOW

Ed Krensel, (center) with Kazuo Azuma,(right)President of TOEI GIKO - surveying the market in Japan.

EF-003

ENECON Ibérica · C/ St. Gervasi de Cassoles, 96-98 entlo. 3ª · 08022 Barcelona·Telf: 93 211.15.30 · Fax: 93.253.11.31

Website: www.proenecon.com · Email: [email protected]

Recommended