Job Element Sheet

Process: Cheesecake Bake – Depanning SetupAuthor: Andreana Crance, RIT MSDDate/Revision: 2/14/10, Rev 0

Labor Requirements: Supervisor Contact Information:

Paul Adams:• 2 employees: depanning• 1 employee: loading bread baskets

Page 2: Labor Requirements:

2

Job Element Sheet

New Depanning Area

Current Depanning Area

Conveyor Path Used

Cheesecake Depanning Layout

Page 3: Labor Requirements:

3

Job Element Sheet Cheesecake Depanning Layout

Water Spider

Empty Pan Rack

Work Table

Conveyor

Depanning Worker

Stack of “Bread Baskets”

Page 4: Labor Requirements:

4

Job Element Sheet Job Element Sheet

Process: Cheesecake Bake – Depanning SetupAuthor: Andreana Crance, RIT MSDDate/Revision: 2/14/10, Rev 0

1. Connect U-conveyor at tunnel oven end

- At current state, wheel water receptacle to unload to pour out water

2. Set oven at correct oven speed(Contact Night Supervisor)

Page 5: Labor Requirements:

5

Job Element Sheet Job Element Sheet

Process: Cheesecake Bake – Depanning SetupAuthor: Andreana Crance, RIT MSDDate/Revision: 2/14/10, Rev 0

At Proposed Depanning Station:3. Angle blue conveyor to fit a station on both sides

4. Set up station on both sides of blue conveyor as shown below and in the drawing on the previous page

Station 1

Station 2

Conveyor

Page 6: Labor Requirements:

6

Job Element Sheet Job Element Sheet

Process: Cheesecake Bake – Depanning SetupAuthor: Andreana Crance, RIT MSDDate/Revision: 2/14/10, Rev 0

5. On each station (set-up similar to current process)– Foam holders– Bread baskets


Recommended