Transcript
Page 1: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Ljt designs

1995 Complete Home Remodel

transformed 8’ ceilings into cathedral ceilings

removed walls to create open concept

replaced doors, millwork, gutted 2 bathrooms and

enlarged master bath by utilizing a second pantry in

the kitchen, replaced floors, lighting, replaced

garage door, front door, etc.

Page 2: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

1995

Interior remodel

for my mother and father in-law

Page 3: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Patio doors off kitchen lead to patio

Page 4: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

A row of bushes was added for privacy

Page 5: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

View upon entering

front door

new polished travertine

marble set at an angle

hallway leads to

full bath on left;

bedrooms 2 and 3

on right;

and master bedroom and

bath in the rear

Page 6: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Before: 8’ ceilings – dining room completely walled in with 3’ openings

from the foyer and by the laundry room/garage entry door shown

Page 7: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Before: living room was walled in with a 4’ opening and 8’ ceiling

after: Arched openings with pillars were added in living and dining rooms

ceilings were vaulted and new front door added

Page 8: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Living room

Page 9: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET
Page 10: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Dining room

Page 11: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Kitchen

Wood floors

replaced linoleum

Page 12: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

cabinets were painted; new hardware and countertops installed

Page 13: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

opening from kitchen sink to family room was enlarged

decorative shelving added above cabinets

Page 14: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

8’ Ceiling was opened

and vaulted and

skylight added

Page 15: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Family room: Vaulted ceiling; added ceiling fan; carpeted

Page 16: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Hall bath

new vanity, sink,

faucets, travertine

tile, custom large

mirror with beveled

edge and inset

sconces

Page 17: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

bedroom #2/office; Double french doors; mirrored closet doors

Page 18: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Bedroom #3

Page 19: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Partial view of master bedroom

Page 20: LJT DESIGNS - 1995 COMPLETE HOME REMODEL ON A TIGHT BUDGET

Master bathroom

complete demolish and remodel

before:

only had small shower;

8’ ceiling

after:

new marble tile; vaulted ceiling;

“borrowed” space from one of

two pantries in the kitchen to

expand the bath and relocate

toilet, vanity and new jetted

bathtub