OverviewInertial Profiler in lieu of California ProfilographInertial Profiler Specifications– Certification– Calibration– Acceptance Criteria

IRILocalized RoughnessAnalysis Tools

Incentive/Disincentive

Page 3: LLP HMA Pavements Inertial Profiler

Inertial Profiler in lieu of California Profilograph

California Profilograph utilizes a center wheelInertial Profiler utilizes an accelerometer and laserMeasures at highway speedNo lane closures required

Page 4: LLP HMA Pavements Inertial Profiler

Inertial Profiler SpecificationsEquipment and Operator certification performed by Texas Transportation InstituteIn accordance with AASHTO PP 49-08Local Calibration at the project– 5 Runs– 0.92 correlation

In accordance with AASHTO PP 50-08

Page 5: LLP HMA Pavements Inertial Profiler

Inertial Profiler SpecificationsIndex Acceptance Criteria– International Roughness Index (IRI) in lieu of

Profile Index– Acceptance between 45.1 and 60 in/mi

Bump Acceptance Criteria– Localized Roughness in lieu of bump must

grind– IRI of 140 in/mi within a 25 foot measurement

Page 6: LLP HMA Pavements Inertial Profiler

Inertial Profiler SpecificationsAnalysis Tools– Vendor analysis tool– Proval analysis tool

Provides reports that include data required in the contract

Page 7: LLP HMA Pavements Inertial Profiler

Incentive/DisincentiveMeasurements based on 0.1 mile lotsIncentive is paid for IRI < 45.1 in/miDisincentive pay adjustment for IRI > 60 in/miCorrection required for IRI > 75 in/mi to within the acceptable range


Recommended