1
MANDATORY DISCLOSURE
I. NAME OF THE INSTITUTION
Name J. J. COLLEGE OF ENGINEERING & TECHNOLOGY
AddressAmmapettai, Poolankulathupatti (Post), Sri Rangam Taluk,Tiruchirappalli - 620 009.
Permanent Location (as approved by AICTE)
Village Ammapettai, Poolankulathupatti (PO)
Taluk Srirangam
District Tiruchirappalli
Pin Code 620 009
State Tamil Nadu
STD Code 0431 Phone No: 2695606 /2695609
Fax No. 0431 – 269 5605 E-Mail: [email protected]
Web site w w w . j j c e t . a c . i n
Nearest Railway Station Tiruchirappalli Junction Distance in Kms: 16 km
Nearest Airport Tiruchirappalli Airport Distance in Km: 25 km
II. NAME & ADDRESS OF THE PRINCIPAL
Name Dr. S.Sathiyamoorthy
Designation Principal
Qualification &Experience :
HighestDegree
Specialization TotalExperience
Date of Birth:18-05-1970
Ph.D.Electronics &CommunicationEngg.
18 Yrs ofTeaching,Research &Industry
STD Code 0431 Phone No. (O)269 5620
Fax No. 0431-269 5605
STD Code 0431 Phone No. (R) - Fax No. -
E-Mail [email protected] Mobile No:9443113476
2
III. NAME OF THE AFFILIATING UNIVERSITY
Name Anna University Tiruchirappalli
Address Pudukottai Road, Trichy‐24.
Pin Code620 024. Period of
Affiliation
Up to 2009 – 10
Awaiting result ofaffiliation for 2012 – 13
STD Code 0431 Phone No. 2407946
Fax No. 0431‐2407333 E‐Mail / Website www.tau.org.in
IV. GOVERNING BODY MEMBERS
Sl.No Members of the Board Background Position
1 Mr. K. Ponnusamy, M.Sc., B.L., Advocate Chairman
2 Mrs. V.Priya, MBA, MFM IndustrialistVice Chair‐
person
3 Mr. G. Venketesan Industrialist Secretary
4 Mrs. P. Prabavathy Agriculturist Trustee
5 Mrs. Renuka Jayaraman Agriculturist Trustee
3
Members of Governing council
S. No Name Designation
1.
Prof. K. Ponnusamy, M.Sc.,B.L.Chairman,J.J. Educational, Health and Charitable Trust ,Tiruchirappalli – 620 009.
Chairman
2.
Mrs. Pon. Priya, MBA., MFM.,Vice - Chairperson,J.J. Educational, Helath and Charitable Trust,Tiruchirappalli – 620 009.
Member( Nominee of the Trust)
3.
Mr. G. Venkatesan,Secretary,J.J. Educational, Health and Charitable Trust,Tiruchirappalli – 620 009.
Member( Nominee of the Trust)
4.
Dr. SW. Rajamanoharane, M.Tech., MBA.,Ph.D.,Director-Management studies,J.J. College of Engineering and Technology,Tiruchirappalli – 620 009.
Member(Faculty Nominee of the Trust)
5.
Dr. G. Paulraj, M.E., Ph.D.,HoD/ Production Engineering Department,J.J. College of Engineering and Technology,Tiruchirappalli – 620 009.
Member(Faculty Nominee of the Trust)
6.
Director,Southern Regional Office, AICTE,Nungambakkam,Chennai-600 006.(OR) His nominee
Member(Ex - Officio)
7.
Dr. R. Narayanan,Associate Professor,Dept. of Mechanical Engineering.,Alagappa Chettiar College of Engg.and Technology,Karaikudi – 630 004.
Member( Nominee of the DOTE)
8.
Registrar,Anna University of Technology, Tiruchirappalli,Tiruchirappalli - 620 024.(OR) His nominee
Member(Ex - Officio)
9.
Padmashri. Prof. R.M. Vasagam,Former VC, Anna University, Chennai &Chairman,National Design & Research Forum,Institution of Engineers India,#3, Dr.B.R. Ambedkar Veedhi,Bangalore - 560 001.
Member(Nominee of the Trust - SeniorAcademician)
4
10.
Dr. V. Shanmuganathan, B.E.,M.Sc.,(Engg.),Ph.D.,Director,J.J. Group of Institutions,Tiruchirappalli-620 009.
Member(Nominee of the Trust-Academician)
11.
Dr. K. Seenivasagam,Joint Director (Retd.),Directorate of Collegiate Education,Government of Tamilnadu,Chennai.
Member(Nominee of the Trust-Academician)
12.
Dr. T. Sivasankaran, M.Tech., Ph.D.,Executive Director,J.J. Group of Institutions,Tiruchirappalli-620 009.
Member(Nominee of the TrustAcademician)
13.
Thiru K. Chandrasekaran,Addl. General Manager, BHEL.,(Retd.)No.4, Sakthi Colony, V.O.C. Road,Cantonment,Tiruchirappalli -620 001.
Member(Nominee of the TrustIndustrialist)
14.
Mr. A. Ramasubramanian,General Manager ,Insight Engineering Systems Pvt. Ltd.,Chromepet, Chennai – 600 044.
Member(Nominee of the TrustIndustrialist)
15. AICTE Nominee To be Nominated
16. AICTE Nominee -- do --
17. AICTE Nominee -- do --
18. State Government Nominee -- do --
19. State Government Nominee -- do --
20. State Government Nominee -- do --
21. UGC Nominee -- do --
22.
Dr. S. Sathiyamoorthy, M.E., Ph.D.,Principal,J.J. College of Engineering and Technology,Tiruchirappalli – 620 009.
Principal & Member Secretary(Ex-Officio)
Frequency of the Board Meetings and Academic Advisory Bodyi) Board Trust meetings are held twice in a year.ii) Governing Council meeting was lastly held on 17.06.2012
5
Organizational chart and processes
CHAIRMAN
DIRECTOR FINANCE OFFICER
EXECUTIVEDIRECTOR ADMINISTRATIVE
OFFICER
PRINCIPAL
ACCOUNTANT
VICE PRINCIPAL
DEANS REGISTRARCLERICAL STAFFMEMBERS
HEADS OF THEDEPARTMENTS
STAFF MEMBERSCLERICAL STAFFMEMBERS OFFICE ATTENDERS
TECHNICALASSISTANTS
DTP OPERATORS
SKILLED OFFICE ATTENDERSASSISTANTS
LAB/DEPT. ATTENDERS
6
™ Nature and Extent of involvement of faculty and students inacademic affairs/improvements
ACADEMIC AFFAIRS MONITORING COUNCIL
This council monitors most of the academic activities. It has the following cells to carryout the various activities
1. ACADEMIC PROGRAMME CELL:
This cell makes the academic calendar for the whole year indicating the days ofperiodical
test, opening and closing dates of the semester etc.
2. ATTENDANCE CELL:
The attendances of all the students are collected and entered everyday. Computer
entries are made and monthly reports are prepared. These reports are sent to different
department heads and parents for taking corrective actions.
3. EXAMINATION CELL:
To evaluate the performance of the students regular monthly test / cycle tests
are conducted. Students must take serious note of this and write the test with utmost
care. The Statement of Marks will be sent to the parents. If the performance is not upto
the mark, parents are advised to meet the Head of the Department immediately after the
receipt of the statement of marks from the college. A student, who is found guilty of any
malpractice either in the monthly test or in the University Examinations, will be severely
dealt with.
7
IV. PROGRAMMES
Sl.no Name of the Programmes Approval of AICTE
1
UNDER
GRADUATE
PROGRAMMES
BE Mechanical Engineering Approved
2 BE Electrical and Electronics Engg. Approved
3 BE Electronics and Communication Engg. Approved
4 BE Computer Science and Engineering Approved
5 BE Information Technology Approved
6 BE Electronics and Instrumentation Approved
7 BE Production Engineering Approved
8 BE Civil Engineering Approved
9 BE Aeronautical Engineering Approved
10POST
GRADUATES
PROGRAMMES
ME Computer Science and Engineering Approved
11 ME CAD/CAM Approved
12 ME Power Electronics and Drives Approved
13 ME Applied Electronics Approved
14 ME Thermal Engineering Approved
15 ME Power systems Engineering Approved
16M.E. Control InstrumentationEngineering Approved
17M.E. Structural Engineering andConstruction ( Part‐Time) Engineering
Approved
18M. Tech Information andCommunication
Approved
8
Name of the Programmes Accredited by the AICTE
Sl. No Name of the Programmes Accreditation of AICTE1 BE Electrical & Electronics Engineering Applied for renewal
2 BE Computer Science and Engineering Accredited by NBA for 2 years w.e.f 4.1.2013
3 BE Civil Engineering Accredited by NBA for 2 years w.e.f 4.1.2013
4 BE Mechanical Engineering Accredited by NBA for 2 years w.e.f 4.1.2013
5 B.Tech Information Technology Accredited by NBA for 2 years w.e.f 4.1.2013
6 B.E. Electronics and Instrumentation Accredited by NBA for 2 years w.e.f 4.1.2013
7 B.E. Production Engineering Applied for renewal
8 B.E. Electronics and CommunicationEngineering
Applied for renewal
™ Details of Fees Structures:
Sl. No NameNo. ofSeat
Duration(in years)
Fees(in Rs.)
01 BE Mechanical Engineering 120 4Accredited ‐
Rs.40,000/‐perYear
Non accredited ‐Rs.32,500/‐ per
Year
For managementquota students ‐Rs.62,500/‐ per
Year (from 2008‐2009)
02 BE Electrical and Electronics Engg. 120 4
03 BE Electronics and Communication Engg. 120 404 BE Computer Science and Engineering 120 4
05 BE Information Technology 120 4
06 BE Electronics and Instrumentation 60 4
07 BE Production Engineering 30 4
08 BE Civil Engineering 60 4
09 BE Aeronautical Engineering 60 4
09 ME Computer Science and Engineering 25 2
Rs.22,500/‐ perSemester
10 ME CAD/CAM 18 211 ME Power Electronics &Drives 18 212 ME Applied Electronics 18 213 ME Thermal Engineering 18 2
14 ME Power systems Engineering 18 215 M.E. Control Instrumentation
Engineering18 2
16 M.E. Structural Engineering andConstruction ( Part‐Time) Engineering
18 2
17. M. Tech Information andCommunication
18 2
9
™ PLACEMENT FACILITIES:
Placement section endeavors to provide career planning, employability Enhancement
an d job seeki ng a ssi sta nce to stude n ts . The department of Training and Placement
is headed by
1. Prof. M. Mahendran Training Officer & HOD
2. Prof. Senthil K. Nathan T&P Officer3. Mr. V. Subramani T&P Officer4. Mrs. V. Chithra Trainee Officer5. Mr. J. Thileepan Trainee Officer6. Mr. M. Chandra Mohan Trainee Officer
The department is equipped with all facilities for training the students in various
personality development programmes. Our students are trained in niche UG & PG Technical
Degree Domain. Students are also given guidance on the resume and application
preparations. Some of the Companies, who recruited our students, are:
• INFOSYS• TATA CONSULTANCY SERVICES• CTS• CARITOR INDIA• IFLEX• WIPRO• SLASHSUPPORT• DSRC• UCAL FUEL• SYSCON• SPECTRUM• SPATHIA• SAFE ZONE• RELIANCE COMMUNICATION• VAGUS• ANBAKAM Metals• TRIX• RAMCO SYSTEMS• SAKHI Autos• DELL• CSC• COSMIC Electricals• HARIHARA Alloy• Sree Energy Valves
10
• SKAVA• FOXCONN
• Placement Details
Total number of students placed by the institution through its placement cell (Discipline Wise)
Year Discipline Total No ofstudents Passed out
Total StudentsPlaced throughPlacement Cell
2009‐2010 ECE 123 42CSE 99 48EEE 80 34
MECH 54 1PROD 10 0
IT 70 5EI 13 0Civil 30 0
2010‐2011
ECE 108 71
CSE 113 64EEE 92 47
MECH 53 29PROD 10 04
IT 90 40EI 12 12
Civil 41 19
2011-2012
Aero 58 2ECE 122 73
CSE 114 56
EEE 122 49MECH 101 45PROD 27 19
IT 120 38EI 56 24
Civil 49 9
11
Sl.N Year Name of Company/Industry
Number of Studentsplaced
1. 2009‐2010
SYSCON 17SPECTRUM 62SPATHIA 02SAFE ZONE 02
RELIANCEVAGUS 06ANBAKAM Metals 02TRIX 01RAMCO SYSTEMS 02SAKHI Autos 03DELL 01CSC 02COSMIC Electricals 01HARIHARA Alloy 02Sree Energy Valves 01SKAVA 01FOXCONN 01
SLASH Support 78
SRI VIGNESH POLY 07
CTS 08ACCESS 08
RELIANCE Life 03
ACCENTURE 02
TCS 02
2. 2010-2011
RENAULT NISSAN1
HCL TECH86
BAHWAN CYBERTEK10
IFIN4
VAGUS TECH2
• Provide details of companies or industries, which visited the institute for placementsince the last three years.
o
12
ANBAKAM METALS2
AON HEWITT1
BAJAJ CAPITAL3
CRDC3
CCCL1
CSS55
SUTHERLAND GLOBAL10
URC08
RELIANCE COMMUNICATIONS10
IVRCL10
GLOBAL LOGIC04
EUREKA FORBES01
INDIA INFOLINE40
TALK MEDIA14
MAHINDRA SATYAM03
HCL BSERVE09
SHRIRAM TRANSPORT FINANCE01
SRM01
ASPIRING SYSTEMS01
STC TECH49
MAHINDRA & MAHINDRA01
TURBO ENERGY02
BAJAJ ALLIANZ03
HARIHAR ALLOYS12
INDIA MART08
ADIENT SOLNS.21
13
TVE ISO01
ACOUSTICS09
TESPRO26
KC MILK01
NAVY01
DALKIA INDIA01
CETHAR VESSELS02
2011-2012
HCL TECHNOLOGIES 17
ZEP INFRATECH 28
BAJAJ ALLIANZ 30
AAS TECHNOLOGIES 10
SYNTEL 1
S ACCORD 46
TALK MEDIA 5
BAHWAN CYBERTEK 2
GDI 40
BAJAJ CAPITAL 15
COCA COLA 5
WIPRO 9
IDEA ELAN 2
INDUS TEQSITE 1
CTS 9
HEXAWARE 1
RJP INFOTEK 3
A&T NETWORK SYSTEM 4
ADS 3
14
AUROLAB 2
CONSIM 10
DEXTRASYS TECHNOLOGIESPVT LTD
3
LGB 15
MELSS SYSTEM 8
NTTF 28
PONPURE CHEMICALS 5
SANKOU TECHNOLOGY 10
SUTHERLAND 13
RISHI LAZER 13
INVEST2CARE 5
RELIANCE ADA 5
PANCHAMI MANAGEMENTCONSULTANCY
17
SUTHERLAND GLOBALSERVICES
1
MICROTEK 1
WABCO 1SREENIDHI MANAGEMENTCONSULTANCY SERVICES
8
IBM 2
AURA NETWORK 1
IDENTITIVE TECHNOLOGIES 2
TECLEVER PVT.LTD. 1
247 HEAD HUNTING 9NISSI INFOTECH 1
VV GROUP OF COMPANIES 3
ANJALI OIL 1
ABI 2
SREE ENERGY VALVE 4
15
VII. PROFILE OF DIRECTOR/PRINCIPAL WITH QUALIFICATIONS, TOTAL EXPERIENCE, AGE ANDDURATION OF EMPLOYMENT AT THE INSTITUTE CONCERNED
Name : Dr. S.Sathiyamoorthy
Date of Birth : 18-05-1970
Academic qualifications (with field of
specialization): Ph.D.
M.E.
B.E.
Details of Experience (Academic / Industrial):
Name of Post
/Academic/Industrial
Date Total Period
From To Year Month
J.J. College ofEngineering,Tiruchirappalli.
Principal 05-09-2011Till Date 1 -
J.J. College ofEngineering,Tiruchirappalli
Professor 01-07-2007Till Date 5 -
J.J. College ofEngineering,Tiruchirappalli.
Asst. Professor 01-07-2002 31-06-20075
-
J.J. College ofEngineering,Tiruchirappalli.
Lecturer 05.08.199701-06-2002 5
-
Tamil Nadu MetalIndustries
Electrical Supervisor 06-05-1991 31-04-19921
-
TNEB Apprentice Training 1 -
Date of the appointment in the present institution: 05.08.1997
16
VIII. FEE
Details of fee, as approved by State fee Committee, for the Institution.
UNDERGRADUATE : Accredited Rs.40, 000/‐ per Year
Non‐Accredited Rs.32, 500/‐ per Year
For management quota students ‐Rs.62,500/‐ perYear
(from2008‐200
9)
POST GRADUATE : ME Rs.22500/‐ per Semester
• Time schedule for payment of fee for the entire programme ‐ 15th June ofEvery Year
• No. of Fee waivers granted with amount and name of students ‐ 40
• Number of scholarship offered by the institute, duration and amount ‐ NIL• Criteria for fee waivers/scholarship ‐ Poor
Students
Estimated cost of boarding and Lodging in Hostels.
Common Room : Rs. 10,000/‐ per year
Double Room with attached batch : Rs 16,000/‐ per year
Double Room without attached batch : Rs 13,000/‐ per year
Mess Bill : 22,000 per year
17
™ Number of seats sanctioned with the year of approval.Sl. No Branch Seats Year
1 Mech 120 1994‐19952 EEE 120 1994‐19953 ECE 120 1996‐19974 CSE 120 1994‐19955 IT 120 1998‐19996 EI 60 1998‐19997 Prod 60 1999‐20008 Civil 60 2004‐20059 Aeronautical 60 2007‐200810 ME‐CSE 25 2003‐200411 ME‐CADCAM 18 2004‐200512 ME‐PED 18 2004‐200513 ME‐AE 18 2004‐200514 ME-Thermal 18 2010-201115 ME-PS 18 2010-201116 ME-C&I 18 2010-201117 M.E. Structural Engg &
Construction ( PT)Engineering
18 2011-2012
18 M. Tech Information andCommunication
18 2011-2012
™ Number of students admitted under various categories each year in the last three years.Branch 2009-2010 2010-2011 2011-2012
Mech 117 118 119EEE 115 113 115ECE 118 115 113CSE 97 116 113
IT 75 111 111EI 51 58 52
Prod 27 28 35Civil 57 59 57
Aeronautical 55 55 54ME-CSE 28 27 28
ME-CAD/CAM 20 11 17ME-PED 20 20 20ME- AE 20 20 20ME-Thermal - 02 17ME-PS - 18 20M.E C&I - - 19
18
ADMISSION PROCEDURE
™ Mention the admission test being followed, name and address of the Test Agency
and its URL (website).
i. Admissions are made for 65% Govt. Quota. Selection is made under
single windows system by Anna University, Chennai
Secretary, Tamil Nadu Engg. Admission Sardar Patel Road, Guindy, Chennai‐25.
www.annauniv.edu
ii. 35% of seats are filled under management quota. Tests are conducted by
Association of Engineering colleges.
Consortium of self‐financing, Professional Arts and Science colleges in Tamilnadu
29/12 Ganapathy Street, Rayapet,
Chennai‐600014 www.tnsfconstrium.org
Number of seats allotted to different Test Qualified candidates separately[AIEEE/CET
(State conducted test/University tests)/Association conducted
test] State Conduct test ‐ 65% seats
Association Conduct test ‐ 35% seats
Calendar for admission against management/vacant seats:
Last date for request of applications 20th June
Last date for submission of application 20th July
Dates for announcing final results 10th August
Release of admission list 10th August
Date for acceptance by the candidate 15th August
Last date for closing of admission 25th August
Starting of the Academic session 1st September
Policy of refundRefunded
(Clearly notified, in case of withdrawal)(Dates will be changed as per Government announcement)
19
XI. CRITERIA AND WEIGHTAGES FOR ADMISSION
™ Describe each criteria with its respective weightages i.e., Admission
Test, marks in qualifying examination etc.
Aggregate of Qualifying Exam and Marks in CET
Marks in qualifying examination 200
Mention the minimum level of acceptance, if any.
QUALIFYING EXAM
Sl.No Candidates Level of Acceptance
1 OC 55%
2 BC 50%
3 MBC 45%
4 SC/ST Minimum pass
Mention the cut‐off levels of percentage & percentile scores of thecandidates in the admission test for the last three years.
Sl.No Branch
AcademicYear
OC BC(M) BC MBC SC
Max.Rank
Max.Rank
Max.Rank
Min.cut‐off
Max.Rank
Min.cut‐off
Max.Rank
Min.cut‐off
Max.Rank
Min.cut‐off
1. CSE 2011 ‐ 2012 174.50 173.00 179.50
156.50 181.50 160.25 175.00 152.25 108.50 168.50
2. MECH 2011 ‐ 2012 181.00 - 178.00
176.75 187.50174.00 185.50 170.75 193.16 148.75
3. EEE 2011 ‐ 2012 176.00 165.50 165.25
149.00 182.75 157.25 170.50 152.25 150.75 85.50
4. ECE 2011 ‐ 2012 180.75 179.75 174.2 128.75 186.50 175.00 192.3 169.00 150.75 146.25
5. IT 2011 ‐ 2012 165.00 161.25 156.25
122.75 176.50 153.00 151.50 141.25 134.25 91.75
6. EI 2011 ‐ 2012 156.75 - 145.7 133.25 161.83 143.25 169.75 85.50 151.50 96.50
7. Prod. 2011 ‐ 2012 - - 106.5 100.05 150.50 116.50 152.091 91.00 - -
8. Aero 2011 ‐ 2012 176.75 161.000 158.0 110.25 165.00 1387 163.00 130.25 167.00 118.00
9. Civil 2011 ‐ 2012 - - 164.5 - 176.00 166.75 185.50 164.75 155.00 136.00
• Display marks scored in Test etc. and in aggregate for all candidates whowere admitted.
20
XII. APPLICATION FORM
• Downloadable application form, www.jjcet.ac.in
XIII. LIST OF APPLICANTS
List of candidates whose applications have been received along withpercentile/percentage score for each of the qualifying examination in separatecategories for open seats. List of candidates who have applied along with percentage andpercentile score for Management quota seats.
ADMISSION UNDER PROCESSING
21
XIV. RESULTS OF ADMISSION UNDER MANAGEMENT SEATS/VACANT SEATS
Sl.No
Selection Process
1Committee Members of the selection team forAdmission
ChairmanPrincipalFinance officer
2 Selection ProcessScore of the individualcandidates admitted arrangedin order of merit
3 List of Candidates Admission under process
4Waiting List of the candidates in order of merit tobe operative from the last date of joining of thefirst list candidates
Admission under process
5List of the candidates who joined within the date,vacancy position in each category beforeoperation of waiting list
Admission under process
XV. INFORMATION ON INFRASTRUCTURE AND OTHER RESOURCESAVAILABLE
LIBRARY:
¾ Number of Library books/Titles/Journals available (programme‐wise)
¾ List of online National/International Journals subscribed.
¾ E‐Library facilities
Library for the Existing Programme.
S. No. Particulars Availability
1. No. of Titles of the books (*) 12286
2. No. of Volumes of the books (*) 37540
3. No. of JournalsNational 91
International 505 (E-Journal)
4. Seating Capacity Ground Floor : 120 + First Floor 60
5. Reprographic Facility Xerox Available
22
3. Details of the Library facilities
S.NO Course(s)
Number of titlesof the books Number of volumes Number of Journals
Required Available Required Available National InternationalRequired Available Required Available
01. CSE & IT 3668 7430 08 40
02. E.E.E & E&I 905 7298 07 42
03. ECE 1680 5852 05 23
04. MECH. & PRODN. 2114 6615 15 93
05. CIVIL 316 1745 10 10
06. AERONAUTICAL 181 431 04 -
07. GENERAL 590 740 05 157
08. PHYSICS 569 1440 06 18
09. CHEMISTRY 400 971 07 19
10. MATHS 1292 3018 05 73
11. ENGLISH 521 1026 - -
12 M.E. (PE&D) 74 225 05 -
13. M.E (AE) 93 250 02 -
14. M.E. (CAD/CAM) 112 252 07 10
15. M.E. (CSE) 71 247 05 10
23
LABORATORY DETAILS
Department : Production
Name of the Lab : Mechatronics Lab
List of Major Equipments (More than Rs.30, 000)
SI.NO EQUIPMENTS NAME COSTS
1 LSM Controller 6,24,624.002 Basic pneumatics 1,62,483.003 Electro pneumatics 1,56,895.00
4 Electro pneumatics with PLC 62,386.005 Pneumatic cut model 61,175.00
6 Fluid SIM3-P1 33,000.007 Hydrosim software 53,040.00
8 Servo controller using closed/open loop system 1,06,250.009 PID Controller Trainer 2,7,408.00
Name of the Lab : Metallurgy LabS.No Name of the Equipment Costs1. Ultrasonic flow Detector 87,500.002. Universal Sand Strength testing machine digital type 40,000.003. Image analyzing system 1,63,800.00
Name of the Lab : Metrology LabS.No Name of the Equipment Cost
1. Auto Colli meter 70,000.002. Profile Projector 50,000.003. Pneumatic comparator with compressor 42,000.004. Floating carriage micrometer 82,000.005. Tool makers microscope 38,000.006. Portable surface roughness tester 86,277.007. 3D Co‐ordinate measuring machine manually operated 6,26,292.008. Electrical comparator 36,000.00
24
Department : EEE
Name of the Lab :Simulation Lab
List of major Equipments(mare than Rs.30,000)
S.No Name of the Equipment Cost
1. Computer 50 Nos 9,50,000.00
2. Server 1-No 85,000.00
3. Ups 2-Nos. 2,24,000.00
4. P-SPICE 9.2 1-USER 48,204.00
5. P-SPICE 10.3 3-USER 2,50,080.00
6. AU power 25-USERS 75,600.00
7. P SIM 5-USER 2,54,144.00
8. Structure Cabling (LAN) 96,000.00
Name of the Lab : Electrical machines Lab
S.No Name of the Equipment Cost
1. DC Power Rectifier 86,000.00
2. DC Panel Board 35,910.00
3. C.T Testing Equipment 46,800.00
4. A.C Distribution Panel 25,350.00
5. D.C Shunt Motor 24,000.00
6. D.C Series Motor 24,500.00
7. D.C Compound Motor 24,500.00
8. Synchronous Motor 23,000.00
9. Slip Ring Induction Motor 23,000.00
10. Synchronous Motor 29,970.00
25
11. D.C Shunt Motor(BENLEC) 30,630.00
12. D.C Compound Motor(BENLEC) 30,630.00
Name of the Lab :Control and Instrumentation Lab
S.No Name of the Equipment Cost
1. AC Servo Motor position Controller Kit 29,000.00
2. Transfer Function of DC Servo Motor 41,376.00
3. 3 Phase Rotary Sub Standard (RSS)Motor 1,39,500.00
4. Digital Storage Oscilloscope(DSO) 2-Nos 2,46,400.00
5. Phase Shifting Transformer 21,600.00
6. Cathode Ray Oscilloscope 22,600.00
7. Speed Control of DC Shunt Motor using 8085microprocessor kit
29,200.00
8. Speed Control of AC Motor using 8085 microprocessor kit 31,670.00
9. Speed Control of Servo Motor using 8085 microprocessorkit
31,130.00
Name of the Lab : Power Electronics Lab
S.No Name of the Equipment Cost
1. 3 Phase Fully Controlled Converter(415V,5A) 48,600.00
2. 3 Phase Fully Controlled Converter 35,000.00
3. IGBT Based PWM 1 phase Inverter 29,500.00
4. Closed loop[ Speed Control of DC Motor usingmicroprocessor
26,150.00
5. IGBT Based PWM 3 phase Inverter 2-Nos 64,800.00
6. Microprocessor Basesd 3 Phase Full Converter 2-Nos 70,000.00
26
7. IGBT Based 3 pahse Inverter speed Controller for ACInduction Motor
38,900.00
8. 3 Phase Fully Controlled Bridge Converter 48,600.00
9. Speed Control of DC shunt Motor using 3 Phase FullyControlled Converter
26,570.00
10. PWM Inverter Based AC Induction Motor SpeedController
38,900.00
11. Single Phase cyclo Converter 29,900.00
12. 3 Phase AC Voltage Regulator Using Thyristors 36,900.00
13. DC Regulated Power Supply 29,900.00
14. Thyristor Based DC Motor Speed Controller 32,700.00
Department : Mechanical EngineeringName of the lab : Fluid Machine lab
S.No Name of the equipment Cost1 Pelton wheel turbine 1,18,800.00
2 Francis turbine 1,13,400.00
3 Kaplan Turbine 2,00,200.00
4 Open circuit wind tunnel 1,77,450.00
Name of the lab : Metallurgy labS.No Name of the equipment Cost
1 Ultrasonic flow detector 87,500.00
2Universal Sand strength testing machinedigital type 40,000.00
3 Image analyzing system 1,63.800.00
27
Name of the lab : Metrology labS.No Name of the equipment Cost
1 Auto collimator 70,000.00
2 Profile projector 50,000.00
3 Pneumatic comparator with compressor 42,000.00
4 Floating carriage micrometer 82,000.00
5 Tool makers microscope 38,000.00
6 Portable surface roughness tester 86,277.00
7 3D coordinater measuring machine manually operated 6,26,292.00
8 Precision angle dekkor opt iregion 36,000.00
9 Electrical comparator 36,000.00
Name of the lab : Thermal labS.No Name of the equipment Cost1 Four cylinder petrol engine with electrical
dynamometer80,000.00
2 Single cylinder diesel engine with belt brakedynamometer
40,000.00
3 Twin cylinder diesel engine with electricaldynamometer
89,000.00
4 Single cylinder diesel engine with belt brakedynamometer
52,000.00
5 Single cylinder petrol engine with belt brakedynamometer
35,000.00
6 Single cylinder petrol engine with electricaldynamometer
40,000.00
7 Reciprocating air compressor 44,000.00
8 Air blower 42,000.00
9 Steam boiler with steam turbine 9,06,048.00
28
Name of the lab : Heat & Mass transfer labS.No Name of the equipment Cost1 Natural –cum ‐ forced convection apparatus 34,750
2 Pin‐fin apparatus 29,500
3 Refrigeration test rig 49,500
4 Air conditioning test 89,000
Name of the lab : Automobile labS.No Name of the equipment Cost1 Jeep mahindra simalindra 4 wd vehicle
classis55,000.00
Name of the lab : Mechatronics labS.No Name of the equipment Cost1 LSM Controller 6,24,624.00
2 Basic pneumatics TP 101 1,62,483.00
3 Electro pneumatics 1,56,895.00
4 Electro pneumatics 62,386.00
5 Pneumatic cut away models 61,175.00
6 Fluid SIM 3 –PI 33,000.00
Name of the lab : Strength of Material LabS.No Name of the equipment Cost1 Electronic Universal Testing Machine 3,11,068/‐
2 Torsion Testing Machine 90,695/‐
3 Tensile Testing Machine 58,893/‐
4 Compression Testing Machine 1,86,920/‐
5 Vickers hardness 89,968/‐
29
Name of the lab : Special Machine LabS.No Name of the equipment Cost
1 Centre lathepl‐4 lathe (4 Nos) 2,09,200/‐2 Champion lathe machine (3 Nos) 1,86,000/‐3 Centre lathe (3 Nos) 1,79,700/‐4 Contre lathe (5 Nos) 2,62,000/‐5 Capstan lathe 1,10,000/‐6 Shaping m/c 65,000/‐7 Shaping m/c 56,000/‐8 Shaping m/c 65,000/‐9 Universal milling machine 2,96,000/‐
10 Cylindrical grinding machine 1,32,542/‐11 Surface grinding m/c 79,300/‐12 Tool and cutter grinding m/c 56,400/‐13 Universal radial drilling m/c 79,300/‐
Department : Information Technology
Name of the Lab : IT LabList of Major Equipments (More than Rs.30, 000)
S.No Name of the Equipment Cost1. HCL Intel Core 2 Duo 70,000/‐2. HP Workstation 72,596/‐3. HP COMPAQ PIV( 65 Numbers) 16,27,633/‐4. 11 KVA UPS 1,07,000/‐5. 10 KVA online UPS 1,40,000/‐
ABACUS (FIRST YEAR LAB)S.No Name of the Equipment Cost
1. Pentium IV (140Numbers) 35,00,000/‐2. 20 KVA online UPS 4,53,215/‐3. Dot Matrix Epson LQ 1050+ 17,900/‐4. TVSE 345 MSP Champion Dot Matrix Printer 27,000/‐
30
Department : Electronics and Communication Engg.Name of the Lab : ECE List of Major Equipments (More than Rs.30, 000)
S.No Name of the Equipment CostSYSTEM DESIGN LAB
1. C –51 Keil Software 1,50,000.00MICROWAVE LAB
1. J Band Test Bench 90,780.002. X Band Test Bench 72,268,003. Gunn Bench 77,526.004 Storage Oscilloscope (Monochromes) 82,000.005. Storage Oscilloscope (color) 1,09,202.006. Microwave power meter 73,8407. Thermistor mount with coaxial cable detector mount 1,85,000
8. UPS 40,000.00FIBER OPTICS LAB
1. Optical Test Bench I 1,15,798.002. Optical Test Bench II 1,02,000.003. Optical Test Bench III 53,040,004. Splicing kit 1,35,878.005. Fiber Link –E Trainer kit 76,860.006. Fiber optic instruments & Accessories 1,53,7207. Connectorization(including splice) 66,5508. Advanced photo diode 32,660
ELECTRONICS LAB1. Multisim Educational version Software 1,30,500.002. Ultiboard Educational version software 40,320.00
COMMUNICATION LAB1. Spectrum Analyzer 1,56,000.002. 100 Mhz CRO 73,500.003. 100 Mhz CRO 67,410.004. Antenna system 2,43,2835. Advance analog communication trainer kit 96,624.006. PLL and application Kit 93,879.007. Antenna Training System 1,40,000.008. RF Circuit Trainer 50,000.00
31
DIGITAL SIGNAL PROCESSING LAB1. MATLAB 5.3 Version 2,17,689.002. LAN Trainer N/W Kit old and New 1,43,997.00
3. UPS (10 KVA) 1,74,000.00LIC LAB
1. VLSI Design software – XILINX 60,000.002 Keil Software ( Version 7.0) 1,06,250
Micro Processor Lab
1 Computer-P IV System 33,500
Department: B.E. Computer Science and EngineeringName of the Lab: Brainland Computer Centre
List of Major Equipments
S.No Name of the equipment Cost in Rs.
1. IBM e‐Server 1,82,7722. Server (Linux) 52,5003. HP P‐IV systems (75 nos.) 25,22,8694. Printers (6 nos.) 79,2005. Line Printer 1,25,0006. UPS (35 KVA) 1,96,740
Name of the Lab: Supernova LabS.No Name of the equipment Cost in Rs.
1. Server (Linux) 56,0892. Server (Windows 2000) 56,0893. HP P-IV systems (60 systems) 15,06,0004. Printers (1 no.) 11,9005. UPS (20 KVA) 3,19,120
32
Name of the Lab: Inet Zone Lab
S.No Name of the equipment Cost in Rs.
1. P‐IV Systems (78 Nos.) 20,58,906
2. Workstations (2 Nos.) 72,596
3. UPS ( 25 KVA) 2,24,235
Department : CivilName of the Lab : S.M. Lab
List of Major Equipments (More than Rs.30, 000)S.No Name of the Equipment Cost
1. Electronic Universal Testing Machine 3,11,068
2. Impact Testing Maching 47,912
3. Torsion Testing Machine 90,695
4. Erichsen Sheet Metal Testing Machine 23,147
5. Harness Tester 9,459
6. Brinell Hardness Tester 28,089
7. Tensile Testing Machine 48,054
8. Tensile Testign Machine 58,893
9. Universal Wood Testing Machine 46,200
10. Compression testing machine 1,86,922
11. Fatique Testing machine for cantilever type 46,500
12. Rubber Hardness Tester 3,535
13. Vickers Hardness Tester 89,968
33
Department : CivilName of the Lab : F.M. Lab
List of Major Equipments (More than Rs.30, 000)S.No Name of the Equipment Cost
1. Pelton Wheel Turbine 1,18,8002. Francies Turbine 1,13,4003. Kaplan Turbine 2,00,2004. Open circuit wind turnel 1,77,4505. Variable speed Centrifugal pump 28,0006. Reciprocating pump 17,0007. Gear oil pump 20,0008. Jet pump 22,0009. Submersible pump 32,000
10. Multistage pump 20,00011. Self proving pump 40,00012. Pumps series and parallel 66,00013. Pipes series and parallel 38,00014. Metacentric height apparatus 10,00015. Renolds Apparatus 16,85016. Apparatus for impact of jet on vanes 27,50017. Apparatus for verification of bernoutis theorem 16,85018. Apparatus for pipe losses 31,50019. Calibration of venturimeter 33,40020. Calibration of Orificenmeter 30,40021. Apparatus for orfies and Mouth pieces 32,50022. Apparatus for notches 38,400
Department : CivilName of the Lab : Construction Materials Lab
List of Major Equipments (More than Rs.30, 000)S.No Name of the Equipment Cost
1. Concrete Mixes 30,0002. Flow Table ‐‐3. Needle Vibrator ‐‐4. Vee bee Consostometer ‐‐
5. CBR Apparatus 39,000
34
Department : Electronics and InstrumentationList of Major Equipments (More than Rs.30, 000)
S.No Name of the Equipment Cost
1. Temperature process control Trainer (Computer Interface) 85800
2. Pressure Process Trainer 97900
3. Flow Control Trainer 1,05,600
4. Level Control Trainer 95,150
5. Double Conversion sineware online UPS System (10KVA) 174000
6. Microprocessor based UV spectrophotometer 1,12,000
7. Calibration of pressure gauge, Temperature Calibration 1,08,792
8. Control Valve Characteristics with pesitioner 66,800
9. Multiprocess system (Flow level cascade, Ratio, Feedforward)
1,39,000
10. Microprocessor and microcontroller kit accessoriesprogrammable logic
75,581
11 Controller (24 DI/12 DO, 8AI/4A0) 1,09,055
12. SCADA package 65,508
13. Smart transmitter module with PC interfaceelectromagnetic flowmeter
55,600
14. 5KVA online UPS 58,459
35
Department : Mechanical ‐ ME (CAD/CAM)
Name of the Lab : CAD Lab
List of Major Equipments (More than Rs. 50, 000)
Sl.No Name of the Equipment No. off Cost / unit Total Cost (Rs.)
1. HP Proliant ML150 G2 server 1 85,000.00 85,000.00
2. HP DX 2000 7 26316.75 1,84,217.25
3. HP XW4550 Workstations 41 36298.08 14,88,221.28
4. HP 430 PLOTTER (A1 SIZE) 1 51,000.00 51,000.00
5. CATIA V5 R12 software 1 User 87,500.00 87,500.00
6. AUTODESK Mechanical education solutionset
10 Users4,16,800.00 4,16,800.00
7. PRO-E WILDFIRE 5.0 software 60 Users 5,29,440.00 5,29,440.00
8. ANSYS Advanced Multiphysics – V 11 .0(Upgrade from V7.1)
5 Users4,54,390.00 4,54,390.00
9. ANSYS Academic Teaching IntroductoryVer 12.1
50 Users5,00,000.00 5,00,000.00
10. Panasonic LCD Projector 1 60,000.00 60,000.00
Department : Mechanical - ME (CAD/CAM)
Name of the Lab : CAM Lab
List of Major Equipments (More than Rs. 50, 000)Sl.No Name of the Equipment No. off Cost / unit Total Cost
Rs1. HP XW4550 Workstations 35 36298.08 12,70,432.80
2. HP DX 2000 7 26316.75 1,84,217.25
3. Unigraphics 5 Users4,90,000.00 4,90,000.00
4. Solid edge 5 Users
36
5. CNC Simulation Lathe 5 Users
6. CNC Simulation Mill 5 Users
7. Workspace 5 Users 3,90,000.00 3,90,000.00
8. Expert CNC Lathe Trainer Kit 1 4,10,000 4,10,000
9. ROBIX (RCS – 06) Pick & Place Robot 1 1,25,550 1,25,550
10. CNC Bench type Milling Machine 1 6,76,000 6,76,000
11. Roland MODELA3D Printer (RPT Machine) 1 1,35,000 1,35,000
Department : CSE
Name of the Lab : ME (CSE)
List of Major Equipments (More than Rs.30, 000)
S.No Name of the Equipment QtyCost
(in Rs.)
1.Windows 2003 ServerHP Proliant Server PIV @ 3 GHz; 512 MB RAM;36 GB SCSI Hard Disk; 15” HP Color Monitor
01 60,000
2.
Linux Server 9.0Pentium IV@ 3 GHz; 128 MB RAM; 40 GB HDD;15” SVGA Color Monitor; Key Board, OpticalMouse
01 24,500
3.HP Pentium IV @3 GHz; 128 MB RAM; 40 GBHDD; 15” SVGA Color Monitor; Key Board, OpticalMouse;
19 4,65,50
4.HP Pentium IV @3 GHz; 256 MB RAM; 40 GBHDD; 15” SVGA Color Monitor; Key Board, OpticalMouse;
10 1,95,000
5. HP Scanjet 2400; 1200 dpi 01 4,500
6. HP 1010 Laserjet Printer 01 13,900
7. Wipro EX 330 DX Dot matrix Printer 02 25,900
8. 10 KVA True Power 120 VDC online UPS systemto support 1hr. Battery Back.
01 97,000
9. 0.5 KVA UPS 01 1,900
37
Department : Aeronautical Engineering
List of Major Equipments (More than Rs.30, 000)
S.No Name of the Lab Name of the EquipmentCost
(in Rs.)
1. Aerodynamics Lab Water Flow Channel, W/TBalance
4,32,850
2. Propulsion Lab Rolls-Royce Turbo Jet EngineCascade Test Setup
13,06,125
3.Aircraft Structure Lab I Column Setting Apparatus,
Deflection of Beams2,20,600
4. Aircraft Structure Lab II Wagner Beam Setup, Shear TestSetup
4,00,625
5. Aircraft Structure RepairLab
TIG and MIG WeldingEquipment
2,63,294
6. Aero Engine Repair Lab Dart Mark Turbo Prop Engine,Piston Engine
8,60,780
7. Aircraft System Lab Cessna-150 Serviceable aircraft 30,00,000
8. Aircraft Component DesignLab
Desktop 7,50,000
9. Avionics Lab MIL-1553 setup 6,90,000
38
PUBLICATION DETAILS
Department : Production
S.No Name of thestaff
Publication
TotalConference Journal
National International National International
1. Prof. G.Paulraj 8 12 1 3 24
2 N. Jayamalathi 1 1 1 ‐ 3
3. R.Joseph RaviSelvan 1 1 ‐ ‐ 2
4.D.Rajkumar 2 ‐ ‐ ‐ 2
5. H. Vinoth Kumar 2 - - - 2
6. Francis Nicholson - 2 - - 2
DEPARTMENT: EEE
S.NO Name of the staff
Publication
TotalConference Journal
National Inter National/Inter
1. K.Dhayalini 7 - - 7
2. S. Thirukkovai 3 - - 3
3. Y.Mohamed Batcha 7 1 - 8
4. M.Priya 1 - - 1
5. S. LalithaPriya 1 - - 1
6. A.Josephine Amala 5 1 1 7
7. M.Banusundareswari 3 - - 3
8. O.Karthikeyan 2 1 - 3
9. A. V. Suganya 2 - - 2
10. B. Muthuselvi 1 - - 1
11. M. Anitha 1 - - 1
12. P. Sivakumar 7 - - 7
13. S. Malarkodi 1 - - 1
39
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. S. Dhanabalan 8 1(National) 09
2. V. Balasubramaniam 2 - 2
3. P. Sivakumar 4 1 5
4. R. Natarajan 2 - -
5. D.Vanaja 1 1
6. N. Indira 3 1 4
7. N. Balamurugan 1 - 1
8 A. Hussain Lal 1 - 1
9 S.Clamencia 1 - 1
10 T.T.M.Kanna - 1 1
Department: Mechanical
2
Department: Information Technology
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. S. Selva Ganesan 5 3 8
2. A. Saravanan 19 4 23
3. P.Subharajam 4 3 7
4. G.V.Shri Chandran 5 1 6
5. G.Rathana Kumari 2 - 2
6 R.Raja 2 - 2
7 A.Sridevi 4 - 4
8 G.Gayathri 1 - 1
9 P.Shanthi Beula 1 - 1
10 S. Rajeswari 1 - 1
11 K. Bakiya 4 - 4
12 S. Beski Prabaharan 2 3 5
13. W. R. SalemJayaseelan
2 3 5
14. M.Ramprasath - 2 2
40
Department: Electronics and Communication Engg.
S.No Name of the staffPublicat
TotalConference JournalNational/Inter National / Inter
1. B. Elizabeth Caroline 15 5 20
2. S.Santhi 7 4 11
3. M. Maheswari 9 1 10
5. K. Ambujam 2 - 2
6. R.Krishnaveni 2 - 27. J. Jayarani 5 - 5
8. V. Vinotha 1 - 1
9. M.Shobana 4 - 4
10. K.Uma Maheswari 7 - 7
11 M. Jonsi Rani 1 - 1
12 G.Sheeba 8 - 8
13 P.Salma Rosline Mary 5 - 5
14 M.Elamathi 2 - 2
15 A.Padma 2 - 2
16 R.Revathi 4 - 4
17 V.Jeyanthi 2 - 2
18 R.Shalini 2 - 2
19 L. Jothi Isabella 2 - 2
20 R.Purushothaman 3 - 3
21 Vinoth Kumar 4 - 4
22 Swaminathan 2 - 2
41
Department : COMPUTER SCIENCE AND ENGINEERING
S.No Name of the Staff
Publication
TotalConference Journal
National/Inter. National/Inter.
1. P.D.Sheba Kezia Malarchelvi 20 3 23
2. M.P.Revathi 9 - 9
2. M.Sujaritha 24 4 28
3. M. Arivazhagan 2 1 3
4. P. Chellammal 7 - 7
5. S. Kalpana 2 - 2
6. N. Kavitha 3 - 3
7. P. Kavitha 12 - 12
8. D. Kirthiga 2 - 2
9. G. Lakshmi Priya 3 - 3
10. S. Lakshmi Narasimman 2 - 2
11. B. Nadiya 2 - 2
12. P. Pavitra 2 - 2
13. G. Raja 2 - 2
14. R. Ravi 2 - 2
15. K. Sravanan 2 - 2
16. P. Shanthi 4 - 4
Department : Civil
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. I.Murugan 02 04 06
2. T.Ayyamperumal 02 04 06
3. A.Ananthi 01 - 01
4. K.Soundaranayaki 01 - 01
5. R.Thenmozhi 01 - 01
42
Department : Aeronautical
S.NoName of the
staff
Publication
TotalConference Journal
National International National International
1. P. R. Mukesh 1 1 1 1 042 L.Prince Raj 1 1 0 1 3
Department : Electronics and Instrumentation
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Dr.S.Sathiyamoorthy 5 3 8
2. M.Banusundareswari 4 - 4
3. B. Padmanaban 2 - 2
4. S. Suresh Kumar 3 - 3
5 P. Prabhakaran 1 - 1
6 B. Sangeetha 1
7 M. Renuga 3
8 M. Saranya 1
9 K.Manikandan 2 2
10 S.Ranganathan 1 1
11 P.N.Prabhakaran 1 1
Department : Control and Instrumentation Engineering
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Mr. T.Rajesh 2 - 2
2. Mr.P.Thirumurugan 2 - 2
43
Department: M.E. (CSE)
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. R. Sumathi 28 -- 28
2. K. Naganandhini 1 1 2
3. R. Senthilarasi 1 - 1
Department: PHYSICS
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Dr.R.Krishnamurthy 02 03 05
2. Dr.P.K.Manimozhi 02 05 07
3. Dr.S.Selvanadan - 05 05
4. Mr.S.Kolangikannan 03 03 06
5. Mr.C.Hariharan 04 02 06
6. Mr.Jeyavijayan 04 06 10
Department: CHEMISTRY
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Dr.A. Prabhakaran 16 03 19
2. Dr.S.Boobalan 16 06 22
3. Dr.T.Veemaraj 43 12 55
4. M. Ramesh 06 04 10
5. V.Rethina Giri 08 03 11
44
Department : English
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Mr.A.NobleJebakumar 04 ‐‐ 04
2.Mrs.Vathana FennSanjeev 04 ‐‐ 04
3. P.Malathy 06‐‐
06
4. D.Balakumar 01 ‐‐ 01
5. B.Pradeepa 03 ‐‐ 03
6. S.Neelakandan 07 ‐‐ 07
Department : Mathematics
S.No Name of the staffPublication
TotalConference JournalNational/Inter. National / Inter
1. Mr. S. Varatharaj ‐ 02 02
2. Mr. R. Nagarajan 05 06 11
3. Mr. P. Sakthivel 02 ‐ 02
4. Mr. G. Jagadeesan 01 ‐ 01
45
Detail of Laboratory Area and Major Equipment
S.NoName of the
CourseName of the
laboratory/workshop
Total Area oflab/workshop
(Sq.M)Major equipments
01. Mechanical
Machine shop 465
Centre latheChampion lathe m/c
Capstan lathe
Shaping m/c
Universal Milling m/c
Cylindrical grinding m/c
Surface grinding
Tool and cutter grinding m/c
Universal Radial Drilling m/c,
Vertical Milling M/c
Gear Hobbing M/c
Planning M/c
Electrical Discharge m/c
CNC Training cum Production Lathe
Thermal Engg. 155
Multi-cylinder four stroke petrol
engine (ISUZU)
Twin Cylinder four stroke diesal engine
Single cylinder four stroke diesel
engine
Air conditioning test rig
Steam boiler
46
Heat and Mass Transfer 155
Automobile engg. Lab 155
CAD/CAM LAB 184
Instrumentation anddynamics
184
Metrology lab69.68
Thermal conductivity apparatusComposite wall apparatusNatural –cum-forced convectionEmissvity measurement appr.Two slab guarded hot plateParallel flow & counter flow appr.Pin-fin appr.Stefan- Boltzman appr.Cooling condenser appr.Refrigeration TestAir conditioning test .4WD Vehicle chassis4 s petrol enfield engine2S diesel Kirlakar engineCAD WorkstationsCNC trainer lath kitROBIX-ROS 06CNC bench type milling machineMDX-20 3D scanning & milling M/c.Vibration measurement systemPiezo electric accelerometerEddy current dynamometerRadiation pyrometerStroboscopeHot wire anemometerAuto collimatorProfile projectorFloating carriage micrometerSurface roughness tester3D – Co ordinate measuring machineElectronic comparator
02. ProductionMetallurgy lab 69.68
Ultrasonic flow detector with standardaccessoriesPneumatics and Electro- pneumatic kitsBasic pneumatics TP 101
Mechatronics lab 69.68
03. EEE Electrical Machines lab 465
Electro pneumatics TP 201/101PLC-TP 301/201Pneumatic cutaway modelsd.c shunt motorcompound motorshunt motor/generatorseries motorrectifierA.C.PanelD.C.PanelShunt motor /series generatorSynchronomous induction motor
47
04. ECE
Control system andinstrumentation lab
134
Power electronics lab 134
Power System Simulationlab
138
DSP lab 69
Electronics lab 159
Electronic system design 69
Digital storage oscilloscopeR.S.S meter3 dia shift transformA.C servo motor positonSpeed control of DC Shunt motor 8005 kit
30MHz CRO-73dia fully controlled bridge converter3 dia AC voltage regulatorThyristor based DC MotorPWM inverter based AC induction motor
Single phase mercury bed fond invertorSingle phase cyclo converteeIGBT based 3 dia PWM inverterPentium IVHelious UPSORCADAV Power labDSP trainer kit(54x)DSP trainer (5x)DSP trainer (5416)MATLAB 5.3Pentium IVPower supplyCROAudio Frequency oscillatorFunction generatorDecade inductance boxDecade capacitance boxDecade resistance boxAnalog ammetersAnalog voltmetersDigital panel voltmeterDigital panel ammeterWireless data modemMultisim(software)Ultiboard (software)CRO8086 Microprocessor kit8051 Microprocessor kitc-51 keil compiler softwareinterfacing kit (LCD)SMPS trainer kitHigh frequency dc/dc converter
48
Communication lab 69
Power supplyCRO,PSK KIT,FSK KIT,PPM KITLine coding and decoding kitAnalog signal sampling trainer kitPulse code modulation kitQPSK kitTime division multiplexing andDemultiplexing trainer kitAmplitude modulation kitFrequency modulation kitPLL and application kitAdvance analog communicationtrainer system,Antenna system with softwareSpectrum analyzer
RF LAB 69
RF Signal generatorAntenna training systemRF Circuit trainers100 MHz CROSpectrum analyzer
Microwave labFiber optics lab
115
Microwave bench(x-Band)Microwave Bench (J-Band)Digital Storage OscilloscopeGunn bench
Optical fiber education kitFiber optic trainer kitLink- E Fiber optic trainer kit based onlaser, Optical video link trainer kit
Microprocessor lab 69
Microprocessor 8085 kitMicroprocessor 8086 kitAdvanced 8086 kit with LCD68-k8031 kitZ-80 kitIn circuit emulatorMicro controller 8051 kitPentium IV computerCathode ray oscilloscopeInterfacing boards
LIC LAB 67
CRODigital trainer kitPower supplyAFOTesting and measuring instruments
49
5 CIVIL
Soil Lab 170
Impact Testing Maching Fatigue TestingMachine Universal Wood TestingMachine Fatique Testing machine forcantilever type
Strength of material lab 184
Electronic Universal test m/cTorsion testing m/cTensile testing machineCompression testing m/cVickers hardness
FM LAB 465
Pelton turbine test rigFrancis turbine test rigKaplan turbine test rigWind tunnelPump series and parallel
Construction Materials Lab 170 CBR Apparatus
6 Aeronautical
Aerodynamics Lab 56 Water Flow Channel, W/T BalancePropulsion Lab
63Rolls-Royce Turbo Jet Engine CascadeTest Setup
Aircraft Structure Lab I56
Column Setting Apparatus, Deflectionof Beams
Aircraft Structure Lab II 56 Wagner Beam Setup, Shear Test SetupAircraft Structure RepairLab
53 TIG and MIG Welding Equipment
Aero Engine Repair Lab63
Dart Mark Turbo Prop Engine, PistonEngine
Aircraft System Lab 112 Cessna-150 Serviceable aircraftAircraft Component DesignLab
56 Desktop
Avionics Lab 56 MIL-1553 setup
7 EIE
Process Control andComputer control of Process
Lab155
Temperature Process satiationFlow Process satiationLevel Process satiationPressure Process satiationControl Valve Characteristics with
PostionerBottling Filling SystemMultiprocess TrainerProgrammable Logic Controller
Industrial Instrumentation &Transducer Lab
155
Microprocessor based UV – VisibleSpectrophotometerCalibration of Pressure gauge,Temperature CalibrationSmart transmitter module with PCinterfacing for electromagnetic flowmeter
50
Electronic Devices andCircuits Lab and Integrated
Circuits Lab
Micro Processor and Micro
155
DC Regulated Power Supply – SingleoutputDC Regulated Power Supply – DualoutputFunction GeneratorDual Trace CRO30 MHz Dual Trace Oscilloscope withComponent testerMicroprocessor and microcontroller kits
Controller Lab115 and accessories
Universal Programmer
CSE Lab -I 195 PIV Systems (509 Nos.) Windows 2003Advanced Server
8 CSE
9 IT
CSE Lab -II 117
SUPER NOVA 134
Internet Lab167
IT Lab I 153
IT Lab II 156
I’st Year Lab 288
(Client Access License -25)Windows XP ProfessionalMS office XP ProfessionalMS Visual Studio .NetMS Visual Studio .Net Professional2003MS Frontpage 2003 LicMS SQL Server 2000Macromedia Studio MaxAdobe PageMakerBorland C++ Builder 6.0Oracle 10g Std Edition 5 User pack withmedia kit box productWindows NT Server 4.0Windows NT Workstation 4.0Novell Netware 4.11Sco Unix Release 5
10 ME (CSE) ME (CSE) Lab 67Adobe BundleWindows Compute Cluster Server 2003(Free Software)
11 Chemistry Chemistry Lab 1680 Sq.feet
Electronic balancepH meterConductivity bridgePotentiometerPlatinum electrodesCalomel electrodesSpectrophotometerFlame photometerOswald viscometerGlassware
51
12 Physics Physics Lab 1680 Sq.feet
Torsional Pendulum apparatus(With accessories)Non-uniform Bending apparatus(With accessories)Viscosity (Poiseuille’s flow) apparatus(With accessories)Lees’ disc apparatus(With accessories)Air Wedge apparatus(With traveling microscopes andaccessories)Uniform Bending apparatus(With accessories)Spectrometer(With grating, prism and accessories)Diode laser (2 mW power) orHe-Ne laser (2mW)(Lycopodium powder, Optical fibre Kitand accessories)Ultrasonic interferometer(With accessories)
52
13 English Language Lab 1800 Sq.feetServer
PIV system, 1 GB RAM / 40 GBHDDOS: Win 2000 serverAudio card with headphones (withmike), JRE 1.3
Client SystemsPIV SystemsOS: Win 2000 Audio card withheadphones (with mike)JRE 1.3
Softwaresa) Interactive Teacher Control Softwareb) English Language Lab Softwarec) Career Lab softwareHandicam Video Camera (with videolights and mic input)Television - 29”Collar mikeCordless mikesAudio MixerDVD Recorder / PlayerLCD Projector with MP3 /CD /DVDprovision for audio / video facility
53
COMPUTING FACILITIES :
S. No. Particulars Availability
1. No. of Computer Terminals 1271
2. Hardware Specification
P-IV / Latest Configuration 1271
P-III ---
Others ---
3. No. of Terminals on LAN/WAN 1271
4. Relevant Legal Software - Listed below -
5. Printers 66
6. Internet Accessibility (in Kbps & hrs) 8192 kbps (Exclusive)
COLLECTIVE LIST OF SOFTWARES AVAILABLE IN THE INSTITUTION
S.No. Particulars No. of Users Date of Purchase Value(in Rs.)
CSE
01. Novell Netware 4.11 50 28.07.97
2,15,72502. Windows NT 4.0 Server 05 -do-
03. Windows NT 4.0 W.S. 15 -do-
04. SCO Unix Release 5.0 05 -do-
05. Windows 2000 Server 01 16.07.03 16,000
06. Windows XP Professional 05 -do- 17,000
07. Office XP Professional 05 -do- 16,600
08. Visual Studio .NET Pro 05 -do- 17,000
09. Borland C++ (Ver. 6.0) 30 10.03.05 50,000
10. Oracle 9i 05 28.07.03 57,000
11. Visual Studio .NET 01 28.07.03 4,975
12. Novell Netware 6.0 05 28.07.03 25,900
13. Windows 2000 Professional 05 28.07.03 27,900
14. Windows 2003 AdvancedServer 1 28.08.03 16,000
54
15. Macromedia Studio MX 10 21.01.05 73,800
16. Oracle 10g 5 13.06.05 39,500
17. Adobe PageMaker 10 30.101.05 72,000
18. MS FrontPage 2003 LIC 1 26.01.05 3475
19 MS SQL Server2000 1 Server10 Clients 26.01.05 27,875
Mechanical Department
20. ANSYS AdvancedMultiphysics – V 11 .0(Upgrade from V7.1)
511.09.2003 4,54,390.00
21.
ANSYS Academic TeachingIntroductory Ver 12.1
50 14.10.2010 5,00,000.00
22. PRO-E WILDFIRE 5.0 software 60 21.08.2010 5,29,440.00
23. CATIA V5 R12 software 1 29.09.2003 87,500.00
24. AUTODESK Mechanicaleducation solution set
10 05.09.2005 4,16,800.00
25.Unigraphics 5
14.10.04 4,90,000.00
SOLID EDGE 5
CNC Simulation Lathe 5
CNC Simulation Mill 5
26. Workspace-RoboticSimulation Software 05 26-07-2005 3,90,000
IT Department
27. Rational Suite EnterpriseEdition Node lock license 30 08.08.03 3,00,000
ECE Department
28. MAT LAB 5.3.1 01 21.09.2000 40,313
29. SIMULINK 3 01 -DO- 40,313
30. Fuzzy Logic Tool Box 01 -DO- 16,125
31. Image Processing Tool Box 01 -DO- 16,125
32. Neural Network Tool Box 01 -DO- 16,125
33. DSP Block Set 01 -DO- 16,125
34. Power System Block Set 01 -DO- 40,313
35. Control System Tool Box 01 -DO- 16,125
55
36. Signal Processing Tool Box 01 -DO- 16,125
EEE Department
37. CAPTURE with PSPICE 01 03.10.2001 46,350
38. AU Power Lab Modules 01 26.06.2004 75,600
E&I Department
39. SCADA 1 25.10.2005 65,508.00
40. Keil Software 1 04.10.2007 70,200.00
41.MAT LAB 7.6 (2008)
SIMULINK with Tool Box 25 Users 30.07.2008 8,33,844.00
English Department
42.Renet Digital Multimedia
Language Software30+1
users 31.01.2006 2,30,000.00
43. Issues in English 1 user 06.10.2007 15,000
44. Euro Movie Talk 1 user 06.10.2007 7400
45. Test Perp TOEFL 1 user 06.10.2007 2800
Instructional Area for the existing programme(s)
ParticularsNumber of Rooms
available in theInstitution
Carpet area of eachroom available in theInstitution Sq.M.
Class rooms62 4839.1
Tutorial Hall7 470.4
Drawing Hall4 883.4
Computer Center8 1267
Library Central Library 852Laboratories & Workshops 35 6125
TOTAL 14436.9
56
LIST OF FACILITIES AVAILABLE1. Games and Sports
¾ Indoor Stadium¾ Gymnastics¾ Foot Ball Ground¾ Basket Ball Ground¾ Ballbadminton Ground¾ 400 mt Track¾ Weight Lifting¾ Cricket Ground¾ Kabbadi Ground¾ Table Tennis¾ Hockey Ground
2. Extra Curricular Activities¾ NSS¾ Exnora¾ Youth Redcross¾ Rotary Club¾ Fine Arts Club¾ Tamil Mandram¾ Yoga Club
3. Soft Skill Development¾ Infosys Campus Connect¾ Wipro Mission 10X
4. Value added Courses¾ Cisco course¾ Ansys course¾ Pro‐E course¾ CNC machines & Programming course¾ Computer Programming Skills