MEE/ GC2 / 05 / 2013 / Dy.CME(ES&CH)
BUDGETARY OFFER
FOR
SUBMITTING FEASIBILITY REPORTS OF ELECTRICAL ENERGY
AUDIT AND DIESEL ENERGY AUDIT IN THE CHENNAI PORT
TRUST
SUBMISSION ON OR BEFORE 06 .06.2013
THE CHIEF MECHANICAL ENGINEER 7TH Floor, Centenary Building Rajaji Salai, Chennai – 600 001.
BUDGETARY OFFER FOR SUBMITTING FEASIBILITY REPORTS OF ELECTRICAL ENERGY AUDIT AND DIESEL ENERGY AUDIT IN THE CHENNAI PORT TRUST
TECHNICAL SPECIFICATION SCHEDULE ‘A’
1.0 GENERAL:
Chennai port trust has proposed to conduct the Electrical Energy Audit and
Diesel Energy Audit with in the port areas. This will be focused to study of entire HT
& LT power distribution, load pattern, maximum demand & connected load, load
distribution (like motors under different operational conditions) mechanical power
transmission system, power factor, monitoring & control system, Harmonic analysis,
water pumping system, Refrigeration and Air conditioning system, to study of
illumination for street light, wharf crane, tower light, yard light and office, to study of
fuel consumption and reduce wastages.
2.0 SCOPE OF WORK
Requirements:
1. Certified Energy Auditors by State Electricity Board
2. Registered society at BEE / State Electricity Board
3. Accredited by the BEE (Bureau of Energy Efficiency) to conduct electrical
energy audit and Diesel Energy Audit.
4. Previous experience in energy (Electrical & Diesel) Audit in Industries.
5. To carryout preliminary and detailed energy audit to be mainly targeted for
identifying practical sustainable & economical viable energy saving
opportunities in all section of the plant on sites for Electrical energy audit
and Diesel energy audit for intensive equipment.
6. To reduce energy consumption and to save energy cost.
7. To create awareness, importance, benefits and methods of conserving
Electrical energy renewable energy and diesel conservation for clean
environment.
8. To conducting feasibility studies to identify the area where waste can occur
and where scope for improvement exists. In general energy audit is carried
out to know the present energy consumption scenario and to determine
ways to reduce energy throughout the Port Trust.
9. Techno Economic feasibility report/ site feasibility report.
10. Detailed project Report
11. Resource Assessment (Potential Survey RA /PS)
SUBSTATION
1. 33 KV Substation (Near MOHP)
The maximum permitted demand (PMD) is 7000 KVA. The 33 KV
incomer power supply is fed from TNEB kalmandapam substation near 2A
gate to 33 KV substation through 33 KV switching station at Gate No.2A. The
average energy consumption per day is 55,512 units. (kwhr)
2. E Substation (Near Heavy work shop)
The Maximum permitted demand (PMD) is 1250 KVA. The 11KV
Supply is fed from TNEB substation (near sea farers club, Rajaji salai to ‘E’
Substation. The average energy consumption per day is 5,513 units. (kwhr).
3. In addition there are 8 Nos. 11KV substation are interconnected and
distribute the power system viz A, B, C, F, G, H, SQ-I, & CB at various
locations.
4. 3.3. KV substation for ore handling plant.
5. 3.3. KV substation for oil dock.
OUT SIDE PORT AREAS
6. Fisheries Harbour 11 KV substation.
The Maximum permitted demand (PMD) is 800 KVA. The 11KV Supply is fed
from TNEB substation.
7. Tondiarpet Housing Colony 11KV substation.
The Maximum permitted demand (PMD) is 650 KVA. The 11KV Supply is fed
from TNEB substation.
TRANSFORMER
1. To study the loading pattern and estimation of efficiency and losses of
transformer.
ENGINES:
MOTORS
1. To study of loading & operation efficiency of motors at various locations
pump motor, crane motor and machineries.
2. Feasibility of replacement by energy efficient motors.
3. To study of existing motor drives and suggest improvement in the present
drives to reduce energy consumption.
AIR CONDITIONERS
Transformer for Air conditioners, power consumption of Air conditioners, Air
flow measurement, Temperature measurements, Humidity measurements in
the air conditioned area estimation of energy efficiency ratio for split, window
type Air conditioners.
PUMPS
Pump performance shall be done by simultaneous measurements of head
flow and power.
DIESEL ENGINE:
To study performance, efficiency and fuel consumption of Tugs, launches,
generators sets, locomotives, Automobiles etc,.
CAPACITOR
To asses the need for power factor improvement from the existing level
measurements of the power at individual capacitor at load centre.
LIGHTING:
To study of illumination levels at different work place, wharves, office, yard
and street area.
To study of feasibility of use energy efficient lighting system practices and
controls.
Note: All the Load details are enclosed separate sheets
3.0. COMPLETION PERIOD:
The contract period is for 2 months for study and further 1 month for report
submission from the date of receipt of order.
4.0. FEASIBILITY REPORT: Development & issue of final report including verification statement.
Original – 1 No.
Copies – 4 Nos.
PDF file – 1 No.
5.0. ESI CLAUSE: The details of employees proposed to be engaged shall be furnished to this office before the commencement of the work. (a) As per the Govt. Notification dated 20.07.2009, Chennai Port Trust has registered under the ESI Act on 26.09.2012 with ESI Corporation and provision of ESI Act, 1948 are applicable to Chennai Port Trust, a Social Security Act, is applicable to Factories using power and employing 10 or more personnel and establishment
employing 20 or more persons and drawing wages/salary upto Rs.15,000/- per month. Workers covered under ESI Act, are entitled for full medical care for self and family. Besides, cash benefit in the event of sickness, maternity and employment injury. Accordingly, the contractual/casual employees drawing wages upto Rs.15,000/- per month employed either directly by Port Trust or through contractor are covered under ESI Act, 1948. It is obligatory on the part of the employer to calculate and remit ESI contribution comprising of employers’ share of 4.75% plus employees’ share of 1.75% which is payable on or before 21st of the following month, to which the salary relates. (b) In case of Contractor employs more than 20 employees, they should register their name with ESI as per ESI Act, 1948 and obtain ESI Code. Both Employers share of 4.75% and Employees contribution of 1.75% (recovered from employees), totally 6.5% to be paid as contribution to ESI in their Code on or before 21st of following month to which the salary relates and acknowledgement for the same shall be submitted to the Port while claiming the bill. The bill without the acknowledgment of ESI contribution will not be entertained. In case the contractor has not paid the ESI contribution same will be recovered in the running bill and paid to the ESI Corporation in contractor’s code. The delay in payment of contribution payable under the Act may be recovered as an arrear of Land Revenue. (c) In case the contractor employs less than 20 employees, the list of employees’ names, their father’s name, identification proof, one passport photo shall be submitted to the Port Trust. The contribution of ESI amount, both Employers share of 4.75% and Employees contribution of 1.75% (recovered from Employees salary), totally 6.5% shall be paid by the Contractor in the Chennai Port Trust Code on or before 21st of the following month to which the salary relates or otherwise payment to the contractor will be withheld. If the contractor fails to comply with the above instruction, then the Principal Employer (Chennai Port Trust) will make payment to the ESI Corporation. Such amount will be deducted from any amount due to the contractor. The delay in payment of contribution payable under the Act may be recovered as an arrear of Land Revenue. 6.0 OTHER TERMS AND CONDITION i) The technical specification – “Schedule-A” and Price Schedule – A1” to be
read in conjunction to make sure of the supply and works involved. ii) The contractor is required to offer rates as per Trust’s format “Schedule-A1”
without fail and mention taxes and duties. iii) The Trust will not be responsible for any damage or loss of any of the firm’s
men and materials and for any damage / accident to the firm’s personnel.
iv) The contractor may inspect the site before quoting. v) Safety and safe custody of all men, materials, tools and plants that are
required by the firm during site works, till handing over to the Trust shall be entirely the responsibility of the firm.
vi) The Contractor shall arrange their own tools and plants and other materials
and components required for the above work. vii) For any clarifications, if any the firm may contact the ‘Executive Engineer’
(ES) at 2nd floor of the Old Administrative Office Building, Tel. Ph. 25362201, Extn. 2542 (or) S.E.(ES) at 2nd floor of the Old Administrative Office Building, Tel. Ph. 25362201, Extn. 2254 (or) Dy.CME(ES&CH) at 7th floor of Centenary Building, Tel. Ph. 25362201 Extn: 2707.
CHIEF MECHANICAL ENGINEER
CHENNAI PORT TRUST
BUDGETARY OFFER FOR SUBMITTING FEASIBILITY REPORTS OF ELECTRICAL ENERGY AUDIT AND DIESEL ENERGY AUDIT IN THE CHENNAI PORT TRUST
SCHEDULE OF PRICES AND QUANTITIES SCHEDULE ‘A1’
Sl.No. Description of Item Unit Qty Rate in Rup Amount in R 1. Cost for carryout
preliminary and detailed energy audit to be mainly targeted for identifying practical sustainable & economical viable energy opportunities in all section of the plant on sites for Electrical audit for intensive equipment as detailed in Schedule ‘A’.
L.S. L.S.
2. Cost for carryout preliminary and detailed Diesel audit to be mainly targeted for identifying practical sustainable & economical viable energy opportunities in all section of the plant on sites for Diesel audit for intensive equipment.
3. Taxes and duties with break up d
Total amount in Rupees only inclusive of taxes and duties
Firm’s Signature and Seal LOAD DETAILS
ANNEXURE - I
Sl.No. Description of Item Location Quantity Wattage
1. 2X36 W Tube light fitting
Old Admn GF to IV floor
510 Nos. 80 W
2. 2X36 W Tube light fitting
COS building GF to IV floor
120 Nos. 80 W
3. 2 x28 W energy efficient fitting
CB building Basement to 10th floor
550 Nos. 80 W
4. 2 x36 W Tube light fitting
Main hospital, new building & Diamond jubilee building
1050 Nos. 80 W
5. 2 x36 W Tube light fitting
Guest house GF,I, II Floor & Annex VIP & VVIP Building
175 Nos. 80 W
6. 2 x36 W tube light fitting
HD 1,2,3 LHS 14,15,16, LHS2 QTRS
290 Nos. 80 W
7. 2x36 W tube light fitting
CDO complex GF to III floor
420 Nos. 80 W
8. 2x36 W tube light fitting
Type V Quarters 650 Nos. 80 W
9. 2x36 W tube light fitting
CISF barracks 400 Nos. 80 W
10. 2x36 W tube light fitting
DCOS Stores 60 Nos. 80 W
11. 2x36 W tube light fitting
Spare part wards 100 Nos. 80 W
12. 2x36 W tube light fitting
EME II OFFICE 60 Nos. 80 W
13. 2x36 W tube light fitting
Civil office & PWD Office
60 Nos. 80 W
14. 2x36 W tube light fitting
Civil office old officers club
50 Nos. 80 W
15. 2x36 W tube light fitting
M.yard loco shed SS room Rly control building
50 Nos. 80 W
16. 2x36 W tube light fitting
Pay loader & FLT 40 Nos. 80 W
17. 2x36 W tube light JD I to VII & 40 Nos. 80 W
fitting Electronics section 18. 2x36 W tube light
fitting C/WS shop & AO canteen
60 Nos. 80 W
19. 2x36 W tube light fitting
Time office and marine offices
180 Nos. 80 W
20. 2x36 W tube light fitting
WQ I to V SM building
30 Nos. 80 W
21. 2x36 W tube light fitting
Call point complex 120 Nos. 80 W
22. 2x36 W tube light fittin Passenger Terminal
160 Nos. 80 W
ANNEXURE – II
Sl.No. Description of Item Location Quantity Load
1. Ceiling fan Old Admn GF to IV floor
390 Nos. 80 W
2. Ceiling fan COS building GF to IV floor
60 Nos. 80 W
3. Ceiling fan CB building Basement to 10th floor
150 Nos. 80 W
4. Ceiling fan Main hospital, new building & Diamond jubilee building
60 Nos. 80 W
5. Ceiling fan Guest house GF,I, II Floor & Annex VIP & VVIP Building
75 Nos. 80 W
6. Ceiling fan HD 1,2,3 LHS 14,15,16, LHS2 QTRS
135 Nos. 80 W
7. Ceiling fan CDO complex GF to III floor
220 Nos. 80 W
8. Ceiling fan Type V Quarters 350 Nos. 80 W
9. Ceiling fan CISF barracks 30 Nos. 80 W
10. Ceiling fan DCOS Stores 25 Nos. 80 W
11. Ceiling fan Spare part wards 30 Nos. 80 W
12. Ceiling fan EME II OFFICE 40 Nos. 80 W
13. Ceiling fan Civil office & PWD
Office 40 Nos. 80 W
14. Ceiling fan Civil office old officers club
40 Nos. 80 W
15. Ceiling fan M.yard loco shed SS room Rly control building
30 Nos. 80 W
16. Ceiling fan Pay loader & FLT 20 Nos. 80 W
17. Ceiling fan JD I to VII & Electronics section
20 Nos. 80 W
18. Ceiling fan C/WS shop & AO canteen
30 Nos. 80 W
19. Ceiling fan Time office and marine offices
60 Nos. 80 W
20. Ceiling fan WQ I to V SM building
20 Nos. 80 W
21. Ceiling fan Call point complex 80 Nos. 80 W
22. Ceiling fan Passenger Terminal
75 Nos. 80 W
ANNEXURE – III
Sl.No. Description of Item Location Quantity Load
1. Geyser Old Admn GF to IV floor
10 Nos. 2000 W
2. Geyser CB building Basement to 10th floor
9 Nos. 2000 W
3. Geyser Main hospital, new building & Diamond jubilee building
25 Nos. 2000 W
4. Geyser Guest house GF,I, II Floor & Annex VIP & VVIP Building
30 Nos. 2000 W
5. Geyser HD 1,2,3 LHS 30 Nos. 2000 W
14,15,16, LHS2 QTRS
6. Geyser CDO complex GF to III floor
4 Nos. 2000 W
7. Geyser Type V Quarters 80 Nos. 2000 W
8. Geyser CISF barracks 5 Nos. 2000 W
9. Geyser Civil office & PWD Office
2 Nos. 2000 W
10. Geyser Civil office old officers club
2 Nos. 2000 W
11. Geyser M.yard loco shed SS room Rly control building
2 Nos. 2000 W
12. Geyser Pay loader & FLT 1 No. 2000 W
13. Geyser JD I to VII & Electronics section
1 No. 2000 W
14. Geyser C/WS shop & AO canteen
3 Nos. 2000 W
15. Geyser Time office and marine offices
1 No. 2000 W
ANNEXURE - IV
GENERATOR SET
Sl.No. Description of Item Location Quantity Load
1. 1000 KVA 33 KV Substation 4 Nos. 3.3 KV
2. 1000 KVA 33 KV Substation 1 No. 11 KV
3. 500 KVA ‘A’ Substation 2 Nos. 415 V
4. 500 KVA ‘CB’ Substation 2 Nos. 415 V
5. 1000 KVA Old Admn Building 1 No. 415 V
6. 320 KVA ‘E’ substation 1 No. 415 V
7. 100 KVA Signal station 1 No. 415 V
8. 500 KVA ‘G’ Substation 1 No. 415 V
ANNEXURE – V
DETAILS OF TRANSFORMERS AND GENERATORS AT VARIOUS SUB STATIONS INSIDE THE CHENNAI PORT TRUST Sl.No Substation and
Location Maximum Demand
Total Capacity
Transformer & Quantity
1. 33 KV Substation (Location: Ore berth)
7000 KVA 25,615 KVA 6300 KVA 33/11KV - 1No. 4000 KVA 33/11KV - 1 No. 4000 KVA 33 / 3.3 KV - 3 Nos. 3000 KVA 3.3 /11 KV - 1 No. 11 /3.3 KV 315 KVA 3.3 / 415 V - 1 No.
2. ‘A’ Substation (Location: Southern side of boat basin)
2000 KVA 500 KVA 11 KV /415 V - 4 Nos.
3. ‘B’ Substation (Location: WQ 1 car export Terminal)
2000 KVA
1000 KVA 11 KV /415 V - 2 Nos.
4. ‘C’ Substation (Location: Near container Terminal)
6250 KVA
3150 KVA 11 /3.3 KV - 2 Nos.
5. ‘CB’ Substation (Location: Marshalling yard – FF Road
2500 KVA
1000 KVA 11 KV /415 V - 2 Nos. 500 KVA 11 KV /415 V - 1 No.
6. ‘E’ Substation (Location: Heavy work shop)
1250 KVA
1000 KVA
500 KVA 11 KV /415 V - 2 Nos.
7. ‘F’ Substation (Location: User complex)
1500 KVA
750 KVA 11 KV /415 V - 2 Nos.
8. ‘G’ Substation (Location: Diabetic specialty centre)
500 KVA
500 KVA 11 KV /415 V -- 1 No.
9. ‘H’ Substation (Location: Opposite to bubble structure on INS Adyar)
500 KVA
500 KVA 11 KV /415 V - 1 No.
10. ‘Hydraulic Power House’ Substation (Location: WQ IV area)
1000 KVA
500 KVA 11 KV /415 V - 2 Nos.
11. ‘South Quay I’ Sub substation (Location: Eastern side of Boat basin)
1000 KVA
500 KVA 11 KV /415 V - 2 Nos.
12. Fisheries Harbour Substation (Location: Fisheries Harbour)
800 KVA
1000 KVA
500 KVA 11 KV /415 V - 2 Nos. 350 KVA 11KV/ 415 V - 1 No.
13. Tondiarpet Housing Colony Substation (Location: TH colony)
650 KVA
1000 KVA
500 KVA 11 KV /415 V - 2 Nos.
ANNEXURE - VI ENERGY CONSUMPTION OF CHENNAI PORT TRUST AND FIRM’S
Sl N
Location Permitted Max Demand
Reached Max Demand (Ave)
Billed Max Demand (Min-90%)
Energy Consumption/month
Billed Energy Consumption Amt in Rs.
1
33 KV sub station HT A/C No. 1291
7000 KVA
6300 KVA
17,61,390
1,47,32,993
2.
E sub station HT A/C No.2052
1250 KVA
1125 KVA
1,86,626
14,39,671
3
ACT
400 KVA
228 KVA
360 KVA
4.
Fisheries Harbour HT A/C No.1208
800 KVA
720 KVA
38,12,870
2,51,62,812
5.
Tondiarpet Housing colony HT A/C No.1522
650 KVA
585 KVA
30,92,042
3,36,77,724
6.
M/S CITPL
2250 KVA
4,34,461
7.
M/S CCTPL
2100 KVA
10,39,526
ANNEXURE - VII
ENERGY CONSUMPTION OF CHENNAI PORT TRUST
Sl No
Location
Energy Consumption/month
Billed Energy Consumpt Amt in Rs).
1.
CISF Barracks
21000 Units
2
Firm’s (Permanent) supply
125330 units
3.
Firm’s (Temporary) supply
20380 units
4.
Officer’s Qtrs. (Type V)
13700 units
5.
LHS Qtrs.
9006 units
6.
Clive Battery Qtrs.
2359 units
7.
DLB Staff Qtrs.
2327 units
8.
Trust Villa Qtrs.
4770 units
ANNEXURE - VIII
MOTOR PUMP CONSUMPTION DETAILS
SL. No
LOCATION
CAPACITY OF MOTOR
IN H. P.
NUMBER OF
MOTORS
POWER
CONSUMPTION 1.
C.B. PUMP ROOM
10 5
3 4
135 KW
90 KW
2.
C.B. & Adm. Office
5 3
1 2
40.5 KW
27 KW 3.
Main Hospital
10 5
3 2
135 KW
45 KW 4.
Marshelling Yard
50
40
1 2
225 KW
360 KW 5.
Timber pond 40 5 900 KW
6.
HWH PUMP ROOM
20 5
2 1
180 KW
22.5 KW 7.
I Section Well water pump room
40
10
2 1
360 KW
45 KW 8. I Section Fresh
water pump room 40
20
1 1
180 KW
90 KW 9. MI – WH Pump
room
20 2 180 KW
10.
M 2 – WH pump room
20 2
2 1
180 KW
9 KW 11. Old tank pump
room 40
25
1 1
180 KW
112.5 KW
12.
ONB Yard pump room
5 2
1 1
22.5 KW
9 KW 13.
T/V quarters pump room
10 2 90 KW
14.
User complex pump room
5 2 45 KW
15.
Diabetic Hospital
10 5
1 1
45 KW
22.5 KW 16.
SCI
10 5
1 1
45 KW
22.5 KW 17.
Documentation office
10 5
1 1
45 KW
22.5 KW
TOTAL
858
50
3861 KW
ANNEXURE ‘IX’
OIL DOCK NEW PUMP HOUSE
Sl.No. Description of item Quantity Capacity
1. 3.3 KV 1 No. 500 HP
2. HT Motor 1 No. 500 HP
3. HT Motor 1 No. 400 HP
4. HT Motor 2 Nos. 350 HP
5. LT Motor 1 No. 30 HP
OLD PUMP HOUSE
6. LT Primary motor 1 No. 25 HP
7. LT Vacuum motor 1 No. 10 HP
BHARATHI DOCK – I
8. Marine Load Arm LT motor 2 Nos. 3.8 KW/ 5 HP
9. Foam motor LT Motor 1 No. 50 HP
10. Slope motor 2 Nos. 5 HP
11. Tower monitor 4 Nos. 0.5 HP
BHARATHI DOCK – III
12. Marine Load Arm LT motor 2 Nos. 7.5 KW /
13. Foam motor LT Motor 1 No. 50HP
14. Slope motor 2 Nos. 5 HP
15. Capstan motor 6 Nos. 10 HP
16. Capstan motor 4 Nos. 0.5 HP
ANNEXURE ‘X’
FLOATING CRAFTS PILOT LAUNCHES & MOORING LAUNCHES
Sl.No. Description of Item Engine details
1. Pilot launch ‘Muthu’ MWM Engine – 2 Nos. TD 232 V8 BHP 232 RPM 2100
2. Pilot launch ‘ Progress’ MWM Engine – 2 Nos. TD 232 V8 BHP 232 RPM 2100
3. Pilot launch ‘Utility’ Ashok leyland – 2 Nos. ALMU 680/1 & ACMO 680/7 BHP 140 & BHP 172 RPM 1500 & 2000
4. Mooring Launch ‘Vettri’ Ashok leyland – 1 No. ALM 680 BHP 127 RPM 2000
5. Mooring Launch ‘Veeram’ MWM Engine – 1 No. TD 232 V6 BHP 152 RPM 2100
6. Mooring Launch ‘Vignesh’ MWM Engine – 1 No. TD 232 V6 BHP 152 RPM 2100
7. Mooring Launch ‘Velan’ MWM Engine – 1 No. TD 232 V6 BHP 152 RPM 2100
8. Nethaji Bergen Diesel – 2 Nos. KRM 8 BHP 1700 RPM 750
9. Singaravelu Bergen Diesel – 2 Nos. KRM 8 BHP 1700 RPM 750
10. Bharathiar Caterpillar – 2 Nos.
Model 3606 TA BHP 2481 RPM 1000
11. Sundaranar Yanmar Engine 8N21A –EN- 2 Nos. BHP 1324 RPM 900
12. Sekkizhar Yanmar Engine 8N21A –EN- 2 Nos. BHP 1324 RPM 900
ANNEXURE ‘XI’ EME – I WORK SHOP
Sl.No. Location Description of Items Quantity Capacity
1. ICE /BTC Air compressor 1 No. 7.5 KW
2. Machine Shop Lathe/ crank/drilling /grinding machine
20 Nos. 5 HP
3. Transport Shop Air compressor
3 Nos. 5 HP
4. Transport Shop Tier machine
2 Nos. 1.5 KW
5. Carpentry Shop Grinder/lathe/wood
4 Nos. 5 HP
6. Diesel Loco Welding generator
1 No.
7. Diesel Loco Travel motor
1 No. 20 HP
8. Diesel Loco Jack motor
4 Nos. 3HP
9. Diesel Loco Grinder
1 No. 1 HP
10. Diesel Loco Drilling machine
1 No. 0.5 HP
11. Diesel Loco Oven 1 No. 10 KW
12. Diesel Loco Air compressor 1 No. 5 HP
ANNEXURE ‘XII’ SE MARINE Sl.No. Description of work
Quantity Capacity
MRS & J.ZONE 1. Beeco lathe 1 No. 30 KW
2. E.O.T. crane 1 No. 18 KW
3. HMT Drilling machine 1 No. 7.5 HP
4. HMT lathe 1 No. 10 HP
5. HMT lathe 1 No. 1.5 HP
6. HMT Slating machine 1 No. 4 HP
7. Bench Grinder 3 Nos. 4 HP
8. Air compressor 1 No. each 10 HP & 1.5 HP
9. Power cutting machine 1 No. 3 HP
10. Water cooler 1 No. 3 HP
11. 250 & 400 W HPSV lamp 42 Nos. 15 KW
12. Welding plant 1 No. 15 KW
13. Battery charger 2 Nos. 4 KW
14. Distilled water plant 1 No. 2 KW
15. Wall/ceiling and tube light 2 KW
PLATING SHOP
16. Plate cutting machine 2 Nos. 20 HP & 5 HP
17. Plate bending machine 1 No. 10 KW
18. Bench grinder 1 No. 2 HP
19. Air compressor 1 No. 2 HP
20. 250 W M.V. Lamps 16 Nos. 4 HP
21. Water cooler & wall mounting 5 HP
22. Ceiling fans / tube lamps 3 HP
23. Welding plant 4 Nos. 60 KW
WELDING PLANT
24. Welding plants 2 Nos. 30 KW
25. M.V.Lamps/water cooler / ce fan/tube lamps
6.7 KW
MAIN SLIP WAY
26. Motor 2 Nos. 60 HP
27. Motor 1 No. 30 HP
28. Motor 2 Nos. 1.5 HP
29. Welding plant 4 Nos. 60 KW
30. Lighting/fans 2 KW
MINI SLIP WAY
31. Capstain motor 1 No. each 30 HP & 10 HP
32. Welding plant 3 Nos. 45 KW
PAINTING SHOP
33. Air compressor 4 Nos. 3 HP
34. Exhaust fan & Water cooler 2 Nos. 15 KW
T.O.SHOP
35. Punching machine 3 Nos.
36. Ceiling fan/ tube lamps 1.6 KW
ANNEXURE ‘XIII’
DETAILS OF DIESEL EQUIPMENTS
SL. No
NAME OF THE DIESEL PLANT
CAPACITY NUMBERS
POWER
CONSUMPTION
1 ACE make Mobile Crane 10 Ton 3 Nos.
2 JCB Pay loader 1.7 m3 2 Nos.
3 TATA P&H Crane 75 Ton 1 No.
4 Sonalika Tractor 1 No.
5 Swaraj make FLT 3 Ton 10 Nos.
ANNEXURE - XIV DETAILS OF FLOATING CRAFTS
SL. No. Name of the vessel Main Engine Generator
Main Harbour
1.
Floating crane Thangam
Electrical Motor Cummins -2Nos Power-815kw RPM-1500 BHP-1180
Cummins-1No 4 Stroke 6 cyl.
RPM-1500 BHP-163
2.
V.I.P Launch Greaves-2Nos TBD 4U12
HP822 RPM 2200
Ruston3YWMK5 Greaves-1 No GABCA 002M Output-25 KVA RPM 1500
Greaves-1No GABCA 002M Output-25 KVA
RPM1500
3.
ORV ANNAM Leyland -1Nos ALMU 680/1
BHP 140 RPM 1800
KIRLOSKAR – 1No TV 2 SR II
Ashok Leyland ALU 680 – 1No.
4.
MPHV PRESTIGE
DAF – 2Nos. DKT 1180
OUTPUT-177kw RPM 1800
DAF – 1Nos. DH 825 AG
OUTPUT-73kw RPM 1500
DAF – 1Nos. DH 825 AG
OUTPUT-57kw RPM 1500
5.
SURVEY III (CISF LAUNCH)
Leyland -2Nos ALMU 680/M
BHP 156 RPM 1800
KIRLOSKAR TV2 POWER -10 3KW
BHP-14 RPM-1500
NIL
6.
SURVEY IV Leyland -2Nos ALMU 680/M
BHP 172 RPM 2000
Greaves 2YWMK5 BHP-23.8
RPM-
NIL
7.
POLICE LAUNCH E.L.STRACEY
MWM ENGINE-2Nos.
TD 232 V12 BHP 440
RPM 2300
KIRLOSKAR–1No TV2 SRII
NIL
8. THSD CAUVERY 2Nos. 1700 KW 1000RPM
2Nos. AC 210KW 1No. AC 210KW
9. DREDGER PRIDE Cummins – 2 Nos KTA 2300 M
BHP- 600 KW RPM – 1800
Cummins – 2 nos VTA – 1710
Power – 500 KVA RPM – 1500
N743 MG – 1 No. POWER – 11KVA
RPM - 1500
Cummins – 2 no VTA 1710
POWER – 500KVA RPM -1500
N743 MG – 1NO POWER-110 KVA
ANNEXURE XV
DETAILS OF DIESEL LOCO SHOP Sl.No. Description of Items Quantity Capacity
1. Loco machines 10 Nos. 700 HP
2. Loco machines 2 Nos. 1400 HP
3. Lorry/car/van 59 Nos.
ANNEXURE ‘XVI’ HIGH MAST TOWER DETAILS
Sl.No. LOCATION
CAPACITY TOTAL
1. WQ1 car park (wharf side)
18 X 400 W 7,200 W
2. WQ 1 car park (wharf side)
18 X 400 W 7,200 W
3. WQ 1 car park (wharf side)
18 X 400 W 7,200 W
4. Car park west
12 X 400 W 4,800 W
5. RLY track car park
18 X 400 W 7,200 W
6. RLY track car park
18 X 400 W 7,200 W
7. Centre berth fire service opposite
18 X 400 W 7,200 W
8. Centre berth road side
18 X 400 W 7,200 W
9. WQIII road side
12 X 400 W 4,800 W
10. Hydraulic power house SS
18 X 400 W 7,200 W
11. Opposite to central work shop
36 X 400 W 14,400 W
12. Central work shop near marine
20 X 400 W 4,000 W
13. SQ1 Yatch club
36 X 400 W 14,400 W
14. JD 1 entrance
36 X 400 W 14,400 W
15. Opposite to JD III passage
20 X 400 W 4,000 W
16. ‘A’ substation back side
20 X 400 W 4,000 W
17. ‘A’ substation opposite side
18 X 400 W 7,200 W
18. 8TH gate opposite
36 X 400 W 14,400 W
19. JD7 south wall
18 X 400 W 7,200 W
20. Gantry crane opposite
18 X 400 W 7,200 W
21. JD VI wharf side
18 X 400 W 7,200 W
22. JD IV wharf side
18 X 400 W 7,200 W
23. JD II wharf side
18 X 400 W 7,200 W
24. SQ II (Near IMC)
18 X 400 W 7,200 W
25. C substation 40 Mtrs. North
21 Nos. 12, 600 W
26. C substation 40 Mtrs. south
21 Nos. 12, 600 W
27. C substation opposite
18 X 400 W 7,200 W
28. E complex west
18 X 400 W 7,200 W
29. E.complex east new
36 X 400 W 14,400 W
30. O&B pay loader shop
18 X 400 W 7,200 W
31. S1 & S2 ware house
36 X 400 W 14,400 W
32. Radio road
18 X 400 W 7,200 W
33. Hazardous cargo near SE
20 X 400 W 4,000 W
34. Hazardous cargo – 20m
20 X 400 W 4,000 W
35. Power supply section
18 X 400 W 7,200 W
36. Marshalling yard SM bunk
18 X 400 W 7,200 W
37. Marshalling yard east 18 X 400 W 7,200 W 38. Marshalling yard as 18 X 400 W 7,200 W
shipping 39. Marshalling yard as
shipping
18 X 400 W 7,200 W
40. Marshalling yard back side
36 X 400 W 14,400 W
41. EME I civil office back side 20 M
20 X 400 W 4,000 W
42. 10 th gate opposite
36 X 400 W 14,400 W
43. EME I canteen
18 X 400 W 7,200 W
44. Balaji weigh bridge
36 X 400 W 14,400 W
45. H1 substation
20 X 400 W 4,000 W
46. New coal yard Rd
36 X 400 W 14,400 W
47. Blacky yard 20 M
20 X 400 W 4,000 W
48. New coal yard Rd
36 X 400 W 14,400 W
49. New coal yard Rd
36 X 400 W 14,400 W
50. WBM road south end
18 X 400 W 7,200 W
51. WBM road new
36 X 400 W 14,400 W
52. WBM ROAD
30 X 400 W 12,000 W
53. WBM ROAD
30 X 400 W 12,000 W
54. WBM ROAD New
36 X 400 W 14,400 W
55. WBM ROAD
20 X 400 W 4,000 W
56. WBM ROAD
20 X 400 W 4,000 W
57. WBM road north end
18 X 400 W 7,200 W
ANNEXURE ‘XVII’ STREET LIGHT POSTS IN CHENNAI PORT TRUST
1. HOD QUARTERS (1 TO 9) - 9 X 250W 2. PILLARKOIL STREET (10 TO 14) - 5 X 250W 3. SPRING HEAVEN ROAD (15 TO 33) - 19 X 250W 4. CWS BACK SIDE RD (OLD 7TH GATE) (34 TO 35) - 10 X 250 W 5. TIMBER POND ROAD (46 TO 49) - 4 X 250 W 6. 7TH GATE (50 TO 53) - 4 X 250 W 7. MAIN HOSPITAL (54 TO 56) - 3 X 250 W 8. JD SOUTH WALL ROAD (57 TO 66) - 8 X 250 W 9. JD VI WHARF (67 TO 70) - 4 X 250 W 10. FF ROAD CPT QTRS BACK SIDE (71TO 78) - 11 X 250 W 11. FF ROAD (ILL SECTION TO CB SS) (79 TO 84) - 6 X 250 W 12. FF ROAD (CIVIL OFF TO PUMP RM) (85 TO 90) - 6 X 250 W 13. NEWLY FORMED FF ROAD (91 TO 105) - 15 X 250 W 14. FF ROAD (BHEL PLOT TO AS SHIP) (106 TO 118)1- 13 X 1250 W 15. FF ROAD (AS SHIPPING TO SICAL) (119 TO 127) - 9 X 250 W 16. FF ROAD (ANDAMAN TIMB – DIA CUT RD) (128 – 129) – 2 X 250W 17. EME I CIVIL OFFICE (136 TO 137) - 2 X 250W
18. EME I OFFICE ROAD (138 TO 141) - 4 X 250W 19. NEW COAL YARD RD INS TO H SS ( 142 TO 156) - 15 X 250 W 20. NEW COAL YARD RD NORTH SIDE (157 TO 160) - 4 X 250 W 21. E COMPLEX ROAD (161 TO 170) - 9 X 250W 22. RADIO ROAD (171 TO 174) - 5 X 250 W 23. JD WEST RD (12 POSTS) - 43 X 250 W 24. S5 TO A SUBSTATION RD - 34 X 250 W 25. WQ WHARF SIDE - 48 X 250 W 26. SIGNAL STATION VIP ROAD - 13 X 250 W 27. B COY ROAD(MAIN GATE TO NORTH PIPE LINE) - 20 X 250 W 28. FF ROAD PERIPERAL WALL (HOD QTRS BACK) - 8 X 250 W 29. NEW COAL YARD RD ALU TOWER – 2Nos. - 16 x 250 W