jack.sunyoto 1
METHOD OF WORKLIFTING and LAUNCHING TRAVELER
ATJ – CABLE STAYED BRIDGEKONTRAKTOR UTAMA :
PT. WASKITA KARYA (Persero) Tbk.
jack.sunyoto 2
METHOD OF WORKLIFTING and LAUNCHING TRAVELER
BAGIAN DARI PEKERJAAN MODIFIKASI TRAVELER EX. PADAMARAN
SUB-SUPERVISI DAN LIFTING TRAVELER
jack.sunyoto 3
PREPARE OF LIFTING AND ERECTION FORM TRAVELER UNIVERSAL SATELITTE
jack.sunyoto 4
1Existing CHECKING and Supervision July, 10th 2015
FT terpasang / masih memerlukan penyempurnaan
Batang Kelapa
jack.sunyoto 5
2Launching Unit FT c/w COCONUTS TRUNKS --
FT masih harus maju 15 m
Batang Kelapa
Karena Roller Batang Kelapa kemungkinan – Launching unitTraveler under control ( Zig-Zag)
jack.sunyoto 6
EQUIPMENT LIST OF LIFTING AND ERECTION FORM TRAVELER UNIVERSAL SATELITTE
jack.sunyoto 7
3EQUIPMENT LIST TO BE THERE ----
FixcityRear Chair
Rear Hollow Jack 50 T
Gantry Lift
PT Bar
Front Chair Front Hollow Jack 50 T
Uni Chair
Static Roller
jack.sunyoto 8
EQUIPMENT and PARTS UNITS ----
HOLLOW JACK SYSTEM
COUPLER JOINT SYSTEM
HANGING LIFT SYSTEM
jack.sunyoto 9
4METHOD of INSTALLATION : LIST of EQUIPMENT -----
Equipment :1. Power pack system w/ hyd. jack 2 units2. Chain block caps 3 ton 6 units3. Lever block caps 3 ton 4 units4. Thread bar c/w nuts dia 36 4 sets (@21 m’)5. Launching Roller 4 units6. Casting Hanger 4 units7. Control panel w/ safety lighting 1 units
jack.sunyoto 10
KINEMATICS SCHEME OF FORM TRAVELER UNIVERSAL SATELITTE
jack.sunyoto 11
5METHOD of INSTALLATION : KINEMATICS SCHEME of TRAVELER ---
Fixing of Casting Hanger, prepare FWStressing 1st Cable Stayed, prepare Concreting,
Jack up and Setting of FW, prepare Concreting,Concreting of Beam and Cross Beam,
Prepare of Launching LH, Going Front of LH and Dismantling of CH,
Launching of Main Truss and FT,
1st
2nd Fixing of Casting Hanger, prepare FW
Stressing 1st Cable Stayed, prepare Concreting,Jack up and Setting of FW, prepare Concreting,
Concreting of Beam and Cross Beam, Prepare of Launching LH,
Going Front of LH and Dismantling of CH,
Launching of Main Truss and FT,
jack.sunyoto 12
PT BAR
Nuts –PT Bar
Washer
Hollow Jack
Chair - HJ
Sendi PT Bar
Static Roller
Universal Satelitte
jack.sunyoto 13
LIFTING AND ERECTION FORM TRAVELER UNIVERSAL SATELITTE
jack.sunyoto 14
6METHOD of INSTALLATION : LAUNCHING and LIFTING UNIT TRAVELER
------------------------
1. Install of Gentry Lift,2. Install and Fixing anchorage of Gentry Lift,3. Install of Rear Hollow Jack Unit,
5. Install of Front Chair4. Install of Universal Hollow Jack Universal
jack.sunyoto 15
7METHOD of INSTALLATION : 1st LAUNCHING UNIT TRAVELER ------
jack.sunyoto 16
8METHOD of INSTALLATION : 2nd LAUNCHING UNIT TRAVELER ----
jack.sunyoto 17
9METHOD of INSTALLATION : 3rd LAUNCHING UNIT TRAVELER ----
jack.sunyoto 18
10METHOD of INSTALLATION : end LAUNCHING UNIT TRAVELER --
jack.sunyoto 19
11METHOD of INSTALLATION : PREPARE and INSTALL PT BAR, RELEASE of TEMPORARY STRESS BAR----
jack.sunyoto 20
12METHOD of INSTALLATION : LIFTING TRAVELER ------
13METHOD of INSTALLATION : VIEW OF LIFTING TRAVELER ------
jack.sunyoto 22
14METHOD of INSTALLATION : FIXING CASHTING HANGER & ROLLING HANGER DISMANTLING of PT. BAR, HYDRAULIC JACK,
GANTRY etc -
jack.sunyoto 23
15METHOD of INSTALLATION : INSTALL TEMPORARY PRESTRESS CABLE etc -----
jack.sunyoto 24
16METHOD of INSTALLATION : JACKING UP FORMWORK – PREPARE of CONCRETING -----
jack.sunyoto 25
17METHOD of INSTALLATION : CONCRETING of BEAM,
INSTALL ANCHORAGE PRESTRESS and STRESSING -----
jack.sunyoto 26
18METHOD of INSTALLATION : JACKING DOWN of FORM WORK,-PREPARE of 1ST LAUNC TRAVELER and ETC -----
jack.sunyoto 27
19METHOD of INSTALLATION : GOING DOWN of CASTING HANGER,-
PREPARE of 1ST LAUNCH TRAVELER and ETC -----
jack.sunyoto 28
20METHOD of INSTALLATION : DISMANTILING of PT BAR LAUNBHING HANGER, MOVING OF ROLL -----
jack.sunyoto 29
21METHOD of INSTALLATION : FIXING and ANCHORING of ROLL --
jack.sunyoto 30
22METHOD of INSTALLATION : DISMANTLING of FORM PT BAR,-
FIXING and ANCHORING of LAUNCHING HANGER---
jack.sunyoto 31
23METHOD of INSTALLATION : STRESSING CABLE, JACK UP FORM WORK and CONCRETING 2nd -----
jack.sunyoto 32
24METHOD of INSTALLATION : CONCRETING DECK and STRESSING CABLE STAYED ---
jack.sunyoto 33
END STRUCTURE ATJ - CABLE STAYED BRIDGEBAGIAN DARI PEKERJAAN MODIFIKASI TRAVELER
EX. PADAMARANSUB-SUPERVISI DAN LIFTING TRAVELER
jack.sunyoto 34
TERIMA KASIH